Responds to NRC Re Violations Noted in IE Insp Repts 50-313/82-15 & 50-368/82-12.Corrective Actions: Schedule for Completing Development of Specific Fire Door Criteria Revised to Approx mid-Feb 1983
ML20064H714
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 12/02/1982
From: John Marshall
ARKANSAS POWER & LIGHT CO.
To: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20064H712 List:
References
NUDOCS 8301170386
Download: ML20064H714 (2)


Text

-

.,, e pgm ARKANSAS POWER & LIGHT COMPANY POST OF FICE BOX 551 LITTLE ROCK. ARKANSAS 72203 (501) 371-4000 December 2, 1982 BCAN128202 Mr. W. C. Seidle, Chief Reactor Project Branch #2 U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011

SUBJECT:

Arkansas Nuclear One - Unit 1 & 2 Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6 Response to Inspection Reports 50-313/82-15 and 50-368/82-12 Gentlemen:

Please refer to our response to you on this subject dated October 8, 1982, (0CAN108207).

In our response to Item 1, Failure to Electrically Supervise or Lock Fire Doors Between Redundant Safe Shutdown Equipment, we stated that specific fire door criteria were being developed and were scheduled to be complete by November 30, 1982.

At this writing, these criteria are still being prepared and are being given substantial review to ensure their accuracy and completeness.

Our revised schedule for completing this task is now approximately mid-February 1983.

l Since we have taken other necessary precautions to prevent recurrence of the stated violation (see our referencad response), we believe that the accuracy of our fire door criteria overrides any necessity for meeting the original November 30, 1982, schedule.

Please be assured, however, we are continuing our efforts to meet or exceed this new schedule.

Very truly yours, f

a

,IJohnR. Marshall Manager, Licensing JRM: LVP: s1 l

8301170386 830111 PDR ADOCK 05000313 G

PDR VEMEiER MtOOLE SOUTH UTILITIES SYSTEM

c s'

  • Mr. W. C. Snidle 2

Daccmbar 2, 1982

~

cc: Mr. Richard DeYoung, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Mr. Norman M. Haller, Director Office of Management and Program Analysis U.S. Nuclear Regulatory Commission Washington, D.C.