JOSEPH M. FARLEY NUCLEAR PLAh"I UNIT 1 NARRATIVE
SUMMARY
OF OPERATIONS November, 1978 The unit was operated at 100% power during November with no unit shutdowns or significant power reductions.
The following significant safety related maintenance was performed in November:
1.
Reworked 1C charging pump motor mount frame, replaced bearings in speed increaser, and realigned pump.
The 1C charging pump is now operable.
2.
Rebuilt 2C diesel generator B air compressor.
3.
Repaired 1B boron injection tank recirculation pump seal.
4.
Replaced R-11/R-12, containment atmosphere particulate / gaseous radioactivity monitoring system, vacuum pump / motor and low flow relay.
5.
Repaired LS-511, river water A train auto-start pond level switch.
6.
Repaired circuit ET-7B, heat tracing on boron injection tank inlet valve.
7.
Pulled river water pump 10 after indication of high vibration.
Flushed the lube and cooling piping for the A and B-train water pumps.
Vibration problems were also experienced on river water pumps 4 and 9.
Motor rework was begun on river water pump 7 after the motor apparently seized.
781231cq,qy
(
OPERATING DATA REPORT DOCKET NO. 50-348 DATE 12-1-lo COMPLETED ltY W. G.
Hairsten, III TELEPHONE (?o;Tc01-5156 OPERATING STATUS
- 1. Unit Name: Joseph M. Farley Unit 1 Notes 1/ Since 12-1-77-date November, 1973 of co:r::::ercial operation.
- 2. Reporting Period:
- 3. Licensed Thermal Power (MWt):
- 4. Nameplate Rating (Gross MWe):
860 829
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe): ' Mo*
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Racings (Items Number 3 Through 7) Since Last Report. Give Reasons:
N/A
- 9. Power Level To Which Restricted,If Any (Net MWe):
N/A
- 10. Reasons For Restrictions. If Any:
N/A
(-
This Month Yr to.Date Cumulative
- 11. Hours In Reporting Period 720 8016 8760
- 12. Number Of Hours Reactar Was Critical 720
-7003.3 7546.6
- 13. Reactor Reserve Shutdo vn Hours u
850.6 960.7
- 14. Hours Generator On Line 720 6892.9 7404.7
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Cross Thermal Energy Cenerated (MWH) 1.896,861 17',731,952 19,035,955
- 17. Gross Electrical Energy Generated (MWH) 610,874 5,679,464 6,100,850 IS. Net Electrical Energy Generated (MWH) 581.888 5,375,770 5,771,700
- 19. Unit Service Factor 100%
d6.u7 84.5 %
- 20. Unit Availability Factor 100%
86.0%
84.5 %
- 21. Unit Capacity Factor (Using MDC Net) 97.5%
80.9%
79.5%
- 22. Unit Capacity Factor (Uning DER Net) 97 5%
80.9%
79.5%
- 23. Unit Forced Outage Rate 0%
6.6%
7,9;
- 24. Shutdowns Scheduled Over Next 6 MonthsIType.Date, and Duration of Eachi:
Refueling, Feburary, 1979, 8 weeks
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
N/A
- 26. Units In Test Status (Prior to Commercial Operationi:
Forecast Achieved INITIAL CRITICALITY 0~0'
~
INITIAL ELECTRICITY
~
e
~
COMMERCI AL Ol'ERATION 12-1-77 12-1-72 The Nameplate Rating / Design Electrical Rating will be used for the Maximum Dependable Capacity until an accurate value can be determined from operating experience.
(9/77 )
t AVERACT DAILY UNIT POWER LEVEL 50-348 DOCKET NO.
WIT Farley Unit 1 DATE 12-1-78 COMPLETED BY W. G. Hairston, III TELEPHONE (205) 899-5156 November 310 NTH DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (31We Net)
(31We-Net) 782 1
817 37 819 748
~
-3 IS 819 796 3
817 805 4
5 21.
813 813 807 812 6
22 799 811 7
23 816 803 g
821 9
25 820 816 10 ii 811 812 805 811
,g 817 810 g3 811 807 34 30 I5 810 N/A 3
16 811 INSTRL'CTIONS Oa thi> format !ist the average daily unit power level in S!We Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/77)
O I
f tJNII SilU1 DOWNS AND POWER REDUC 110NS NAIE ty Unit 1 DATE 12-1-/8 COMPT EIFD Igy
.W.
C.
15irsto 8 W 5T$8i' jII REPORT MONTil November
' LEPlONE (205) e.;
.$ ~
3 Yk Licensee jg f%
Cause & Corresa ne No -
Date c-
~E 4
- E5 Event
?
n?
At:4on to S
2s cE 3e Itepost c uTC
!0 Pievent itetunente
{
v O
There were no unit shutdowns or significant power reductions during November, 1978.
1 2
3 4
IS Forced Reason:
Method:
Exhibii G - Instinctions S: Scheduled A.I'quipment Failure (Esplain) 1 Manual for Preparation of Data I
114f aintenance ci Tes 2 Manual Scram.
Entry Sheets for Licenwe I
C Rcruel.ng 3 Autonutie Scram.
Eveni Reposi (LI RIl' ele (NtlRI G-i D Regulator) Ressaiction 4-Other (Explain) 01611 j
1:-Operator Traming & Licenw Examination j
F Atinunistrative 5
G Operational 1:sros (Explain)
Estubis 1 - Same Somcc I
l'8/77)