JOSEPH M. FARLEY NUCLEAR PLAh"I UNIT 1 NARRATIVE

SUMMARY

OF OPERATIONS November, 1978 The unit was operated at 100% power during November with no unit shutdowns or significant power reductions.

The following significant safety related maintenance was performed in November:

1.

Reworked 1C charging pump motor mount frame, replaced bearings in speed increaser, and realigned pump.

The 1C charging pump is now operable.

2.

Rebuilt 2C diesel generator B air compressor.

3.

Repaired 1B boron injection tank recirculation pump seal.

4.

Replaced R-11/R-12, containment atmosphere particulate / gaseous radioactivity monitoring system, vacuum pump / motor and low flow relay.

5.

Repaired LS-511, river water A train auto-start pond level switch.

6.

Repaired circuit ET-7B, heat tracing on boron injection tank inlet valve.

7.

Pulled river water pump 10 after indication of high vibration.

Flushed the lube and cooling piping for the A and B-train water pumps.

Vibration problems were also experienced on river water pumps 4 and 9.

Motor rework was begun on river water pump 7 after the motor apparently seized.

781231cq,qy

(

OPERATING DATA REPORT DOCKET NO. 50-348 DATE 12-1-lo COMPLETED ltY W. G.

Hairsten, III TELEPHONE (?o;Tc01-5156 OPERATING STATUS

1. Unit Name: Joseph M. Farley Unit 1 Notes 1/ Since 12-1-77-date November, 1973 of co:r::::ercial operation.
2. Reporting Period:
3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe):

860 829

5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe): ' Mo*
7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Racings (Items Number 3 Through 7) Since Last Report. Give Reasons:

N/A

9. Power Level To Which Restricted,If Any (Net MWe):

N/A

10. Reasons For Restrictions. If Any:

N/A

(-

This Month Yr to.Date Cumulative

11. Hours In Reporting Period 720 8016 8760
12. Number Of Hours Reactar Was Critical 720

-7003.3 7546.6

13. Reactor Reserve Shutdo vn Hours u

850.6 960.7

14. Hours Generator On Line 720 6892.9 7404.7
15. Unit Reserve Shutdown Hours 0

0 0

16. Cross Thermal Energy Cenerated (MWH) 1.896,861 17',731,952 19,035,955
17. Gross Electrical Energy Generated (MWH) 610,874 5,679,464 6,100,850 IS. Net Electrical Energy Generated (MWH) 581.888 5,375,770 5,771,700
19. Unit Service Factor 100%

d6.u7 84.5 %

20. Unit Availability Factor 100%

86.0%

84.5 %

21. Unit Capacity Factor (Using MDC Net) 97.5%

80.9%

79.5%

22. Unit Capacity Factor (Uning DER Net) 97 5%

80.9%

79.5%

23. Unit Forced Outage Rate 0%

6.6%

7,9;

24. Shutdowns Scheduled Over Next 6 MonthsIType.Date, and Duration of Eachi:

Refueling, Feburary, 1979, 8 weeks

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

N/A

26. Units In Test Status (Prior to Commercial Operationi:

Forecast Achieved INITIAL CRITICALITY 0~0'

~

INITIAL ELECTRICITY

~

e

~

COMMERCI AL Ol'ERATION 12-1-77 12-1-72 The Nameplate Rating / Design Electrical Rating will be used for the Maximum Dependable Capacity until an accurate value can be determined from operating experience.

(9/77 )

t AVERACT DAILY UNIT POWER LEVEL 50-348 DOCKET NO.

WIT Farley Unit 1 DATE 12-1-78 COMPLETED BY W. G. Hairston, III TELEPHONE (205) 899-5156 November 310 NTH DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (31We Net)

(31We-Net) 782 1

817 37 819 748

~

-3 IS 819 796 3

817 805 4

5 21.

813 813 807 812 6

22 799 811 7

23 816 803 g

821 9

25 820 816 10 ii 811 812 805 811

,g 817 810 g3 811 807 34 30 I5 810 N/A 3

16 811 INSTRL'CTIONS Oa thi> format !ist the average daily unit power level in S!We Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77)

O I

f tJNII SilU1 DOWNS AND POWER REDUC 110NS NAIE ty Unit 1 DATE 12-1-/8 COMPT EIFD Igy

.W.

C.

15irsto 8 W 5T$8i' jII REPORT MONTil November

' LEPlONE (205) e.;

.$ ~

3 Yk Licensee jg f%

Cause & Corresa ne No -

Date c-

~E 4

E5 Event

?

n?

At:4on to S

2s cE 3e Itepost c uTC

!0 Pievent itetunente

{

v O

There were no unit shutdowns or significant power reductions during November, 1978.

1 2

3 4

IS Forced Reason:

Method:

Exhibii G - Instinctions S: Scheduled A.I'quipment Failure (Esplain) 1 Manual for Preparation of Data I

114f aintenance ci Tes 2 Manual Scram.

Entry Sheets for Licenwe I

C Rcruel.ng 3 Autonutie Scram.

Eveni Reposi (LI RIl' ele (NtlRI G-i D Regulator) Ressaiction 4-Other (Explain) 01611 j

1:-Operator Traming & Licenw Examination j

F Atinunistrative 5

G Operational 1:sros (Explain)

Estubis 1 - Same Somcc I

l'8/77)

Il4);hes (l:splain t