AP600 DESIGN CERTIFICATION TEST PROGRAM OVERVIEW N
Revision 4 Marcli 7,1994
%Q(:g$aw&yb
'; ff
/j c y
-.n N;
yg[:j!fs9"v >f s
A p -
v 3
yg q
8 m.py
~~
1
(
/
~
N N
9403160270 940308 k,
PDR ADOCK 05200003 i'
s-A PDRi V
s-Na AP600 Low Pressure Integral System Test Isometric
i AP600 DESIGN CERTIFICATION TEST PROGRAM OVERVIEW Revision 4
[k March 7,1994 g.
r-6 N
i LN
(
\\ :,
\\
g' O
A
,,n J jpq 44 w h?
\\
i A!!k[]
D
.~3 v
4
,e(
v L
j f
l sj i
AP600 Low Pressure Integral System Test Isometric w -.,
hamma
- p i
i l}
A[-]STt' apt L! ' ~
l'D/
'4[j A bo Av,4!'c No on Aperture Ccrd TAllLE OF CONTENTS Test Prograin Overview (Part 1)
Table 1 Table 2 Test Program Overview (Part 2)
Test Program Overview (Part 3)
Table 3 Table 4 Test Matrix. Automatic Depressurization System Test, Phase U Test Ntatrix, Core Makeup Tank Test Table 5 Table 6 Test Ntatrix, Low Pressure 1/4 Ileight Integral Systems Test (OSU)
Table 7 Test Matrix, Full Pressure Full lleight Integral Systems Test (SPES-2)
Table 8 Suunnary of Westinghouse AP600 Test Program Related Materlats Transmitted to NRC x
Matrix Testing Schedules
/
Chart 1 9 4 0 316 0 2 7 0 - C) 1 f
i m
' ' " ~
Westinghouse Electric Corporation APG00 DESIGN CERTIFICATId nevhion 4, March 7,1994 f
APG00 TEST PROCRAMS: TABLE 1. TEST PROGR AM OVERVIEW (PART 1) ftem TESTING -
No.
TEST DESCRIPTION FACILITY LOCATION SCALE CATEGORY STATUS PASSIVE CONTAINMENT COOLING SYSTEM TESTS IN SUPPORT OF AP600 DESIGN 1
Air Flow Path Delta P Test W Science & Technology Contor - Churchill, PA 1.6 linear Basic Roscarch Compietod 2
Water Film Formation Tmt W Science & Technology Contor Churchdl, PA f4A Basic Roscarch Completed 3
Hoated Plate Test W Scienco & Technology Center Churchill, PA f4'A Basic Research Cornpated 4
Bench Wind Tunnel Exporiment W Science & Technology Contor Churchill, PA 1:120 liioat Basic Research Completed 5
Condensatico Tests Bare surfaco upward University of Wisconsin - Madrson, WI f4'A Basic Research Completed 6
Condonsat>on Tosts - Baro surface downward Universtty of Wisconsin Madison, WI P4'A Basic Research Comploted 7
Condensation Tests - Painted surface down University of Wisconsin - Mad; son, WI N/A Basic Rosoarch Completed 8
Condonsation lets - Lyht noncondonsbles University of Wisconsin - Madison, WI N/A Basic Research Comploted 9
Condensation Tests - Stagnaten Flow University of Wisconsin - Madison, WI f4 A Basic Roscarch Completed Londmons 10 Condonsation Tmts - Stagnatiornght Universdy of Wisconsin Madison, wi N/A Basic Roscarch Completed noncondensibles 11 Condonsation Tosts - 2D corr.fonsation University of Wisconsin Madison, WI f4'A Basic Rosaarch in Progross PASSIVE CONT AINMENT COOLING SYSTEM TESTS IN SUPPORT OF APCOO DESIGN CERTlFICATION
- N 12 Intryral(small scalo) Tosts Phase 1 W Scienco & Technoicgy Contor - Churchill, PA 1:3 height Safety Relatod Comploted (Feasbility) 1:40 diametor 13 Integral (small scale) Tests Phase 2.A W Science & Technoyy Contor Churchill, PA 1.3 height Safety Related Completod 1 (Extension Tosts) 1:40 diameter 14 Intrnyal(small scale) Tests - Phase 2B W Scienco & Technology Contor Churchill, PA 1:3 height Safety Related Comploted (Continuation Tests) 1:40 diamotor 15 1/8th Scalo Hoat Trartsfor Test - Phaso I W Scionco & To< hnology Contor - Churchill, PA
~1-8 finear Safety Rolated Cornpleted (Basehno) 16 1/8th Scalo Hoat Transtor Tent - Phaso 2 g Scienco & Technoingy Contor - Churchill, PA
-1:8 linear Safety Related Complotod (Conbrmatory) 17 Water Ontrioution Systom Test Phaso 1 (20tt W Waltz Mill Srto Madison, PA 1.t Safoty Rolatod Completed Dia rnutar) t ft Water Omtnbutton Systom Test - Phaso 2 (1/8th W Waltz Mill Sito - Madison, PA 1:1 Safety Related Complotud Sector) 19 Wator Distnbution System Test - Phno 3 (1/8th W Waltz WI Sito - Madison, PA 11 Safoty Related Completed soctor with selectod distobution systern) 20 Wind Tunnel Tost Phaso 1 Univ, of Western Ontano - London, Ontario
~1:100 linear Safety Related Comploted 2i Wind Tunnel Test Phaso 2 Univ. of Wostorn Ontario - Lordon, Ontario
-1:100 linear Safoty Rolated Completed 22 Wind Tunnol Tost - Phase 4 A CNRC Wind Tunnel - Ottawa. Canada 1:30 linear Safety Related Completod 21 Wind Tunnel Test Pham 4B Univ, of Wottern Ontario London, Ontario 1 500 linear Safaty Rotatnd Completed i L lt l
)
N TEST PROGRAM OVERVIEW ADDITIONAL INFORM ATION OBTAINED ftern TEST PtJRPOSE (optional)
No.
i fbtain pressuto drop data through the downcomer and annulus 1
firm wettability of coated stool surf ace 2
firm Passive Containment Cooling System heat transfor capability 3
f seQs effects of wind on shield buildity design (inlet / outlet location) 4 femparison with past separate effects tosta 5
in hsat transfor coefhcients with downward f acing cudaces 6
hin the oHect of AP600 paint on heat transfer porformance 7
hain the effect of light noncorwfonsibios on beat transfer performance 8
in tho heat transfer performance under stagnant fk)w condstions 9
h-hain tho heat transfor peformanco unrfor stagnant flow condstons in in to presence of light noncondonsibles r
ysure corwiensation boat transfor confficient using 2D test rnodel Investgata sffect of non-condensblos on heat transfer coefficient and 11 l
visuahzo flow field i[
ermino feasibility of water onhanced containment cooling system Investgato external cooling impact from air velocity, air humkfity, 12 l
terrporature and water film flow rates l
e ionstrato cperation of Passive Containment Cooling System (PCS)
Investigate offect of various annuttus wkfths and uniform steam 13 por increased range of oporatirg conditions. Confirm PCS internal distributions. Obtain data on water film behavior on extemal surf ace
- extemal boat transfar capabilitms (with 1:1 scale coolug air over long vertical heat transfer surf ace nulus at controllod air tomperature & humidity) hmonstrato operation of Passivo Containment Cooling System with 14 fototypic steam injection htain heat transfer data for WGOTHIC computer code validation wdh 15 pinimal intervals hain heat transfer data for WGOTHIC computor code validation invest' ate offect of nortcondenseles on PCS heat romoval capability 16 g
and internal temperature distributons a
hvesthate pmformanco of passivo containment cooling systom contor Assess containment wator coverago at top of domo 17 pator Lehvery/distnbution dovko hasure cont.Cnmont water coverage using drstrubution system Obtain film thickness measurements 18 I
$oasuso containment water coverage using solocted design distrbution Ot>tain film thickness measurements 19
)ystem i
vestgate wind sonsitivity of shn)ki buikfing design Asess offects of sito structuros on wind loading 20 hsoss wirvj loads on containtnet baffb Compare wind offects w & w/o internal flow path 21 forify Phase 1 & 2 tost results at hghor Reynolds numbors Confirm battle tornado loads 22 i
vestgato sete topography offects on air flow throught PCS annulus
!nvestg#e effects of largo structures on air flow throught PCS 23 j
annulus i
l 9403160270-t i
l
,,. ~ ~
Westinghouse Electric Corporation
~~~~
L.
nevision 4, March 7,1994 APG00 DESIGN CERTIFICATI(
AP600 TEST PROGRAMS: TABLE 1. TEST PROGRAM OVERVIEW (PART 1)
TESTING -
item FACllJTY LOCATION.
SCALE.
CATEGORY STATUS No' TEST DESCRIPTION PASSIVE CORE COOLING SYSTEM TESTS IN SUPPORT OF AP600 DESIGN CERTIFICATION 1
24 PRHR Heat Exchsnger Test - Phase 1 W Science & Technology Center - Churchill, PA 1:1 height Safety Related Completed 25 PRHR Heat Exchanger Test Phase 2 W Science & Technology Centor - Churchdl, PA 1:1 height Safety Related Completed 26 Automatic Depressurization System Test - P ase ENEA (VAPORE facility) Casaccia. Italy 1:1 Safety Related Completod A (sparger) 27 Automatic Depressurtzation Systems Test.
ENEA (VAPORF f acittty). Casaccia, Italy 1:1 Safety Related Planned Phase B 28 Core Makeup Tank Test W Weitz Mill Site Mad! son, PA
~1:8 Safety Related in Progress diameter
-1:2 height 20 DNDH Tests Columbia University New York, NY 1:1 Safety Rotated Completed I
30 Low Pressure 1/4 Height integral Systems Oregon State University. Corvallis, OR 1:4 height Safety Related Planned Tests 1:192 volume I
j 31 Full Pressure Full eight Integral by6tems SIET (SPES-2 Facility). Placenza, Italy 1:1 height Safety Related in Progress Tests 1:395 i
volume f
l f
i i
i l
1 I
1 i
l j
a
,. - -.. -..., - -. -. - -. -, - -. _ -.,.,. ~..... -. -,,.., -..,.. -..,,,., -.,..,,
.4...,*..#...
~.,-
l 1
j i TEST-PROGRAM OVERVIEW l
. ADDITIONAL INFORMATION OBTAINED i
-hem -
- TEST PURPOSE
' (optional)
. No'.i termine thermal performance of the PRHR heat exchanger tubes.
Assess water mixing in the IRWST and the effects of mixing on heat 24 transfer rates and steaming.
mrxi the targe of test conditions to more tully define a PRHR hr.at Determ:no the impact of lower initial tank water level on steaming.
25 1sfer correlation.
tain sparger performanco data, measure loads imposed on qurach Obtain thermal hydtaufic data for computer code validation 26 k for use in confirming IRWST design tain vrtvs performance data; Piping, structure loadshosporaes Obtain thermal-hydraulle data for cornputer code validation 27 h both 14 and 24 flow tain thermt! hydraulle duta for computer code validation Confirm adequacy of CMT levelinstrumentation 28 tain DNB data at low flow conditions Obtain data on fuel assembly flow mixing grids at design flow 29 conditions
$11n thsemal hydraulle data for computer code volldollon investigate long term cooling behavior 30 4In thermal hydraulle data for computer code validation investigate systems Interactions during high pressure transWits 31 3,,,,..
.f A i~ " " < i f il E
- m L.>
l
> u k:0 I
l@ QG Apertem Cam 9403160270-P
-yN
+uiv g-
--y--+
f 9nq et g-
- ase9 w-< y m y-9-yw--u-w,w-wywg, g Ngr4 e wa-1-YMem--prrw q
9e7==-
m m i-sq e vs---+mmy Y-44 m-4 y-tmeqgmes-g e-spWW W-TT-v WM-q,T
Westinghou.se Electric Corporation noviaion 4, mrch 7,1994 AP600 DESIGN CERTIFICATIt AP600 TEST PROGRAMS: TABLE 2. TEST PHOGRAM OVERVIEW (PART 2)
TEST SCHEDULE ltem ho.
TEST NAME Start End SCHEDULE MATI PAkSIVE COffTAINMEffT COOLINO SYSTEM TESTS IN SUPPORT OF AP000 DESIGN j
1 Au Flow Path D Ata P Tost January 1988 February 1988 Comptotal ftA 2
Water Film Formation Tost February 1988 March 1988 Complotai itA 3
Heated Plato Test Apnl1988 June 1988 Completa3 ftA j
)
4 Donch Wind Tunnel Esperimont August 1988 September 1988 Completed itA S
Condonsation Tosts - Baro surfaco upward September 1988 Docomber 1988 Compktod N/A 6
Condensation Tests Baro surfaco downward Septomtwr 1989 Docomber 1989 Comphtat N/A 7
Condensation Tosts - Paintod surf ace downward Snptombor 1990 December 1990 Complottd PSA 8
Condon$ation Tosts Light noncondonsblos Septomtwr 1991 Docomber 1991 Comploted tt'A 1
9 Condonsation Tests - Stagnation flow conditions Septnmber 1992 March 1993 Complotni PUA 10 Condonsation Tosts Stagnatiorvlight noncordensibios March 1993 July 1M3 Completal PCA 11 Condensation Tests - 2D Condonsabon January 1994 April 1994 In Pray ess tt A PASSIVE COf(TAINMEffT COOLING SYSTEM TESTS IN SUPPORT OF AP600 DESIGN CERTIFICATION 12 Integral (sma!! scalo) Tests Phaso 1 (FoasibCy)
May 1989 October 1989 CompM ttA 13 Intogral (small scalo) Tosts Phaso 2A (Estonsion Tests)
January 1990 Juno 1990 CompMini N/A j
14 Intujral (small scalo) Tests - Pham 28 (Continuation Tests)
June 1992 August 1992 Compfoted it'A y
5 t/Uth Sca:o Hnat Transfar Tost - Phaso 1 (Basnlino)
Fubruary 1992 Juno 1992 Compinted N/A 16 1/8th Scala Hoat Transfer Test - Phaso 2 (Confirmatory)
Junn 1993 Snptomber 1993 Complotai PCA 17 Wator Distnbution Systom Tost Phase 1 (20ft Diamotor)
June 1991 August 1991 CompMtod (FA 18 Wator Distnbution System Test - Phase 2 (1/6th Sector)
Septorntwr 1991 February 1992 Completal ffA i
19 Water Distnbution Systorn Test. Phasn 3 Septembor 1993 Soptnmbw 1973 CompMtoi ft A 20 Winri Tunnol Test Phaso I Juno 1991 August 1991 Completal ffA 21 Wirri Tunnni Tnst Pham 2 Fetxuary 1992 March 1992 Compintoi PLA 1
22 Wirwt Tunnel Tost Pham 4A Juno 19H August 19%
Complotwf FFA 23 Wird Tunnel Test Phaso 4B Soptomtwr 1993 Soptomtwr 1993 Completai tt A PASSIVE CORE COOLING SYSTEM TESTS IN SUPPORT OF AP600 DESIGN CERTIFICATION 24 PRHR Hoat Enchangor Test - Phaso i Novombor 1989 January 1990 Complottd Pt A J
1 25 PRHR Heat Euharwy>r inst Phaso 2 July 1%0 Novomber 1990 Comp 4 tai PCA 26 Autanatic Duprossunzation Systnm Test Phaso A ppargor)
Juno 1992 Novonbor 1992 Complottd Pt A j
27 Automatic Depressurlzation Systems Test Phase D June 1994 October 1994 Chart 1 Table 4 28 Core Makeup Tank Test February 1994 September 1994 Chart 1 Table 5 29 DNDR Tosts Juno 1993 February 1994 Complotal PCA 30 Low Pressure 1/4 Height integral Systems Tests Juiy 1994 March 1995 Chart i Table 6 31 Full Pressure Full Height Integral Systems Tests February 1994 December 1994 Chart 1 Table 7 1
-_u=:--
1
\\
ns~~
l
TEST PROGRMI OVERVIEW tinc WITNESS OF KEY TESTS Ram TEST t4AMElt40.
DESCRIPTIOf4 WEEK OF
.l No.
ii N'A ttA M'A 1
l c
[
N/A ftA t& A 2
l I
ttA ttA PtA 3
A N'A 4
N/A ttA ttA 5
)
I^
(WA ttA
,1~
ttA PLA
^
ftA 6
r ttA PCA ttA 7
M'A 8
MA ttA r
ftA PtA i _,I(!
M'A 9
ftA PCA ttA 10 NA M'A N/A 11 I
PCA ttA ttA 12 MA FSA M'A 13 ftA NA M'A 14 PSA tvA PtA 15 FCA ffA N'A 16 ttA PtA ttA 17 ftA PtA t#A 18 FCA NA M'A 19 ftA ttA ffA 20 ttA N'A ttA 21 NA NA PCA 22 ttA PIA ttA 23 I
t1 A ttA ttA 24 M'A NA FCA 25 l
ttA PtA tl A 26 210 Saturated water blowdown from 2250 psig, maxirnum flow 9/5/94 27 403 Hot CMT draindown during depressurization 8/29 S 4 28
[
FLA NA ttA 29 SD12 SOLOC A - DEC DVillne break 9+ 5i94 30 1
SBLOCA - ~1ln Cold Lg Break 5/ t 6.94 31 11 Steam Generator Tube Rupture 12/5/94 s
9403160270-e
I' Westinghouse Electric Corporation novision 4, March 7,1994 AP600 DESIGN CERTIFICATIq AP600 TEST PROGRAMS: TADLE 3 TEST PHOGRAM OVERVIEW (PART 3) l ttom REVIEW Test Matrix Scaling Test Specttication Operating Pros No-TEST DESCRWTION MEETINGS Report j
PASSIVE COHTAINMENT COOLING SYSTEM TESTS IN SUPPOFir OF AP600 DESIGN 4
1 Air Flow Path Delta P Test ftA P&A F"A fvA 9
2 Water Fitrn Formation Tost ftA fvA ffA 4'A 1
3 Heated Plate Tost ffA M'A N/A FUA 4
Bench Wim! Tunnel Experiment ftA N/A ff; PCA 5
Condonsatuan Tests - Baro surf ace upward Reference 5 3 ffA ffA PCA 6
Condensation Tmts - Bare surf ace downward Roference 6 3 PCA M'A K'A j
7 Condonsation Tmts - Paintart surf ace WCAP 13307 ffA PLA ftA downw el 8
Condonsation Tests - Light nuncondombfos Roforanco 8 2 fLA fvA M'A 9
Condensation Tosts Stagnatx>n flow T94 hvA POA ftA condrtions to Condonsation Tosts StagnaturVlight TM PCA ftA N/A nonconiansiblos
)
11 Cominnsation Tasts - 20 condensation 8/M ftA MA ffA PASSIVE COfM AINMENT COOLING SYSTEM TESTS IN SUPPOHT OF AP600 DESIGH CERTIFICATION 12 Intwpal (small scalo) Tests - Phase 1 WCAP 12667, PLA PCA Completed (Feashility)
Rev 1 13 Intogral (small sca!a) Tests Phaso 2A Presentation N/A WC AP 1331 S Completed (Extansion Tosts)
Mat'l from 3/1'7/92 monting w/ NRC 14 Intapal(small scale) Tor.ts - Phaso 20 Prosontation fLA WCAP-13315 Completal (Continuah Tosts)
Mat'l from 3/17/W mooting w/ NR 3 15 t/8th Scato Hoat Transfor Test Phaso 1 WC sP 13566 WC AP-13246 WCAP 13207 Completal (Baselmo) 16 1/8th ScaW Hnat Transfor Test Phase 2 3/23-24'93 l.ottur ET-WC A P-13240 WC AP-132G7 Completal (Con 0rmatory) 2,23 24/94 NRC-93 3845 17 Wator Distnbuton Syt. tem Tost - Phaso 1 (20ft WCAP 13290 PLA WCAP 13290 Completed Diamot ar) 18 Wator Distobution System Tost Phaso 2 WC AP-13290 ftA WCAP 13290 Complettd (1/8th Sector) 19 Water Distnbuton Systnm Test Phasa 3 WC AP-13816 fLA WC AP-1381 G Completed 20 Wini Tunnel Test Ph:ise 1 WC AP-13294 WC AP-13294 WCAP 13318 Completed f
21 Wind Tunnel Test Phaso 2 WCAP 13323 WC AP-13323 WCAP 13318 Completed WC AP-13294 22 Wimt runnot Towt Phaso 4 A WCAP-13756 4/N WC AP-13318 Completal 21 Wu vi Tunnel Tost Phaso 48 9 94 5/94 WCAP 13318 Completed
f TEST PROGRAM OVERVIEW TEST DOCUMENTS
\\es
- Facilhy Description Report Oulck Look Final Test Report Other Relevant Information f
, Ryorts item No.
E f
- . FACILITf OPbCAT!NG PROCEDURES ARE MAINTAINED lH WESTINGHOUSE FILES AND ARE AVAILABLE FOR REVIEW.
WC AP-13328 ft'A WC AP-13323 WCAP 13330 t
WCAP 13834 f4 A WCAP 13884 WCAP 13330 2
WCAP 12665 N/A WCAP 12665 WCAP 13330, WCAP 13246 3
4/94 N/A 4/94 WCAP-13330 4
I Rotoro ico S 3 PLA Roforence S 3 WCAP 13246 5
Rotornem a G 3 ft A Reference 6 3 WCAP 13246 6
WC A P-1'. 30 7 f4 A WCAP 13307 WCAP.13246 7
l l
Reforanco 8.2 tvA Rotorence 8 2 8
3< %1 tt'A 3/94 g
3< st None 3/94 On 10
'l l
8/St None a 94 11 IM WCAP-12c67 Rev 1 f1 A WCAP-12667, Rov 1 WCAP 13330, WCAP 1324G 12
&M Nono
& St WCAP 13246 13 i
& St tbne a St WC A P.13246 14 i
8 94 Nono WC A P-13566 WCAP 13725, WCAP 13246 15
&M 11/93 4 St S St WCAP 13566 16 WCAP 13292 None WC A P-13353 WC A P-1324 6 17 WC A P-13292 Nee WC AO-13296 WCAP-13246 18 l
WCAP 13292 None WCA P-13960 WCAP 13353, WCAP 13296 19 l
WC AP-13294 None WCAP 13294 WCAP 13246 20
!)
WC A P-13323 None WCAP 13323 WCAP-13294, WC AP-13246 21 i
i f
4 41 Nono 4/94 WCAP 13294, WCAP 13323 22 l
Sul Nme SN WCAP-13294, WCAP-13323 23 l
9403160270-
Westinghouse Electric Corporation Revision 4, March 7,1994 APG00 DESIGN CERTIFICATK AM(U TEST PftOGRAMS: TADLE 3 TEST PflOGRAM OVERVIEW (PART 3)
Item REVIEW Test Matrix Scaling Test Speciffeation Operating Prococ N o.
TEST DESCRIPTION MEETit4GS Report PASGIVE SAFETY SYSTEMS TESTS IN SUPPORT OF AP000 DESIGN CERTIFICATION
- .FACILfTY OPEHATING 24 PF41R Heat ?scharvyw Tost Phase 1 WCAP-12G66 (CA (VA Coinpintal WC AP-12%0 FFA WCAP 13368 Completal l
25 PFlHR Hoat Exchangor Test Phase 2 26 Automate Dapressurizatkan System Test -
L'6 27/93 WCA P-13342 fuA WCAP-13342 Completad Phaso A (Spargor) 1 77 Automatic Depressurization Systerns Test -
5/2G-77M Table 4 N/A WC AP 13342 5< 94 Phase B 2/25/04 To be revised 4/94 28 Core Atake Jp Tank Test 2/25/93 Table 5 WC AP 13963 WCAP 13345, Series 100-300 C 3/14'94 Revision 2 Series 400-600 4g FCA fvA WCAP-12488 Complotal 29 DNDH Tosts 30 Low Pressure 1/4 Height integral Systems 12/9'92 Table G 5/94 WCAP 13234 Ot494 f
Te st s 9:20-21/93 l
31 Full Presmre Full Height integral Systems 12110 92 Table 7 WCAP 13277 W letter FT NRC.
12;93 594 Tests 92-3776, WCAP to
.]
be Issied 4/94 i
i i
f i
i I
4 l
1
(
I
)
I g
%m
TEST PROGRAM OVERVIEW 1
- TEST DOCUMENTS l i
no 9 Facility Description Report.'
Oulek Look -
Final Test Report j Other Relevant Informellon '
' ~
Reports c h Nov OCEDURE3 ARE MAINTAINED IN WESTINGHOUSE FILES AND ARE AVAILABLE FOR REVIEW :
l WCAP 12666 N/A WCAP 12666 24
(.
WCAP 12980 N/A WCAP 12980 25 4/94 N/A 4/94 26
{
3/95 None 3/95 27 l
plate 5/94 4/94 10/94 11/94 28 L:
[
S'94 None 8/94 29 6/95 8/94 4/95 6/95 30 h-l-
5/94 4941/95 3/95 31 l
i l
i
/ dNb$IE O O
A P E'; ~! R E n
.)
A!So AVE hio on Apariurn Card I
l l
9403160270--
Yo l-j
~m_
e v~~
em mn w.-
k i
1 1
1 Westinghouse Electric Corporation Rwiston 4. March 7,1994 AP600 DESIGN AND DESIGN CERTIFICATION TEST PROGRAM OVERVIEW TABLE 4 - MATRIX TESTS, AUTOMATIC DEPRESSURIZATION SYSTEM TEST, PHASE B TEST CATEGORY TEST NO.
DESCRIPTION Cetecyary 2 Matnx Testa 110 Saturated Steam from top of suppty tank. Stage 1 open. -2250 to 400 psg thmum now reestance s:muwed. Ottam smgie phase TM cata 120 Saturated Steam tem top of supply tank. Stages 1 and 2 open. -800 to 100 psg himum flow res. stance manutated. Obtain smgfe pnase TM data 130 Saturated Steam from top of suop8y tank Stages 1 and 3 open. -500 to 50 pas hrnum flow resstance salated. Ootain sog'a phase TM data 140 Sarumted Steam from top of supply tank, Stages 1,2 and 3 open. -500 to 50 psag, hanum flow resatance arrulated. Obtaan segte phase TM cata 21 0 Satu ated Water from bottom of supoly tank, Stage 1 open -2250 to 400 peg himum flow resistance s: mutated.12-inch gate valve paseoned to obtain a range of twophase TM data.
220 Satura*ed Wa:er from bo!!cm of suppiy tank, Stages 1 and 2 open. -1200 to 100 peg hunutn flow resistance simulateo. 12-incn gate va.Ve positx>ned to obtam a eange of two-phase TM daut 230 Saturated Water from bottom of supply tank Stages 1 and 3 open. -500 to 50 psig hmum flow resetance smuistect 12 anch gate valve posmoned to obtain a range of twophase TM data.
240 Saturated Water from bottom of supply tank, Stages 1,2 and 3 open. -500 to 50 psig, htmum flow resistance simulated.12-r ch gate vatve posecned to ot) tam a range of two-phase TM data.
250 Saturated Water from bottom of supply tank, Stage 2 open (inadvertent openirig at futt power). -2235 psig. Mammum flow resistance sanulated. 12-inch gate valve posboned to obtain a range of two-phase TM data.
3t0 Saturated water from becom of supp'y tana, Stages i. 2 and 3 open. -500 to 50 psig, Quench tank water initsany at 212*F, unenum h resis:ance s#nulated. himum flow! minimum qualRy for man w,acs on sparger and quench tank.
320 Satura*ed water from boeom of supply tank. Stages 1,2 and 3 ope -500 to 50 psig. Quench tank water at amosent. Mnrnum flow resstance simulated. Maximum flow /mirumum quaidy for man loads on sparge es cuench tank.
330 Saturated water from bottom of supply tank. Stages 1and 2 open,-1200 tc "O esig Quench tank water initialty at 212*F, unmum fkw resstance sanulated. htmum flow /minrnum qualty for rneur loads on 2,parger and quence.mak.
340 Saturated water from bocom of supply tank Stage 2 open, ~2235 psig. Quench tank wate irely at 212*F Mnsmum flow resistance simulated,
{
Maximum flowdrumum quakty for man loads on sparger and quench tank.
TABLE 5 - MATRIX TESTS, CORE MAKEUP TANK TEST
TEST TEST NCL TEST TYPE CMT ORtJN Re TE STEAM SUPPLY PRESSURES), PSIG Cont?1ENTS' CATEGCRY Category 1 101-105 CMT waa N/A CMT dran rate based on 10/13568510852235. we subsequent CMT intiely contans rio wars *, and is evacuated (no ork Mama Tests condensaton we steam canderscon rare and dran copressarcanon and without ennaN!ay 106-108 noncondensbie to CMT incai'y evacuated and then pmarded wet er (or N,) to
.236.1.13 and 2.13 psia, respecovely gasee 109-111 1085 CMT mt:aN evacuated and then pressmM we behum to 42, 146, and 296 psia, respective ;
201 208 CMT Was and Water N. A - CMT level 1med. Water 10535N 085'2235, wet subsequent CMT incally 90% and 75% fus. CMT 4el contret used to Sut* ace draned from CMT va extamat path depressurnabon mantan fixed CMT tevel Condensaton to rnatch stea n concer saton 209-214 10d35N005, with subsequent CMT nneaDy 50?. and 25% tu!!, CMT levei control useo to I
depressorizatson menta.n faed CMT level 301-312 CMT craindown at 6n1M6hs 10n35d 085 Low resatance steam so;ely Ime ro 2 uth2ed; drain rate constart pressure controlled by dscharge ime res:starice.
313-316 Flow rate conuoted ty steam 1c652235
. Low resstance steem suppty kne no. 2 utaxed; dram rate supply lee no.1 res. stance (3 conuotied by dsenarge ime resatance.
9/gpn8).
Category 2 401-402 CMT drandown Decharge Ene resstance for 646 1085 fouowed by depressurcation to 20.
Low resstance steam supp!y line no. 2 utiized; dram rate Matrix Tests during gpm controlled by cischarge hne resstaze.
depressurizaten 403-404 Dran rate contrated by steam 2235 followed by depressurnation to 20 Discharge une resstance set to provide 606 gpm gravey draa supply line no.1 vesistance rate at atmosphenc pressure.
'5 501-502 Na: ural circulation Discharge line r-f=N:e set for 1085 followed by depressureatron to 20 Steem supply tee no.1 is closed. Reservor water level at "H!"
O fotowed by 6NS gpm dran rate tevel Reservost water terrporature inma!!y StS*F. Steam -
creLMoon and suppiy hne no. 2 is opened to inmate natural cuculation untd g
depressurganon one-ffth of CMT heated. Reservor water levella reduced to W
irutate diendown. The steam suppy is escleted and the water / steam reservoir is vented when the CMT is oraeed to 97 inches.
O 503-504 Repeat we naturas cucu: ten unta one-har of cut naated.
y M
505-506 Repeat we natural cuculation until CMT a comp etely heated..
C 601-606 CMT actuanon with Dacharge line resstance set for 1835 - constant Reservor water levet vt. Reservor water tempersture nuany boot steam Enes.
6d6 gpm. Steam supply line no.1 545*F. Steam suppy line no.1 is open. Bom steam supply a
with and weout resstance set to be 3 ft/gpm',
ime no. 2 and CMT eschange lines opened simultaneously.
6074512 noncondensible gaa.
1085 - constant Pav4cemed with steam,. and we 146 and 296 psxj of He inrua!Iy in CMT eide of stearn supply line no 2 I
J
\\
ma ms 4
3%
O) h.k
! r
.i g;
4d
- D 3 C c e
. f a _,
w m
O O" F) F $is m --~
u A
X Q-1 i
uo
~3 il 1
?
's u
_._._n.
i I
i i
Westinghouse Electric Corporation RDvision 4, March 7,1994 AP600 DESIGN AND DESIGN CERTIFICATION TEST PROGRAM OVERVIEW TABLE 6 - MATRIX TESTS, LOW PRESSURE 1/4 HEIGHT INTEGRAL SYSTEMS TEST (OSU)
TEST CATEGORY TEST NAfK DESCR;PTION Ccid ProCperaxnal Tests C01 Core memeup txk g-awy dra n f
!l 4f i
CO2 Acrumulator tank ora n Cc3 tn<ontanment refueimg water storage tara dram C04 Cnence and Volme Cantrol Sysaem punp flow vs. pressure C05 NomW rud.ar beat removal system pump b vs pressure C06 Steam generator feed flow versus pressure C07 ADS 1-3 Une Fiow Test Cos ADS 4 Une Flow Test C09 RNS In;ection Flow Test Hot PreOperaaonal Tests HS01 Reactor Coo: ant Forced Cuculacon Locp Flow Test HSO2 Reactor Coount Natural C!rculaten Loop Flow Test HSO3 Reactor Power Calonmetrc HSO4 Ament Heat Loss Deemreon HS05 PRHR Loss Deremm.maton HS06 Steam Genenator Performance Test HS07 Reackw Coolant System Heatup'Co:* sown Test Ca'agory 1 Abtrix Tests SB1 2-inch coid leg break. bottom of p@e. loop A with contruanon into long teen a a mode S84 24nch cold leg break, bottom cf pipe loop A SB10 Doutwe+nded guihoone tweak of cold leg balance Ene. vert cal loop, loop A weh contmuaton into :03 term cooieg SB12 Dohnoed gudkrJne break of direct vesset in;eccon Ene SB13 2-inch besak of direa vossai injecten ice SB16 DoutA>encad guaiottne brem cf pressunzer/ core makeup tank ba:ence Ene, between check valvetore rnaaeup tank, loop A, we.h contmuation into long term cochng
(
l ANsTEC A'ocn,URG yna
.1 cal-][]
g 3
I
'$U Availab!O on y
g
'Tertuso Card 0
i l
1 s'
t e
l 1
8 1
1 e
9 Y
j 8
E f
1 8
e f
l j
q 3
k j
I !
s,,t I
( "l u
- i 3
1
=i 1
6 4
2 2 I j
a r
2 1 1 1 1 ! 1,j t i
l8 l
3 i
d 2
1 1 m
3 3
l 3 $ I s a s s i s i g
9403160270-
,m-o
/
~ -,
E
\\
b i
I
)
Westingnouse Electric Corporation Revision 4, March 7,1994 AP600 DESIGN AND DESIGN CERTIFICATION TEST PROGRAM OVERVIEW TABLE 7 - MATRIX TESTS, FULL PRESSURE FULL HEIGHT INTEGRAL SYSTEMS TEST (SPES-2)
I TEST CATEGORY TEST NUMGER DESCRIPTION Cok! Shakedown Tes s C-01 Seg:e pnase f:ow through the pressunzer surge line. 4 fkw rates CG.B Segie phase flow through the zwessuruer to :mre snakeup tank balance knes. 4 fkaw ra'es per baance :me C43A.B Segie phase flow through the cold leg to core rnakeup rank balance lines. 4 f!ow rates per balance bne C 4sA.B Core maneup tank drmr'down useg cold leg to core rnakeup tank ba:ance hne C-CSA.B Core makeup tank graety draindown uomg pressunzer to core rnakeup rank balaxe kne C-06A.B Sa'ery injection Acrumulator blowdown C-07A.B In<ontainment retaeang water storage tank gravity draindown, tnree water leveis C-00 Chemical and Volume Control System. Normal Readua! Heat Removal System anc Startup Feecwa:er System pump t'.ow ste went.caten C49 Operation of pntnery system with 2 reector coolant purnps runneg C-10A.B Opera:lon a prernary system with 1 reactor coolant purnp runmng C-11 Fachy votume measurement Hot shakedown tests H41 Facky heated and riear at five cons: ant tenversteres H42 Startbg from norruna! conditions, power will be shut off and steam generators moisted H-03 Facftty operated at narrnal fut pressure, temperature ano pcwe-H44 Facky transa:oned from fut power operating condbons to hat shutco*. natural circututen mcde of operaten H-05 Core makeup tank drandown using pr assuder to core makeup tank osiance we H-06 Low pressure, safety system actuanon using the automate depressun2aton system wa core rnamoup tark craindown and accumut tor oehvery H-07 Full power. fut pressure, safety system actuaten init:sted by the opereg of me frst stage or rne autornatic capressun2aton system Category 1 Ma:rix Tests 3
24nch cod leg tweak teth non-safety systems att 1
1-inch coM leg tweak with rion-safety systerns off 4
2-inch cold leg break with non-safety systems on 5
24nch direct vessel hjecton Bne break with non4afety systems oft DoNnded PD break of the direct vessat Et~EQ line with non-safety systems off 6
- i;
-. t
.i r
I-l E
h R
d 1l H
Li
.i h
'B g
3
/u,1 e O l t... v p- ; p a
s l
APERTURE 8
I
?
CARD l
h 1
{&
g d
2 8
j 1
1 I
Also Avai!abio on 8
5 5
i Apenure Carri
}
{
.5
.j g
.e 1
}
t, F
I }e} f-e 4
a
.,i 1 1
I e
3 g
h a
v F
)
B 2
8 r
s i.
3 a
a g
1 a
{
e 3
I i 1
{t e
3 d
l a
c.
a.
} }u}
I I
i 5,
g i-
[ 1 1 l i 3
- 1..
1 I
k e
=
u o
I-h'
.k.
9403160270-b L
8 1
(,,,......
..,~.....M
Westiriglicuse Electric Corpot atiori nevwion 4, March 7, itm4 AP600 DESIGN CERTIFICATM TADLE O - TEST PROGRAM REFERENCES (
SUMMARY
OF WESTINGHOUSE APCOO TEST PROGRAM RELATED MATERIALS TRANGMITTED TO NI
._..a.
- ==-- -
=
... ~. -.
-= ~.
- =-
DESCRIPTION TEST PROGRAM GENERAL 0.1 Reponse to Novomber 14.1991 Requost for Information Raprding AP600 Tmt Prcyram 02 Rosponw to January 1S,1992 Rrquest for Informaton Rapobm] the AP600 PanNo Containmont Coobog Systom Tosts 03 Rmponses to "AP600 Doe,ign hsuos to bo RosoM>d by thgh-Pensuro Full Hught inbyral Testwy*
O4 Prosor tatmn Matorul from Fobruary 25,1992 Wustinghouse NRC Moo 0rg on AP600 Testing 0S Reponso to Novombar 14,1991 Rw;uost for Addibonal Informahnn R<gwhng AP600 Test Prcyram 06 Prosontation Matonat from March 3,1992 ACRS Montity on APG00 Tostirvj 0.7 Prosontation Matonal ham Juno 1,1992, AP600 Mouting on intograt Systnms Tost ng 0.8 Prosontation Matonal frorn Juno 23,1992 AP600 ACRS Tostug Prosontabon 09 NRC ibqua i for AdditnnalInformatvin Regardug tho APmo Tmhng Prcyram 0.10 AP600 Tosting to Support Docyn Cortihcaton 0 11 AP600 Tosting Schaluin 0 12 Prosentahon Matonal from Decomtwr 14,1992 Wostirghoono NRC Mootag on apt:00 Tmtag 0.13 Woytinghnuso Ro.ponsa to NRC Roqumt for Additional loformation on tho AP600 Toshog Progam datod July 2 t.1992 0 14 U;datwf Testwy Schnduk.s foe tho AP600 Tosting Program 0 15 Wost,tyhuno Ro.porm to NRC Roquost for Additional Informahon on the AP600 Tosury Pro <pam dabd September 1,1992 l
Tost S;hodolo for AP600 Automahc Deprov.unzation System Test Phaso B 0 16 a
1 0 17 Prosontat on M itonal hom tho March 9-10,1993 Moehng on tho AP600 Tmbng Procyam J
0.18 Matovial in Supp<nt of March 23 24.1993 Washnghouso'NRC Moohng on Containment Tmts for AP600 (Tost Spoc addshons, Tmt Matror, Schndq 0 i3 N=" V600 instWitnms Matra 0 20 Prosontation Matoral f ann tho March 23 24, 1933 Montaq on tho AP600 Containmont Test Program 0 21 Urdahd Toshng Scholulos for the AP600 Toshng Program O 22 Badgmurd Mitonah in Proparation for the July 22 23 Mooting of ACRS Subcommetoo on Tal Phonomona 1
0 23 Prosont ition Matnnah from tho Juno 10,1993 Mmting on tho AP600 Tosting Program 0 24 AP600 Dosgo and Dougn Cort.bcation Test Prcyrarn Ovorwow. Rovision 2 0 25 Gunoral Outhno for Gumk Look Data Fhports on AP600 Tmts 0 26 AP600 Omgn and Dosan Cortif cation Test Pro. yam CNorwow Rova on 3 l
0 27 Outhno for AP600 Codo Valsf ahon Pmcoss Steps Incorporating NRC Raymt for Swgle Blind Tnst Prohctons g
0 28 Prusontation Matonais from tho Docomter 10.1993 Moohng on AP600 Tmt Pngram ksuos
- 1. Air Flow Detta P Test i
1.1 WCAP 13 32a. "To.ts of Air FL;w for Codug the AP600 Do ictor Containmont Rov. 0*
12 WCAP 13329 *Tosts of Aa F low for Coolog the AP600 Roar. tor Cont.unment. Roy 0" 13 WC AP 13310. ~ Natural Convoction Cooling of AP600 Conta<nment, Rev O' i
14 WC AF 13331 "Natmal Convocton Cookng of AP600 Containmoret, Eov O' l
{
$N TEST PROGRAM OVERVIEW IC)i PROPRIETARY TRANSMITTAL LETTER DATE ADDRESSEE Yes ET NRC 913650, NPP APSL-910286 12 16 91 Murley Yes ET-N RC-91 -3656, NPP APSL 92-0013 12292 Murley Yes ET NRC-92 3663, NSRA-APSL 92 0037 21492 Crutchfieki Yes ET-NRC-924664, NSRA APSL-92-0047 22492 Murley No ET-NRC-92-3666 NSRA APSL-92-0046 22492 Hasselberg 7.
Yes ET NRC 92 3671, NSRA APSL 92-0053 3492 Murley
^
fs+
~
Yes ET NRC-924713, NSRA APSL-92-0130 62592 Murley Yes ET-NRC-92 3716 NSRA APSI-92-0133 63092 Murley i
Yes ET NRC-92 3750, NSRA-APSL 92-0189 91492 Murley
[dCD No ET-NRC-92-3754, NSRA-APSL-92-0200 to 592 Ward
- O i- - Lj No ET-NRC-92-3768, NSRA-APSL 32-0239 11592 Murtoy l-Yes ET NRC-92-3783 NSRA-APSL 92 0264 12 14 92 Murloy f
No ET-N RC-93-3799, NSRA-APSL 93-0010 11993 Murfey No ET NRC-93 3800, NSRA APSL-93-0011 11993 Murley f
tb ET-NRC-93 3798 NSRA-APSL 93-0009 11993 Murley No ET-NRC-93 3811, NSRA APSL 93-0026 2293 Borchardt No ET-NRC-93-3834, NSRA-APSL-93-0065 399:3 Borchardt
)
Yes ET NRC-93-3841, NSRA APSL 93 0076 31693 Borchardt No ET-NRC-93 3848, NSRA-APSL 93 0093 32393 Borchardt Yes ET-NRC 93-3845, NSRA APSL 93-0090 32493 Borchardt f
No ET-N RC-93-3855, NSRA APSL 93 0109 41393 Borchardt f
No ET-NRC-93 3911, NSRA APSL 93 0224 62893 Boehnert f
No ET-NRC 93 3910, NSRA APSL 93-0223 62893 Borchardt f
No ET NRC-93-3919, NSRA APSL-93-0233 7793 Borchardt f
N.
ET-NRC-03 3946, NSRA APSL 93-0305 8169-3 Borchardt f
No ET NRC-93 3947, NSRA APSL-93-0306 81893 Borchardt f
No ET NRC-93 3976, NSRA APSL 93-0360 92793 Borchardt f
Yes ET-NRC-93 4029, NSRA-APSL 93-0492 12 16 93 Borchardt L
f Yes ET NRC 92-3688, NSRA-APSL 92 0094 43092 Murley
- l l
No ET NRC 92-3688, NSRA APSL 92-0094 43092 Murley Yes ET NRC-92-3688, NSRA APSL-92-0094 43092 Muitey
)
f No ET-NRC-924688, NSRA-APSL-92-0041 43092 Murloy 94031G0270-
4p Westinghouso Electric Corporation nevision 4, March 7, in AP600 DESIGN CERTIFICATI(
TABLE 8 TEST PROGRAM REFERENQES (
SUMMARY
OF WESTINGHOUSE APCOO TEST PROGRAM RELATED MATERIALS TRANSMITTED TO 0 DESCRIPTION
- 2. Wetw Film Formation Test 2.1 WCAP tn30,' Natural Convocbcn Cochry of AP600 Containnwnt, Rov. 0*
22 WCAP 13331,
- Natural Convoction Coohry of AP600 Containment Rev 0*
23 WCAP-13884," Water Fdm Formaton on AP600 Reactor Contamment Surface *, Revision 0 24 WCAP.13885,'Wator FJm Formation on AP6w Reactor Containment Surface *, Revtsion 0 3, Heeled Plate Test f WCAP 12fMS," Test of Heat Transfor and Water Film Evaporaton on a Heatod Plato Simulating Cooliry of the AP600 Reactor 3.1 32 WCAP 12665,
- Tests of Heat Transfer arvt Wator Fdm Evaporabon on a Hoated Plate Simulating Coobng of tho AP600 Roactor Containment, Ros 33 WCAP-13341, " Tests of Heat Transh>r arnt Wator Fih Evaporanon on a Hoatai Plate Simulating Coobog of the AP600 Reactor Containment, Re.
34 WCAP-Imo, %Neal Convatten CocJng c4 AP660 Contae>rmnt, Rev,0*
35 WCAP-13331, %tural Car,voction Coohry of AP600 Containmont, Rov O' 36 WCAP-13246,"Westayhouso GOTHIC A Corrputer Codo For Analpes of Thormal Hydraulic Transionts for Nuctoar Plant Containments & Auxih 37 WCAP 13412 " West 4ghouso GOTHIC A Computor Codo For Ana!ysos of Thonnal Hydraulic Trantients for Nucioar Plant Containments & Auxdi.
4, Benth Wind Tunnel En portment 41 WCAP-13330, %tural Convection Coolirg of AP600 Containment, Rov. O' 42 WCAP 13331, " Natural Convnction Cochry of AP600 Containmorit, Rev O'
& Condensation Tests Date Surface Upward 5i WCAP 13246, ' West,nghouso' GOTHIC. A Computer Codo For Ana!ysos of Thormal Hydrauhc Transmnts for Nuctoar Plant Containments & Auxili.
52 WCAP-13412,"Washryhouso GOTHIC A Computor Codo For Analysos cf Thormal Hydrauhc Transmnts for NucHr Plant Contarnments & Auxih 53 Rotoruncos for Basic Rmoarch Tests on Cond.nsation Pneformod in Support of the AP600 Dosjn l
54 J J Darry, "Effncts of Inforfacial Structuro on Film Condonsabon? PhD Thosis (1987)
G, Corxlenmillon Tests Dare Surf ace Downward j
l 61 WCAP 13246,"Westityhnuso GOTHIC' A Conptor Coda For Ana'ysos of Thurmal Hydraulic Transmnts for Nuctoar Plant Containmonts & Auiilj 62 WCAP 13412,"Wastayhouso GOTHIC A Computer Cixjo For Analysos of Thormal Hydravhc Transionts for Nucloar Plant Containments & Auxil 03 Rotoroncos for Basic Research Tusts on Condonubon Performed in Support of tho AP600 Design 7, Condensation Tests Painted Surfeco Downward r~
71 WCAP-13307, "Coexionsabon la the Pmonco Of A Nancondonsatdo Gas Exporimontal investigabon*
7.2 WCAP 13308, "Ccodonsation lo tho Prosenco Of A Noncondonsab!o Gas Exporimontal invostigation" 1
73 WCAP-13412, "Wastayhouso GOTHIC: A Computar Codo For Analysos of Thermal Hydraabc Transionts for Nuclear Plant Containrnunts & Au 74 WCAP 13246,"Nostnjhouso-GOTHIC A Computer Codo For Analysos of Thermal Hydrauhc Transtonts for Nucioar Plant Containmnnts & Auxd 8, Condensation Tests Light Noncondensibles l
01 Rafaroncos for Basic Rosoarch Testa on Condensation Podormed in Support of the AP600 Desyn B2 A P Pornstoinor, "Cor<1ontaten :n the Prmnnco of Noncondonsible Gas Effoct of Heliurn Concontraronf 1993, Univoruty of Waconsin Thosis 03 i K Huhtintomi. "Cordonsabon in the Pro %nce of Noncondensrolo Gas The Effect of Surf aco Orientat>on " Prol.m Thosis (1990)
J 84 I K Huhhniemi. 'CorWonsahnn in thn Prnsonco of Nancondenblo Gas Tho Effoce of Surf ace Onotabon.* Prohm Thesis (1990) l b
i TEST PROGRAM OVERVIEW C)
PROPRIETARY TRANSMllTAL LETTEH DATE ADDRESSEI'.
A:n l
Yes ET NRC-924688, NSRA APSL-92-00M 43092 Mudey No ET NRC 924688, NSRA-APSL 92-0094 43092 Mur%y l
Yes NTD ' RC 94-4056, DCP,NRC0002 2294 Borchardt I
l NTD-NRC 94 4056, No DCP/NRC0002 2294 Borchardt k
m.
- s. s h
(.
Yes NS-NRC-90-3525, NPAP-APSL-944048 71690 Donatell h*
- P Yes ET-NRC-92 3688, NSRA APSL 92 0094 43092 Mudey y
H
^p No ET-N RC-92-3688, NSRA-APSL-92 0094 4 $* 92 Mudey f-Yes ET-NRC-92-3688, NSRA-APSL-92 00Gi 43092 Murley t
- i 4
I ET NRC-92-3688, NSRA-APSL 92-0094 43092 Mudey No f BuMir:gs" 00 yo,
-NRC-92-3726 73192 Mudey r
.v-,a
) BuMings" No l -T-NRC-92-3726 73192 Mudey L
[
Yes ET-NRC-92 3688. NSRA APSL-92 00M 43092 Mudey
?
[
No ET-NRC-92 3688, NSRA APSL-92-0094 43092 Mudey p BuMings*
Yes ET NRC-92-3726 73192 Mudey r
y Buadings" No ET-N RC-92 3726 73192 Mudey No ET-NRC-93 3945, NSRA-APSL-93-0304 81693 Borcha.dt
-l-U NRC-93-3945, NSRA APSL 93-03N 81693 Rnrcharett No n
1
[ 5 p Bddirtgs' Yes ET-N RC-92-3726 73192 Murley y Bu2 dings" No ET-N RC-92-3726 73194 Modey '.
No ET NRC-93 3945, NSRA APSL-93-0304 81693 Borchardt L:
I Yes ET-NRC-92 3688, NSRA.APSL 92-0094 43092~
Muriey No ET NRC-92-3684 NSRA-APSL 92-0094 43092 Mudey t-
[BuMengs*
No ET-NRC-92 3726 73192 Mudey r
Buik4 ) '
Yes ET-N RC-92-3726 73192 Mudey 7j L
No ET NRC-93 3945, NSRA-APSL 93-0304 81693 Borchardt f
No ET-N RC-934014, NSRA-APSL 93-0448 11 12 93 Borchardt f
No ET-N RC-93-394 5, NSRA-APSL-93-03M 81693 Borchardt
(
Yes ET-NRC 93-3945, NSRA-APSL-93-0304 81693 Borchardt 940-3160270-[
Westinghouse Electric Corporation j
hvision 4, March 7,1904 APG00 DESIGN CERTIFICATI(
. TABLE 8 TEST PROGRAM REFERENCES (
SUMMARY
OF WESTINGHOUSE AP600 TEST PROGRAM RELATED MATERIALS TRANSMfTTED TO !
DEScalPTION 9, Condensation Tests Stagnation Flow Co'.ditions 9.1 References for Base Rosaarch. f'ests on Condonsation Performat in Support of the AP600 Design j
5
- 10. Condensation Tests Stegnatforttight Noncondensibles 10.1 References for Basic Rosaarch Tests on Condensation Perforrned in Support of the AP600 Design if
- 11. Condensation Tests. 2D Condensation 11.1 References for Basic Rosearch Tests on Ccndensation Performod in Support of the AP600 Design
- 12. Integral (small scale) Tests - Phase 1 (Feesibility)
}
l 12.1 WCAP 12667," Test of Heat Transfer and Water Film Evaporation From a Simulated Containment To Demonstrate the AP600 Passive Containm<
12 2 WCAP-13330," Natural Convection Cooling of AP600 Containment, Roy 0" 12.3 WCAP 13331 " Natural Convection Cooling of AP600 Containrnont, Rev. 0*
12.4 WCAP 13340,"Tosts of Heat Transfer and Water Film Evaporation from a Simulated Containment to Demonstrate the AP600 Passive Contain WCAP 12667," Tests of Heat Transfer and Water Film Evaporation from a Simulated Containment to Demonstrate the AP600 Passive Contain 12.5 12 6 WCAP 13412. "Westiryhouse-GOTHIC: A Computor Code For Analyses of Thermal Hydraulic Transiente for Nucioar Plant Containments & Aux (
12.7 WCAP 13246,"Westiryhooso-GOTHIC: A Computer Code For Analyses of Thermal Hydraulic Transionts for Nuclear Plant Containments & Aux (
- 13. Integrel(amall scale) Tests. Phase 2A (Extension Tests) 13 i WCAP 13316," Integral Contabrnant Cooling Test Extonsion. Tost Speedication, Rov. 0" 13 2 WCAP-13315," Integral Containmont Cooling Test Extension - Test Speedication, Rev. 0*
13 3 WCAP 13412. "Westirghouse GOTHIC: A Computer Code For Analyses of Thermal Hydraulic Transients for Nuclear Plant Containments & Aux) 13 4 WCAP-13246," Westinghouse-GOTHIC: A Computer Codo For Analyses of Thermal Hydraulic Transients for Nuclear Plant Contairwnents & Aux
- 14. Integral (small scale) Tests Phase 2 (Continuation Tests) 3 1
14 1 WCAP-13315, " Integral Containmont Cooliry Toct Erfonsion Test Speedication, Rov. 0" 14 2 WCAP 13316, " Integral Containmern Cw ;.9 T:d Ew.im Tmt Soncification, Rev. 0" j
WCAP 13246,"Wostinghouse GOTHIC: A Computer Code For Analyses of Thormal Hydraulic Transients for Nuclear Plant Containments & AuxE 14 3 14 4 WCAP 13412 "Westinghouso-GOTHIC: A Computor Code For Analyses of Thermal Hydraulic Transients for Nuclear Plant Containments & Aux
- 15. It8th Scala Heat Transfer Tests Phase 1 (Baseline)
H t51 WCAP 13267," Test Specification: Large Scale Passnre Containment Coolirg Tost, Rev.1" i
15 2 WCAP 13268 " Tost Specihcation" Largo Scale Passr<a Containment Cooling Tost, Rov.1*
15.3 WCAP 13246,"Wesbrghouso-GOTH C: A Cornputer Code For Analysas of Thermal Hydraulic Transients for Nuclear Plant Containments & Aux 15 4 WCAP-13412. "Wostuvjhouse GOTHIC: A Conputnr Code For Analyses of Thorrnal Hydraulic Transients for Nuclear Plant Containments & Aux 155 WCAP-13566,"AP6001,0th largo Scale Passive Containment Cooling Systom Heat Transfer Test Basehne Data Roport." Rev. O, 156 WCAP 13%7,"Ao6001/dth large Scale Passive Containmont CcAg System Heat Transfer Test Basehne Data Report," Rev. 6 1
1
'N TEST PROGRAM OVERVIEW IC)-
PROPRIETARY TFIANSMITTAL LETTER DATE ADDRESSEE No ET-NRC-93-3MS, NSRA APSL-93 0304 81693 Borchardt No ET N RC-93-3945, NSRA-APSL-93-0304 81693 Borchanft No ET-NRC 93-3945, NSRA-APSL-93 0304 81693 Borchardt l
t Cooling System" Yes NS-N RC-904525, NPAP-APSL-90-0M8 71690 Donato!!
Yes ET-N RC-92-3688, NSRA-APSL-92-0094 43092 Mudey No ET-N RC-92-3688, NSRA-APSL 92-00.I4 43092 Mudey i Cooliry System, Rev. O' No ET-N RC-92-3688, NSRA-APSL-92-0094 43092 Mudey t Cooling System, Rev t' Yos ET-N RC-92-3680, NSRA-APSL-92-0004 43092 Murfey ry Buildirgs" No ET NRC 92-3726 73192 Mudey ry Buildngs*
Yes ET NRC-92-3726 73192 Mudey No ET NRC-92 3688, NSRA APSL-92 0094 43092 Mudoy Yes ET-NRC 92 3688, NSRA-APSL-92 009.f 43092 Mudey ry Buildirgs" No E T-N RC-92-3726 73192 Marfey iry Duildirgs' Yos ET N RC-92-3726 73192 Mudey Yes ET-NRC 92 3688, NSRA-APSL 92-0094 43092 Murley No ET-N RC-92-3688, NS RA-APS L-92-0094 43092 Mudey kry Builditss' Yos ET-NRC-92 3726 73192 Mudey ry Buildngs" No ET-N RC-92-3726 73192 Mudey b
ET-NRC 92-3688 NSRA-APSL-92-0094 43092 Mudey f
No ET-N RC-92-3688, NSRA-APSL-92 0094 43092 Mudey ry BuMirgs' Yos ET NRC-92-3726 73192 Mudey ry Buildugs*
No ET-N RC-92-3726 73192 Mudey Yes ET-N RC-93 3801, NSRA-APSL-93-0012 12533 Mudoy No ET-NRC 93 3801, NSRA.APSL-93 0012 12593 Murley m
_n
~
9403100270-a
E Westinghouse Electric Corporation nevision 4, March 7,1994 APG00 DESIGN CERTIFICATI/
~ -
TADLE 8. TEST PROGRAM REFERENCES (
SUMMARY
OF WESTINGHOUSE AP600 TEST PROGRAM RELATED M ATERIALS TRANSMITTED TO l DESCRIPTION 16.1/eth Scale Heat Transfer Test. Phase 2 (Confirmatory) 16.1 WCAP 13267," Test Specification: Large Scale Passive Containment Cooling Test, Rev.1" 16 2 WCAP-132d8, " Test Specification
- Large Scale Passive Containment Cooling Test, Rev.1*
16.3 Phase 2 Large Scale Ta.t Matnx Rationale; Information in Support of Request for Additional Information on the AP600 Des 6.
'RAI 480.12) 16 4 Quick Look Data Report for AP600 PCCS Large Scale Phase 2 Tests; Constant Pressure Tests (Tests 202.3 and : 03 3) 16.5 Facihty *as buitt' Drawings for AP600 PCCS Large Scale Test Facihty 16 6 Ovirk Look Data Report for AP600 PCCS Large Scale Phase 2 Tests: Tests 212.1 and 213.1 16.7 Heat Sink Data for AP600 PCCS Large Scale Phase 2 Test Facility 16 8 Proposed Initial Condtions Data and Forcing Functions for Large Scale Phase 2 Test 220.1 16.9 Oukk Look Data Report for AP600 PC'.,3 Large Scale Phase 2 Tests: Tests 214.1 and 215.1 16.10 Quick look Data Report for APG00 PCCS Large Scale Phaso 2 Tests-Tests 217.1 and 2181 16 11 Test Descripton Package for AP600 PCCS Large Scale Phase 2 Test: Test 220.1 16.12 Oukk look Data Report for AP600 PCCS Large Scale Phase 2 Tests: Test 216.1 16.13 Quick Look Data Report for AP600 PCCS Large Scale Phase 2 Tests: Test 219.1 16.14 Quick Look Data Report for AP600 PCCS Large Scale Phase 2 Tests: Test 221.1 16.15 Presentation Matenals from the February 23 24,1994 Meeting on AP600 PCCS Tests and Analysis
- 17. Weter Distributloo System Test. Phase 1 (20ft Olameter) 17.1 WCAP 13353, " Passive Containment Cooling System Water Distrbution Phaso 1 Test Data Report, Rev. 0*
17 2
- WCAP-13354, " Passive Containment Cooling System Water Distribution Phase 1 Tost Data Report, Rev. 0*
17.3 WCAP 13291, " Passive Containment Cooling System Water Distrbution Test, Rev. 0*
17.4 WCAP 13290,"Passivo Containment Cooling System Water Distibution Test, Rev 0*
17.5 WCAP-13293,"ConstructmTest Plan For the Passive Containment Cooling System Test Articles, Rov. /
17 6 WCAP 13292," Construction / Test Plan For the Passive Containment Cooling System Test Articles, Rev. 0" 17.7 WCAP 13412. " Westinghouse-GOTHIC: A Computer Coda For Analyses of Thermal Hydraulic Transients for Nuclear Plant Containments & Aux 17.8 WCAP 13246," Westinghouse GOTHIC: A Computer Code For Analyses of Thermal Hydraulic Transients for Nuclear Plant Containments & Aur 18, Water Distribution System Test Phase 2 (1/8th Sector) '
18.1 WC AP-13291, " Passive Containment Cooling System Water Distrbution Test, Rev. 0*
19 2 WCAP-13297,"PCS Water Distrbution Test Phase ll Test Data Report" 18 3 WCAP 13296, "PCS Water Distreution Test Phase ll Test Data Report" 18 4 WCAP-13290. "Passivo Containment Cooling System Water Distrbution Test, Rev,0*
18 5 WCAP 13293," Construction / Test Plan For the Passive Containment Coo!ing System Test Articles, Rev. 0*
18 6 WCAP 13292," Construction, Test Plan For the Passive Containment Cooling System Test Articlos, Rev. 0*
18 7 WCAP 13246," Westinghouse-GOTHIC: A Computer Code For Analysos of Thermal Hydrautic Transients for Nuclear Plant Containments & Aux 18 8 WC AP-13412. "Westnyhouso GOTHIC: A Computer Code For Analyses of Thermal Hydraulic Transionts for Nuclear Plant Containments & Aug l
)N TEST PROGItAM OVERHEW IRC)
PROPRIETARY TRANSMITTAL LETTER DATE ADDRESSEE Yes ET-NRC-92 3688, NSRA-APSL 92 r:'M 43092 Murley No ET HRC-92-3688, NSRA-APSL-92 0094 43092 Murley Yes ET NRC 90 3961, NSRA-APSL-93-0334 92393 Borchar ft Yos ET-NRC n3981, NSRA APSL 93-0300 t o 493 Borchardt Yes ET-N RC-934983, NSRA APSL-93-0381 10093 Borchardt Yes ET NRC-n3991, NSRA-APSL 93-0394 to 15 93 Borchardt Yes ET-NRC 93 3997, NSRA.APSL-93-0405 10 21 93 Borchardt No ET-NRC-h3998, NSRA APSL-93-M06 10 22 93 Borchardt
[i 4 Yes ET-N RC-93 -4006, NSRA APSL-93 0421 10 29 al Borchardt Yes ET-NRC-%4012, NSRA;APSL-93-044G 11 12 93 Borchardt Yes ET-NRC 93 4030, NSRA APSL-93 0495 12 20 93 Borchardt in.
a,
? r)
Yos ET N RC-94 4035, N S RA-At'SL-94-0002 11894 Borchardt "w:
Yes NTD NRC-94 4053, SAL /NRC0037 12894 Borchardt Yes N TD-NRC-94 4062, DCP/NRC0004 21194 Borchardt Yes NTD-NRC4M-4067, DCP/NRC0009 22394 Borchardt Yes ET NRC-92-3688, NSRA APSL 92-00M 43092 Muriey No ET-NRC 92-3688, NSRA APSL-92 0094 43092 Murley No ET NRC-92 3688, NSRA APSL-92-0094 43092 Murley La LT-N RC424608 NGRA AFGL 92-00s4 450s2 Munuy No E7-NRC 92-3688, NSRA APSL 02-0094 43092 Murley Yes ET-NRC 02-3688, NSR A-APSL-92-0094 43092 Murley iary Buildings
- No ET-N RC-92-3726 73192 Murley iary Buildings
- Yes ET NRC 92-3726 73192 Murley i
No ET-NRC-92 3688, NSR A-APSL-92-0094 43092 Murley No ET-N RC-92-3688 NSRA-APSL-92 0094 43092 Murley Yes ET NRC-92-3688, NSRA APSL-92-0004 43092 Murley Yes ET-N RC-92-3688, NSRA APSL 92-0094 43092 Murley No ET-NRC-92 3688, NSRA APSL-92 00W 43092 Murley Yes ET-N RC-92-3608, NSRA-APSL-92 0094 43092 Murley lary Buiktings*
Yes ET NRC-92 3726 73192 Murley ary Buildings
- No ET-NRC 92-3726 73892 Murley 9403160270 I
~
j
Westinghouse Electric Corporation Revision 4, March 7,1994 APG00 DESIGN CERTIFICATI TABLE 8 -TEST PROGRAM REFERENCES (
SUMMARY
OF WESTINGHOUSE AP600 TEGT PRO DESCRIPTION 19, Water Distst>ution System Test. Phase 3 19.1 WCAP 13292," Construction / Test Plan For the Passive Containment Cooling System Test Artdes, new. 0*
19 2 WCAP 13293,' Construction / Test Plan For the Paswo Containment Cooling System Test Articles, Rov. 0*
19 3 WCAP 13816,
- Phase 3 Passive Containment Coo 4ing System Water Distributon Test" 19 4 WCAP-13817,
- Phase 3 Passive Containment Cooling System Water Distribution Test" 19.5 WCAP 13960,"PCS Water Distrbution Phase 3 Test Data Report," Revision 0 19 6 WCAP 13961,"PCS Water Distrbution Phase 3 Test Data Report," Revision 0 20.Wkd Tunrwl Test - Phase 1 20 1 WCAP 13294,
- Phase i Wind Tunnol Testing For the Wesboghouse AP600 Reactor" 20 2 WCAP-13295,' Phase I Wind Tunnol Testing For the Westinghouse AP600 Reactor" 20 3 WCAP 13318, " Passive Containment Cooling System Wind Tunnel Test Specification, Rev. 0*
20.4 WCAP 13412,'Westn;bouso GOTHIC: A Computer Code For Analyses of Therraal Hydraulic Transients for Nuclear Plant Containments & Auxi 20.5 WCAP 13246," Westinghouse GOTHIC A Computer Code For Analyses of Thermal Hydraulic Transients for Nuclear Plant Containments & Auxi
- 21. Wind Tunnel Test. Phase 2 21.1 WCAP 13318, *Passivo Containmont Cooling System Wind Tunnet Test specifkation, Rov. 0*
21.2 WCAP-13412, *Westinghouso-GOTH;C: A Computer Code For Analysos of Thurmal Hydraulic Transients for Nuclear Pfar,t Containments & Aut 21.3 WCAP-13248,"Westinghouso GOTHIC: A Computer Code For Analyses of Thermal Hydraulic Transients for Nuclear Plant Containments & Aux.
21 A WC AP-13323 Rev. O, " Phase ll Wind Tunnel Testing for the Westinghouse AP600 Reactor" 21.5 WCAP 13324, Rev. O,
- Phase 11 Wird Tunnot Testing for the Westinghouso AP600 Roactor" l
- 22. Wind Tunnel Test Phase 4A 22 1 WC AP.133 t3, 'Panha ContMnmont Coe!Mg System Wind Tonnal Tott Specification, Rev. 0*
22 2 WCAP 13757,
- Wind Tunnel Phase 4A Test Plan, invostigation of the High Reynolds Number Behavior of the Westinghouse AP600 Syste,n,"
22 3 WCAP 13756," Wind Tunnel Phase 4A Test Plan, investigation of the Hgh Roynokis Number Behavior of the Westinghouse AP600 System,*
i
- 23. Wind Tur. net Test Phnse 48 23.1 WCAP 13318, " Pas sive Containment Cooling System Wind Tunnel Test Specification, Rev. 0*
24, PRHR Heat Exchanger Test Phase 1 24.1 WCAP 12666, *AP600 Passive Residual Heat Removal Heat Exchanger Test, Test Report *
- 25. PRHR Heat Exchanger Test Phase 2 25 t WCAP 13368, " Passive RHR Hoat Exchanger Test Extension, Rev. 0*
25 2 WCAP 13369,
- Passive RHR Heat Exchanger Tost Extension, Rev O'
'25 3 WCAP-13573, *AP600 Passive Rosdval Hoat Exchanger Test Final Report
- j 25 4 WCAP-12980, Rev 1,AP600 Passive Rosdual Heat Exchanger Test Final Report" s--
$N TEST PROGRAM OVERVIEW NRC)
PROPRtETARY TRANSMITTAL LETTER DATE ADDRESSEE Yes ET-N RC-92-3608, NSRA APSL 92-00M 43092 Murley No ET-NRC.92 3688, NSRA APSL-92-0004 43092 Murley Yes ET-NRC-93-39M, NSRA APSL-93 0318 81993 Borchardt No ET NRC-93 3952, NSRA APSL-93-0318 81993 Borchardt Yes NTD-NRC-94 4056, DCP/NRC0002 2294 Borchardt No NTD-NRC-944056, DCPsNRC0002 22M Borchardt 4
Yes ET NRC-92 3688, NS RA-APSL-92-00M 43092 Morley No ET NRC 92 3G88, NSRA APSL-92-00M 43092 Murtoy No ET-N RC-92-3688, NSRA-APSL 92-0094 43092 Murley l ary BuMirys" No ET-N RC-92-3726 73892 Murley Fary Buddirys' Yos ET-NRC-92 3726 73192 Murley No ET NRC-92 3688,NSRA-APSL 92 00M 43092 Murley liary Buiklings" No ET-NRC 92 3726 73192 Murley liary Buddirys" Yes ET-NRC 92 3726 73192 Murley Yes ET NRC-924753, NSRA APSL 92-0198 10292 Murtoy No ET-N RC-92-3753, NSRA-APSL-92-0198 10292 Murley No Fr NpC 02 3:30, N3RA ATGL-92 0094 43092 Murley
..7
~('
No ET-NRC 93 3926, NSRA-APSL-93-0250 71593 Borchardt
/'
[\\k' i'
Yes ET-NRC 93 3926, NSRA APSL-93 0250 71593 Borchardt
(,),5 l l "i No ET-N RC-92 -3688, NSRA-APSL 92-00M 43092 Murley Nv0 Uf db;3 gg An
(
iQ Yes NS-NRC-90-3525, NPAP-APSL 90-0048 71690 Donatell Yes ET-NRC-92-3730, NSRA APSL-92-0161 8792 Murfey No ET-NRC 92 3730, NSRA APSL 9-2 0161 8792 Murley No ET-NRC-92 3779, NSRA-APSL 92-0259 12 15 92 Murley Yes ET-NRC-92 3779, NSRA-APSL 92-0259 12 15 92 Murley 9403100270 - }'
I
]
westinghouse sectric corpmauon j
nevision 4, march 7,1994 APG00 DESIGN CERTIFICATI i
TABLE D TEST PROGRAM REFERENCES (
SUMMARY
OF WESTINGHOUSE AP600 TEST PROGRAM RELATED M ATERfALS TRANSMITTED TO DESCRIPTION
- 26. Autornatic Depossurtzation System Test Phase A (Spargor) 26.1 WCAP-13343, 'AP600 Automatr Depresunzatnn System Tost, Rev. 0*
j 26 2 WCAP 13342, *AP600 Automate Depressurization Systorn Tost, Rev 0*
26 3 Prnsentation Matorial from the April 20,1993 Mooting on the AP600 ADS Tests at tho VAPORE Facihty 26.4 Prosontabon Material from the May 4,1993 Mouting to discuss the AP600 ADS Phase A Test Rosults 26.5 Prosentation Materfab from the May 26-27,1933 Mooting on tho AP600 ADS Tests 1
- 27. Automatic Dy esv.artratlor) System Test - Phase B 27.1 WCAP-13 M3, "AP600 Automatic Dcprosurizaton System Test, Rov. 0*
27 2 WCAP-13st2, "AP600 Automat >c Deprossurization System Test, Rov 0"
{
27,3 Prosentation Material from the April 20,1993 Moetng on the APG00 ADS Tests at the VAPORE Facihty 27.4 APCOO Automate Deprossurizaton System Phase B Test Matnx, Rovision 1 27 5 Prokminary Facdity Deskjn Drawrgs for the APG00 AOS Phase B Tests 4
l 27 6 Presontation Materiab from the May 26 27,1993 Monting on the AP600 ADS Tosts 27 7 AP600 Autornabc Doprossurization System Phaso B Test Matru, Revsion I A 27 8 Prosentation Matoriak from the January 25,1994 Moeting on AP600 ADS Dosig, Cortincation Test Plans j
23 Core Makeup TarJr. Test 26 1 WCAP 13345, "AP600 Coro Mak+Up Tank Tost Specdicaton. Rev. 0*
20 2 Matonali, Support of February 25,1993 WestiryhousaNRC Mouting on CMT Tests for AP600 (Test Matn4, instrument List, Drawings) 28 3 Procontation Matonal from the February 25,1993 Westinghousa NRC mooting on tho AP600 GMT Tests 28 4 Transrn ttal of Drawiry of Stoam Destobutor for AP600 Core Makeup Tank Test 28 5 WCAP-13345, *AP600 Cora Mahoup Tank Test Spocification", Revisien 2 28 6 WCAP 13%3, "Scahng logic for tfn Coro Makaup Tank Test," Revison 0 28 7 WCAP 13975, *Scahng Logic for the Coro Makeup Tank Test,* Rovison 0
- 29. DNDR Tests 29.1 WC AP 12483, %stavjhouso Fool Cntorb Evaluation Process" 29 2 Test Matnx fcr AP600 Doparturo from fludoato Baikng Tosts
~ ~
- )N TEST PROGIbtM OVERVIEW l
RC)
PROPRIETARY TRANSMITTAL LETTER DATE ADDRESSEE No ET NRC-92-3680, NSRA-APSL-92 0094 43092 Mudey Y-)s ET-NRC 92 3688, NSRA-APSL-92-0094 43092 Murley Yes ET NRC 93 3877, NSRA APSL43-0159 53 4 Borchardt Yes ET-NRC-93 3879, NSRA APSL-93-0166 5593 Borchardt Yes ET-NRC 934881, NSRA-APSL 93 0197 61 93 Borchardt No ET-NRC 92-3688, NSRA-APSL 92-0044 43092 Muriey Yes ET-N RC-92-3688, NSRA-APSL 92-0094 43092 Mudey Yes ET-NRC 93 3877 NSRA-APSL-93 0159 5393 Borchardt Yes ET-NRC-93 3885 NSRA-APSL-93-of 71 51193 Borchardt Yes ET-NRCM 3893, NSRA-APSL 93-0189 52493 Boriardt l
1 Yes ET-NRC 93-3881, NSRA-APSL-93 0197 6133 Borchardt Yes ET-N RC-93-3801, NSRA-APSL 93-0197 6193 Borchardt Yes NTD-NRC-94 4050, NSRA-APSL 94 0030 12594 Borchardt i
l No ET-NRC-92 3688, NSRA APSL 92 0094 43092 Murley Yes ET NRC 93-3823, NSRA-APSL-93 0042 21893 Borchardt Yes ET NRC-93-3829, NSRA-APSL 93-0053 22593 Borchardt Yes ET NRC 03 3944, NSRA APSL 03-C303 01093 Bordiardt No NTD-NRC 94-4068 DCP/NRC0010 22294 Borchardt Yes NTD NRC 94-4068, DCPiNRC0010 22294 Borchardt No NTD-NRC-944068, DCP/NRC0010 22294 Borchardt Yes NS NRC-90 3482 4290 Wilson Yes ET-NRCM 3984, NSRA-APSL-93 0385 to 8 93 Borchardt j i[
il:
o A;.
9403160270- /
t
Wectinghouso Electric Corporation APG00 DESIGN CERTIFICA
~~
nevision 4, March 7,1994 w
TADLG 8. TEST PROGRAM RPFERENCES (
SUMMARY
OF WESTINGHOUSE AP600 TEST PROCRAM RELATED MATERIALS TRANSMITTED TO I DESCRIPTION 30, Lowr Pressure 1/4 Height Integral Systems Testa 30.1 Scalog Roport on Glass Model of the APG00 30.2 WCAP 13234,"AP600 Long Term Coohng Tes' Speci0 cation, Rov. 0 30 3 WCAP 13233, *AP600 Long Term CooEng Te,t Spocification, Rov. 0*
30.4 Draft Scaling Anahsis for the OSU AP600 'ategral Systoms Test 30.5 Matodalin Support of WestinghousM4RC Meeting on OSU Test Program for AP600 (Test Schedule, Draft Scaling Rmort. Test Spoedication Roh Matrix and Facihty Dosen Drawirys) 30 6 Presentation Material from Decernbor 910,1992 Wostinghousa/NRC Mootings on AP600 Test Program 30.7 Component and Piping Drawing for the AP600 Long Term Coolirg Tests 30.8 WCAP 13283 Revksion 1. "Long Torm Cooling Test.'
30.9 WCAP 13234 Revision 1. "Long Torm Cooling Test,*
30.10 Response to INEL Roquests for Information rogarding OSU Long Torm Cooling Test Facility (Roquests dated April 14,1993 and May 12, 1993)
I i.
30.11 RELAPS/ MOD 3 Input Filo Notobook for OSU/AP600 Cornponents 30.12 Draft Scaling Analysis for tho OSU AP600 Integral System and Long Term Cooling Test Facility 30.13 Facility Drawings and Piping and instrumentation Diagrams for tho AP600 Lorg Term Cooling Test Facihty at Oregon Stato Univorsity 30.14 Presentation Materials from the September 20,1993 Meeting on AP600 Low Pressuro Intwpal Systems Tosts at Orogon State University 30.15 Draft Scaling Analysis for the AP600 Coro Makeup Tank Soparato Effects Tests
- 31. Full Pressure Full Height integre! Systems Tests -
31,1 WCAP 13277,' Scaling Design and Venfication of SPES-2, the Italian Experimental Facihty Simulator of the AP600 Plant *
]I2 WCAP 13278,"Scality Design and Vorification of SPES 2, the Italian Expedrnontal Facihty Simulator of the AP600 Plant
- 31.3 NRC Roquost for Additionallnformaton Related to SPES 2 Test Facility 31 4 Matnrialin Support of Westoghouso/NRC Mooting on SPES Test Program for AP600 (Test Schedulo. Draft Scaling Report. Draft Test Specificat 31 5 Presentation Matorial from December g-10,1992 WestinghouswNRC Mootings on AP600 Test Program 31.6 Cornhonent and Piping Drawings for the SPES-2 Facliity 31.7 Prosentation Material from the April 22,1993 Mooting on the AP600 Integral Systems Tests at SPES 2 Facihty I
l 31.8 WCAP-13278 Revision 1," Scaling, Desgn, and Verdication of SPES-2, The Italian Experimontal of the AP600; Scaling Update *
\\
31.9 WCAP 13277 Revision 1," Scaling Dosign, and Vonfication of SPES 2, The Italian Experimental of the AP600; Scaling Update
- 31.10 SPES.1 Pump Charactorization SIET NT/54 31,11 Response to INEL Request for SPES 2 InformatiorvClanfu ation MGO 29 93 1
31,12 SPES 1 System Descrip6cn, SIET NT/32 j
31.13 Informaton on Test Conditions for AP600 Testing Performod at the SPES 2 Test Facihty t
4#. y 4.
)N TEST PROGRAM OVERVIEW n
==:r RC)h PROPRIETARY TRANSMITTAL LETTER DATE ADDRESSEE No NPAP-APSL-91-0095 3591 Sheron Yes ET NRC 92 3688, NSRA APSL-92 00N 43092 Murley No ET-NRC-92 3688, NSRA APSL-92-0094 43092 Murley Yes ET NRC-924715, NSRA APSL 92-0132 7792 Murley
- R, Updated instrumentation Ust, Test Yes ET-NRC-92 3775, NSRA APSL-92-0250 11 24 92 Murley Yes ET-NRC 92 3785, NSRA-APSL 92-0268 12 17 92 Murley Yes ET NRC-93-3830, NSRA-APSL-93-0062 3 3 SK3 Borchardt No ET-NRC-93 3883, NSRA APSL-93 Ot69 51193 Bordardt Yes ET NRC 93-3883, NSRA APSL-93-0169 51193 Borchardt Yes ET-NRC 93-390t, NSRA-APSL-93-206 61093 Borchardt Yes ET-NRC 93 3932, NSRA APSL-93-0273 72793 Wilson Yes ET NRC-93-3933, NSRA APSL 93 0274 72893 Wilson Yes ET-NRC 93-3969 NSRA-APSL-93 0350 91793 Borchardt Yes ET NRC-93 3993, NSRA APSL-93-0401 10 15 93 Borchardt Yes ET NRC 93-4031, NSRA-APSL-93 0497 12 20 93 Borchardt Yes ET-NRC-92 3685, NSRA APSL 92-0002 4392 Murley No ET NRC 92 3685, NSRA APSL-92 0082 4392 Murley Yes ET-NRC-92 3749, NSRA APSt. 92-0188 91492 Murtoy o)
Yes ET-NRC-92 3770, NSRA APSL-92-025l 11 24 92 Murley j,
Yes ET NRC-92-3785, NSRA-APSL 92-0268 12 17 92 Murfey Yes ET-NRC-93 3825, NSRA-APSL-93-0046 22393 Borchardt Yes ET-NRC-93 3877, NSRA APSL 93 0159 5393 Borchardt No ET NRC-93 3883 NSRA APSL-93-0169 51193 Borchardt Yes ET NRC-93 3883, NSRA-APSL-93-0169 51193-Dorchardt No ET-NRC-93 3943, NSRA-APSL-93-0300 81203 Borchardt
[
i No ET-N RC-93-394 3, NSRA APSL-93-0300 81293 Borchardt f
No ET-NRC-93-3943, NSRA-APSL 93-0300 81293 Borchardt Yes NTD-NRC-94 4070, DCPiNRC0012 3~
9Yf Borchardt b ?' Y' f*
- }
AP.
@gg CARD fr8" 9403160270 -
of
-. ~..,
1 We:tinghouse Electric Corporation hvision 4, March 7,1994 AP600 DESIGN CERTIFICATI(
I m y:
]ADLE 8 TEST PROGRAM REFERENCES (
SUMMARY
OF UESTINGHOUSE AP600 TEST PROGRAM RELATED DESCRIPTION
- 32. Ottwr Tests 32.1 WCAP 12668, *AP600 Hgh inertia Rotor Testing Phase 1 Test Report" i
32.2 WCAP-13299,"RCP Air Model Test Roport, Rev. 0*
323 WCAP-12648. "AP600 Incore instrunwntation System Electromagnet:c Interference Test Report, Rev.1*
32.4 WCAP 13352,
- Stud es of Hyrfraulic Phenomena in the Reactor Vessel Lower Plenum Region - Test Report, Rev. 0*
32.5 WCAP 13105, Shxfim of Hy&aulic Phenomena in Reactor Lower Plenum Rogion - Test Plan
- 32.6 WCAP-13298,"RCP Air Model Test Roport, Rev. O' 32.7 WCAP-13322, "AP600 incore Instrumentation System Electromagnete Interference Test Report, Rev. 0*
32.8 WCAP 13312, "Joomal Bearing Test Task 2 Test Specification
- 32.9 WCAP-13313, " Journal Bearing Test Task Plan For the DOE Phase it High inertia Rotor Test Program
- 3210 WCAP 13320,"AP600 Hgh inertia Rotor Testing Phase 2 Report, Rev 0*
I l
1 32.11 WCAP-12668,"AP600 Hgh Inertia Rotor Testing Phase 1 Test Report, Rev.1*
[
32.12 WCAP 13319, "AP600 High inertia Rotor Testing Phase 2 Report, Rev. 0*
32.13 WCAP 13288, *PassNe Core Cooling System Check VaNo Test Specification, Rev. O' 32.14 WCAP-1328-1, " Test Plan For the Passive Core Cooling System Chock Vane Test, Rev. O' 32 15 WCAP 13314," Journal Bearing Test - Task Plan For the DOE Phaso ll H gh Inertia Rotor Test Program
- 32.16 WCAP-13287, "AP600 PassNe Core Cooling System Check Vane Test Final Roport, Rev. 0*
32 17 WCAP 13285," Test Plan For the Passive Core Cooling System Check Vane Test, Rev. 0*
]
32.18 WCAP 13321,"AP600 High (nortia Rotor Testing Phase 1 Roport, Rev. 0*
32 19 WCAP 13286, *AP600 Passke Core C% ling System Check Vane Test Final Reort, Rev. 0*
32.20 WCAP 13289,"PassNe Core Cooling Syrtem Checx vaNo Test Spucif;cativo, Rev. 0*
j
\\
32 21 WCAP 13310," Journal Bearirg Test Task 1 Test Specification
- j r
1 l
32 22 WCAP 13351," Studies of Hydraulic Phenomena in the Reactor Yessel Lower Plenum Region Test Roport, Rev. 0*
l 1
32 23 WCAP 13306," Studies of Hydraulic Phenomena in Reactor Vessel Lower Plenum Region - Test Plan
- 32.24 WCAP-13309," Journal Bearing Test Task 1 Test Specification
- j 3225 WCAP-13487, Rev. 0, *High inertia Rotor Phase 3, Task i Test R+urt' 32 26 WCAP 13488, "High inertia Rotor Phase 3, Task 1 Test Report" 32 27 WCAP 13560,"Advancod Plant Check Vane Study *, Rev. 0 1
l, 32.28 WCAP 13743," Heavy Wator Reactor Facildy Project Phase 1 AP600 Sman Scala Passive Containment Cooling System Test ' Dry
- Test Results ;
'l 91 0021*
i lL" t
32 29 WCAP 13742," Heavy Water Reactor Facility Project Phase i AP600 Sman Scale Passive Containment Cooling System Test ' Dry' Test Results l
91 0021*
1 WC AP 13726. " Heavy Water Reactor Facility (HWRF) Large Scale Passive Containment Cooling System Baseline Test Data Report HWRF 92k 32.30 32 31 WCAP-13728, " Heavy Water Reactor Facility (HWRF) Srna!! Scalo Containment Cooling System Test Final Report HWRF-RPT 92-003, Revisior f
WCAP-13733 "Heag Water Reactor Facihty (HWRF) Smaa Scale Containment Cooling Test Preliminary Series 2 Test Results HWRF RPT 92f 32 32 WCAP 13725,"Heavi Water Reactor Facihty (HWRF) Largo Scale Passive Containment Cookng System Baseline Test Data 32 33 I'
32.34 WCAP-13727,"Heav) Water Reactor Facikty (HWRF) Small Scale Containment Cooing System Tnt Final Report HWRF-RPT 92-003, Revisio(
m.:
. ~.
@N 2JHS,J dHODIIVN OA311AISM u
+
hO(?
duod 8131VUA 11tVNSN111V113113H OV13 VO083SS33 l
Aes NSNUO-60-CSES' NdVdPd3160-00tO L 49 60 Ooue18tl NO B-N UO-63 C998' NSWWdS16200M t C0 6E WnpeA AeS 3dNUO-6E C999' NSUYPdS1-6200M rt C0 6E WnpeA
[
~
No 31-NUO 62C998' NSUVPdS1-6200N P CD SE NnpeA A8$
B NUO-6tC998' NSUYPdS1-6200M t cO 6E WnpeA Aes 3dN UO-62-0998' NSWPdS16E 00M P C0 6E WnpaA NO 3dNUO 6E C988' NSWPdS1-6100M t CO 62 NnpeK NO 31-N UO-6TC999" NS UYPdS1*02-00M P CO 62 NnpeA Aes 3dNUO 63 C988' NSWWdS163 00M y C0 6E NnpeA
.l No B-N UO-620988' NSW-VdS16Z-006P t CO 62 NnpeA AeS 3dNUO 62-C988' NSWPdS162-00M P C0 62 NnpeA j.gS,,;r g A85 3dNUO-62 C998' NSWPdS1-62 00M t CO 62 NnpeA
- iL]
Aes 3dNUO-GE 0988' NSUVWdS1-6E-00M t C0 62 NnpeA s.
3pi;i7, A0$
3dNUO 63 C980' NSUYPdS16Z-00M t C0 6E WnpeA W"#
NO 31-N UO-62-C988' NSUVPdS1*6Z-00M P CO 6E NnppA MMNIIUU 'y No 31-NUO-62 C998' NSWPdS1-6Z'00M t CO 62 NnpsA NO 31 NUO-62 C988' NSWWdS1-63-00M P C0 6E WnpeA NO D NUO 6E-C989' NSWWdS1-6E 00M t CO 6E WnpeA Aes 3dNUO-6E C998' NSUYPdS1-6E-00N P CO 6E WneleA NO B-N UO-6E-0998' NS WPdS1-6E-00N P CO 6E NnpeA NC 3dNUO-6E 0900' NSWPdS163 00M Y C0 6E NnpoA A85 31-NUO GED49'C'NbuYPdS16E 00M t CD ot NnpeA NO 3dN UO-6E 0999' NSUVPdSI' 6E 00M t CO 6E WnpeA A88 3dNUO-62 C988' NSUVWdS1-62 00N P C0 6E WnpeA A*S D-NUO 6E-C29C' NSUVPdS1-6E-0169 L0 2 6E NnpeA NS 3dNUO 63-Ct9C' NSWWdS1-6E-OL60 60262 NnpeA NO 3dNUO 60 0008' NSUYPdS160-00lE 4 ES 6C WnpeA AdiMH no 140 HMud dm!ool NdU-ud1+
NO 3L-NUO 6C-C60C' NSWfdS1-60-0E09 9 !t 60 003348Pi MP9 4014e HAtud dm!wi NdU udi-Aes 31-NUO 60 C00C' NSWWdS1-60-0200 9 it 60 00334WW st', uoAtstou 4 NO M-NUOtO-060C' NSUVWdS160 0E09 9 iP 6C 80J348PI L
NO 3dNUO 60 0600' NSUYPdS160 OBOB 9 n # 6C GOJ34eP3 al NO D NUO-60 060C' NSUYPdSI' 60 0E00 9 it 6C 00334 EPI 6E OM*, uopsseu t Aes 31 NUO-60 060C' NSWPdS160 0300 9 it 6C 00334 EPI 4-
.Aes D-N UO-60-060C' NS BVPdS160-0300 9 it 6C BOJ34vPI
t
' '. ~
We:tinghon:e Electric Corporation l,l APG00 DESIGN CERTIFICATIt Revision 4, March 7,19RI l
TAB 1.E 8
- TEST PROGRAM REFERENCES (
SUMMARY
OF WEST 1HGHOUSE APC00 TEST PROGRAM RELATED M ATERIALS TRANS DESCRIPTION t
1 32.35 WCAP-13732, %wy Water Reactor Facility (HWRF) Srnali Scale Containment Cochng Test Prelirninary Series 2 Test Results HWRF RPT 924 3230 WCAP 13758,"Hyh inertaa Rotor Tost Phase 3 Report? June,1993 32 37 WCAP 13759,'Hyh Inertia Rotor Test Phase 3 Report
- June,1993 3238 WCAP 13415, 'Hyh inertia Rotor Tost 3 Task 1, Test Specihcaton/
32.39 WCAP 13413,'RCP Hydrauhc Flow Test Prospoctus,"
32.40 WCAP 13420,'Hyh inortia Rotor Test Phase 3 Test Plan,*
32.41 WCAP 13419,"Hyh Inertia Rotor Test Phase 3 Test Plan,*
32.42 WCAP-13414, *RCP Hydradic Flow Test Prospectus,"
32 43 M. H. Kim, "Modelling of Condensation Heat Transfer in a Reactor Containment,* PhD Thesis (1985) 4 h
I f
e rw* sue e
)
i
>N TEST PROG 1 TAM OVEltVIEW
-u_
e _. __.
RC)
-m-_
PROPRIETARY TRANSMITTAL LETTER DATE ADDRESSEE t
Yes ET i4RC 73 3903 NSRA APSL 93 0208 61493 Borchardt Yes ET-NRC-33 3918, NSRA APSL-93 0230 7793 Borchardt No ET-NRC 93 3918, NSRA APSL.93-0238 7793 Borchardt No ET NRC-931926, NSRA APSL 93 0250 71593 Borchardt Yes ET HRC 93-3926, NSRA APSL 93 0250 71593 Dorchardt No ET NRC-93-3026, NSRA-APSL 93 0250 71593 Borchardt Yes ET NRC-S3 3926. NSRA APSL-93-0250 71593 Borchardt No ET NRC-93-3026, NSRA-APSL 93 0250 71593 Borchardt No El NRC 93 3945 NSRA APSL 93 0304 81693 Dorchardt m
l C
y At
! D( 1U f&
a,fo a:
/\\'.
("
f p
i i
l 9403160270 f
1 i
o
CHART 1 AP600 DESIGN CERTIFICATil 1994::
- JAN-
- FED -
M AR >
- APR; MAY.
.JUN c.JLY :-
iAUG
.SEPf
- 0CTl
.-' NOV
- DEC.
- JAN/
CMT CATEGORY 1 Start: 2/15/94 MATRIX TESTS End:
5/27/94 CMT CATEGORY 2 Start: 6/6/94 M ATRIX TESTS End:
9/19/94 b
SPEG-2 CATEGORY 1 MATRIX TESTS E
1/94 SPES 2 CATEGORY 2 MATRIX TESTS OSU CATEGORY 1 Start: 7/2d/94 MATRIX TESTS End:
10/21/94 l
OSU CATEGORY 2 E TESTS ADS PHASE 13 CATEGORY 2 Start: 6/94 M ATRIX TESTS End:
10/94 l
1994
JN TEST SCHEDULE
-1995 e
FEBJ EMAR:
APR-
' M AY :
EJUN.
"JLY.
iAUG-(SEP l0CT ~
.NOV?
DEC':
,'1
.s Si A! ?n,
- , r i
- U pr2; 11/9/94 W:
12/22/94 ATRIX Start: 10/26/94 find:
3/2/95
-}
1995-9403160270-
$1 4