POWER AUTHORITY OF THE STATE OF NEW YORK t o Col.uMaus Clact.2 NEW Yonx. N. Y.10019 (212) 397-6200
"**!."*""I
.no cm.P n.am...
FREDERICK R. CLARK u.i.
,R,.,.=,,,,,
- ":: L'":*,
":":::r'~~'
,G,R O N DE WILSU R RICHARD M. FLYNN RCEERT l. MILLONZI December 4, 1978
"" 7;."a',7,.",
J wn.uaM r. Luour JNRC-78-60
""'"""*"."JR.
THO MAS McCJEANN Director of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, D. C.
20555 Attnntion:
Mr. Thomas A. Ippolito Operating Reactors Branch No. 3 Division of Operating Reactors
Subject:
James A. FitzPatrick Nuclear Power Plant Summary Tabulation for Calendar Year 1977 Control Rods Failing to Fully Insert on Reactor Scrams Docket No. 50-333
Dear Sir:
In response to the U. S. Nuclear Regulatory Commission's August 29,1978 letter to the Power Authority requesting a review of plant records for calendar year 1977, a summary tabulation of control rods failing to fully insert during reactor scram is enclosed. As stated in the tabulation, a report of the drives that were replaced dur-ing the current refueling outage was included in the FitzPatrick Monthly l
Report to the Commission for October 1978. An ongoing tabulation of any additional such events that may occur during calendar year 1978 will be maintained.
Very truly youg,
'N 7
l
/bk f
Paul I[ Early Assistant Chief Engineer-Projects Cnc.
78121101 C f
~
James A.
FitzPatrick Nuclear Power Plant Summary Tabulation For Calendar Year 1977 Control Rods Failing To Fully Insert On Reactor Scrams Position Date of Event Rods Initial Final 1/22/77 42-39 48 02 2/ 1/77 42-39 48 02 2/28/77 42-39 48 02 4/15/77 42-39 48 02 22-07 48 02 11/12/77 10-35 48 02 6 /21/78 18-15 48 02 9 / 8/78 10-15 48 02 18-15 48 02 14-23 48 02 34-15 48 02 The drives for rods 42-39 and 22-07 were replaced during the 1977 refueling outage and the old drives rebuilt.
There was no apparent reason for the events.
The drives for rods 10-35, 14-23 and 34-15 have been replaced during the present refueling outage.
Details regarding their replacement were included in the FitzPatrick Monthly Report to the Commission for Cetober 1978.
Drives 18-15 and 10-15 are not scheduled to be replaced at this time.
l l