Responds to 781013 NRC Ltr Re Violation Noted in Inspec Rept 50-348/78-25.Corrective Actions:Restored 1B Diesel Generator to Operable Status
ML20064F770
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 11/01/1978
From: Clayton F
ALABAMA POWER CO.
To: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20064F768 List:
References
NUDOCS 7812050010
Download: ML20064F770 (2)


Text

^

%".t W:e ben 2b41 p

a S a' rvyt t 3, 4hDN 3 TJ231 Te agrcna 205 323-5N1

,'.. v..~ 6.

F. L CL.AYTON, JR.

^

n.,

.ei AlabamaPower,

senorvce prue 16 :,;l c

ne scuenem decmcsys:cm
'ovember 1,1978 J. M. Farley Nuclear Plant NRC Inspection of September 12-15, 1978 lir. F. J. Long U. S. Nuclear Regulatory Commission 101 Marietta Street, ti. W.

4 Suite 3100 Atlanta, Georgia 30303

(

RE: RIl:AKH

  • 50-348/78-25

Dear Mr. Long:

This refers to the apparent infraction in the subject inspection report which states:

Technical Specification 3.8.1.1 requires that two separate and independent diesel generator sets (one 4075KW and one 2850KW) be operable in Modes 1, 2, 3 and 4.

Contrary to the above, on September 4, 1978, the inspector observed that the starting air receivers for the 1B (4075KW) diesel were insufficiently pressurized to insure starting of the diesel.

The above incident was reported to the Nuclear Regulatory Commission in Licensee Event Report (LER) 78-066/03L-1. The corrective action taken to restore the 1B diesel generator to an operable status and the corrective actio3 taken to avoid further noncompliance are stated in that report. Alabama Power Company is now in full compliance.

We do not consider any of the information in the subject inspection repor6 to be proprietary.

Sincerely yours, A

%L K f 0 2!4 R F. L. Clayton, Jr.

FLCJr:bhj 781SG50010

~