Text
F a NordicaSg Rope Ferry Rd. (Route 156), Waterford. CT 06385 jj Nuclear Energy nai, ton, socicar pom stauon Northeast Nuclear Energy Company p.o. Box 128 Waterford, CT 06385-0128 (203) 447-1791 DONAIJDB hi1L11R.Jr Fax (203) 444-4277 h1NIOR F7CKlWE17DDT ADU3 TONE The Northeast Utihuca System Re: 10CFR50.71(a)
March 8, 1994 MP-94-158 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555
Reference:
Facility Operating License No. NPF-49 Docket No. 50-423
Dear Sir:
In accordance with reporting requirements of Technical Specifications Section 6.9.1.5, the hiillstone Nuclear Power Station - Unit 3 hionthly Operating Report 94-3 covering operation for the month of February 1994 is hereby forwarded. Additionally, a corrected page for the Unit Shutdowns and Power Reductions and a corrected page for the Average
- Daily Unit Power level for the month of January (Monthly Operating Report 94-2) are included. Gross daily MWe were reported in the Average Daily Unit Power Level instead of net hfWe. A power reduction was not reported in the Unit Shutdowns and Power Reductions because gross MWe were used instead of net MWe.
Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY FOR: Donald B. Miller Jr.
Senior Vice President, Millstone Station - NNECO
)
BY:
F. C. Rothen Director, Maintenance Services Attachment ec: T. T. Martin, Region 1 Administrator P. D. Swetland, Senior Resident Inspector, Millstone Unit Nos.1,2 & 3 V. L. Rooney, NRC Project Manager, Millstone Unit No. 3 an14r4 RI V.144 94Q3}$Q4gg 94Q3Qg PDR ADOCK 05000423 f
\\