ML20064F752

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Feb 1994 for Millstone Unit 3 & Corrected Page for Unit Shutdown & Power Reduction & Average Daily Unit Power Level for Jan 1994
ML20064F752
Person / Time
Site: Millstone Dominion icon.png
Issue date: 03/08/1994
From: Miller D, Rothen F
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES SERVICE CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20064F755 List:
References
MP-94-158, NUDOCS 9403150429
Download: ML20064F752 (1)


Text

F ..

a NordicaSg Rope Ferry Rd. (Route 156), Waterford. CT 06385 jj Nuclear Energy nai, ton, socicar pom stauon Northeast Nuclear Energy Company p.o. Box 128 Waterford, CT 06385-0128 (203) 447-1791 DONAIJDB hi1L11R.Jr Fax (203) 444-4277 h1NIOR F7CKlWE17DDT ADU3 TONE The Northeast Utihuca System Re: 10CFR50.71(a)

March 8, 1994 MP-94-158 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Reference:

Facility Operating License No. NPF-49 Docket No. 50-423

Dear Sir:

In accordance with reporting requirements of Technical Specifications Section 6.9.1.5, the hiillstone Nuclear Power Station - Unit 3 hionthly Operating Report 94-3 covering operation for the month of February 1994 is hereby forwarded. Additionally, a corrected page for the Unit Shutdowns and Power Reductions and a corrected page for the Average

- Daily Unit Power level for the month of January (Monthly Operating Report 94-2) are included. Gross daily MWe were reported in the Average Daily Unit Power Level instead of net hfWe. A power reduction was not reported in the Unit Shutdowns and Power Reductions because gross MWe were used instead of net MWe.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY FOR: Donald B. Miller Jr.

Senior Vice President, Millstone Station - NNECO

. <. )

BY: F. C. Rothen Director, Maintenance Services Attachment ec: T. T. Martin, Region 1 Administrator P. D. Swetland, Senior Resident Inspector, Millstone Unit Nos.1,2 & 3 V. L. Rooney, NRC Project Manager, Millstone Unit No. 3 an14r4 RI V.144 94Q3}$Q4gg 94Q3Qg

1. d vg PDR ADOCK 05000423 f \

R PDR-

_ _ _ _