ML20064F345
| ML20064F345 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 11/06/1978 |
| From: | Schwencer A Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20064F337 | List: |
| References | |
| NUDOCS 7811290175 | |
| Download: ML20064F345 (3) | |
Text
.
UNITED STATES NUCLEAR REGULATORY COMMISSION i
DOCKET NOS. 50-280 AND 50-281 VIRGINIA ELECTRIC AND POWER COMPANY NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY i
OPERATING LICENSE AND NEGATIVE DECLARATION The U. S. Nuclear Regulatory Commission (the Commission) has issued Amendment Nos. 45 and 45 -to Facility Operating License Nos. DPR-32 and l
DPR-37, issued to Virginia Electric and Power Company (the licensee),
~
which revised Environmental Technical Specifications for operation of the Surry Power Station, Unit Nos. I and 2 (the facilities) located in Surry County, Virginia. The amendments are effective as of the date of issuance.
The amendments revise the Non-radiological Environmental Monitoring Program Technical Specifications, Section 4.13 of Appendix A by (1) deleting the biological monitoring program except for a low-intensity fish sa'.spling program and (2) reducing the programs for temperature, salinity, and impingement monitoring.
Tia application for the amendments complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations. The Commission has made appropriate findings as required by the Act and the Commission's regulations in 7811290 /75
g(~
eq s
'4 s
w -,
s s
j g
.s e
gs
.q
\\
T a
j g;
?j
./
s('
1
(
10 CFR Chapter 1, which are het forth in the license amendment. Prior I
0 l
kublicnoticeofthisamenamentwasnotrequiredsincetheamendment t.."
?
?
u l
does net involve a significant bazards consideration.
i i
1
,.The; Commission has prepared an environmental impact appraisal for e
x ib x
, the revised Technical Specifications and has concluded that an environ-l mehtal impact statement for this particular action is not warranted
- i j
,'i
~
4.
hecause there wilh be no environmental impact attributable to the
\\
3 action other than,tbat which has already been predicted and described s
x M,the Commission's Final Environmental Statement for the facility dated May 1972.
sa sm s
t s
I For further det' ails with' respect to this action, see (l) the applica-tios!- for am.ndment dated May 16, 1977, as supplemented February 6, April 17, w
'May 18, e.nd August 18,1978;(2) Amendment.Nos. 45'and 45 to, License Nos.
,u l
DPR-32land;DPR-37;and(3)theCommission's'EnvironmentalImpactAppraisal.
All of thes'e items are available for public inspection at the Commission's d
!j' Public Hcwent Room,1M7 P; Street, N.W., Washington, D. C. and at the i
y3 Swem folle,9edibrary. College of William and Mary, Williamsburg, Virginia.
(
st
,s A copy of itess (2) and (3) may be obtained upon requested addressed
' ts he U. E. N,;c1' ear Re.gulatory Commission, Washington, D. C.
- 20555, t
c
'i
' Attention:
Director, Division of Operating Reactors, Office of Nuclear Riactor Regulation.
N w
.(-
v,.
c
<Q*
s s
I i
s%
6\\
c 1 I -
+
\\
x l
s<?
. s
- 1. i g 3
k
\\
f
i
- f "
Dated at Bethesda, Maryland, this 6th day of November,1978.
FOR THE NUCLEAR REGULATORY COMMISSION d
9 A. Schwencer, Chief Operating Reactors Branch #1 Division of Operating Reactors t
n I
i k
P w
-c.
y, 7
.m 7
,-