ML20064E975
| ML20064E975 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 12/16/1982 |
| From: | Daltroff S PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20064E969 | List: |
| References | |
| NUDOCS 8301060196 | |
| Download: ML20064E975 (1) | |
Text
. _
PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STREET P.O. BOX 8699 PHILADELPHI A. PA.191o1 SHIELDS L DALTROFF etec'in'ic en'oYc som s
December 16, 1982 Re: Docket Nos. 50-277 50-278 Mr. Harold R. Denton, Director Nuclear Reactor Regulation i
U.S. Nuclear Regulatory Commission Washington, DC 20555
Dear Mr. Denton:
In accordance with our Octobe~r 29, 1982 letter transmitting the September, 1982 revision of the Peach Bottom j
Atomic Power Station emergency plan, ten copies of the most recent revision of the State of New Jersey plan is herewith j
submitted.
}
j In addition, numbered controlled copy cover sheets are provided for inclusion in the 10 copies previously transmitted.
l i
Three copies of the New Jersey plan and numbered controlled copy cover sheets have been forwarded to Mr. Haynes under separate cover.
i1 i
very truly yours l
TlT hl v[./
.P l
t l
cc:
Mr. R. C. Baynes, Director Off ce of Inspection & Enforcement i
Reg, ion I U.S. Nuclear Regulatory Commission 631 Park Avenue i
King of Prussia, PA 19406 R. A. Blough, Site Inspactor y$d f
j[ga
{
Peach Bottom I
8301060196 830103 PDR ADOCK 05000277 i
F PDR
.