ML20064E635
| ML20064E635 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 03/04/1994 |
| From: | Hutchinson C ENTERGY OPERATIONS, INC. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20064E638 | List: |
| References | |
| GNRO-94-00036, GNRO-94-36, NUDOCS 9403140388 | |
| Download: ML20064E635 (2) | |
Text
7:
[L Entsrgy Opsrations,Inc.
e ENTERGY m a, m Fut Gesm, MS 39150 Tel 601437 2800 C. R. Hutchinson
, :%+n March 4, 1994 U.S. Nuclear Regulatory Commission Mail Station P1-37 Washington, D.C.
20555 Attention:
Document Control Desk
Subject:
Grand Gulf Nuclear Station Docket No. 50-416 License No. NPF-29 Inservice inspection Summary Report GNRO-94/ 00036 Gentlemen:
The attached Report Number NIS-1-00010 provides the Inservice Inspection (ISI) Summary report for the period ending with the sixth refueling outage (RF06) for Grand Gulf Nuclear Station (GGNS).
This report is provided in accordance with the requirements of ASME Section XI, Article IWA-6000, which is incorporated by reference into 10CFR50.55a(g).
Report Number NIS-1-00010 contains an overall summary of inservice inspections performed since June 10, 1992 to December 4, 1993 on the GGNS Unit 1 reactor pressure. vessel, piping, components, and component supports.
NIS-2 Forms, which provide information concerning ASME Section XI repairs and replacements, are also included.
All opon items identified in this report are listed on Pages 130 and 131.
The resolution of these items will be reported in NIS-1-00011 after RF07.
t Please note that for the purpose of this report under ASME Section XI requirements, Entergy Operations, Inc. is
-l considered to be the " Owner" of GGNS.
If additional inforp' tion is required, please contact this office.
a Yours t uly, O' O Oj j] O k
?_
4-C WBB/ams attachment:
service Inspection Summary Report l
cc:
(See Next Page)
G9403011 9403140388 940304 PDR ADOCK 05000416 0
r--
March 4, 1994 GNRO-94/ 00036 Page 2 of 3 cc:
Mr.
R.
H. Bernhard (w/a)
Mr. H. w. Keiser (w/o)
Mr.
2.
B. McGehee (w/o)
Mr.
N.
S.
Reynolds (w/o)
Mr.
H.
L. Thomas (w/o)
Mr. Stewart D. Ebneter (w/a)
Regional Administrator U.S. Nuclear Regulatory Commission Region II 101 Marietta St.,
N.W.,
Suite 2900 Atlanta, Georgia 30323 Mr.
P.
W.
O'Connor, Project Manager (w/2)
Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 13H3 Washington, D.C.
20555 G9403011
-