JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE
SUMMARY
OF OPERATIONS OCTOBER, 1978 Following completion of a scheduled unit outage for maintenance and plant modifications, the unit was brought on line October 5.
The unit was operated at reduced power (350 MW - 370 MW) until October 8, due to damage to the condensate 1B, 1C motors because of possible insufficient cooling during startup.
On October.25 a unit shutdown resulted from an automatically initiated reactor trip due to an apparent voltage spike on the 1A inverter (120 V vital AC bus lA).
The remainder of the month the unit was operated at 100%
power.
The following significant safety related maintenance was performed in October:
1.
Completed replacement of 1B accumulator vent / relief piping.
2.
Investigated and corrected problem on solid state protection system train B 48V D.C. power supply 1.
3.
Performed preventive maintenance on 1C diesel generator.
4.
Rebuilt air compressors on 1B and 1-2A diesel generators; rebuilt Service Water B compressor.
5.
Removed No.10 river water pump for inspection / repair following indications of high vibration.
6.
Replaced seal on lA boron injection system recirc pump; replaced mechanical seal on 1C diesel generator jacket water pump.
7.
Replaced light diffusion disc on the A train chlorine detector.
8.
Investigated and corrected problem with failure of 1-2A diesel generator to tie on-line within required time limit.
9.
Investigated and corrected problem with failure of 1C diesel generator output breaker to close on bus 1H while performing SI/LOSP Surveillance Test.
10.
Completed repair / retest on B train penetration room filtration system after a review indicated i
initial surveillance test data was unsatisfactory.
7 811210 D1 R
l
)
11.
Added oil to reservoir for hydraulic snubber MS-R227 after inspection indicated oil level was low.
12.
Corrected high voltage drift problem on source range channel N-31; corrected bistable problem wih source range channel N-32.
13.
Replaced and recalibrated NLP card for steam line delta-P channel PT484 after it failed low.
14.
Disassembled 1C charging pump to correct alignment problem.
OPERATING DATA REPORT DOCKETNO. 50-348 DATE No" 1.
1978 COMPLETED BY W. G. Hairston, III TELEPHONE (7nci 9o9-5156 OPERATING STATUS
- 1. Unit Name:
Toseeh M.
Farlev Unit 1 Notes 1/ Since 12-1-77 date
- 2. ReportingPeriod: n n a n,- 1978 of commercial operation
- 3. Licensed Thermal Power (MWt):
2652
- 4. Nameplate Rating (Gross MWe):
860 829
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe): 860*
829*
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Repart. Give Reasons:
N/A
- 9. Power Level To Which Restricted. If Any (Net MWe):
N/A
- 10. Reasons For Restrictions,if Any:
N' / A This Month
- Yr.-to.Date Cuandatiu. /1
- 11. Hours In Reporting Period 745 7706 8040
- 12. Number Of Hours Reactor Was Critical 611.7 6283.3 6826.6
- 13. Resctor Reserve Shutdown Hours 133.3 850.6 960.7
- 14. Hours Generator On.Line 601.9 6172.9 ggps_y
- 15. Unit Reserve Shutdown Hours 0
0 o
- 16. Gross Thermal Energy Generated (MWH) 1 501.768 _ _
15.835.091 17.I39.094
- 17. Gross Electrical Energy Generated (MWH) 483.520 5.068,590 5.489.976
- 18. Net Electrical Energy Generated (MWH) 454.134 a 791 oR7 5.189.812
- 19. Unit Service Factor 80.1%
- 20. Unit Availability Factor 80.1%
84.6%
g3.1%
84.6%
83.1%
- 21. Unit Capacity Factor (Using MDC Net) 73 7%
70.3%
77.9%
- 22. Unit Capacity Factor (Using DER Net) 73.7%
79.3%
77.9%
- 23. Unit Forced Outage Rate 3.7%
7.3%
8.7%
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of E:chp
% s., a e.,3, v,,. A 1o7o_ R unote.
- 25. If Shut Down At End Of Report Penod. Estimated Date of Startup: N/A
- 26. Units In Test Status 1 Prior to Commercial Operation):
Forecast Achiesed INITIAL CRITICALITY R-6-77 8 0-77 INITIAL ELECTRICITY 8-20-77 8-18-77 COMMERCIAL OPERATION 12-1-77 12-1-77
- The Nameplata Rating / Design Electrical Rating will be used for the Maximu:n Dependable Capacity until an accurate value can be determined fro-operating experiencep
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-348 UNIT Farley Unit 1 DATE Nov. 1, 1978 COMPLETED BY W. G. Hairston, III TELEPHONE (205) 899-5156 MONTH October DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)
(MWe-NetI 818 i
0 37 0
18 816 0
3 i,
810 4
0 20 802 3
232 23 804 815 6
308 22 815 7
293 23 g
403 24 818 9
813 763 25 10 811 26 0
13 810 799 37 811 812.
,3 13 809 29 810 14 812 30 Ano 15 819 33 g33 16 919 INS 1 RUCTIONS On this format, list the average daily unit power levelin MWe Net for each day in the reportmg month. Compute to the nearest whole megawatt.
(9/77 )
3 I
s i
I r
5 l
?
DOCKET NO. 50 'l'*8 I
UNITSilUTDOWNS AND POWER REDUCTIONS UNITNAnfE Eilrlev linir 1 l
DATE Nov_
1_
1978 COhfrLETED 8Y W. G. itairston, III l
REPORT MONTil October TELLPilONE (205) 899-5156
.$ g
}
Y Licensee gg
- fvl, Cause & Corrective No.
Date h
3g 2s5 Event uT o"
Action to jb H
$E 5
j$g Report
- iN0 Prevent Recurrence 6
i 42 781001 S
120.0 B
N/A N/A ZZ ZZZZZZ Continuation of previously reported Shutdown No. 41.
43 781025 F
23.1 11 3
N/A EB CENERA Reactor trip resulted from apparent voltage spike on IA inverter. 120V Vital AC Bus IA was aligned to the Sola transformer and the 1A inverter was connected to a dunny load with i
recorded output voltage. No further variations in voltage occurred. The cause of the voltage spike was not determined.
t e
I 2
3 4
8 F: Forced Reason:
hiethini:
Exhibit C. Instructiims S: Sthedulcil A Equipment Failure (Explain) 1 Manual for Prep 4:ation of Data l
Il Maintenance or Test 2 Manual Scram.
Entry Sheets for Ikensee C-Refueling 3 Automatic Scram.
Event Repost (LER) file INURfG-D Regulatory Restriction 4-Other (Explain) 0161) l' E-Operator Training & License Examination F-Ailministrative t
G-Operational Error (Explain)
Exhibit I - Same Source (9/77)
Il-Other (Explain)
!