JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE

SUMMARY

OF OPERATIONS OCTOBER, 1978 Following completion of a scheduled unit outage for maintenance and plant modifications, the unit was brought on line October 5.

The unit was operated at reduced power (350 MW - 370 MW) until October 8, due to damage to the condensate 1B, 1C motors because of possible insufficient cooling during startup.

On October.25 a unit shutdown resulted from an automatically initiated reactor trip due to an apparent voltage spike on the 1A inverter (120 V vital AC bus lA).

The remainder of the month the unit was operated at 100%

power.

The following significant safety related maintenance was performed in October:

1.

Completed replacement of 1B accumulator vent / relief piping.

2.

Investigated and corrected problem on solid state protection system train B 48V D.C. power supply 1.

3.

Performed preventive maintenance on 1C diesel generator.

4.

Rebuilt air compressors on 1B and 1-2A diesel generators; rebuilt Service Water B compressor.

5.

Removed No.10 river water pump for inspection / repair following indications of high vibration.

6.

Replaced seal on lA boron injection system recirc pump; replaced mechanical seal on 1C diesel generator jacket water pump.

7.

Replaced light diffusion disc on the A train chlorine detector.

8.

Investigated and corrected problem with failure of 1-2A diesel generator to tie on-line within required time limit.

9.

Investigated and corrected problem with failure of 1C diesel generator output breaker to close on bus 1H while performing SI/LOSP Surveillance Test.

10.

Completed repair / retest on B train penetration room filtration system after a review indicated i

initial surveillance test data was unsatisfactory.

7 811210 D1 R

l

)

11.

Added oil to reservoir for hydraulic snubber MS-R227 after inspection indicated oil level was low.

12.

Corrected high voltage drift problem on source range channel N-31; corrected bistable problem wih source range channel N-32.

13.

Replaced and recalibrated NLP card for steam line delta-P channel PT484 after it failed low.

14.

Disassembled 1C charging pump to correct alignment problem.

OPERATING DATA REPORT DOCKETNO. 50-348 DATE No" 1.

1978 COMPLETED BY W. G. Hairston, III TELEPHONE (7nci 9o9-5156 OPERATING STATUS

1. Unit Name:

Toseeh M.

Farlev Unit 1 Notes 1/ Since 12-1-77 date

2. ReportingPeriod: n n a n,- 1978 of commercial operation
3. Licensed Thermal Power (MWt):

2652

4. Nameplate Rating (Gross MWe):

860 829

5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe): 860*

829*

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Repart. Give Reasons:

N/A

9. Power Level To Which Restricted. If Any (Net MWe):

N/A

10. Reasons For Restrictions,if Any:

N' / A This Month

  • Yr.-to.Date Cuandatiu. /1
11. Hours In Reporting Period 745 7706 8040
12. Number Of Hours Reactor Was Critical 611.7 6283.3 6826.6
13. Resctor Reserve Shutdown Hours 133.3 850.6 960.7
14. Hours Generator On.Line 601.9 6172.9 ggps_y
15. Unit Reserve Shutdown Hours 0

0 o

16. Gross Thermal Energy Generated (MWH) 1 501.768 _ _

15.835.091 17.I39.094

17. Gross Electrical Energy Generated (MWH) 483.520 5.068,590 5.489.976
18. Net Electrical Energy Generated (MWH) 454.134 a 791 oR7 5.189.812
19. Unit Service Factor 80.1%
20. Unit Availability Factor 80.1%

84.6%

g3.1%

84.6%

83.1%

21. Unit Capacity Factor (Using MDC Net) 73 7%

70.3%

77.9%

22. Unit Capacity Factor (Using DER Net) 73.7%

79.3%

77.9%

23. Unit Forced Outage Rate 3.7%

7.3%

8.7%

24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of E:chp

% s., a e.,3, v,,. A 1o7o_ R unote.

25. If Shut Down At End Of Report Penod. Estimated Date of Startup: N/A
26. Units In Test Status 1 Prior to Commercial Operation):

Forecast Achiesed INITIAL CRITICALITY R-6-77 8 0-77 INITIAL ELECTRICITY 8-20-77 8-18-77 COMMERCIAL OPERATION 12-1-77 12-1-77

  • The Nameplata Rating / Design Electrical Rating will be used for the Maximu:n Dependable Capacity until an accurate value can be determined fro-operating experiencep

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-348 UNIT Farley Unit 1 DATE Nov. 1, 1978 COMPLETED BY W. G. Hairston, III TELEPHONE (205) 899-5156 MONTH October DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)

(MWe-NetI 818 i

0 37 0

18 816 0

3 i,

810 4

0 20 802 3

232 23 804 815 6

308 22 815 7

293 23 g

403 24 818 9

813 763 25 10 811 26 0

13 810 799 37 811 812.

,3 13 809 29 810 14 812 30 Ano 15 819 33 g33 16 919 INS 1 RUCTIONS On this format, list the average daily unit power levelin MWe Net for each day in the reportmg month. Compute to the nearest whole megawatt.

(9/77 )

3 I

s i

I r

5 l

?

DOCKET NO. 50 'l'*8 I

UNITSilUTDOWNS AND POWER REDUCTIONS UNITNAnfE Eilrlev linir 1 l

DATE Nov_

1_

1978 COhfrLETED 8Y W. G. itairston, III l

REPORT MONTil October TELLPilONE (205) 899-5156

.$ g

}

Y Licensee gg

fvl, Cause & Corrective No.

Date h

3g 2s5 Event uT o"

Action to jb H

$E 5

j$g Report

  • iN0 Prevent Recurrence 6

i 42 781001 S

120.0 B

N/A N/A ZZ ZZZZZZ Continuation of previously reported Shutdown No. 41.

43 781025 F

23.1 11 3

N/A EB CENERA Reactor trip resulted from apparent voltage spike on IA inverter. 120V Vital AC Bus IA was aligned to the Sola transformer and the 1A inverter was connected to a dunny load with i

recorded output voltage. No further variations in voltage occurred. The cause of the voltage spike was not determined.

t e

I 2

3 4

8 F: Forced Reason:

hiethini:

Exhibit C. Instructiims S: Sthedulcil A Equipment Failure (Explain) 1 Manual for Prep 4:ation of Data l

Il Maintenance or Test 2 Manual Scram.

Entry Sheets for Ikensee C-Refueling 3 Automatic Scram.

Event Repost (LER) file INURfG-D Regulatory Restriction 4-Other (Explain) 0161) l' E-Operator Training & License Examination F-Ailministrative t

G-Operational Error (Explain)

Exhibit I - Same Source (9/77)

Il-Other (Explain)

!