Forwards Response to Combined Insp Repts 50-277/93-34 & 50-278/93-34 on 940124-28 Re TSC Ventilation Sys Surveillance Procedure.Corrective Actions:Listed Enhancements Incorporated Into EP Action Item Tracking Sys
ML20064E417
Person / Time
Site: Peach Bottom  
Issue date: 03/04/1994
From: Meyers D
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9403140286
Download: ML20064E417 (3)


Text

- _ _ _ _ _ _ - _ - _ _ _ _ _ _ _ _ - _

Peach Bottom Atomic Power Station e

ik

~ ~~,-?. :YMA

}-Q'.'.L~

9 PECO ENERGY

??N; s' ~""'

Def!a. PA 173f 4d3739 717 450 7014 March 4,1994 Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555 l

1 Docket Nos.

50-277 50-278 License Nos.

DPR-44 DPR-56

Subject:

Peach Bottom Atomic Power Station Unit 2 & 3 Response to Combined Inspection Report 50-277/93-34 &

50-278/93-34)

Dear Sir:

In the cover letter of the subject inspection report, the inspector raised a question regarding the Technical Support Center (TSC) ventilation system survelflance procedure and the effectiveness 1

of the discrepancy resolution systern that is being used by the Emergency Preparedness Group.

j During NRC !nspection 50-277/94-02 and 50-278/94-02 conducted January 24 - 28,1994, a

information was provided to the inspector concerning the TSC ventitation system surveillance i

procedure. It is our understandlag that no other information is required at this time for the surveillance procedure. Please find attached our plans to enhance the discrepancy resolution system. Although the discrepancy resolution system was assessed in the inspection report as being adequately implemented, the planned improvements will strenc'han the overall process.

If you have any questions or require further Iriformation, please do not hesitate to contact us.

l Sincerely, c D O A 2; y.hLA

\\

D. R. Meyers Director, Site Support Services DRM/RKS: bah attachment i

10017t3 CCN 94-14031 I

l 9403140286 940304 s

PDR HDOCK 05000277 L_____

-__O

__ _. __ _ _.__ _ __ _ _ _PD R.

--a.

1 l

d cc:

T. T. Martin, Administrator Region I, USNRC W. L Schmidt, Senior Resident inspector, USNRC -

W. P. Dornsife, Commonwealth of Pennsylvania R. l. McLean, State of Maryland i

H. C. Schwemm Atlantic Electric O. D. Schaefer, Delmarva Power e

i

= _-

=

Response to inspection Report 93-34/34 The effectiveness of the discrepancy resolution system was identified during the 1993 EP self.

assessment process as a watch area, with the particular focus being to upgrade the trending of Issues. In order to improve the EP discrepancy resolution process, the following enhancements will be incorporated into the EP. Action item Tracking (EP-AIT) System:

1)

The trending system will be enhanced to incorporate an EP activity specific coding system that will provide for action items to be categorized and trended by problem type.

2)

The pre-programmed reports will be modified to utilize the EP-soecific trend codes The search capabilities will be expanded to inciease the speed and ease of access to specific subjects and items.

3)

Procedure EP-C-2, entitled " Action item Tracking System", will be revised to reflect these revisions to the EP-alt system.

Implementation of trending capability will allow us to perform assessments to identify common issues of concern and ensure that corrective actions are applied, it is expected that these EP-AIT enhancements will further allow for trending and analysis of historical data. In order to establish an appropriate base line, previously identifled drill action items will be reviewed for categorization of trends. The improved EP-AIT system will be in place by June 30,1994.