ML20064E370
| ML20064E370 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 11/01/1978 |
| From: | Clayton F ALABAMA POWER CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| NUDOCS 7811170038 | |
| Download: ML20064E370 (1) | |
Text
racn c n,-.
w. r e-s~c..
(t MJ 7Fk eW V.'3;.? W '.c..
.7,fe -jv.5 w,w:.m,
,.,,, ; ; c,....
p 4 ' ti r o cuna sa
~
To.M. r0 AlabamaPower November 1, 1978 NRC IE Bulletin No. 73-08
/
f Mr. James P. O'Reilly y
U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, N.W.
Suite 3100 Atlanta, Georgia 30303 i
Dear Mr. O'Reilly:
As part of our response to the referenced IE Bulletin, Alabama Power Company committed to installing a security fence with a gate requiring a special radiation work permit for entry onto the walking deck leading to the access port adjacent to the fuel transfer tube.
As a result of further evaluation, Alabama Power Company rescinds the above response and provides the following alternative in answer to questions 2 and 3 of the subject Bulletin:
The access port adjacent to the fuel transfer tube will be completely filled by solid concrete blocks stacked loose with no mortar joints, and braced in place with
(
bolted steel plates on both face.
Yours very truly, h f CL?~ '
F. L. Clavton)
Jr.
FLCJ r/HRF:bhj i
cc:
Mr. R. A. Thomas Mr. G. F. Trowbridge 1
781117 0032 i
sm
.