P n etpono auoto annansas A R K A N S A S P O W E R S L I G HT-C O M P A N Y PO eOx sei LsT TLE T40CK. A AK ANS AS 72203. E5013 371 4000 November 6, 1978 i
2-118-3 Director of Nuclear Reactor Regulation ATTN: Mr. J. F. Stolz, Chief Light Water Reactors Branch #1 A
U. S. Nuclear Regulatory Commission I/
Washington, D. C.
20555
Subject:
Arkansas Nuclear One-Unit h Docket No.60-368" License No. NPF-6 Conformance to GDC-17 (File: 2-6012, 2-1510)
Gentlemen:
Our letter of October 27, 1978, on the above subject, transmitted our interim comitment to alleviate the Staff's concerns as to our confor-mance with GDC-17.
However, in conversations with the Staff, subsequent to the above letter, we understand that the Staff has found our proposal (made in an October 20, 1978, telecon) of " splitting" the loads on Startup Transformer #2 (SU2) between AN0-1 and 2 to be acceptable. Therefore we wish to revise our -
U interim comitment to be as follows.
We.will, before Mode 2 operation of ANO-2, place the appropriate feeder i
breakers, from SU2 to AN0-1 and/or ANO-2, in the " pull-to-lock" position i
such that no more' loads than the equivalent of full ANO-2 house loads can be automatically connected to SU2 at the same time. Implementation of
,9"'
this commitment will be effected before Mode 2 operation (of ANO-2) by incorporating a standing order in our Operating Procedures.
j In order to verify correct alignment of the feeder breakers, we will:
(1) following any change in the breaker alignment, log the positions of the breakers and verify that the alignment is in accordance with j
the procedure or (2) as a minimum, log the positions of the breakers and verify that the alignment is in accordance with the procedure at least cnce every 14 days.
g O
781109olW 3
T AX A AYtNG. INVESTOR OWNE O D MEMBER MlOOLE SOUTH UTILITIES SYSTEM
Mr. J. F. Stolz NovembIr 6, 1978
~
~
?
2-118-3 We wish to repeat that we believe that the existing ANO-2 design meets the requirements of GDC-17 and we wish to pursde this issue further with the Staff. We will, however, maintain appropriate breaker arrange-ments, as committed above, until final resolution of this issue.
This letter supersedes our letter of October 27, 1978, on the same subject.
Ver truly yours, Lk Daniel H. Williams Manager, Licensing DHW:JTE:tw P