Responds to NRC Re Review of Environ Rept - OL Stage.Info Covers Archeological Investigation of Tittabawassee River Floodplain,Mitigation or Avoidance of Archeological Sites & Ecological Surveys
ML20064D470
Person / Time
Site: Midland
Issue date: 10/30/1978
From: Howell S
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Regan W
Office of Nuclear Reactor Regulation
References
NUDOCS 7811070149
Download: ML20064D470 (2)


Text

4,

  • o I

c :l j] (,

r

.A

[

CfGUf,'.C.'

33(]

RC

[;i:,'.,;$'

Stephen H. Howell j

y Senin Vice Prasadent General O fficos: 1945 West ParnaH Roed, Jackson, Michigan 49201 * (51H 7884453 i

October 30, 1978 nove 225-76 Mr Willia = It Regan, Jr, Chief Environmental Projects Brar.ch 2 Division of Site Safety and Environmental Analysis US Nuclear Regulatory Commission Washington, DC 20555 MIDLAdD PROJECT DOCKET No 50-329, 50-330 ENVIR0iit'clTAL Ri. PORT (OIS)

RE.iUEST FOR ADDITIONAL INFORMATION FILE: 0505.5 SERIAL: 6020 Your October 11, 1976 letter requested additional infornation necessary for review of the Midland Plant-Environmental Report - Operating License Stage.

Regarding certain questions on archeology and endangered species, Consumers Power Company provides the following general information:

Archeology, Question 1 An archeolo6 cal investigation of the Tittabavassee River floodplain was i

initir.ted in October 1978. Results are expected to be available and provided to the Nuclear Regulatory Commission in December 1978. No additional construc-tion activities vill be started in the floodplain until the investigation is complete.

Archeolocy, Question 9 A detailed plan for the =itigation or avoidance of archeological sites which could be disturbed by construction and operation of the transmission line vill be provided in Dece=ber 1976.

Endangered Species, Questions 1. 2 and 3 Consumers Power Company vill not begin construction of transmission line facilities between the Midland Plant and the Tittabavassee Substation, or between the Tittabavassee Substation and Kencva/Thetford line until data from an ecological survey of the transmission line right-of-way are available.

781107 o Id o

d'\\

O

u 2

Serial 6020 Hove 225-78' This ecological survey was initiated in October 1978, and data vill be available and provided to the duelear Regulatory Cox.ission in mid-1979 Detailed responses to all requests for infor=ation in the above referenced letter will be provided by Environmental Report revisions in accordance with the schedule provided to Mr Oliver D T Lynch, Jr by telephone.

A SHH/jbg e

9