ML20064D397

From kanterella
Jump to navigation Jump to search
Forwards Calvert Cliffs Unit 2 SGs 21 & 22 Eddy Current Testing Final Rept Mar 1993, Consisting of Results of SG Tube Exams Conducted on Unit 2 SGs in Mar 1993,per TS 6.9.1.5.b,requiring Annual Submittal of Rept
ML20064D397
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 02/28/1994
From: Cruse C
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20064D399 List:
References
NUDOCS 9403110182
Download: ML20064D397 (1)


Text

. _..

i

\\

l BALTIMORE l

GAS AND l

ELECTRIC l

\\

CALVERT CLIFFS NUCLEAR POWER PLANT 1650 CALVERT CLIFFS PARKWAY

  • LUSBY, MARYLAND 20657-4702 CHARLES H. CRUSE February 28,1994 PLANT GENERAL MANAGER CALVERT CLIFFS U. S. Nuclear Regulatory Commission l

Washington,DC 20555 l

ATTENTION:

Document Control Desk

SUBJECT:

Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2: Docket Nos. 50-317 & 50-318 1993 Steam Generator Inspection Results Report

REFERENCE:

(a)

Calvert Cliffs Units 1 and 2 Technical Specification 6.9.1.5.b Reference (a) requires that we report, on an annual basis, the results of steam generator tube examinations conducted in the past year. This report includes the number and extent of tubes examined, imperfections noted, and the identity of tubes plugged. Attached please find the report of steam generator tube examinations conducted on the Unit 2 steam generators in March 1993. No similar examinations were conducted on the Unit 1 steam generators in 1993.

Should you have any further questions regarding this matter, we will be pleased to discuss them with you.

Very truly yours, p

Md CHC/RCG/ojd i

Attachment i

ec:

D. G. Mcdonald, Jr., NRC T. T. Martin, NRC P. R. Wilson, NRC R. I. McLean, DNR 3 o - 1 O W' l'

J. H. Walter, PSC (Without Attachment) f i

l D. A. Brune, Esquire Og[

J. E. Silberg, Esquire R. A. Capra, NRC

,I

[

l 9403110182 940228 f"/-

l PDR ADOCK 05000318 R

PDR