MONTHYEARIR 05000259/20240032024-11-0404 November 2024 Integrated Inspection Report 05000259/2024003 and 05000260/2024003 and 05000296/2024003 CNL-24-043, Application for Subsequent Renewed Operating Licenses, Second Safety Supplement2024-11-0101 November 2024 Application for Subsequent Renewed Operating Licenses, Second Safety Supplement ML24305A1692024-10-31031 October 2024 Site Emergency Plan Implementing Procedure Revision 05000259/LER-2024-003, Valid Specified System Actuation Caused the Automatic Start of Emergency Diesel Generators2024-10-29029 October 2024 Valid Specified System Actuation Caused the Automatic Start of Emergency Diesel Generators 05000259/LER-2024-001-02, Secondary Containment Isolation Valve Inoperable Due to Mechanical Failure2024-10-28028 October 2024 Secondary Containment Isolation Valve Inoperable Due to Mechanical Failure ML24299A2632024-10-25025 October 2024 Response to Apparent Violation in NRC Inspection Report 05000260/2024090, EA-24-075 ML24289A1232024-10-24024 October 2024 Letter to James Barstow Re Environmental Scoping Summary Report for Browns Ferry CNL-24-074, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-10-23023 October 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24308A0042024-10-16016 October 2024 Ahc 24-1578 Environmental Review of the Browns Ferry Nuclear Plant, Units 1, 2 and 3 Subsequent License Renewal Application Limestone County CNL-24-077, Application for Subsequent Renewed Operating Licenses, Response to Request for Additional Information, Set 12024-10-0909 October 2024 Application for Subsequent Renewed Operating Licenses, Response to Request for Additional Information, Set 1 ML24270A2162024-09-27027 September 2024 Notice of Intentions Regarding Preliminary Finding from NRC Inspection Report 05000260/2024090, EA-24-075 CNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description ML24262A1502024-09-24024 September 2024 Requalification Program Inspection - Browns Ferry Nuclear Plant ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML24263A2952024-09-19019 September 2024 Site Emergency Plan Implementing Procedure Revision CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000260/20240902024-09-17017 September 2024 NRC Inspection Report 05000260/2024090 and Preliminary White Finding and Apparent Violation - 1 CNL-24-062, Cycle 16 Reload Analysis Report2024-09-16016 September 2024 Cycle 16 Reload Analysis Report ML24255A8862024-09-10010 September 2024 Core Operating Limits Report for Cycle 16 Operation, Revision 0 IR 05000259/20244042024-09-0303 September 2024 Cyber Security Inspection Report 05000259/2024404 and 05000260-2024404 and 05000296/2024404-Cover Letter ML24239A3332024-09-0303 September 2024 Full Audit Plan IR 05000259/20240052024-08-26026 August 2024 Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2 and 3 - Report 05000259/2024005, 05000260/2024005 and 05000296/2024005 ML24225A1682024-08-16016 August 2024 – Notification of Inspection and Request IR 05000259/20244022024-08-0606 August 2024 Security Baseline Inspection Report 05000259/2024402 and 05000260/2024402 and 05000296/2024402 ML24219A0272024-08-0606 August 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000259/20240022024-08-0202 August 2024 Brown Ferry Nuclear Plant – Integrated Inspection Report05000259/2024002 and 05000260/2024002 and 05000296/2024002 ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter ML24183A4142024-07-10010 July 2024 – License Renewal Regulatory Limited Scope Audit Regarding the Environmental Review of the License Renewal Application (EPID Number: L-2024-SLE-0000) (Docket Numbers: 50-259, 50-260, and 50-296) 05000296/LER-2024-003, Main Steam Relief Valves Lift Settings Outside of Technical Specifications Required Setpoints2024-07-0808 July 2024 Main Steam Relief Valves Lift Settings Outside of Technical Specifications Required Setpoints 05000259/LER-2024-001-01, Inoperability of Unit 3 Diesel Generator Due to Relay Failure2024-07-0303 July 2024 Inoperability of Unit 3 Diesel Generator Due to Relay Failure ML24184A1142024-07-0202 July 2024 Site Emergency Plan Implementing Procedure Revision ML24183A3842024-07-0101 July 2024 Registration of Use of Cask to Store Spent Fuel (MPC-364, -365) ML24179A0282024-06-26026 June 2024 Evaluation of Effects of Out-of-Limits Condition as Described in IWB-3720(a) 05000259/LER-2024-002, Reactor Scram Due to Generator Step-Up Transformer Failure2024-06-24024 June 2024 Reactor Scram Due to Generator Step-Up Transformer Failure ML24176A1132024-06-23023 June 2024 American Society of Mechanical Engineers, Section XI, Fourth 10 Year Inspection Interval, Inservice Inspection, System Pressure Test, Containment Inspection, and Repair and Replacement Programs, Owner’S Activity Report Cycle 21 Oper ML24175A0042024-06-23023 June 2024 Interim Report of a Deviation or Failure to Comply Associated with a Valve in the Unit 3 High Pressure Coolant Injection System ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24155A0042024-06-18018 June 2024 Proposed Alternative to the Requirements of the ASME Code (Revised Alternative Request 0-ISI-47) ML24158A5312024-06-0606 June 2024 Registration of Use of Cask to Store Spent Fuel (MPC-361, -362, -363) ML24071A0292024-06-0505 June 2024 Subsequent License Renewal Application Enclosure 3 - Proprietary Determination Letter ML24068A2612024-06-0505 June 2024 SLRA Fluence Methodology Report - Proprietary Determination Letter IR 05000259/20244032024-05-22022 May 2024 – Security Baseline Report 05000259/2024403 and 05000260/2024403 and 05000296/2024403 05000260/LER-2024-002, High Pressure Coolant Injection Inoperable Due to Rupture Disc Failure and Resulting System Isolation2024-05-20020 May 2024 High Pressure Coolant Injection Inoperable Due to Rupture Disc Failure and Resulting System Isolation ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A0702024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report IR 05000259/20240012024-05-14014 May 2024 Integrated Inspection Report 05000259/2024001, 05000260/2024001, and 05000296/2024001 CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24123A2012024-05-0202 May 2024 NRC Cybersecurity Baseline Inspection (NRC Inspection Report 05000259/2024404, 05000260-2024404, 05000296/2024404) and Request for Information ML24122A6852024-05-0101 May 2024 2023 Annual Radioactive Effluent Release Report and Offsite Dose Calculation Manual 2024-09-03
[Table view] Category:License-Operator Examination Report
MONTHYEARML23206A1512023-07-25025 July 2023 2A-3, Exam Administrative Items (Delayed Release), Browns Ferry 2022-301 ML23206A1482023-07-25025 July 2023 2A-2, Exam Final Items (Delayed Release), Browns Ferry 2022-301 ML23206A1432023-07-25025 July 2023 2A-1, Exam Draft Items (Delayed Release), Browns Ferry 2022-301 ML23206A1382023-07-25025 July 2023 2B Exam Admin Items Bf 2022-301 (Normal Release) IR 05000259/20233012023-07-18018 July 2023 NRC Operator License Examination Report Nos. 05000259/2023301, 05000260/2023301, and 05000296/2023301 ML22210A1292022-07-20020 July 2022 2022-301 Examination Report and Letter IR 05000259/20213012021-07-28028 July 2021 NRC Operator License Examination Report Nos. 05000259/2021301, 05000260/2021301, 05000296/2021301 ML20064C7572020-03-0202 March 2020 Bf 2019301 Exam Report 2019301 IR 05000259/20193012019-10-30030 October 2019 Operator Licensing Written Examination Approval 05000259/2019301, 05000260/2019301 and 05000296/2019301 ML19115A0682019-04-25025 April 2019 301 Exam Administrative Items (ADAMS-2D) IR 05000259/20183012018-08-24024 August 2018 NRC Operator License Examination Report Nos. 05000259/2018301, 05000260/2018301,05000296/2018301 IR 05000259/20173012017-06-16016 June 2017 NRC Operator License Examination Report Nos. 05000259/2017301, 05000260/2017301, 05000296/2017301 IR 05000259/20153012015-03-0202 March 2015 Er 05000259/2015301, 05000260/2015301, 05000296/2015301; Operating Test on January 19 - 22, 2015 & Written Exam January 28, 2015; Browns Ferry Nuclear Plant; Operator License Examinations IR 05000259/20133022013-10-21021 October 2013 Er 05000259/13-302, 05000260/13-302, and 05000296/13-302; Operating Retake Test September 25-26, 2013, Browns Ferry Nuclear Plant, Operator License Examination IR 05000259/20133012013-07-23023 July 2013 Er 05000259/13-301, 05000260/13-301 and 05000296/13-301, Operating Test June 3-7, 2013, & Written Exam June 28, 2013, Browns Ferry Nuclear Plant, Operator License Examinations, Units 1, 2, and 3 IR 05000259/20123012012-07-16016 July 2012 Er 05000259-12-301, 05000260-12-301 & 05000296-12-301; 05/17 - 18/2012 & Written Exam 05/18/2012; Browns Ferry Nuclear Plant, Operator License Examinations ML1126403852011-09-19019 September 2011 Er 05000259-11-302, 05000260-11-302, and 05000296-11-302, Operating Test August 8 - 12, 2011 & Written Exam August 19, 2011; Browns Ferry Nuclear Plant, Operator License Examinations IR 05000259/20113022011-09-19019 September 2011 Er 05000259-11-302, 05000260-11-302, and 05000296-11-302, Operating Test August 8 - 12, 2011 & Written Exam August 19, 2011; Browns Ferry Nuclear Plant, Operator License Examinations ML1020302062010-07-22022 July 2010 Er 05000259-10-301, 05000260-10-301, 05000296-10-301, 06/7-14/2010 & 06/17/2010; Browns Ferry Nuclear Plant; Operator License Examinations ML1004000752010-02-0909 February 2010 Notification of Licensed Operator Initial Examination - 05000259-10-301, 05000260-10-0301, 05000296-10-301 IR 05000002/19600102010-02-0909 February 2010 Notification of Licensed Operator Initial Examination - 05000259-10-301, 05000260-10-0301, 05000296-10-301 IR 05000259/20093012009-09-0909 September 2009 Er 05000259-09-301, 05000260-09-301, 05000296-09-301, 07/13-17/2009 & 07/22/2009, Browns Ferry Nuclear Plant, Operator License Examinations ML0918101022009-06-30030 June 2009 Initial Exam 2008-302 Draft Administrative Documents IR 05000259/20083022009-01-29029 January 2009 Er 05000259-08-302, Er 05000260-08-302 and Er 05000296-08-302, on 12/8 - 11, 2008 & 12/18, 2008, Browns Ferry Nuclear Plant, Units 1, 2 & 3, Licensed Operator Examinations ML0902302452009-01-23023 January 2009 (December 2008 - 302) OL Exam & Ref Materials ML0812604072008-05-0202 May 2008 Er 05000259-08-301, Er 05000260-08-301 and Er 05000296-08-301; on 02/25 - 28, 2008 & 03/25, 2008; Browns Ferry Nuclear Plant, Units 1,2 & 3, Licensed Operator Examinations IR 05000259/20073012007-10-0101 October 2007 Er 05000259-07-301, Er 05000260-07-301 and Er 05000296-07-301, on 08/27-29/2007 & 08/31/2007, Browns Ferry Nuclear Plant, Units 1, 2 & 3, Licensed Operator Examinations ML0302307782003-01-23023 January 2003 NRC Examination Report 50-259/02-301, 50-260/02-301, & 50-296/02-301 2023-07-25
[Table view] |
Text
March 2, 2020 Mr. James Barstow Vice President, Nuclear Regulatory Affairs and Support Services Tennessee Valley Authority 1101 Market Street, LP 4A-C Chattanooga, TN 37402-2801
SUBJECT:
BROWNS FERRY NUCLEAR PLANT - NRC OPERATOR LICENSE EXAMINATION REPORT NOS. 05000259/2019301, 05000260/2019301, 05000296/2019301
Dear Mr. Shea:
During the period November 4-8, 2019 the Nuclear Regulatory Commission (NRC) administered operating tests to employees of your company who had applied for licenses to operate the Browns Ferry Nuclear Plant. At the conclusion of the tests, the examiners discussed preliminary findings related to the operating tests and the written examination submittal with those members of your staff identified in the enclosed report. The written examination was administered by your staff on November 13, 2019.
All applicants passed both the operating test and written examination. There were no post-examination comments. A Simulator Fidelity Report is included in this report as Enclosure 2.
The initial examination submittal was within the range of acceptability expected for a proposed examination. All examination changes agreed upon between the NRC and your staff were made according to NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 11.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
J. Barstow 2 If you have any questions concerning this letter, please contact me at (404) 997-4551.
Sincerely,
/RA/
Gerald J. McCoy, Chief Operations Branch 1 Division of Reactor Safety Docket Nos: 50-259, 50-260, 50-296 License Nos: DPR-33, DPR-52, and DPR-68
Enclosures:
- 1. Report Details
- 2. Simulator Fidelity Report cc: Distribution via Listserv
ML 20064C757 SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS/OB RII: DRS/OB RII: DRS/OB RII:DRS/OB RII:DRS/OB TTC RII:DRS/OB NAME PCAPEHART DLANYI JVIERA AGOLDAU DDUMBACHER MEMRICH GMCCOY DATE 2/24/2020 2/26/2020 3/2/2020 3/ 2 /2020 2/24/2020 2/24/2020 3/3/2020 U.S. NUCLEAR REGULATORY COMMISSION REGION II Examination Report Docket No.: 50-259, 50-260, 50-296 License No.: DPR-33, DPR-52, DPR-68 Report No.: 05000259/2019301, 05000260/2019301, 05000296/2019301 Licensee: Tennessee Valley Authority (TVA), LLC Enterprise identifier: L-2019-OLL-0024 Facility: Browns Ferry Nuclear Plant, Units 1, 2, and 3 Location: Athens, AL 35611 Dates: Operating Test - November 4 - 8, 2019 Written Examination - November 13, 2019 Examiners: Phillip Capehart, Chief Examiner, Senior Operations Engineer Dave Dumbacher, Chief Examiner Under Instruction, Senior Operations Engineer Matthew Emrich, Senior Reactor Technology Instructor David Lanyi, Operations Engineer Joseph Viera, Operations Engineer Andreas Goldau, Operations Engineer Approved by: Gerald J. McCoy, Chief Operations Branch 1 Division of Reactor Safety Enclosure 1
SUMMARY
ER 05000259/2019301, 05000260/2019301, 05000296/2019301; operating test November 4 -
8, 2019 & written exam November 13, 2019; Browns Ferry Nuclear Plant; Operator License Examinations.
Nuclear Regulatory Commission (NRC) examiners conducted an initial examination in accordance with the guidelines in Revision 11 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." This examination implemented the operator licensing requirements identified in 10 CFR §55.41, §55.43, and §55.45, as applicable.
Members of the Browns Ferry Nuclear Plant staff developed both the operating tests and the written examination. The initial operating test, written RO examination, and written SRO examination submittals met the quality guidelines contained in NUREG-1021.
The NRC administered the operating tests during the period November 4 - 8, 2019. Members of the Browns Ferry Nuclear Plant training staff administered the written examination on November 13, 2019. All nine Reactor Operator (RO) and twelve Senior Reactor Operator (SRO) applicants passed both the operating test and written examination. All applicants were issued licenses commensurate with the level of examination administered.
There were no post-examination comments.
No findings were identified.
2
REPORT DETAILS
- 4. OTHER ACTIVITIES 4OA5 Operator Licensing Examinations
- a. Inspection Scope The NRC evaluated the submitted operating test by combining the scenario events and JPMs in order to determine the percentage of submitted test items that required replacement or significant modification. The NRC also evaluated the submitted written examination questions (RO and SRO questions considered separately) in order to determine the percentage of submitted questions that required replacement or significant modification, or that clearly did not conform with the intent of the approved knowledge and ability (K/A) statement. Any questions that were deleted during the grading process, or for which the answer key had to be changed, were also included in the count of unacceptable questions. The percentage of submitted test items that were unacceptable was compared to the acceptance criteria of NUREG-1021, Operator Licensing Standards for Power Reactors.
The NRC reviewed the licensees examination security measures while preparing and administering the examinations in order to ensure compliance with 10 CFR §55.49, Integrity of examinations and tests.
The NRC administered the operating tests during the period November 4 - 8, 2019. The NRC examiners evaluated nine Reactor Operator (RO) and twelve Senior Reactor Operator (SRO) applicants using the guidelines contained in NUREG-1021. Members of the Browns Ferry Nuclear Plant training staff administered the written examination on November 13, 2019. Evaluations of applicants and reviews of associated documentation were performed to determine if the applicants, who applied for licenses to operate the Browns Ferry Nuclear Plant, met the requirements specified in 10 CFR Part 55, Operators Licenses.
The NRC evaluated the performance or fidelity of the simulation facility during the preparation and conduct of the operating tests.
- b. Findings No findings were identified.
The NRC developed the written examination sample plan outline. Members of the Browns Ferry Nuclear Plant training staff developed both the operating tests and the written examination. All examination material was developed in accordance with the guidelines contained in Revision 11 of NUREG-1021. The NRC examination team reviewed the proposed examination. Examination changes agreed upon between the NRC and the licensee were made per NUREG-1021 and incorporated into the final version of the examination materials.
Using NUREG-1021, the NRC determined that the licensees initial examination submittal was within the range of acceptability expected for a proposed examination.
3
All applicants passed both the operating test and written examination and were issued licenses.
Copies of all individual examination reports were sent to the facility Training Manager for evaluation of weaknesses and determination of appropriate remedial training.
The licensee did not submit any post-examination comments. A copy of the final RO and SRO written examinations and answer keys, with all changes incorporated, may be accessed not earlier than November 15, 2021, in the ADAMS system (ADAMS Accession Number ML19324H571 and ML19324H601).
4OA6 Meetings, Including Exit Exit Meeting Summary On November 8, 2019 the NRC examination team discussed generic issues associated with the operating test with Mr. Steve Bono, Site Vice President, and members of the Browns Ferry Nuclear Plant staff. The examiners asked the licensee if any of the examination material was proprietary. No proprietary information was identified.
KEY POINTS OF CONTACT Licensee personnel Steve Bono, Site Vice President Glenn M. Pierce, Director Nuclear Training James A. Kent, Director, Plant Support Chris Vaugh, Director, Operations Thomas Jackle, Facility Representative Donald C. Binkley, Jr., Simulator Services Manager/Exam Team Supervisor Christopher R. Baxter, ILT Supervisor R. D. Busick, Operations Training Manager Jamie Paul, Site Licensing Manager Russell Joplin, Corporate Exam Program Manager Michael Schulte, Examination Author Michael Tharpe, Examination Author 4
SIMULATOR FIDELITY REPORT Facility Licensee: Browns Ferry Nuclear Plant Facility Docket No.: 50-259, 50-260, 50-296 Operating Test Administered: November 4 - 8, 2019 This form is to be used only to report observations. These observations do not constitute audit or inspection findings and, without further verification and review in accordance with Inspection Procedure 71111.11 are not indicative of noncompliance with 10 CFR 55.46. No licensee action is required in response to these observations.
No simulator fidelity or configuration issues were identified.
Enclosure 2