ML20064C103

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Sept 1978
ML20064C103
Person / Time
Site: Millstone 
Issue date: 10/10/1978
From: Opeka J
NORTHEAST UTILITIES
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML20064C108 List:
References
MP-2-1009, NUDOCS 7810160126
Download: ML20064C103 (1)


Text

-

- i NoltTHI!R!iT UTH.ITHIS l

fh,$,$?""5""

L [::hijif((i.I..

1 s

L

==

~.

t I

i l

October 10, 1978 i

MP 1009 I

I Director i

Office of Inspection and Enforcement l

U.S. Nuclear Regulatory Commission Washington, D.C.

20555 -

i i

Reference:

Fa'cility Operating License No. DPR-65 Docket No. 50-336

Dear Sir:

This letter is forwarded to provide the report of-operating and shutdown experience relating to Millstone Unit 2 for the Month of September in accordance with Appendix A Technical Specifications, Section 6.9.1.3.

Ten additional copies of the report are enclosed.

Yours truly, I

. F. Opeka Station Superintendent Millstone Nuclear Power Station

. e0!GF/llm cc: Director, Office of Inspection and Enforcement, Region 1 Director, Office of Management Information and Program Control, Washington, D.C.

(2) k008f 6 7 fr / o / L o / 2 4 p.

lllo

,