Forwards Fitness for Duty Program Performance Data for 6- Month Period Ending 931231
ML20064C087
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 02/28/1994
From: Richard Anderson
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9403090145
Download: ML20064C087 (7)


Text

_

i Northem States Power Company 414 Nicollet Mall Minneapolis, Minnesota 55401 1927 Telephone (612) 330-5500 February 28,1994 10CFR Part 26 Section 26.71 (d)

)

U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C.

20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket No.

50-282 License No. DPR-42 50-306 DPR-60 Fitness For Duty Performance Data for the 6-month period Endina December 31.1993 In accordance with 10 CFR Part 26, Section 26.71 (d), please find enclosed Northem States Power (NSP) Company's Fitness For Duty (FFD) Program Performance Data for the six (6) month period ending December 31,1993.

If you have any questions conceming the Performance Data reported, please call Ge e Miser ndi at 61 30-5630.

e d. nd N-n irector Licensing & Management issues c:

Regional Administrator Ill, NRC NRR Project Manager, NRC Resident inspector, NRC State of Minnesota, Attn: Kris Sanda i

J. Silberg i

Attachments:

Attachment A (1-3)

Fitness For Duty Program Performance Data Personnel Subject to 10CFR26 Attachment B Confirmed Positive Tests for Specific 1

Substances Attachment C Fitness For Duty Summcry Report, including:

l Management Actions.

Reportable Fitness For Duty Events under 10CFR 26.73 A

.~

9403090145 940228 PDR ADOCK 05000282 R

PDR

ATTACIMNT A-1 I

Fitnessfor Duty Program Performance Data i

Personnel Subject to 10CFR26 l

i Northern States Power Company December 31,1993 Company 6 Months Ending General Office Location Craio-S. Johnson (612) 330-7999 Contact Name Phone (include area Code)

Cutoffs: Screen / Confirmation (ng/ml) & Alcohol (%BAC) 2 Appendix A to 10CFR26 Levels Testing Results Licensee Employees Long Term Short Term Contractor Personnel Contractor Personnel Average Number With 253 N/A 18 Unescorted Access Cateaorles Tested Positive Tested Positive Tested Positive 4

0 7

0 Pre-badging 0

0 0

0 For Cause 0

0 0

0 Post Accident 141 0

6 0

Random 6

0 0

0 Follow-up j

i 151 0

13 0

Total

-=-

ATTACM A-2 i

Fitnessfor Duty Program Performance Data Personnel Subject to 10CFR26 Northern States Power Company December 31, 1993 Company 6 Months Ending Monticello Location Craio S.

Johnson (612) 330-7999 Contact Name Phone (include area Code)

Cutoffs: Screen / Confirmation (ng/ml) & Alcohol (%BAC) bAppendixAto10CFR26 Levels Testing Results Licensee EmploiNs Long Term Short Term Contractor Personnel Contractor Personnel Average Number With 394 N/A 105 Unescorted Access Categories Tested Positive Tested Positive Tested Positive 48 0

18 0

Pre badging 0

0 b

0 0

For Cause 0

0 o

o Post Accident s

220 0

30 0

Random 0

0 3

0 Follow up Total 268 0

51 0

L

ATTACIMNT A-3 Fitnessfor Duty Progratn Performance Data Personnel Subject to 10CFR26 Northern States Power Company December 31, 1993 Company 6 Months Ending Prairie Island Location Craio S.

Johnson (612) 330-7999 Contact Name Phone (include area Code)

Cutoffs: Screen / Confirmation (ng/ml) & Alcohol (%BAC) b Appendix A to 10CFR26 Levels Testing Results Licensee Employees Long Term Short Term Contractor Personnel Contractor Personnel Average Number With 607 N/A 258 Unescorted Access Categories Tested Positive Tested Positive Tested Positive 198 1

245 0

Pre-badging For Cause 0

0 0

0 Post Accident 0

0 0

0 l

Random 360 1

93 0

1 10 0

5 0

l Follow-up g

Total 568 2

343 0

l

t ATTACM B Fitnessfor Duty Program Performance Data Personnel Subject to 10CFR26 Northern States Power Company December 31, 1993 Company 6 Months Ending i

General Office, Monticello, Prairie Island i

Location l

Craio S.

Johnson (612) 330-7999 Contact Name Phone (include area Code)

Cutoffs: Screen / Confirmation (ng/ml) & Alcohol (%BAC) 2 Appendix A to 10CFR26 Levels 1

l l Breakdown of Cortfirmed Positive Testsfor Spec {fic Substances l

l Amphe-Phency-Refusal Marijuana Cocaine Oplates tamines clidine Alcohol to test 0

1 0

0 0

2 0

Licensee Employees Long Term Contractors 0

0 0

0 0

0 0

Short Term Contractors Total 0

1 0

0 0

2 0

3 l

l

ATTACHMENT C February 28,1994 Page 1 of 2 Fitness For Duty Summery Report Six (6) Month Period Ending December 31,1993 Manaaement Actions

1. During the six (6) month period ending December 31,1993 Northem States Power Company conducted 1394 drug and alcohol tests in accordance with 10CFR26.

NSP workers subject to random drug and alcohol testing are each assigned to one of three pools: Prairie Island, Monticello, and General Office. Random test rates for each pool are as follows:

Semi Annual Period POOLS Ending 12/31/93 General Office 108%

Monticello 100 %

Prairie Island 105%

ALL 104 %

For the reporting period ending December 31,1993, two (2) workers tested positive for drugs or alcohol and were immediately denied unescorted access to NSP Nuclear Plants..

Of these two (2) individuals, one (1) has been retumed to duty.

The one (1) positive for alcohol resulted from one (1) licensee employee random test.

Pre-access testing resulted in one (1) licensee craft employee positive for alcohol &

cocaine.

l 2.

For the semi-annual period referenced herein all blind specimens submitted to NSP's HHS-certified laboratory yielded expected results.

3.

NSP has analyzed program performance data for the six 6 month period ending December 31,1993 and has revised existing FFD procedures to incorporate i

enhancements as indicated by the analysis.

j

ATTACHMENT C February 28,1994 Page 2 of 2 l

Fitness For Duty Summary Report Six (6) Month Period Ending December 31,1993 Reportable Events.

NSP had one (1) Fitness For Duty related Reportable Event as defined in 10CRF 26.73 (26.73 (a) (2)(ii). The event was reported to the NRC on August 2,1993, the same day NSP declared the worker's alcohol test a confirmed positive. The individual was retumed to duty in accordance with 10CFR 26 on August 13,1993.