Interim Deficiency Rept Re MCC Powers HVAC Damper Actuator Spring Defects.Action Plan Revised Due to Addl Analysis. Three Actuators Will Be Replaced & Three Will Require Actuator Spring Adjustment.Next Rept by 830331
ML20064C057
Person / Time
Site: Zimmer
Issue date: 12/21/1982
From: Borgmann E
CINCINNATI GAS & ELECTRIC CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, QA-2178, NUDOCS 8301040297
Download: ML20064C057 (2)


Text

. -..

P*

TIIII CINCINNATI GAS & ELECTRIC COMPANY sg-CINCINNATI, OHIO 452o1 December 21, 1982 4

QA-2178 E. A. BORG M AN N SENion vict PatsautNT U. S. Nuclear Regulatory Commission Region Ill 799 Roosevelt Road Glen Ellyn, IL 60137 Attention:

Mr. J. G. Keppler Regional Administrator RE:

WM. H. ZIMMER NUCLEAR POWER STATION UNIT I 10CFR50.55(e) ITEM M-14, HVAC DAMPER ACTUATOR SPRING DEFECTS, DOCF~T NO. 50-358, CONSTRUCTION PERMIT NO. CPPR-88, W.O. 57300, JOB E-5590 FILE NO. NRC-8, M-14 Gentlemen:

This letter constitutes an interim report concerning the subject condition reported to the Commission under 10CFR50.55(e).

Our previous report, QA-1835, dated June 25, 1982 stated that certain corrective actions were required on several essential iso-lation dampers supplied by MCC Powers (MCC). Additional analysis by Sargent & Lundy (S&L) and actual field torque measurements have re-sulted in a revised action plan as follows:

1.

Three (3) actuators will be replaced rather than the eight (8) previously reported.

2.

Of the seventeen (17) which originally required actuator spring replacement, the additional analysis has determined that two (2) require replacement, five (5) have been determined acceptable, and torque tests for the remaining ten (10) cannot be performed until the VQ & VP system duct work installation is completed.

This work is currently suspended by the NRC Show Cause Order and Order Immediately Suspending Construction. This installation completion is required to establish the test conditions for mak-ing the torque measurements necessary for dispositioning these remaining ten (10) actuators.

3.

Three (3), as previously stated, will require actuator spring adjustment.

-} f}]92 Ub 8301040297 821221 PDR ADOCK 05000358 S

PDR

8 Mr. J. G. Keppler Regional Administrator Region 11I December 21, 1982 QA-2178 Page 2 A follow-up report will be submitted by March 31, 1983.

We trust the above will be found acceptable as an interim report under 10CF"50.55(e).

Yours very truly, THE CINCINNATI GAS & ELECTRIC COMPANY

(

b 4 bR4AtM By F

~

E. A. BORGMANN SENIOR VICE FRESIDENT FKP:plc cc: NRC Office of Inspection & Enforcement Washina, ton, D.C. 20555 NRC Senior Resident Inspector Attn:

W. F. Christianson Zimmer Project Engineer Region III i