Telephone (412) 4564000 Nuclear Dirlslon October 5, 1982 P.O. Box 4 Shippingport, PA 150714004 United States Nuclear Regulatory Commission Office of Inspection and Enforcement Attn: R. C. Haynes, Regional Administrator Region 1 631 Park Avenue King of Prussia, Pennsylvania 19406

Reference:

Beaver Valley Power Station, Unit No. I Docket No. 50-334, License No. DPR-66 Cycle 3 Startup Report Gentlemen:

Enc'osed are (2) two copies of the Beaver Valley Power Station, Unit No. 1 Startup Report, submitted in accordance with Technical Specification Section 6.9.1.

The startup testing included critical boron concentration measure-ments, control rod bank worth measurements and temperature coefficient measurements. This report summarizes the testing performed and verifies the Cycle 3 reload core design data af ter criticality and the calibra-tion of the excore instrumentation at several different power levels.

Very truly yours, J. . Carey Vice President, Nuclear Attachment cc: Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Attn: Mr. Richard E. DeYoung, Director (36)

Office of Inspection and Enforcement Washington, DC 20555 Mr. W. M. Troskoski, Resident Inspector U. S. Nuclear Regulatory Commission Beaver Valley Power Station, Unit No. 1 Shippingport, PA 15077 U. S. Nuclear Regulatory Commission c/o Document Management Branch Washington, DC 20555 I210150312 021005 hDRADOCK 05000334 PDR g6 d