Department of Energy Washington, D.C. 20545 Docket No. 50-537 HQ:S:82:100 OCT 0 71982 Mr. Paul S. Check, Director CRBR Program Office Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555-
Dear Mr. Check:
MEETING
SUMMARY
- CRBRP LEAK DETECTION SYSTEM SEPTEMBER 28, 1982 The CRBRP Project met with the NRC staff to discuss the CRBRP Leak Detection System for the primary coolant boundary on September 28, 1982.
The system design requirements were discussed and extensive test results were reviewed. The test results discussed in the meeting are hereby enclosed (40 copies) in a report as previously agreed to.
Specific questions concerning system safety classification, electric power requirements, seismic qualification, and the application of lessons learned from FFTF were discussed. The NRC staff agreed that information currently on the docket, supplied during the meeting, and the information enclosed is sufficient to support their review at the present time. The NRC further agreed to notify the Project if additional information is required for their review.
Sincerely, 1.
- 6 Jo n R. Longene r
Acting Director, Office of the Clinch River Breeder Reactor Plant Project Office of Nuclear Energy Enclosure QC!
cc: Service List Standard Distribution 4>
Licensing Distribution
~(8 f{gEo13031i8210o7 ADOCK 05000537 PDR