ML20063P275

From kanterella
Jump to navigation Jump to search
Second Interim Deficiency Rept Re Reactor Containment Bldg Liner Plate Nuclear Coating Failure.Corrective Action Not Yet Completed.Final Rept to Be Submitted by 830323
ML20063P275
Person / Time
Site: Waterford Entergy icon.png
Issue date: 10/01/1982
From: Maurin L
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, NUDOCS 8210130243
Download: ML20063P275 (1)


Text

LoulSIANA 24a octAnoNos Srnter POWER & L1GHT P O BOX 6008 + NEW ORLEANS. LOUISIANA 70174 + (504) 366-2345

$i20$ItsYE L V. MAURIN October 1, 1982 Vice President Nudear Operations W3182-0053 Q-3-A35.07.56

(=

~

Mr. John T. Collins, Regional Administrator, Region IV l

l//[g l

U. S. Nuclear Regulatory Commission f

~

/

611 Ryan Plaza Drive, Suite 1000 j l' g

41982 I

Arlington, Texas 76012 j

i 1

Docket No. 50-382

~~~ %.b, SU3 JECT:

Waterford SES Unit No. 3 I

~

Significant Construction Deficiency Report No. 56

~ ~ ~ -

"RCB Liner Plate Nuclear Coatings Failure" Second Interim Report

REFERENCE:

LP&L Letter W3K-82-0389 dated July 6, 1982

Dear Mr. Collins:

The corrective action as described in the reference above has not yet been completed. A final report will, therefore, not be submitted until March 23, 1983.

Very truly yours, W

L. V. Maurin LVM/ MAL:keh cc:

1) Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555

2) Director Office of Management Information and Program Control U. S. Nuclear Regulatory Commission k

Washington, D. C.

20555

~

IB210130243 B21001 j'PDR ADOCK 05000382 (0,

PDR