Final Significant Deficiency Rept 82-05 Re Misapplication of Torquing Equipment on Emergency Diesel Generators Shaft Spider Assemblies.Retorquing of All Fasteners to Vendors Specified Value of 5,000 ft-lb Has Been Performed
ML20063N761
Person / Time
Site: Beaver Valley
Issue date: 09/24/1982
From: Woolever E
DUQUESNE LIGHT CO.
To: Haynes R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
10CFR-050.55E, 10CFR-50.55E, NUDOCS 8210070155
Download: ML20063N761 (2)


Text

_ _ - _ _,

D*

e'

.s

'Af 1 iecopy Nuclear Construction Division Robinson Plaza, Bulleng 2, Suite 210 September 24, 1982 Pittstmtgh, PA 15205 United States Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, PA 19406 ATTENTION:

Mr. R. Haynes Administrator

SUBJECT:

Beaver Valley Power Station - Unit No. 2 Docket No. 50-412 Misapplication of Torquing Equipment on the Emergency Diesel Generators' Shaft Spider Assemblies Significant Deficiency Report No. 82-05 Gentlemen:

Pursuant to the requirements of 10CFR50.55(e), the " Final Report on Diesel Generator Shaft Spider Assembly" is attached for review. If there are any questions concerning this report, please contact the Beaver Valley Unit 2 Project Of fice.

DUQUESNE LIGHT COMPANY By qg,

[

E. J /Wo61ever Vice resident JMM/spm Attachment cc:

Mr. R. DeYoung, Director Office of Inspection and Enforcement (w/ attachment) (3)

NRC Document Control Desk (w/ attachment)

Mr. G. Walton, NRC Resident Inspector (w/ attachment)

Ms. E. Doolittle, Project Manager (w/ attachment)

?

SUBSCR AND SWO T0 BEFORE ME THIS y

M D / D Y OF _

27f </ ira /1982.

- Not ARY Nf3t*

( uf[b VI,e Iih

$f!?$u

//

//

Notary Public 8210070155 820924

[

PDR ADOCK 05000412

-p S

PDR

l~

3.

v.

BEAVER VALLEY POWER STATION - UNIT 2 DUQUESNE LIGHT COMPANY FINAL REPORT ON DIESEL GENERATOR SHAFT SPIDER ASSEMBLY 1.

SUMHARY Beloit Power Systems (BPS) has reported that the Emergency Diesel Generator sets, assembled with Colt Industries (Colt) diesel engines and BPS Frame IX generators, may have loose stud and nut combinations (fastene;s) on the shaft spider assembly because of possible misapplication of manufacturers torquing equipment. A loose fastener has the potential for further loosening with an attendant risk of generator damage.

2.

IMEDIATE ACTION TAKEN Upon notification of the problem by BPS, an inspection of both l.

BVPS-2 Emergency Diesel Generator sets was carried out to determine whether the above condition existed. BPS has informed the NRC l

(Region III) of the above problem.

3.

DESCRIPTION OF DEFICIENCY Each BPS Frame IX generator is equipped with 14 fasteners which hold the generator rotor to the generator shaft. Upon inspection at the jobsite, using BPS provided procedures, it has been determined that most fasteners were torqued at the factory to a lower than acceptable value.

4.

ANALYSIS OF SAFETY IMPLICATION The Emergency Diesel Generators are required, during design basis events, to supply electric power to the safety-related ' components.

The potential for further loosening of the fasteners under operating l

vibrations and load cycling could cause the diesel generator to i

be unavailable or fail while carrying emergency loads and, therefore, could adversely affect the safety of operations.

5.

CORRECTIVE ACTION TO REMEDY DEFICIENCIES Retorquing of all the fasteners to the BPS's specified value of 5,000 ft-lb, has been performed. Degree of rotation, of each nut, has been documented cnd will be forwarded to BPS for record and further evaluation.

6.

ADDITIONAL REPORTS l

No further' action is required. This is the final report.