THE CINCINNATI GAS & ELECTRIC COMPANY C
CIN CIN N ATi,O HIO 4 5201 August 19, 1982 QA-1949 E. A. BORG M AN N stheon vect Pas siotNT U. S. Nuclear Regulatory Comnission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Attention:
Mr. J. G. Keppler Regional Administrator RE:
WM.11. ZIMMER NUCLEAR POWER STATION UNIT I 10CFR50.55(e) - ITEM S SWPS INTAKE FLUME CONNECTIONS - DOCKET No. 50-358, CONSTRUCTION PERMIT NO. CPPR-88, W.O. #57300 JOB E-5590 FILE NO. NRC-9, S-1 Gentlemen:
This letter constitutes a final report concerning the subject deficiency originally reported to the Commission under the require-ments of 10CFR50.55(e).
As stated in our previous report, QA-1820, dated June 16, 1982, the as-built weld connections of the two horizontal sheet piling l
walers at the 506' Sh" elevation to the embedded plates on the Service l
Water Pump Structure were not installed in accordance with the design I
drawings. The installed connection provided a one-sided clip angle connection rather then the concentric two-sided connection as detailed on the drawings. Since the connection transfers both shear and tensile loads, an eccentricity was created during any lateral loading of the sheet piling. The construction tolerances in driving the sheet piling necessitated the waler on the south side to be installed with a slight offset from the center of the embedment plate.
This offset created additional eccentricity on the connecting joint.
Further investigation revealed similar irregularities at the in-termediate and lower elevation connections (Elevations 478' and 458').
1 8209160154 820819
,)L f PDR ADOCK 05000358 PDR S
AUG 2 7 msg k
e s
e Mr. J. G. Keppler Regional Administrator Region III August 19, 1982 - QA-1949 Page 2 A total of five (5) connections required repair to improve the design integrity of the connections and one will be reworked. Presently, work has been completed on all but one of the six connections.
Com-pletion was scheduled for August 1,1982,however, because of delays associated with ongoing bracing installation in the fiume, the scheduled completion date is October 31, 1982.
We trust the above will be found acceptable as a final report under 10CFR50.55(e).
i Very truly yours, THE CINCINNATI GAS & ELECTRIC COMPANY dd Sp= _
j E. A. BORGMANN SENIOR VICE PRESIDENT j
FKP:as cc: NRC Office of Inspection & Enforcement Washington, D.C.
20555 NRC Senior Resident Inspector Attu:
W. F. Christianson
{
Zimmer Project Inspector Region III I