ML20063M424

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EI-2.1 Re Actions/Notifications During Emergency & EI-2.2 Re Emergency Staff Augmentation.Receipt Form Encl
ML20063M424
Person / Time
Site: Palisades Entergy icon.png
Issue date: 08/12/1982
From:
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC
Shared Package
ML20063M423 List:
References
NUDOCS 8209140089
Download: ML20063M424 (1)


Text

. _

~

RECORDS CONTROL FORM , i Date a /, o mo

  • * ~'
  • EMERGENCY IMPLEENTATION PROCEDURES
1) G.O. DCC 1"l) Power Control 21) S.H. Ambulance 39 h1) Oper. Support
2) Plant Manager 12) Maint. Supt. 22) Covert Ambulance h2) US NRC
3) Control Rocm 13) oper. Supt. 23) MFDIC I Ambulance h3) G.O. DCC l h) Chem /HP Office Ib) E=er. Kit /CR 2h) Op/Maint. Supt. hk) G.O. DCC
5) Chem /EP Office 15) Emer. Kit /SS 25) Security Office 'h5) Emer. Operations
6) Training 16) E=er. Kit / Training 26) NRC-JGKeppler Facility -KJRidley
7) Master File 17) WMiller 27) NRC-JGKeppler h6) US NRC- Washin6 ton
8) WMHodge 18) Rad Pro Office 28) Shift Technical Adv. h7) Ann Jungnitsch
9) RWSinderman 19) Mercy Hospital 29) Gen. Health Physicist
10) Shift Supv. 20) S.H. Hospital 30-38) Tech. Support To:

Notice of New/ Revised See Belov Number (s) See Below Title PALISADES PLANT EMERGENCY IMPLEMENTATION PROCEDURES I have received the above document (s) and have destroyed all previous issues, or as delineated below.

1. REMOVE AND DESTROY: . REPLACE WITH:

9

  • EI-2, R/6 EI-2.1, R/7 Temporary Change EI-82-023 -

EI-10, L/3 EI-10, R/4 Temporary Change EI-82-020 D0'NOT REMOVE TEMPORARY CHANGE EI-82-028 EI-lh, R/0 EI-lk, R/l Temporary Change EI-82-021

2. Please sign, date and return this form to Palisades Plent Document Control.

O Palisades Plant Return to: Docu ent Control Signature or Initials File: QA-02 Book G209140089 820827

  • PDR ADOCK 05000255 , 2 -@.'J F PDR ,R n'-

_ _ _ _ _ _ _ _ _ _ _