Category:INTERROGATORIES; RESPONSES TO INTERROGATORIES
MONTHYEARML20078N9451983-10-27027 October 1983 Responses to 831011 Interrogatories.Questions 1-5 Will Be Answered at Later Date.Certificate of Svc Encl.Related Correspondence ML20078M1581983-10-20020 October 1983 Objections to 831011 Interrogatories & Document Production Requests.Certificate of Svc Encl ML20078K3221983-10-13013 October 1983 Errata to Instructions for Interrogatories & Requests for Production Filed on 831011.Related Correspondence ML20080R1771983-10-11011 October 1983 Request for Production of Documents.Certificate of Svc Encl ML20080R1591983-10-11011 October 1983 Interrogatories Re Ofc of Investigations Rept.Certificate of Svc Encl ML20080R4041983-10-11011 October 1983 Request for Production of Documents.Certificate of Svc Encl ML20078J3491983-10-11011 October 1983 Interrogatories Directed to Util.Certificate of Svc Encl ML20073R7191983-04-28028 April 1983 Renewed Amended Objections to Interrogatories Directed to Util on Zack Issues & Renewed Motion for Protective Order. Certificate of Svc Encl.Related Correspondence ML20073P9991983-04-22022 April 1983 Request for Production of Documents.Certificate of Svc Encl.Related Correspondence ML20073B7051983-04-0808 April 1983 Second Set of Interrogatories.Certificate of Svc Encl ML20073B8011983-04-0808 April 1983 Third Set of Interrogatories.Certificate of Svc Encl ML20072T4811983-04-0707 April 1983 Request for Production of Documents,Per ASLB 830406 Order. Certificate of Svc Encl ML20064C7481982-12-29029 December 1982 Responses to 821126 Discovery on Stamiris Cost/Benefit Contention.Certificate of Svc Encl ML20067C5061982-12-0202 December 1982 Interrogatories Re Nonfuel Operation & Maint Cost Considerations.Related Correspondence ML20067A8601982-11-26026 November 1982 Interrogatories & Request for Production of Documents on Stamiris Cost/Benefit Contention,Per ASLB 821029 Memorandum & Order.Related Correspondence ML20067A8551982-11-26026 November 1982 Interrogatories & Request for Production of Documents on Stamiris Cost/Benefit Contention,Per ASLB 821029 Memorandum & Order.Related Correspondence ML20063N7561982-10-0606 October 1982 Response to Request for Production of Documents ML20065C0981982-09-22022 September 1982 Interrogatories on Contentions 6,8 & 16.Related Correspondence ML20065C1331982-09-20020 September 1982 Interrogatories on Zack Issues Re Sinclair Contentions 6,8 & 16.Certificate of Svc Encl.Related Correspondence ML20065C1401982-09-20020 September 1982 Response to 820830 Second Set of Interrogatories.Related Correspondence ML20065C1081982-09-20020 September 1982 Response to 820830 Interrogatories.Certificate of Svc Encl. Related Correspondence ML20071M5451982-09-18018 September 1982 Response to 820830 Interrogatories & Document Requests. Related Correspondence ML20071M5561982-09-18018 September 1982 Response to 820831 Interrogatories.Related Correspondence ML20071M8641982-09-17017 September 1982 Objections to 820913 Second Set of Interrogatories Based on New Info.Interrogatories Do Not Pertain to Any Admitted Contention & Are Untimely.Certificate of Svc Encl ML20063N1941982-09-14014 September 1982 Response to Requests for Admission of Truth of Relevant Matters of Fact.Related Correspondence ML20069D5531982-09-13013 September 1982 Responses to 820814 Discovery Questions Based on New Contentions Accepted by ASLB Order.Certificate of Svc Encl ML20027B2621982-09-13013 September 1982 Discovery Based on New Info in Fes.Related Correspondence ML20027B2531982-09-13013 September 1982 Second Set of Interrogatories Based on New Info.Related Correspondence ML20063J3611982-08-30030 August 1982 First Set of Interrogatories.Certificate of Svc Encl. Related Correspondence ML20063J3521982-08-30030 August 1982 Request for Production of Documents.Certificate of Svc Encl. Related Correspondence ML20063M2781982-08-30030 August 1982 Interrogatories & Document Requests Re Contentions on Cost/Benefit,Qa,Effects of Dewatering & Independent Design Audit.Related Correspondence ML20063J3381982-08-30030 August 1982 Request for Production of Documents.Certificate of Svc Encl. Related Correspondence ML20063J2431982-08-30030 August 1982 Second Set of Interrogatories.Certificate of Svc Encl. Related Correspondence ML20065H7161982-08-30030 August 1982 Request for Admission of Truth of Relevant Matters of Fact Re Contention 5.Certificate of Svc Encl ML20063J7441982-08-25025 August 1982 Discovery Questions on New Contentions Accepted by ASLB 820814 Order.Related Correspondence ML20063N1961982-08-14014 August 1982 Objections to Certain B Stamiris 820830 Interrogatories & Document Requests.Certificate of Svc Encl.Related Correspondence ML20058E5741982-07-28028 July 1982 Partial Responses to 820618 Interrogatories.Certificate of Svc Encl ML20063G6781982-07-28028 July 1982 Reply to First Set of Interrogatories.Certificate of Svc Encl ML20054L5221982-07-0202 July 1982 Response to CPC First Interrogatories.Related Correspondence ML20054H5841982-06-18018 June 1982 Discovery Questions Pursuant to ASLB 790226 Special Prehearing Conference Order.Proof of Svc Encl.Related Correspondence ML20054G4661982-06-16016 June 1982 First Set of Interrogatories.Certificate of Svc Encl ML20054G4531982-06-16016 June 1982 First Set of Interrogatories.Certificate of Svc Encl ML20078K1951982-05-12012 May 1982 Response to Interrogatory IV Re Contention 8 on Independent Design Audit ML20005C1751981-11-11011 November 1981 Request for Admission of Genuineness & Authenticity of Encl Audit Repts.Related Correspondence ML20009B6331981-07-10010 July 1981 Correction to Interrogatory Response to B Stamiris 810114 Discovery Request 9.Certificate of Svc Encl.Related Correspondence ML20005B4121981-06-30030 June 1981 Reply to B Stamiris Answers to Util Interrogatories Re Contention 2 on Soil Settlement Issues.Certificate of Svc & Affidavit Encl ML19350E2701981-06-10010 June 1981 Supplemental Responses to NRC 801126 Interrogatories Re Extent of Design Safety Margins,Wall Footing Design, Structural Analyses & Diesel Generator Bldg Analysis. Affidavit & Certificate of Svc Encl.Related Correspondence ML20004E5081981-06-0303 June 1981 Request for RO Documents Directed to Applicant ML19346A2271981-05-27027 May 1981 Responses to B Stamiris Discovery Requests Re Bldg Const,Per ASLB 810508 Order.Affidavits & Certificate of Svc Encl. Related Correspondence ML19347D8851981-03-30030 March 1981 Response to Intervenor B Stamiris 810114 Interrogatories. Provides Info Re IE Insp Repts 50-329/78-12 & 50-330/78-12, Audits Re Soil Settlement & Administration Bldg.A Boos & N Swanberg Affidavits Encl.Related Correspondence 1983-04-08
[Table view] Category:LEGAL TRANSCRIPTS & ORDERS & PLEADINGS
MONTHYEARML20070E4671991-02-26026 February 1991 Comment Opposing Petition for Rulemaking PRM-73-9 Re Upgrading Design Basis Threat for Radiological Sabotage of Nuclear Reactors.Recommends That NRC Deny Petition to Increase Design Basis Threat for Security ML20207C1331986-12-18018 December 1986 Order Terminating CPPR-81 & CPPR-82,per Util 860711 Motion to Withdraw Applications for OLs ML20215E7301986-12-17017 December 1986 Memorandum & Order Authorizing Withdrawal of OL Application & Dismissing OL Proceeding,Per Applicant 860711 Motion. Served on 861218 ML20215B2071986-12-11011 December 1986 Responds to Questions Posed in ASLBP 861203 Memorandum & Order Re Conversion to gas-fired Facility.Imposition of Conditions on Withdrawal of OL Application Unnecessary. Certificate of Svc & Svc List Encl ML20211L6391986-12-11011 December 1986 Affidavit of Gb Staley Re Preparation of Answers to Board 861203 Questions on Termination of OL Proceeding. Certificate of Svc Encl ML20211L6181986-12-11011 December 1986 Response to Board 861203 Questions Re Util Request to Terminate OL Proceeding ML20214Q4431986-12-0303 December 1986 Memorandum & Order Granting Motion to Expedite Completion of Withdrawal Proceedings & Posing Questions to Parties.Served on 861204 ML20214G7941986-11-24024 November 1986 Motion to Expedite Completion of Withdrawal of Licensee OL Application & Terminate Pending OL & CP Mod Proceedings. Certificate of Svc Encl ML20214T7361986-09-26026 September 1986 Memorandum & Order Dismissing OM Proceeding as Moot & Deferring Action on Applicant Motion for Authorization to Withdraw OL Application Pending NRC Preparation of Environ Assessment.Served on 860929 ML20212M7661986-08-25025 August 1986 Response to Util 860711 Motion for Authorization to Withdraw OL Application & for Dismissal of OL & Order of Mod Proceedings.Board Should Hold Motion in Abeyance Pending NRC Review of Stabilization Plan.Certificate of Svc Encl ML20206M8171986-08-15015 August 1986 Response to ASLB 860716 Order Requesting Responses Re Termination of OM Proceeding.Termination of OL Proceeding & Withdrawal of OL Application Requested.Om Proceeding Should Be Considered Moot.Certificate of Svc Encl ML20212B0311986-08-0101 August 1986 Memorandum & Order Withdrawing Retention of Jurisdiction Over Radon Issue Presented in Facility CP Proceeding & Vacating ASLB Partial Initial Decision on Remedial Soils in Consolidated CP Mod & OL Proceeding.Served on 860801 ML20212B0521986-07-31031 July 1986 Order Extending Time Until 860815 for Util & Other Parties to Respond to Questions Posed by 860716 ASLB Order.Time Extended Until 860825 for NRC Response to ASLB Questions & Util Motion.Served on 860801 ML20203F8791986-07-28028 July 1986 Response Supporting Util 860711 Motion for Termination of Appeal Board Jurisdiction Over Proceeding.Certificate of Svc Encl ML20207H6871986-07-22022 July 1986 Motion for Extension Until 860815 to File Responses to Four Questions Re Util Motion to Dismiss OL & OM Proceedings. Certificate of Svc Encl ML20207E2851986-07-16016 July 1986 Order Presenting Questions in Response to Util 860711 Motion to Dismiss OL Proceeding & to Terminate Order of Mod Proceeding.Served on 860717 ML20202G1621986-07-11011 July 1986 Notice of Change of Address for Washington Ofc of Isham, Lincoln & Beale,Attys for Util.Certificate of Svc Encl ML20202G0121986-07-11011 July 1986 Motion for Authorization to Withdraw OL Application & Dismissal of OL & Order of Mod Proceedings ML20202G1201986-07-11011 July 1986 Motion for Termination of Aslab Jurisdiction to Facilitate Termination of Cps,Withdrawal of OL Application & Dismissal of Consolidated OM-OL Proceeding ML20202G0491986-07-10010 July 1986 Affidavit of JW Cook Re Conversion of Plant Into combined- cycle,gas-fired Power Plant.Plant Never Operable as Nuclear facility.Nuclear-related Equipment Will Be Sold ML20202G0281986-07-0808 July 1986 Affidavit of Ta Mcnish Re True & Correct Extracts of 860408 & 0618 Minutes of Meetings.Resolutions Recited Therein in Full Force & Effect ML20198J3861986-05-27027 May 1986 Notice of ASLB Reconstitution.C Bechoefer,Chairman & J Harbour & Ga Linenberger,Members.Served on 860529 ML20198J4651986-05-27027 May 1986 Notice of ASLB Reconstitution.C Bechhoefer,Chairman & J Harbour & Ga Linenberger,Members.Served on 860529 ML20137E0041985-11-21021 November 1985 Notice of Appearance in Proceeding ML20137D9651985-11-21021 November 1985 Notice of Withdrawal of Appearance in Proceeding.Certificate of Svc Encl ML20133F6421985-10-0909 October 1985 Notice of Withdrawal of Appearance in Proceeding.Certificate of Svc Encl ML20134N3771985-08-30030 August 1985 Notice of Withdrawal of Appearance in Proceeding.Certificate of Svc Encl DD-84-17, Order Affirming 840724 Director'S Decision DD-84-17 Denying Bp Garde 10CFR2.206 Petition for Action Against Util Re Plant Const.Const Abandoned on 840910.No Further Enforcement Action Required.Served on 8506241985-06-24024 June 1985 Order Affirming 840724 Director'S Decision DD-84-17 Denying Bp Garde 10CFR2.206 Petition for Action Against Util Re Plant Const.Const Abandoned on 840910.No Further Enforcement Action Required.Served on 850624 ML20127N7591985-06-20020 June 1985 Transcript of Commission 850620 Affirmation/Discussion & Vote in Washington,Dc Concerning Denial of 2.206 Petition for Midland plant,SECY-85-60 Concerning Pressurized Thermal Shock Rule & Shoreham Order.Pp 1-4 ML20133D9481985-05-13013 May 1985 Response to Aslab 850423 Order.Aslab Should Cancel OL Application & CPs Because Compliance W/Nrc Basic Requirements Not Met ML20116G5181985-04-29029 April 1985 Response to Memorandum of City & County of Midland,Mi Re ASLB 850405 & 0313 Orders on CP Mod Proceedings.Bechtel Should Not Be Granted Admission to Proceedings ML20115J5551985-04-19019 April 1985 City & County of Midland,State of Mi Response to Aslab 850313 Order to File Memoranda Re Whether Aslab Should Vacate ASLB Decision Re Certain Mods to CP Due to Mootness. Proof of Svc Encl ML20115J4751985-04-19019 April 1985 Memorandum in Response to Aslab 850405 Order Re Dismissal of OL Application.Application Neither Abandoned Nor Delayed in Dilutory Manner.Certificate of Svc Encl ML20115J5501985-04-19019 April 1985 Response Opposing Aslab 850405 Memorandum & Order Re Dismissal of OL Applications.Urges Board to Permit OL Applications to Continue in Suspension Until Applicant Affirmatively Resolves Disposition ML20116G5321985-04-19019 April 1985 Motion to Participate as Amicus Curiae in Resolution of Issue to Involuntary Dismissal of License Application,Per Aslab 850405 Memorandum & Order.Granted for Aslab on 850422. Served on 850429 ML20115J4351985-04-19019 April 1985 Motion for Leave to Participate as Amicus Curiae,Per Aslab 850313 & 0405 Memoranda & Orders Requesting Response to Questions Re Proceeding ML20115J5461985-04-19019 April 1985 Motion to Participate Amici Curiae in Resolution of Issue of Involuntary Dismissal of License Application as Identified in Aslab 850405 Memorandum & Order ML20115J5421985-04-19019 April 1985 City & County of Midland,State of Mi Motion for Leave to Participate as Amicus Curiae in Aslab Request for Responses to Questions Presented in 850313 & 0405 Memoranda Orders. Proof of Svc Encl ML20112J5281985-04-0101 April 1985 Memorandum in Response to Aslab 850313 Order LBP-85-2. Decision Should Not Be Vacated.Ol Should Be Dismissed.Based on Listed Changes,New OL Review Required ML20112J6301985-04-0101 April 1985 Memorandum Requesting Aslab Not Take Any Action to Vacate LBP-85-2 or Dismiss OL Applications,Per 850313 Order,Based on Current Intent to Hold CPs & Attempt to Sell Plant. Certificate of Svc Encl ML20112H0981985-03-27027 March 1985 Response to Aslab 840313 Order Re Whether ASLB Decision to Review Issues in Soils Hearing Appropriate Use of Public Resources.Concurs W/Decision to Remand OL W/Instructions to Dismiss OL Application for Failure to Pursue Soils Issue ML20106F6531985-02-0808 February 1985 Response Opposing Intervenor B Stamiris 841224 Motion for Evidentiary Hearings Re Litigation Between Applicant & Dow Chemical Co.Supporting Documentation & Certificate of Svc Encl ML20106D6631985-02-0808 February 1985 Response Opposing B Stamiris 841224 Pleading Requesting Evidentiary Hearing on Matter Raised in applicant-Dow Chemical Trial & Referral of Certain Matters to Ofc of Investigations.Certificate of Svc Encl ML20101S9111985-02-0101 February 1985 Motion for Extension of Time within Which to File Notice of Appeal of ASLB 850123 Partial Initial Decision.Certificate of Svc Encl ML20101S9421985-02-0101 February 1985 Motion for Extension Until 850306 to File Notice of Appeal of ASLB 850123 Partial Initial Decision.Granted by Aslab on 850201 ML20101F3191984-12-24024 December 1984 Request for Evidentiary Hearings on Matter Raised in CPC-Dow Trial & Referral of Certain Matters to Ofc of Investigations.Certificate of Svc Encl ML20107K8011984-11-0101 November 1984 Affidavit of Jd Selby Re Plans Concerning Facilities.Const Will Be Resumed Only If Proposed by Appropriate Governmental Agencies & Officials & If Funds from Some Other Source Become Available.Related Correspondence ML20106F5241984-10-24024 October 1984 Motion to Request ASLB to Cancel Const License & Application for OL ML20092J0241984-06-22022 June 1984 Reply to B Stamiris Second Supplemental Proposed Findings of Fact & Conclusions of Law on QA & Mgt Attitude Issues. Certificate of Svc Encl ML20092J0361984-06-22022 June 1984 Reply to NRC Further Supplemental Findings of Fact & Conclusions of Law Re QA 1991-02-26
[Table view] |
Text
>
CO gte, TEM 00cKETED USHRC g p -3 50 52 f0C IIG SUN ERANCH U. S. Nuclear Regulatory Commission In the Matter of Docket Nos.
CPC Midland Plant 329-OL Units 1 & 2 330-OL BEFORE THE ATOMIC SAFETY AND LICENSING BOARD STAMIRIS INTERROGATORIES AND DOCUSENT REQUESTS TO CONSUMERS POWER COMPANY 8/30/82 (Documents are meant to include studies, models, notes reports, working papers, or other written records of communication of CPC/Bechtel or other plant employees, or outside consultants, experts, agencies, or companies contacted on the subject.
Provide names and address of authors or sources for documnts provided.)
COST / BENEFIT: CONTENTION'Ib and 1 c
- 1. Explain in detail the " prompt removal / dismantlement decommissioning plan for i
l Midland. Describe any special procedures or equipment which will be used to 1
protect the workers and the environment from radiation. Include estimates of length of time to complete the job and the condition of the plant site upon comple tion.
- 2. Provide documents which form the basis for the decommissioning plan described in 1 above.
- 3. To what extent if any will Midland's decommissioning be affected by soils remedial measures such as underpinning supports, dewatering equipment, or others?
- 4. Explain in detail how the $235 million (1984 dollars) decommissioning estimate was derived for Midland. Include breakdown of costs for the component steps described. 8209100199 820830 l
' {DRADOCK 05000329 PDR bO3 v
i 2
- 5. What does CPC calculate Midland decommissioning costs to be as a % of its projected lifetime production cost savings? Explain this calculation.
- 6. To what extent is the Midland decommissioning financing, and collection plan based upon the Big Rock and Palisades models? Explain any differences if they exist.
i
- 7. Explain in detail the method CPC proposes to finance and collect Midland decom-missioning costs until the year 2000 Include explanations of inflation allow-a::ces, interim use of money collected by CPC, liquidity of these assets, and method of guaranteeing availability of money when needed for decommissioning.
t 1
l
- 8. Provide documents which form the basis for the financing and collection plan described in q. 7.
- 9. If Big Rock and Palisades' combined $111 million decommissioning cost in 1980 dollars (MP 6/81-50M, 62-51912 CPC decommissioning pamphlet) results in the collection of $526 million (exhibit A/S-1, MPSC case 6150) by the year 2000, what amount is estimated to be collected for Midland by the year 2000 according to your plan? Explain these calculations.
- 10. Does- the $235 million estimate represent the full amoun't to be co'11ected accord-ing to your decommissioning plan described in' the last part of your pamphlet cited 'ab' ave , if not , explain why it shouldn' t.
- 11. a) According to current laws, explain the federal income tax rate and manner by which CPC will be taxed for' decommissioning money collected early. b) What are these tax amounts projected to total through the year 2000 on the decom-1 missioning amounts projected in q. 9? c) Will money be collected from rate-payers above and beyond amounts estimated in q. 9 to support these CPC tax expenditure s? If so explain and estimate these added ratepayer contributions.
- 12. What was the projected life expectancy for Midland units 1 & 2 respectively.
3 i
- 13. Explain in detail how the 66% lifetine capacity factor is derived for Midland.
Does this estimate take into account any expected differences between Unit 1 & Unit 2 operating capacity, pressure, or temperature limitations due to the defective beltline weld in Unit I? Explain these differences if they exist.
- 14. Explain in detail the apparant diacrepancy in the EFPY estimates for Unit I operation appearing on pages 5-19 and C-10 of the SER?
- 15. What is the EFPY estimate you are currently using for Unit I? Explain any e differences between this estimate and those submitted for the SER.
- 16. Explain in detail the apparant discrepencies between flux properties on SER
- p. 5-19 and FSAR section 5.3.1.6.1.3 fcr surveillance samples and actual belt-line material samples. Provide the calculations and other documents which 4
form the basis of this explanation.
l
- 17. Provide documents relating to reduced operating capacity or life expectancy of Unit I.
- 18. Explain any contingency economic plans for shorter life expectancy of Unit I in terms of electrical production and related costs to ratepayers, and in terms of inability to produce steam f or Dow according to contractual obli6ations.
what will happen if Unit I must shut down after 10 years?
i
- 19. Has CPC considered performing' preventative rather than remedial thermal an-nealing or other corrective measures for defective reactor welds prior to plant A
i operation to avoid the safety and economic costs associated with post opera-
- tive radiation? If yes , explain. If not why not.
2d. Explain in detail the nethal of performance and frequency of inspections planned by the B & W Owners Group Surveillance program for monitoring reactor weld
4
\
. kl\
' fracture toughness and other weld conditions? How does this program protect
. ,\ '
against the possiblity of sudden failure?
s 21. Provide documentation for B & W program above.
- 22. Explain in detail when and how CPC first became aware' of the defective weld material--or the questionable quality of weld materi'al in heir reactors.
- 23. Provide all documents and correspondence sent and received r,egarding the reac-
~
tor vessel weld properties prior to the installati~on of the reactors at Midland.
4,
- 24. When were the Unit I and Unit II reactors installed (give month and year)?
l 25 Were Unit I and Unit R reactors ever switched from their originally planned f , 's containments? If yes, explain why.
j 26.
Did anyzconfusion tification of Unit I and Unit II reactors ever occur.
If so explain when' and .how this occurred, what occurred and how it was resolved.
3~L i
QUALhTY7 ASSURANCE: SINCLAIR CONTENTION 6 j t
- 1. If a plant workeb(has a safety concern, what is the chain of re' porting open I
to him? Describe the workings of this, internal reporting system.
l
- 2. In' reporting a safety concern to the NRC would a plant employee be free to T
\
provide the NRC with back up site work documentation without the permission t
l of Bechtel or CPC superiors?- -
- 3. If the answer to q. 2 is no, how does this affect the z necessary free flow of
\ ,
s information to the NRC7
- 4. Does CPC, Bechtel or any subcontractor encourage workers with safety related
~
complaints to keep 'the problems "in house" as opp' osed to going to the NRC?
Explain. ,
i >
\ \
n
______r_ ___._ - . -.. . _ _ _
j- , . 6 =
- ~
s i
5
- )
\ +
l i :>
4
- 5. If a plant worker has pursued the internal QA reporting system, and gone to the NRC, but still feels his safety concerns have not been properly addressed, i is he free to go to the public with .those concerns as an employee of CPC, or Bechtel--as an ex-employee of CPC or Bechtel? If not, explain why.
l
- 6. What records are kept of worker safety related cosiplaints, reports of violations l of QA procedures allegations, or use of internal reporting system described
. in q. 1 above? (I am interested in the incidence of reporting, not the reports themselves.)
j 7. Provide a list of former plant employee names and forwarding addresses who lef t in 1981 or 1982 and had reported a complaint about improper QA/QC proce-4 dures, made use of the internal reporting system described in q.1, or filed an allegation.
- 8. How long has the MPQAD internal allegation form been in existance? Is this form made available to all plant workers--how? Please provide a copy.
EFFECTS OF DEWATERING: CONTENTION 3
- 1. Explain in detail the prolonged (40 year) effect of permanent dewatering upon i
the various subsoil layers and underlying groundwater.
L
! In answering this question:
4
- a. Include explanations of the potential 40 year effects of removal of fines from soil layers, and how this is monitored.
- b. Discuss the interrelated effects of one soil layer upon another.
i
! c. Explain the potential 40 year effects of groundwater movement from lower to upper levels during dewatering.
,d. Discuss the possible weakening of the " essentially impervious" intermediate I clay layer separating the perched ground w:1erfr(m ehe underly.confinea aquifiers.
under artesian pressure. In so doing consider all possible combined effecte of a 40 year dewatering system.
. o 6
- e. . Discuss the possible af ter-effects of 40 year dewatering on groundwater movement between upper and lower levels and upon interrelated soil layers,
,' possibly weakened or changed by dewatering.
- 2. What studies or other data exist concerning prolonged (40 year) effects of de-watering upon subsoils and groundwater relationships?
1
! 3. Provide documents upon which answers to q. I are based.
i l 4 '. Did the assurances provided to the NRC for the FEs analysis regarding the effects j
of possible radioactive release to groundwater following a core-melt accident take into account the effects of prolonged dewatering on subsoil and ground-j water conditions? If yes, explain. If not, why not.
[
INDEPENDENT DESIGN AUDIT: CONTENTION 4
- 1. How much time , money, and ef fort is involved in the Bechtel Audit of Bechtel construction and design announced at the 5/20/82 ACRS meeting? What is the purpose and justification for this self-audit? Who will pay for it?
- 2. What plans have been made toward an independent design and construction audit I
j at Midland?
- 3. What contacts have been established thus far with various firms concerning the design and construction audit?
i 4 Provide names and addresses of all firms considered for performing the indepen-dent design and construction audit.
- 5. What criteria are being used to select the firm for the independent design and construction audit--what are the job requirements, t 6. Explain in detail the job description, scope of the audit, and other descrip-tions of what exactly is to be done during this audit.
y v 7
- 7. Provide all docunents and correspondence exchanged thus far between CPC and prospective companies or individuals regarding the design and construction audit.
8 Explain to what extent the audit scope, depth, or nothodology will be controlled by CPC.
- 9. Explain CPC's proposed plan of action for responding to audit findings.
10 When does CPC exrect the selection of this audit firm to be decided?
- 11. When does CPC expect the audit to begin? To be concluded?
- 12. How is it possible for an outside auditor to independently assess the struc-tural adequacy of the containment structures and other structures (due to the missi g reinforcing bars) without relying upon CPC's statements and analysis of internal wall conditions?
ADDITIONAL 9 The Midland Daily News (8/26/82)QA INIEFROCATORIES reported a Suit against Bechtel by Ronald Corto charging job loss due to QA reporting. Why were coreholes being drilled into structures--name all structures into which coreholes were drilled? Provide documents related to QA procedures for this drilling and to the Carto allega-tions.
l Respectifully Submitted, Barbara Stamiris cc. ASLB members l
W. Pa ton , NRC NRC Secretary l .
l l
l
!