Informs of Util Implementation Status for NUREG-0737,Item II.K.3.13 Re Reactor Core Isolation Cooling Sys Mod.Mod to Be Completed During Next Scheduled Maint Outage.Installation of Motor Operator on Trip Valve Delayed
ML20063K922
Person / Time
Site: Pilgrim
Issue date: 09/01/1982
From: Morisi A
BOSTON EDISON CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.K.3.13, TASK-TM 82-233, NUDOCS 8209080541
Download: ML20063K922 (2)


Text

r

. A.'

4e BasTON EntsON COMPANY l

DEMERAL OrrscEs GOD BovLaTON STREET BOSTON MASSACHUSETTS 02899 A. V. M O RISI MANAGER NUCLEAR OPERATIONS SUPPORT DEPARTM ENT September 1, 1982 BECo. Ltr. #82-233 Mr. Darrell G. Eisenhut, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 License No. DPR-35 Docket No. 50-293 NUREG 0737, Item II.K.3.13

Reference:

(a) BECo. Ltr. #81-37 dated February, 11, 1981 "Information in Response for NUREG-0737 January 1, 1981, requirements" (b) BECo. Ltr. #82-91 dated March 25, 1982.

Dear Sir:

The purpose of this letter is to provide a status of Boston Edison Company's (BECo.) implementation of the NRC's NUREG-0737 item II.K.3.13 requirement that the "RCIC System be modified so that the RCIC System will restart on low water level." As stated in reference (a) BECo. has committed to implement the following:

1.

Replace present solenoid oil dump valve with electro-mechanical trip device.

2.

Logic modifications to effect automatic closure of the steam supply valve on high vessel level rather than the tr.ip valve.

The trip valve would stay open throughout the high level trip.

Our planned implementation date to complete this modification, as we previously advised in reference (b), is the next scheduled maintenance outage of sufficient duration (8 days).

Implementation of these modifications is sufficient to satisfy the intent of the NUREG item.

In reference (a) we advised that we were also investigating the installation of a motor operator on the trip valve replacing the handwheel. The purpose of this modification would be to provide remote reset capability of the trip valve, 1

thereby, achieving auto-restart capability of RCIC following a protective trip (e.g. overspeed). We have concluded that this modification is fersible and desirable and have initiated procurement actions with Terry Corporation to l

l obtain the necessary hardware. Due to procurement difficulties with the vendor j

8209080541 820901 PDR ADOCK 05000293 P

PDR

i J,

BO' TON EDEON COMPANY s

Mr. Darrell G. Eisenhut, Director September 1, 1982 Page 2 we were not able to complete this modification July 1,1982 as previously planned. However, the modification is not necessary in order for us to achieve. compliance with NUREG-0737 and therefore our implementation schedule is not provided herein, as this modification is not included as part of our efforts addressing closeout of this item.

Should you have any questions relative to the above, please contact us at your convenience.

Very truly yours,