Forwards Millstone 2 Initial Updated Fsar.Requirement of 10CFR50.59 Met by Util 820301 Annual Rept.Separate,Redundant or Overlapping Lists of 10CFR50.59 Changes Not Identified. W/Notice of Receipt & Record of Changes
ML20063F622
Person / Time
Site: Millstone Dominion icon.png
Issue date: 07/20/1982
From: Counsil W
CONNECTICUT YANKEE ATOMIC POWER CO., NORTHEAST NUCLEAR ENERGY CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20063F628 List:
References
F0003A, F3A, NUDOCS 8207270205
Download: ML20063F622 (5)


Text

,

,k G.n rol ome.

  • Seld n str..t, Berlin, conn.cticut 5

Z.%%,'N!TU5"Z ~

Enho*n!. CONNECTICUT 06101

'":.T:::,r: % '~

ammen L

L

C;
J"= 7%

July 20, 1982 Docket No. 50-336 F0003A Mr. H. R. Denton, Director Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.

20555

Reference:

(1) 45 FR 30614, " Periodic Updating of Final Safety Analysis Reports."

(2)

W. G. Counsil letter to R. C. Haynes (Region 1),

dated March 1, 1982, transmitting Millstone Unit Nos. 1 and 2 Annual Report.

Gentlemen:

Millstone Nuclear Power Station, Unit No. 2 Initial Submittal of Updated FSAR In Reference (1), NRC regulation 10 CFR 50.71 (e) was promulgated, requiring licensees to periodically submit revised pages of their Final Safety Analysis Reports (FSAR). Northeast Nuclear Energy Company (NNECO) hereby submits the initial updated FSAR for Millstone Unit No. 2.

This FSAR accurately presents changes made since the original FSAR submittal that were necessary to reflect the information and analyses submitted to the Commission or prepared pursuant to l

Commission requirements, as of six months prior to this submittal.

l We note that 10 CFR 50.71 (e)(2)(ii) stipulates, "{This) submittal shall include an identification of changes made under the provisions of 550.59 but not previously submitted to the Commission." Pursuant to 550.59(b) and DPR-65, Appendix A, Section 6.9.5.1, the latest 50.59 report for Millstone Unit No. 2 was submitted in Reference (2) for the period January 1, 1981 thru December 31, 1981.

Since 50.71(e)(2)(ii) does not contain any " cut-off" dates, we have interpreted December 31, l

1981 to be appropriate for the. reporting of 50.59 changes. Thus, all 50.59 changes thru December 31, 1981 have been previously reported.

50.59 changes completed in 1982 will be submitted in the next annual report due March 1, 1983, and will be used to update the Millstone Unit No. 2 FSAR in the subsequent revision due to the NRC July 22, 1983.

In conclusion, no separate, redundant, or overlaping lists of 50.59 changes are identified herein, because the requirement is met by reference.

p Respectfully submitted, 8

)h NORTHEAS

' CLEAR EN Y COMPANY

$0. efMt 8207270205 820720 W. G. Counsil PDR ADOCK 05000336 PDR Senior Vice President K

STATE OF CONNECTICUT )

)

ss.

Berlin COUNTY OF HARTFORD

)

t Then personally appeared before me W. G. Counsil, who being duly sworn, did state that he is Senior Vice President of Northeast Nuclear Energy Company, a Licensee herein, that he is authorized to execute and file the foregoing information in the name and on behalf of the Licensees herein and that the statements contained in said information are true and correct to the best of his knowledge and belief.

$A: L.

>m O.L.

Notary Public

'l My Commissica Exgkes M:rd 2, "M 4

h r

c r2244 riv..4o NUSCO NUCLIAR CPERATICNS DEPARTMENT NOTICE OF RECEIPT Ouc\\ecu [Mecetrele3v k%<.ad TO: WC

'tre c17 or f

NOTICE OF RECEIPT OF Millstone Unit #2 Final Safety Analysis Reoort CHANGE NO.

O COPY NO. M C MNE O Approved FSAR Change Requests d's 1-2-82. 2-2-82, 3-2-82, 4-2-82, 5-2-82' Authorization for issue 6-2-82. 7-2-82. 8-2-82. 9-?-R7.

In-7-R9

}l-2-82.

17-?-R9.

1t_?_R7 14-2-82, 15-2-82, 16-2-82, 17-2-82, 18-2-82, 19-2-82 and 22-2-82 Please insert the revisions, listed below, into your copy of the obove document and dest oy oil superseded and outdated pagest Revision Insert Date De stroy Upon receiving the Millstone Unit #2 FSAR Update, responsibility to maintain and update this document will be assumed.

=>ied,;c >

<r CL Q 37 m

cee g s u.,

b. m, o.s e A h u A c :s y m. <. x s csu w.

Please enter change number on " Record of Changes" form.

This ackno-ledges receipt of the revisions listed above. In addition, all superseded pages have been removed onJ destroyed. Affected personnel have been notified.

Date Signature Return this ENTIRE sheet to Judy Boardman (tJ i)- Berlin when above instructions have been completed.

l Ouestions regarding distribution should be directed so Ext. mi i

Nuclear Operations Department Northeast Utilities Service Company P. O. Box 270 Hartford, CT 06101

~

O

~

i 5

Northeast Nuclear Energy Company Unit #2 S ^"'

"e" O

ae Controlled Copy No.

Pf/

h \\ A S T E E. cot ^)

Issued To: t3 d-

, uuc\\ece % cm.<cn,c-O

~ <3 0 <-

"A< : d,3cm % J O

m

$ mas: m NUSCO NUCLEAR PRODUCTION DEPARTMENT RECORD OF CHANGES f

DOCUMENT: Millstone Unit 2 Final Safety Analysis Report w/

CH ANGE NO.

DATE ENTERED INITI AL CHANGE NO.

DATE ENTERED INITI A L Y

a w

J