ISI 1993 Outage Summary Rept of Millstone Unit 3 Nuclear Power Station for Interval 1,Period 2
ML20063F553
Person / Time
Site: Millstone Dominion icon.png
Issue date: 11/30/1993
From: Koehl A, Lyons T, Macneill D
NORTHEAST NUCLEAR ENERGY CO.
To:
Shared Package
ML20063F538 List:
References
NUDOCS 9402150049
Download: ML20063F553 (250)


Text

{{#Wiki_filter:INSERVICE INSPECTION 1993 OUTAGE

SUMMARY

REPORT OF THE ) MILLSTONE UNIT 3 NUCLEAR POWER STATION l FOR NORTHEAST NUCLEAR ENERGY COMPANY WATERFORD, CONNECTICUT COMMERCIAL SERVICE DATE APRIL 23, 1986 REPORT DATE NOVEMBER 1993 FOR INTERVAL 1 PERIOD 2 Prepared By: [ 8 d'/ 8c f [ . h A. A. Koehl NUSCO ISI Coordinator Reviewed By: 9 m,-r [ I cu. D. R. MacNeill NNECO ISI Coordinator Approved By: m _ e ,J , [ m v T. W. Lyons G ISI Engineering Supervisor 9402150049 940204 PDR 0 ADOCK 05000423 PDR 1 . A

( _ - _ - -

1. FORM NIS-1 OWNER'S DATA REPORT Contained in this section is the owner's data report for inservice inspection, NIS-1 form, as required by ASME Section XI. Table 1-1 is provided as a supplemental list to the NIS-1 form.

Ei! l I i J

T TABLE OF CONTENTS SECTION TITLE 1 FORM NIS-1 OWNER'S DATA REPORT 2 ABBREVIATIONS 3 INTRODUCTION 4 FIRST INTERVAL

SUMMARY

5

SUMMARY

OF EXAMINATIONS 6 PRESSURE TEST

SUMMARY

7 PROCEDURES 8 PERSONNEL 9 EQUIPMENT AND MATERIAL LISTS , 10 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS i I 1 i

                                                        'l l

l l s - _ .

(r-4 1) ABSTRACT OF EXAMINATIONS This report contains a summary of the examination and test 'l results for the inservice inspection (ISI) conducted at the I Northeast Nuclear-Energy Company Millstone Unit 3 Nuclear Power Station during the fourth refueling outage which is the

   .second and last outage of the second period of the first.

interval. Included in this report are the required ASME i Section XI forms for the items examined (NIS-1) and repairs 1 and replacements (NIS-2) that have been completed since the-  ! last Inservice Inspection Summary Report was submitted in  ! July 1991. Reported herein are the examinations and tests j required by the ASME Section XI Code and the NRC through 'l augmented requirements.  :; 1 All' examinations and tests were completed as delineated in ~ the Millstone Unit 3 Inservice Inspection Program Plan except 'l for sixteen pipe welds in thin wall stainless steel piping .i and four integral attachment welds. These did not receive 1 100% coverage and will be addressed later in relief requests, i' All examinations and test completed meet the acceptance criteria stated in Millstone Unit 3 Inservice Inspection Program Plan. ) PSI examinations were performed on 10 Class 2 welds that were l added as a result of replacements. The same replacements eliminated 9 welds. ] , All required examination and test records and associated documentation generated during the performance of this  :

   -inservice inspection are maintained at the plant for the                ;

service life of-the plant.  ; 1

                                                                        'l i

_1 i 1 1 o

                                                                        'l
                                                                        -l y

i

                        ,       n -,   .        ,-

(- . FORM NIS-1 OWNERS' DATA REPORT FOR ' INSERVICE INSPECTIONS As required by the Provisions of the ASME Code Rules f

1. owner Northeast Nuclear Energy Company (Name and Address of Owner) i 2. Plant Millstone P.O. Box 345, Waterford, CT 06385 (Name and Address of Plant)
3. Plant Unit 3 4. Owner Certificate of Authorization (if required) None
5. Commercial Service Date 4/23/86 6. National Board Number for Unit ' !

I

7. Components inspected Manufacturer Component or Manufacturer or Installer State or Nationa!

Appurtenance or installer Scrial No. Province No. Board No. See supplemental sheet.

                                                                                                                                                                                     ~y 1

i Note: Supplemental sheets in form of lists, sketches, or drawings may be used provided (1) size is 8% in. x 11 in.,  ; (2) information in items 1 through 6 on this data report is included on each sheet, and (3) each sheet is numbered l and the number of sheets is recorded at the top of this form. ] This form (E00029) rnay be obtained from the Order Dept., ASME, 345 E. 47th St., New Yor k, N.Y. 10017 l _ - _ _ . . _ _ ___ _ __ _________ ______ ____ _____ ___________ _ _ ____________z__ _ .. . . . . .. .. ..

ri? L-. L FORM NIS-1. OWNERS' DATA REPORT FOR INSERVICE INSPECTIONS As required by the Provisions of the ASME Code Rules

1. Owner Northeast Nuclear Energy Company (Name and Address of Owner)
2. Plant Millstone P.O. Box 345, Waterford, CT 06385 (Name and Address of Plant)  ;
3. Plant Unit 3 4. owner Certificate of Authorization (if required) None
5. Commercial Service Date 4/23/86 6. National Board Number for Unit N/A
7. Components Inspected ,

Manufacturer , Component or Manufacturer or Installer State or National Appurtenance or installer Serial No. Province No. Board No. See supplemental sheet. j [ t i i 3 c7 I I Note: Supplemental sheets in form of lists, sketches, or drawings may be used provided (1) size is 8% in. x 11 in., l (2) information in items 1 through 6 on this data report is included on each sheet, and (3) each sheet is numbered I and the number of sheets is recorded at the top of this form. l This form (E00029) may be obtained from the Order Dept., ASME,345 E. 47th St., New York, N.Y. 10017 I

h. .

FORM NIS 1 (back) l

8. Examination Dates 7/31/93 to 11/5/93 9. Inspection Interval from 4/23/86to 4/23/96
10. Abstract of Examinations, include a list of examinations and a statement concerning status of work required f ' c""*'d ia' l- See section 4 and 5 of this summary report.
11. Abstract of Conditions Noted See section 5 of this summary report. .
12. Abstract of Corrective Measures Recommended and Taken See section 5 of this summary report; We certify that the statements made in this report are correct and the examinations and corrective mea-sures taken conform to the rules of the ASME Code.,Section XI.

Date D 19 diSigned . ' By A/ A/ E c. C) Owner Certificate of Authorization No. (if applicabic) N/A Expiration o ,,, N/A

  • CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and/or the State or Province of CONNECTICUT and employed by *HSBIGI CO of HARTFORD, CT have inspected the components described in this Owners' Data Report during the period 07/31/93 to M /3'iL_. . and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Data Report in accordance with the requirements of the ASME Code, Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Data Report. Furthermore, neither the inspector nct his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. Date 03 FEBRUARY 19 R4

%               ELIZABEIH YOK                  _

Commissions NB9384 CT1137-Inspector's Sign re National Board, State Province and No. I ',

e.- TABLE 1 SUPPLEMENTAL SHEET TO FORM NIS-1 NNECO - MILLSTONE UNIT 3 - WATERFORD, CT COMMERCIAL SERVICE DATE: 4/23/86 Component or Manufacturer Manuf. or Installer State or National Exam e Appurtenance or Installer Serial No Province No. Board No. Zorw Cat. r RPV Nuts Con 6ustion Eng. 7272 N/A N/A 001 B G-1 RPV Washers 'Conbustion Eng. 7272 N/A N/A 001 B-G-1 S/G 1C Manway Studs Westinghouse NEGT 1778 N/A W15216 005 B-G-2 RCP 1D Flange Westinghouse 4-1162E93G01 N/A 4 011 B G-1 RCS FE428 Bolting Stone and Webster See Sm nary Report N/A N/A 030 B-G-2 CCIS Class 1 Piping Stone and Webster See Stamary Report N/A N/A 011 B-J

       $1L Class 1 Piping    Stone and Webster              See Smsnary Report         N/A         N/A      023   B-J
     ' RCS Class 1 Piping    Stone and Webster              See Smunary Report         N/A         N/A      023   B-J HIS Class 1 Piping    Stone and Webster              See Smynary Report         N/A         N/A      038- B-J DRN Class 1 Piping    Stone and Webster              See Sm nary Report         N/A         N/A      042   B-J RCS Int. Attachment   Stone and Webster              See Sm nary Report         N/A         N/A      029   B-K-1 RPV CRD Housing       Canbustion Eng.                        7272               N/A         N/A      002   B-0 RHR HX Noz. Welds     Stone and Webster              See Smsnary Report         N/A         N/A      074   C-B -

MS Int. Attachments Stone and Webster See Summary Report N/A N/A- 058 C-C FWS Int. Attachnents Stone and Webster See Smsnary Report N/A N/A 070 C-C SIL Int. Attachments Stone and Webster See Sm nary Report N/A N/A 076 C-C SIL Class 2 Piping Stone and Webster See Smynary Report N/A N/A 076 C-F 1 QS$ Class 2 Piping Stone ard Webster See Smynary Report N/A N/A 097 C-F MS Class 2 Piping Stone and Webster See Smunary Report N/A N/A 058 C-F-2 FWS Class 2 Piping Stone and Webster See Smynary Report N/A N/A 070 C-F-2 > QSS Supports Stone and Webster See Sm: nary Report N/A N/A 097 F-A SWP Stpports Stone and Webster See Smynary Report N/A N/A 170 F-B FWS Supports Stone and Webster See Smunary Report N/A N/A 068 F-C

                                                                                                                         +

Repor1;akdnis1 Page rmber 1

3. INTRODUCTION This inservice inspection summary report documents the inservice inspections conducted at Millstone Unit 3 during the fourth refueling outage from July 31, 1993 through 1993 These examinations and tests were November performed 5[n acco.rdance with the Millstone Unit-3 Inservice Inspection Program Plan.

Welds, components and their supports were examined in accordance with the requirements of the Millstone Unit 3 . Technical Specification, Section 4.0.5 and the requirements of ASME Boiler and Pressure Vessel Code, Section XI, 1983 Summer 1983 Addenda (Section XI) except where noted Edition,illstone in the M Unit 3 Inservice Inspection Program Plan. Millstone Unit 3 started commercial operation on April 23, , 1986. As allowed by Section XI, subparagraph IWA-2430(d) i Northeast Nuclear Energy Company (NNECO) has elected to extend the interval by 6 months. Therefore this fourth refueling outage is the second outage in the second period which ends October 23, 1993 (7 years per Inspection Program B plus 6 months). Also included in this summary report are augmented inservice inspections performed to meet additional NRC requirements and preservice inspections performed on new welds. Examination and test procedures were approved prior to the outage. Also certification documents relative to personnel, equipment, and materials were reviewed and determined to be satisfactory. Manual nondestructive and visual examinations and tests were performed by Northeast Nuclear Energy Company; Northeast Utilities Service Company; ABB/Amdata, Inc.; and EBASCO, Inc. examination personnel. The Inservice Inspection Program was reviewed by the Hartford-Steam Boiler Inspection and Insurance Company. They provided NNECO with the Authorized Nuclear Inservice Inspector for the ' 1993 refueling outage. All required examination and test records and associated documentation generated during the performance of this inservice inspection are maintained at the plant for the service life of the plant. i i l 1 l l

                                                                   ,i 1
2. ABBREVIATIONS ,

t The following abbreviations are used in this summary report: Abbreviation Definition UT Ultrasonic Test

  • PT Penetrant Test e

MT Magnetic Particle Test RT Radiographic Test , i ET Eddy Current Test VT-1,2,3,4 Visual Test  ; NUSCO Northeast Utilities Service Co. NNECO Northeast Nuclear Energy Co. S/G Steam Generator RPV Reactor. Pressure Vessel  ; B.E.A. Break Exclusion Area LPSI Low Pressure Safety Injection System l RCS Reactor Coolant System RHS Residual Heat Removal System FWS Feedwater System MS Main Steam System SIL Low Pressure Safety Injection System FWA Auxiliary Feedwater System , SWP Service Water System CHS Chemical Volume Control System . SIH Intermediate Safety Injection System l r HPSI High Pressure Safety Injection System i

4. FIRST INTERVAL

SUMMARY

4.1 SECTION XI Table 4-1 provides a summary for the first interval for those examination categories where a percentage requirement is imposed by Section XI. Examination Categories B-A, B-E, B-L-2, B-M-2, B-N-1, B-N-2, B-0, B-P, C-H, D-A, D-B, and D-C are not included since the percentage requirement does not apply to them. Of these all the interval examinations required by Examination Category B-O were completed during this outage. Also all required pressure tests were completed and are reported on in Section 6. 4.1 AUGMENTED Table 4-2 addresses the interval status for augmented examinations performed to meet NRC requirements. Included in the listing are the augmented examinations to protect against postulated piping failures within the break exclusion area (B.E.A.) and the reactor coolant pump flywheel examinations required by Regulatory Guide 1,14 (RG 1.14).

  • 4

7 i 1 . TABLE 4-1 MILLSTONE UNIT 3 - 1993

SUMMARY

REPORT l FIRST INTERVAL - CATEGORY kJMMARY l EXK4 TOTAL INTERVAL 1 PERCENT l PERICO 1 PERIOD 1 PERIOD 1 ] PERIOD 2 PERICO 2 PERIOD 1+2 l PERIOD 3 PERIOD 3 PERIOD 1 3 l TOTAL PERCENT i CATEGORY ACTIVE REC SCHEDULED TOTAL POP l SCHEDULE 0 COMPLETE PERCENT l SCHEDULED COMPLETE PERCENT l SCHEDULED COMPLETE PERCENT lCOMPLETECOMPLETE B8 8 8 100.0% 3 3 38% 2 2 63% 3 0 100% 5 62.5% B-0 44 44 100.0% 6 6 14% 10 10 36% 28 0 100% ~ 16 36.4% B-F 22 22 100.0% 4 4 18% 7 7 50% 11 0 100% 11 50.0% B-G-1 248 222 89.5% 50 50 23% 77 77 57% 95 0 100% 127 57.2% B G-2 62 62 100.0% 19 19 31% 14 14 53% 29 0 100% 33 .53.2% 8-M 9 9 100.0% 1 1 11% 3 8 100% 0 0 100% 9 100.0% 9-J 1193 608 51.0% 146 146 24% 172 172 52% 291 0 100% 318 52.3% B-K-1 9 9 100.0% 1 1 11% 4 4 56% 4 0 100% 5 55.6% C-A 24 7 29.2% 3 3 43% 1 1 57% 4 0 114% 4 57.1% C-B 28 10 35.7% 4 4 40% 2 2 60% 4 0 100% 6 60.0% C-C 43 26 60.5% 10 10 38% 9 9 73% 7 0 100% 19 73.1 % C-0 6 2 33.3% 1 1 50% 0 0 50% 1 0 100% 1 50.0% C-F-1 2472 214 8.7% 48 48 22% 86 86 63% 80 0 100% 134 62.6% C-F-2 514 53 10.3% 27 27 51% 16 16 81% 10 0 100% 43 81.1% C-G 22 5 22.7% 4 4 80% 0 0 80% 1 0 100% 4 80.0% F-A 11 6 54.5% 1 1 17% 3 3 67% 2 0 100% 4 66.7% Report: akcatsum File: sch_ cat Index: aksunary Nge ramter 1

TABLE 4-1 MILLSTONE UNIT 3 - 1993

SUMMARY

REPORT FIRST INTERVAL - CATEGORY

SUMMARY

EXAM TOTAL INTERVAL 1 PERCENT l PERIOD 1 PERIOD 1 PERIOD 1 l PERIOD 2 PERIOD 2 PERIOD 1+2 l PERIO) 3 PERIOD 3 PERIOD 1-3 l TOTAL PERCENT CATEGORY ACTIVE REC SCHEDULED TOTAL POP l SCHEDULED COMPLETE PERCENT l SCHEDULED COMPLETE PERCENT l SCHEDULED COMPLETE PERCENT lCOMPLETECOMPLETE F8 933 606 65.0% 2 73 2 73 45% 93 93 60% 2(0 0 100% 366 60.4% F-C 1054 361 34.3% 169 169 47% 72 72 67% 121 0 100% 241 66.8% Report: akcatsum File: sch_ cat Irdex: aksunary Page isrber 2

TABLE 4-2 MILLSTONE UNIT 3 - 1993

SUMMARY

REPORT FIRST INTERVAL - AUGMENTED

SUMMARY

EXA;4 ITEM TOTAL INT 1 PERCENT l PERIOD 1 PERI @ 1 PERIOD 1 l PERIOD 2 PERIOD 2 PERIOD 1+2 l PERIOD 3 PERIOD 3 PERIOD 13l TOTAL PERCENT CATEGORY NUMBER ACTIVE SCHED TOTAL POP l SCHEDULED COMPLETE PERCENT l SCHEDULED COMPLETE PERCENT l SCHEDULED COMPLETE PERCENT lCO4PLETECOMPLETE AUG B.E.A. 433 433 100.0% 51 51 12% 197 197 57% 185 0 100% 248 57.3% - AUG RG 1.14 4 4 100.0% 4 4 100% 4 4 200% 4 0 300% 8 200.0% Report: skitmsta File: sch_ltem Indent skaug Page ruber 1 L ._ _ . _ _ _ . . . . _ _ . _ . _ _ . ._ _ _ _ _ _ . _ _ . _ _ _ _ _ _ _ _ ._ _ _ . _ _ _ . _ _ _. ,,. _ , ,_ , _ . , _

e . L 4

5.

SUMMARY

OF EXAMINATIONS 5.3 INSERVICE AND AUGMENTED INSPECTIONS This section provides in table 5-1 a detailed list of the examinations and tests conducted since the last summary report was issued in July 1991. It should be ncted that all i examinations and tests listed in this report were conducted during the 1993 refueling outage. .The list is by examination category and includes the examination method and data sheet number along with the identification of the weld or component. Included in the comments column are any conditions noted on the examination data sheet and there resolution. , Acceptance criteria was based on ASME Section XI, 1983 Edition, Summer 1983 Addenda, except for certain Class 2 , welds and components which were based on the 1983 Edition, F Winter 1985 Addenda as noted in the Inservice Inspection Program Plan. Following is a summary of the examination results and any - limitations noted during the exam

  • i Examination Items Catecorv Examined Comments AUG (RG 1.14) 4 All examinations acceptable AUG (B.E.A.) 82 All examinations acceptable B-G-1 73 All examinations-acceptable B-G-2 5 All examinations acceptable B-J 79 All examinations acceptable B-K-1 4 All examinations acceptable -

See Note 1 B-O 2 All examinations acceptable C-B 2 All examinations acceptable C-C 7 All examinations acceptable t C-F-1 69 All examinations acceptable See Note 2 C-F-2 24 All examinations acceptable F-A 2 All examinations acceptable . F-B 2 All examinations acceptable See Note 3 F-C 5 All examinations acceptable l See Note 4 Note 1: Seventeen percent of the weld length for each  ; integral attachment is inaccessible and not examined. This will be addressed later in a relief request. Note 2: Sixteen welds that were examined with the L-wave technique did not receive full volumetric coverage. The percent coverage is noted in the comments column. This will be addressed later in a relief request. j l Note 3: These supports were scheduled as successive examinations.

                                                                 ]

Note 4: Two supports were scheduled as successive - examinations and 3 supports were examined as i additional examinations. 5.2 PRESERVICE INSPECTIONS During the outage the welds joining the feedwater piping to the four steam generator feedwater nozzles were examined for information only as a result of the thermal fatigue cracking- , issue (NRC IN93-20). As a result of these examinations it was decided to repair indications noted in the nozzle ID and the piping counterbore region. This resulted in the. replacement of piping immediately upstream of the nozzles resulting in the deletion of 7 C-F-2 welds and the addition , of 8 new C-F-2 welds. Also one elbow in the feedwater system i outside containment was replaced as a result of the erosion corrosion program. This resulted in 2 new C-F-2 welds replacing the 2 welds cut out. All 10 welds received the required preservice examination i which is noted in the comment column of table 5-1. As allowed by ASME Boiler and Pressure Vessel Code, Code Case N-416 the hydrostatic test required by IWA-4400 has been deferred, for the 8 new C-F-2 welds, until the system hydrostatic test scheduled for the end of the inspection , interval. The 2 new welds outside containment received a ) hydrostatic test as required by Section XI. 1 5.3 ADDITIONAL EXAMINATIONS ) , 1 l For Examination Category F-C support 3-SWP-4-PSR132 was found to have a loose nut wh1ch required corrective action. In accordance with IWF-2430 additional examinations were-  ; conducted which included the two adjacent supports (3-SWP ' PSSH131 and 3-SWP-4-PSR133) and one more support (3-SWP PSR126) since only one support of this type, design, and  ; function was scheduled this outage.  ; 5.4 SUCCESSIVE EXAMINATIONS i The two supports in examination category F-B and the two in

                                                                ~

F-C were examined as successive examinations from period 1.. i The one support noted as-reguiring corrective action in 5.3 I above will require examination in period 3 as a successive examination. l 1 l l

                                                                                                                                                                         .     . . ~

TABLE 5-1 MILLSTONE UNIT 3 - 1993

SUMMARY

REPORT AUG EXAMINATION CATEGORY ZONE EXAM CAT. COMPONENT OR WELD EXAM DATA SMEET UIR DWG/P&lo & ITEM No SYS IDENTIFICATION SIZE COMMENTS 008 AUG RCS 03-008-005 0.00 UT 93-UT-133 25212 20906-SM.1 RG 1.14 FLYWHEEL P'JMP 1A MT 93-UT-134 009 AUG RCS 03-009-005 0.00 UT 93-UT-135 25212-20907-SN.1 RG 1.14 FLYWHEEL PUMP 18 MT 93-UT-136 010 AUG RCS 03-010-005 0.00 UT 93-UT-137 25212-20908 SM.1 RG 1.14 FLYWHEtt PUMP 1C MT 93-UT-138 011 AUG RCS 03-011-005 0.00 UT 93-UT-139 25212-20909-SN.1 RG 1.14 FLYWHEEL MT 93-UT 140 i 060 AUG MS MSS-501 FW-6 30.00 UT 93-MT-044 25212-20962 B.E.A. PEN # 4-TO-PIPE (INSIDE CONTAINMENT) MT 93-UT-129 93 UT-130 061 AUG MS MSS-33-FW V1-1M 0.00 MT 93-MT-028 25212-20975 B.E.A. VALVE BCDY WELD 061 AUG MS MSS-33-FW-V1-2M 0.00 MT 93-MT-028 25212-20975 8.E.A. VALVE BODY WELD

  -061-                         AUG        MS   Mss-33-FW-V1-3M                     0.00       MT    93-MT-028 25212-20975                 B.E.A.          VALVE BG)Y WELD 069                         AUG        FWS FWS-11 FW-10                         18.00      UT    93-MT-026 25212-20979                 B.E.A.          PIPE-TO-VALVE                         -

MT 93-UT-022 069 AUG- FWS FWS-11 FW-11 18.00 UT . 93-MT 017 25212-20979 8.E.A. VALVE-To-PIPE MT 93-UT-054

 -Report: aksunsry                                                                                                                  Legend: UIR = Unresolved Indication Report File: tkview Irwiex: q-ak93rpt/s-cat / zone /id Pege ruber 1
                                                                                                                   . . ~ . _ -   ._                 _

P TABLE 5-1 MILLSTONE UNIT 3 - 1993

SUMMARY

REPORT AUG EXAMINATION CATEGORY ZONE EXAM CAT. CD4PONENT OR WELD DWG/P&l0 & ITEM NO SYS IDENTIFICATION S!ZE EXAM DATA SHEET UIR COMMENTS 069 AUG FWS FWS-11-FW-12 20.00 UT 93-MT-017 25212-20979 B.E.A. PIPE-TO-PENETRATION MT 93-UT-061 069 AUG FWS FWS-11-FW-54 8.00 UT 93-MT-008 25212-20979 B.E.A. PIPE-TO-PIPE MT 93-UT-065 069 AUG FWS FWS-11-FW-68-1 0.00 MT 93-MT-024 25212-20979 B.E.A. REINFORCING PIPE-TO-BRANCH PIPE 069 AUG FWS FWS-11-FW-69-1 0.00 MT 93-MT-025 93-021 MT INDICATIONS NOTED - ACCEPTABLE 25212 20979 B.E.A. REINFORCING PIPE TO-MAIN PIPE 069 AUG FWS FWS-11-FW-6-BM 16.00 UT 93-MT-029 93-023 MT INDICATIONS NOTED - ACCEPTA.BLE 25212-20979 B.E.A. P!PE-TO-REDUCER MT 93-UT-091 069 AUG FWS FWS-11-FW-6 CM 18.00 UT 93-MT-023 93-020 MT INDICATIONS NOTED - ACCEPTABLE 25212-20979 B.E.A. P!PE-TO-REDUCER MT 93-UT-055 069 AUG FWS FWS-11 FW-6-FM 8.00 UT 93-MT-014 93-016 MT INDICATIONS NOTED - ACCEPTABLE 25212-20979 B.E.A. PIPE-TO-ELBOW MT 93-UT-066 069 AUG FWS FWS-11-FW-6-GM 8.00 UT 93-M -008 25212 20979 B.E.A. PIPE-TO-ELBOW MT 93-UT-067 069 AUG FWS FWS FW-5-K 8.00 UT 93-MT-036 25212-20979 B.E.A. PIPE-To-Ete'W 93-UT-089 MT 069 AUG FWS FWS-11 Fw-6 KM 8.00 UT 93 MT 052 25212-20979 B.E.A. P1PE-T0-REDUCER MT 93-UT-165 Report: ekstanary Legend: UIR = Unresolved Indication Report File: tkview

    . Index: q-ak93rpt/s-cat / zone /id Page number 2
                      ..u    _

2 TABLE 5-1 MILLSTONE UNIT 3 - 1993

SUMMARY

REPORT AUG EXAMINATION CATEGORY ZONE EXAM CAT. COMPOWENT OR WELD DWG/P&lD & ITEM NO SYS IDENTIFICATION SIZE EXAM DATA SHEET UIR COMMENTS 069 -AUG FWS FWS-11-FW-6-LM 6.00 UT 93-MT-020 25212 20979 B.E.A. PIPE-TO-REDUCER MT 93-UT-085 069 AUG FWS FWS-11-FW-7-BM 18.00- UT 93-MT 016 93-018 MT INDICATIONS NOTED - ACCEPTABLE 25212-20979 B.E.A. PIPE-To-REDUCER MT 93-UT-053 069 . AUG FWS FWS-11 FW-7-CM 20.00 UT 93-MT-017 25212-20979 B.E.A. REDUCER-TO-PIPE MT 93-UT-062 069 AUG FWS FWS-11 FW-9 16.00 UT 93-MT-026 25212-20979 8.E.A. PIPE-TO-VALVE MT 93-UT-090 069 AUG FWS FWS 12-FW-13 6.00 UT 93-MT-020 25212 20979 8.E.A. VALVE TO-PIPE MT 93-UT 086 06* AUG FWS FWS-12-FW-6 6.00 UT 93-MT 053 25212-20979 B.E.A. VALVE-TO-PIPE MT 93-UT-164 069 AUG FWS FWS-12-FW-7 6.00 UT 93-MT-036 25212-20979 B.E.A. VALVE-TO-PIPE MT 93-UT-166 070 AUG FWS FWS-13-FW-10 16.00 UT 93-MT 027 25212-20980 B.E.A. VALVE BODY-TO-PIPE MT 93-UT-092 ~070 AUG FWS FWS-13-FW-11 18.00 UT MT-018 25212-20980 B.E.A. VALVE BODY-To-PIPE MT 93-UT-060 070 AUG FWS FWS-13-FW-13 20.00 UT 93-MT-037 25212-20980 B.E.A. PIPE-TO-PENETRATION MT UT-064 Reports eksunary Leemd: UIR = unresolved Indication Report File: akview Index: q-sk93rpt/s-cat /rone/id Pege tu ser 3

o 3 3 t B N w b A w n  : .

                                                    #                                           E                                d                                                                           3 0                                          8                                 M 2;                                         2                                   .

h

  • 8 S 5 oW E5
  • S
  • 5
  • 5- -

5- - 8-w 8 o 2 b- $- g O e e- - z se 3 y N 5 e o o ~t  ? o $ e A e S% eS so ~ 9 $. 5 m - g o? AA 55A m o u N *O 8 og e. c$ O 9p r Ar E 3 z?

  • N g 4 Q m A z q-5 3 *h n$

5a - w ~

                         ~                  o g s.
                                            ~                     ?~                 A r.z?g      .           ;, r.         ce A              se
  • W W* ?y 5 Ar* a & & r r y A 5 r.? s. p p@ ** 3 5 d

8w 4

                            ?

e An$ e* 5x y

                                                                                                                                                   &5
                 %          *                                                              -                   5   .-5 8                                                                 "g                                                                                          o               b i r                5          -                 BE                                                                8              8                   8                .             J e$b                 $          5 m

W J d 0 - 3r S g 8 5 A CI gW w eW g

  • s w e GJ %b i

e W< t. w w 5w t. w6

   %                                      5                                        E-                  S                    5                            ,E T                iSt TE 6

Y y 0b t 0~ Eg

5. S yat ey>0r. So w E. 6 Y w e. Taw y .y r *
                   . o".

0 3 T3 e E $. *A 2 T Tk AT

  • G. o=

9.sw g$ G. owg 2 i o r -

                   ' . W ' E.-2. o*                                                                t.8                                                       -- 3, ri w                -                                            .w 2 5                       E. o               n                                          *
                                                                                                                                                            $s" 9e e

TWs

                       '5 8 D'eE.
                             -                 <-G.toor                         C, .,   g                                g e,                                                  m          9w oc
  • y 4 en. mg
                            .t.*   .c          w                W                       w            w >                                                                       w 8    8'
                               ' . ', 5 .,. , %D*                                 w     W 9-                    h-             es.

S= w W ,.

                                                                                   $                  9-                                                                             .

4* j

,. e*= 4 v$?
                                                         ' ;                                                                                                         g                            w*

oW

                                                                                                                                      .              d-
  • o w o w y e. ag
                                                                                                                              $g
                                                                                          -<                                                       a e.

h, w*.

                                                                                       $ ;g
                                                     < SK. . ..                                                                                                                                                        t.
Sc f a g S g ..

o S g S ~~ t o

  • g gy u. n
n. ~ -

u

                                                                                                                                            ~

y A 5 E EMo n o u Ro +~ Rea

U.-

mu geE R$ o EN ._ o u

TABLE 5 1 MILLSTONE UNIT 3 - 1993 SUMMART REPORT AUG EXAMINATION CATEGORT 20NE EXAM CAT. COMPONENT OR WELD 'DWG/P&lD & ITEM NO STS IDENTIFICATION SIZE EXAM DATA SHEET UIR COMMENTS 070 AU(a FWS FWS-13-FW-62-1 8.00 MT 93-MT-027 25212-20980 B.E.A. REINFORCING PAD-TO-BRANCH PIPE 070 AUG FWS FWS-13-FW-63 6.00 UT 93-MT-022 25212-20980 8.E.A. PIPE TO-REDUCER MT 93-UT-096 93-UT 098 070 AUG FWS FWS-13-FW-63-1 18.00 MT 93-MT-030 93-024 MT INDICATIONS NOTED - ACCEPTABLE 25212-20980 8.E.A. REINFORCING PAD-TO-MAIN PIPE 070 AUG FWS FWS-13-FW-64 6.00 UT 93 MT 022 25212-20980 B.E.A. VALVE BODT TO-PIPE MT 93-UT-056 93-UT-100 070 AUG FWS FWS-13-FW-7-BM 16.00 UT 93-MT-015 93-015 MT INDICATIONS NOTED ACCEPTABLE 25212-20980 B.E.A. PIPE TO REDUCER MT 93-UT-093 070 AUG FWS FWS-13 FW-7-CM 18.00 UT 93-MT-018 25212-20930 8.E.A. REDUCER-TO-PIPE MT 93-UT-021 070 AUG FWS FWS-13-FW-7-FM 8.00 UT 93-MT-019 93-017 MT INDICATIONS NOTED - ACCEPTABLE 25212-20980 B.E.A. ELBOW-TO-PIPE MT 93-UT-087 070 AUG FWS FWS-13-FW-7-GM 8.00 UT 93-MT-018 25212-20950 B.E.A. ELBOW-To-PIPE MT 93-UT-088 070 AUG FWS FWS-13-FW-7-MM b.F UT 93-MT-021 25212-20980 B.E.A. ELBOW-To-PIPE MT 93-UT-068 Reports eksunary Legend: UIR = Unresolved Indication Report Fila: (kview Index: q-ek93rpt/s-cat /rone/id Page nunber 4

TABLE 5-1 MILLSTONE UNIT 3 ' 1993

SUMMARY

REPORT AUG EXAMINATION CATEGORY ZOCE EXAM CAT. COMPONENT OR WELD DWG/P&lD & ITEM NO STS IDENTIFICATION SIZE EXAM DATA SHEET UIR COMMENTS 070 AUG FWS FWS-13-FW-7-KM 8.00 UT 93-MT-037 25212-20980 B.E.A. REDUCER-TO-PIPE MT 93-UT-172 070 AUG FWS FWS-14-FW-6 6.00 UT 93-MT-022 25212-20980 B.E.A. VALVE B00Y-TO-PIPE MT 93-UT-057 070 AUG FWS FWS-14-FW-7 6.00 UT 93-MT 022 25212-20930 B.E.A. PIPE-TO-VALVE BODY MT 93-UT-058 071 AUG FWS FWS-15-FW-10 16.00 UT 93-MT-005 93-008 MT INDICATIONS NOTED - ACCEPTABLE 25212-20981 B.E.A. VALVE-TO-PIPE MT 93-MT-011 93-UT-094 0 71 AUG FWS FWS-15-FW-11 18.00 UT 93-MT-004 25212-20981 B.E.A. VALVE-TO-PIPE MT 93-UT-009 071 AUG FWS FWS-15-FW-13 20.00 UT 93-MT-009 25212-20981 B.E.A. PIPE-TO-PENETRATION MT 93 UT-003 0 71 AUG FWS FWS-15-FW-14 6.00 UT 93-MT-009 25212-20981 B.E.A. VALVE-TO-PIPE MT 93-UT-050 0 71 AUG FWS FWS-15-FV-7-BM 16.00 UT 93-MT-004 AREA BELOW MIN. WALL - ACCEPTAsLE 25212-20981 B.E.A. VALVE-TD-PIPE MT 93-UT-007 93-011 071 AUG FWS FWS-15-FW-7-CM 18.00 UT 93 MT-004 25212-20901 B.E.A. REDUCER-TO-P!PE MT 93-UT-008 0 71 AUG FWS FWS-15-FW-7-GM 8.00 UT 93-MT-006 25212-20981 B.E.A. ELBOW-TO-PIPE MT 93-UT-014 Reports akstanary - Legend: UIR = Unresolved Indication Report File: skview Index: q-ek93rpt/s-cat / zone /id Pege rumber 5

TABLE 5-1 MILLSTONE UNIT 3 - 1993

SUMMARY

REPORT AUG EKAMINATION CATEGORY ZONE EXAM CAT. COMPONENT OR WELD DWG/P&ID & ITEM NO. SYS IDENTIFICATION SIZE EXAM CATA SHEET UIR COMMENTS 071 AUG FWS FWS-15-FW-7-NM 8.00 UT 93-MT-009 25212-20981 B.E.A. ELBOW-To-PIPE Mi 93-UT-015

             .071                               AUG          FWS FWS-15-FW-7-JM                               8.00       UT    93-MT-045                ARE4 BELOW MIN. WALL - ACCEPTEBLE 25212-20981                  B.E.A.                           ELBOW-To-PIPE                           MT    93-UT-145   93-036 93-UT-146 0 71                         AUG          FWS FWS 15-FW 7-KM                               8.00       UT    93-MT-009 25212-20981                  B.E.A.                           REDUCER-T0-PIPE                         MT    93-UT-171 071                          AUG          FWS FWS-15-FW-7-LM                               6.00       UT    93-MT-009 25212-20981                  B.E.A.                           ELBOW-TO-PIPE                           MT    93-UT-049 071                          AUG          FWS FWS-16-FW-30                                 6.00       UT    93-MT-009 25212-20981                  B.E.A.                           VALVE-TO PIPE                           MT    93-UT-048 93-UT-097 071                          AUG          FWS FWS-16-FW-32                                 6.00       UT    93-MT-009 25212-20981                  B.E.A.                           VALVE-TO-PIPE                           Mi    93-UT-170 072                          AUG          FWS FWS-17-FV-10                                 18.00      UT    93-MT-001                UT INDICATION NOTED - ACCEPTABLE 25212-20982                  B.E.A.                           VALVE-To-PIPE                           MT    93-UT-011   93-019 072                          AUG          FWS FVS FW-11                                18.00      UT    93-MT-001 25212-20982                  B.E.A.                           VALVE-To-PIPE                           MT    93-UT 010 072                          AUG          FWS FWS-17-FW-12                                 20.00      UT    93-MT-007 25212-20982                  B.E.A.                           PIPE-TO-PENETRATION                     MT    93-UT-004 93-UT-019 Report: aksunery                                                                                                                                                Legeruf: UIR = Unresolved Indication Report l File ckview f Indext q-ak93rpt/s-cat /rene/id Page runber 6

d TABLE 5-1 MILLSTONE UNIT 3 - 1993

SUMMARY

REPORT AUG EXAMINATION CATEGORY l ZONE EXAM CAT. COMPONENT OR WELD DWG/P&ID & ITEM NO SYS IDENTIFICATION SIZE EXAM DATA SHEET UIR COMMENTS 072 AUG FWS FWS-17-FW-60-1 18.00 MT 93-MT-007 25212-20982 B.E.A. REINFORCING PAD-TO-PIPE 072 AUG FWS FWS-17-FW-62-1 18.00 MT 93-MT-007 25212-20982 B.E.A. REINFORCING PAD-T0-PIPE 072 AUG FWS FWS-17-FW-64* 8.00 UT 93-MT-088 93 045 PSI, UT INDICATIONS ACCEPTABLE, MT REMOVED BY CLEAN!NG 25212-20982 B.E.A. ELBOW-TO-PIPE MT 93 MT-089 93-UT-187,9 93-UT-191,3 93-047 93-UT-175 072 'AUG FWS FWS FW-6-BM 16.00 UT 93-MT-003 93 009 MT INDICATIONS NOTED - ACCEPTABLE 25212-20982 B.E.A. P!PE-TO-REDUCER MT 93-MT-013 93-UT-095 072 AUG FWS FWS-17-FW-6-CM 18.00 UT 93 MT-002 93-010 MT INDICATIONS NOTED - ACCEPTABLE 25212-20982 B.E.A. VALVE-TO P!PE MT .93-MT-012 93-UT-059 072 AUG FWS FWS-17-FW-6-FM 8.00 UT 93-MT-007 25212 20982 B.E.A. ELBOW-TO-PIPE MT 93-UT-017 93-UT-063 072 AUG FWS FWS-17-FW-6-GM 8.00 - UT 93-MT-007 25212-20982 B.E.A. ELBOW-TO-PIPE MT 93-UT-018 072 AUG FWS FWS-17-FW-6-NM 8.00 UT 93-MT-010 25212-20982 B.E.A. ELBOW-TO-PIPE MT 93-0T-016 Report: aksumary- Legend: UIR e Unresolved Indication Report File: akview Irdext.q-ak93rpt/s-cat / zone /id

                                                                                                                                                                                         .Page number 7 ..

4 TABLE 5-1 MILLSTONE UNIT 3 - 1993

SUMMARY

REPORT AUG EXAMINATION CATEGORY .

    ' ZONE                       EXAM CAT.        COMPONENT OR WELD DWG/P&ID                   & ITEM No SYS IDENTIFICATION                    SIZE       EKAM DATA SHEET UIR     COMMENTS 072                        AUG         FWS FWS-17-FW-6-KM                  8.00       UT    93-MT 010
    ~ 25212-20982                B.E.A.           ELBOW-TO-PIPE                             MT    93-UT-169 072                        AUG         FWS FWS FW LM                6.00       UT    93-MT-010 25212-20982                B.E.A.           ELBOW-To-PIPE                             MT    93-UT-012 072                        AUG         FWS FWS-17 FW-7-BM                  18.00      UT    93-MT-007 25212-20982                B.E.A.           PIPE-TO-REDUCER                           MT    93-UT 002 0 72                       AUG         FWS FWS-17-FW-7-CH                  20.00      UT    93-MT-007         UT INDICATION NOTED - ACCEPTABLE 25212-20982                8.E.A.           PIPE-TO-REDUCER                           MT    93-0T-005 93-UT-020  93-022 072                        AUG         FWS FWS-17-FW 9                     16.00      UT    93-MT-001         AREA BELOW MIN. WALL - ACCEPTABLE 25212-20982                B.E.A.           VALVE TO-PIPE                             MT    93-UT-006  93-012 072                        AUG         FWS FWS-18-FW-13                    6.00       UT    93-MT-010 25212 20982                B.E.A.           VALVE-TO-PIPE                             MT    93-UT-013 0 72                      AUG         FWS FWS-18-FW-29                    6.00       UT    93-MT-010 25212-20982                B.E.A.           VALVE-TO-PIPE                             MT    93-UT-052 93-UT 101 0 72                      AUG         FWS FWs-18-FW-31                    6.00       UT    93-MT-035 25212 20982               B.E.A.           VALVE-TO-PIPE                             MT    93-UT-051 93-UT-099 127                       AUG         SIN SIN-10-2-SW-B                   4.00       PT    93-PT-003 25212-20047               B.E.A.           P!PE-TO-ELBOW Reports eksunary                                                                                                                    Legend: UIR = unresolved Indication Report File: Ekview Index: q-ek93rpt/s-cat / zone /id Page ruber 8

TABLE 5-1 MILLSTONE UNIT 3 - 1993

SUMMARY

REPORT AUG EXAMINATION CATEGORY 20NE EXAM CAT. COMPONENT OR WELD DWG/PEID & ITEM NO SYS IDENTIFICATION S!ZE EXAM DATA SHEET UIR COMMENTS 127 AUG SIN SIM-10-2-SV-C 4.00 PT 93-PT-003 m 25212-20047 B.E.A. PIPE-To<LBOW 127 AUG SIM SIH-10 FW-3 4.00 PT 93-PT-003 25212-20047 B.E.A. PIPE-TO-VALVE 127 AUG SIM S!H-10-FW-4 4.00 PT 93-PT-003 25212-20047 B.E.A. PIPE-TO-PENETRATION 127 AUG SIN SIH-7-5-SU-B 4.00 PT 93-PT-002 25212-20047 B.E.A. PIPE-TO-ELBOW 127 AUG SIN SIN-7-5-SW-C 4.00 PT 93-PT-002

       - 25212-20047                             B.E.A.                               PIPE-TO-ELBOW 127                                     AUG                             SIN SIM 7-FW-7                                      4.00     PT         93-PT-002 25212-20047                             B.E.A.                               PIPE TO-VALVE 127                                     AUG                             SIN SIN-7 FW-8                                      4.00     PT         93-PT-002 25212-20047                             B.E.A.                               PIPE-TO-PENETRATION 127                                     AUG                             SIH SIN-8-4-SW-B                                    4.00     PT         93-PT-003 25212-20047                             B.E.A.                               PIPE-TO-ELBOW 127                                     AUG                             SIM S!H-8-4-SW-C                                    4.00     PT         93-PT-003 25212-20047                          - B.E.A.                                PIPE-TO-ELBOW 127                                     AUG                             SlH 5tH-8-FW-6                                      4.00     PT         93-PT-003 25212-20047                             B.E.A.                               PIPE-TO-VALVE
   ' Report: sksumery                                                                                                                                                                        Legend: UIR = Unresolved Indication Report Ffte ekview Index: q-sk93rpt/s-cat / zone /id Page runber 9

-__m.a. __s._.m.m.__ ___-._.m____...m__ _ _6.__L____-__.._=_____-._m___ _.-m_ ___ ____ _ w_-.a_ _ _ . - w' -hm___a m- ___ _* _ ___ _ _ e h_= =1--_ u 4 4

TABLE 5-1 MILLSTONE UNIT 3 - 1993

SUMMARY

REPORT AUG EXAMINAfl0N CATEGORY ZONE EXAM CAT. COMPONENT OR WELD DWG/ PAID & ITEM NO SYS IDENTIFICATION SIZE EXAM DATA SHEET UIR COMMENTS 127 AUG $1H SIM-8-FW-7 4.00 PT 93-PT-004 25212-20047 B.E.A. PIPE-70-PEWETRATION Reports aksinary Legend: UIR = Unresolved Indication Report Fils: akview Index: q-ak93rpt/s-cat / zone /id Pege tu 4er 10

L - C= g ...L es g

                                                                                                                                                                                          ~
                                                                                                                                                                                          =              ..

U

                                                                                                                                                                                         -               .M
                                                                                                                                                                                     . -]               db '
                                                                                                                                                                                         'E
                                                                                                                                                                                         -o O

M

                                                                                                                                                                                         .M=

a l M.

                                                                                                                                                                                       - a M
               >=

2 u

   ~           o m           .-

U"

 .- g 5

M b. $. $. $. $. $. $. $. $. $.

                    **      b-      >=       .-              W                    H       >-           >=        .=                                             H 5   Y       Y       Y        Y               Y                     Y      Y            Y         Y                                               Y g       <

O m m a m m m c> m m m m m m m

.m     -

m & .6 - r W - .- W - .- .- .- .- .- .- .- .- g,; w x x x x x x x x x x .- m g -

     - x
   - w        W     D      o       o        o                o                    cp     O                      O                                       =O 3   e-     5            9       9          .

o o. o 8 o o. us M O O O O O O O . O O O

   >6 8

M a a E O a ,- - .- .- .- .- - .- .- - W=O E E E E E E E E E E E:< mm 2 ~ w2 2 m Om 2 N w 2 .4 2 m mW 2 . w 2 sm 2 .2m

          .- U          E       E       Z       Z                  Z                  Z        Z .         Z              Z                                                      Z Z        O.      O.      e.-      N.              N.                   N.      N.           N.        N.                                            N.

W ha . NW NW NW NW NW NW NW NW NW NW O at OW O ta: O E O O O O O O E 8 ==

                            .a      .R m Z       , Ma        M             .R             .
                                                                                   .      .            .         .                                                .R 5%

u == RS e- U RSu e= RS

                                   == u RS e- U RS e- U RS wa u RS
                                                                                         == u      -

RS w= u Ra e- u RS e- u M iL CL CL CL cL c6 a n. cL c., M M N GC K E E at og es gg

            . O H 2 E

w e- O *= O *~ O e O *= O e= O *= O == O == O e- O I= 4. 6 ".. A ". "6 6 .-. ". 6". -3 m e.

4. .".

6 .". . A. ." 6 .-. . . s. 3.e v W 4a n N N N N N '%' N. N. e e e N. s e N. Ne > v Z Z Z Z Z Z Z Z Z Z - L (1.' M M L M. M. M. M. M. M. M. M. M O O O O O O O O . 3 D-

              ==O og       N.       N. N. ,     N.                 N.                 N.     ' N.         N.            N.                                                      N.      *. -e 4 7 EA       N       N       N        N:                 N                  N        N          N.            N                                                       N       &        **

w N - - e e- == - e- e- e- e- - L e. at 2 Q *= N ** N ==N, ** N e- N *= N e- N e- N *- N e= N O OJ ' O J N O O en

                  .O N O en O N O en O N .

D m O N

                                                         ' oO enN Om O N o en O N o en -

O N O in 1ON O en O N C.L* - at b ==

                                                    . _.     ...............___..m                                  _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ . _ _ , _ _ _

TABLE 5 1 MILLSTONE UNIT 3 - 1993

SUMMARY

REPORT B-G 1 EXAMINATION CATEGORY ZONE EXAM CAT. COMPONENT OR WELD DWG/P&I0 & ITEM NO SYS IDENTIFICATION SIZE EXAM DATA SHEET UIR COMMENTS 001 B-G-1 RPV 179-102-29 0.00 MT 93-MT-090 .25212-20900-$N.2 B6.10 CLOSURE HEAD NUT 001 8-G-1 RPV 179-102-30 0.00 MT 93-MT 090 25212-20900-$N.2 86.10 CLOSURE HEAD NUT 001 B G-1 RPV 179-102-31 0.00 MT 93-MT-090 25212-20900-SM.2 B6.10 CLOSURE HEAD NUT 001 B-G-1 RPV 179-102-32 0.00 MT 93-MT-090 25212-20900-$N.2 86.10 CLOSURE HEAD NUT 001 B-G-1 RPV 179-102-33 0.00 MT 93-MT-090 25212-20900-SN.2 B6.10 CLOSURE HEAD NUT 001 B-G-1 RPV 179-102-34 0.00 MT 93-MT-090 25212-20900-SH.2 B6.10 CLOSURE HEAD NUT 001 B-G-1 RPV 179-102-35 0.00 MT 93-MT-090 25212-20900 SM.2 B6.10 CLOSURE HEAD NUT 001 B G-1 RPV 179-102-36 0.00 MT 93-MT-090 25212-20900-SN.2 B6.10 CLOSURE HEAD NUT 001 8-G-1 RPV 179 102-37 0.00 MT 93-MT-090 25212-20900-SH.2 B6.10 CLOSURE HEAD NUT 001 B-G RPV 179-102-38 0.00 MT 93-MT-090 25212-20900-SH.2 B6.10 CLOSURE HEAD NUT Report: akstrary Legend: UIR = Unresolved Indication Report Fils: akview index: q-ak93rpt/s-cat /rone/id Page nuser 12 ' _ - _ . . . _ . . .. , , ~ ,

1

c l h u ..

n E

                                                                                                                                               ).
                                                                                                                         .E                     I~

y r.

                                                                                                                         }

5 5 5 E

s 3

a e 3 5 b E

       +.          :s E

w -

       ~

E

                    ~

f!" B5 a E E E E E E E E E E Tmg

     "&~
     "! " E        w

[ E E E E E E E E E E a'=-

     -n5
       *= x W                8                     8    8     8     8     8    8     8    8        8

[3 BA

                   ;                d                     d    d     d     d     d    d     d    d        d d

7 S - - - - - - - - - W g E E E E E E E E E O se a e a a e a a a t; eW a

                .- 5               AW                     SW   GW    UW    OW    4W   0W    3W            SW 5:                Aw                      Aw   Aw    A=    4m    4w   Aw    Aw   A=       Aw
5. 3 S. S. $-

2 2 S. F S. $ S. E

                                                                                               . E.       S.

l

                *W 8                 Ra
                                  - u Ra
                                                          - u RS
                                                               -u Ra
                                                                     -u R
                                                                           -d    Ra
                                                                                 - u  R .d RS
                                                                                            -u Ra
                                                                                                 - u Ra
                                                                                                          - u t

t t t t t t t 2 R

                                                                                                          =
                *E 5x
TS TS TR TS TS TR TS TS TS TS ,

( 5.W w

v. s. v a.
                                                          . v a.
                                                               .     .v a. .e s. vg
                                                                                 . v
                                                                                      . a. v a.
                                                                                            .    .v a. .v a.                   c
 ,                                                                                                                              y
                                                                                                                                ?

u u u u u u u u ~ u R 5 $ $ 5 5 5 5 5 5 $ D f. L o o o o 6 6 6 $g[& ' o $ $ $ $ $ $ $ H E E ist 3  ?  ?  ?  ?.  ?  ?  ?  ?  ?  ? 1; " l wt 5 ~~ 5 ~~ 2 2 ~~ 5 ~~ 0 ~~ S c 5 t_4 8N uo 8" N" 8N 8N 8" N" 8N 8N

                                                                                      ~~

8N 80

                                                                                                 ~~

8N

                                                                                                          ~~

8N b :* 4e 5 aw -.

            < =
                                                                                                                                                                                   ~ __;__        7__.-.. ., g TABLE 5                                                                                       MILLSTONE UNIT 3 - 1993 

SUMMARY

REPORT B-G-1 EXAMINATION CATEGORY ZONE EXAM CAT. COMPONENT OR WELD

   - DWG/PSID                     & ITEM NO SYS IDENTIFICATION                                  SIZE      EXAM DATA SHEET UIR        COMMENTS 001                         B G-1        RPV 179-102-49                                   0.00      MT    93 MT-090
    '25212-20900-SM.2             B6.10               CLOSURE HEAD NUT 001                          B-G-1        RPV 179-102-50                                   0.00      MT    93-MT-090 25212-20900-SH.2             B6.10               CLOSURE HEAD NUT 001                          B-G-1        RPV 179-102-51                                   0.00      MT    93-MT-090 25212-20900-SM.2             B6.10              CLOSURE HEAD NUT 001                          8-G-1        RPV 179-102 52                                   0.00      MT    93-MT-090 25212-20900-SM.2             B6.10              CLOSURE HEAD NUT 001                          B-G-1        RPV 179-102 53                                   0.00     MT     93-MT-090 25212-20900-SM.2             B6.10              CLOSURE HEAD NUT 001                           B G-1        RPV 179-102 54                                   0.00     MT    93-MT-090 25212 20900-SH.2              B6.10              CLOSURE HEAD NUT 001                          B-G-1         RPV 179-103-05                                  0.00      VT-1 93-VT-049 25212-20900-SM.2             B6.50               CLOSURE HEAD WASHER 001                          B-G-1        RPV 179-103-07                                   0.00      VT-1 93-VT-049 25212-20900-SH.2              B6.50               CLOSURE HEAD WASMER 001                           B-G-1        RPV 179-103-18                                   0.00      VT-1 93-VT-049 25212-20900-S4.2              B6.50              CLOSURE HEAD WASMER 001                          -B-G-1        RPV 179-103-20                                   0.00      VT-1 93-VT-049 25212-20900-SH.2              B6.50              CLOSURE HEAD WASHER Report: sksumary                                                                                                                                     Legend: UIR = Unresolved indication Report File:.akview inder.: q-ak93rpt/s-cat / zone /id
                                                                                                                                                                                   - Page resber 14 a____.

_ _ _ . . _ _ . _ _ _ _ _ _ - _ _ _ _ _ ____:_________.__________.__._.____.______. .u_._______._. _ - ___ . ~_n._.__.-._..-.c~-_ . - . . _ . _ _ . . _ _ _

e TABLE 5-1 MILLSTONE UNIT 3 - 1993

SUMMARY

REPORT-B-G-1 EXAMINATION CATEGORY 20NE EXAM CAT. COMPONENT OR WELD DWG/P&!D & ITEM NO SYS IDENTIFICATION SIZE EXAM DATA SHEET UIR COMMENTS 001 B-G-1 RPV 179-103 22 0.00 VT 1 93-VT-049 25212-20900-SN.2 B6.50 CLOSURE HEAD WASHER 001 B-G-1 RPV 179-103-24 0.M vi-1 91-VT-049 25212-20900-SM.2 86.50 CLOSURE HEAD WASHER not B-G 1 RPV 179-103-25 0.00 VT-1 C-WT-049 25212 20900-SM.2 B6.50 CLOSURE HEAD WASHER 001 B G-1 RPV 179-103-26 0.00 VT 1 93-VT-049 25212 20900 SM.2 86.50 CLOSURE HEAD WASHER 001 B-G 1 RPV 179-103 27 0.00 VT-1 93-VT-049 25212-20900-SM.2 86.50 - CLOSURE HEAD WASHER 001 B-G 1 RPV 179 103-28 0.00 VT-1 93 VT 049 25212-20900-SM.2 B6.50 CLOSURE HEAD WASHER 001 B-G-1 RPV 179-103-29 0.00 VT 1 93-VT 049 25212-20900-54.2 B6.50 CLOSURE HEAD WASHER 001 B-G-1 RPV 179-103-30 0.00 VT-1 93-VT-049 25212-20900-SN.2 B6.50 closure HEAD WASHER 001 B-G-1 RPV 179-103-31 0.00 VT 1 93-VT-049 25212-20900-SM.2 B6.50 CLOSURE HEAD WASHER 001 B-G-1 RPV 179-103-32 0.00 VT-1 93-VT-049 25212-20900-SM.2 B6.50 CLOSURE HEAD WASHER Reports eksunery Legend: UIR = Unresolved Indication Report Fils: 'skview Index: q-ek93rpt/s-cat / zone /fd Page runber 15 u . - - -

TABLE 5 1 MILLSTONE UNIT 3 - 1993 SUMMART REPORT B-G-1 EXAMINATION CATEGORY ZONE EXAM CAT. COMPONENT OR WELD DWG/P&lD & ITEM NO SYS IDENTIFICATION SIZE EXAM DATA SHEET UIR COMMENTS 001 B-G 1 RPV 179-103-33 0.00 YT-1 93-VT-049 25212-20900-SH.2 B6.50 CLOSURE HEAD WASHER 001 B-G-1 RPV 179 103-34 0.00 YT-1 93-VT-049 25212-20900-SM.2 66.50 CLOSURE HEAD WASHER 001 B-G-1 RPV 179 1G3-35 0.00 VT-1 93-VT-049 25212-20900-SH.2 B6.50 CLOSURE HEAD WASHER 001 8-G-1 RPV 179-103-36 0.00 VT-1 93-VT-049 23212-20900-SM.2 86.50 CLOSURE HEAD WASHER 001 B-G-1 RPV 179-103-37 0.00 VT-1 93-VT-049 25212-20900-SH.2 B6.50 CLOSURE HEAD WASHER 001 B-G-1 RPV 179-103-38 0.00 VT-1 93-vi-049 25212-20900-SM.2 B6.50 CLOSURE HEAD WASHER 001 B-G-1 RPV 179-103-39 0.00 VT-1 93-VT 049 25212-20900-SM.2 B6.50 CLOSURE HEAD WASrLER 001 8-G-1 RPV 179-103-40 0.00 VT-1 93-VT-049 25212-20900-SH.2 B6.50 CLOSURE HEAD WASHER' 001 B-G-1 RPV 179-103-41 0.00 VT-1 93 VT-049 25212-20900-SM.2 -B6.50 CLOSURE HEAD WASHER 001 B G-1 - RPV 179-103-42 0.00 VT-1 93 VT-049 25212 20900-SM.2 B6.50 CLOSURE HEAD WASHER Reports eksunery Legend: UIR = Unresolved indication Report - Film: skview Inden: q-sk93rpt/s-cat /rone/id Pege insber 16

Tf.BLE 5-1' MILLSTONE UNIT 3 - 1993

SUMMARY

REPORT B-G 1 EXAMINATION CATEGORT ZONE. EXAM CAT. CmPONENT OR WELD DWG/P&lD - & ITEM NO SYS IDENTIFICATION SIZE EXAM DATA SHEET UIR COMMENTS 001 B-G-1 RPY 179-103-43 0.00 VT-1 93-VT-049 25212-20900-SH.2 86.50 CLOSURE HEAD WASHER 001 B-G-1 RPV 179-103-44 0.00 VT-1 93-VT-049 25212 20900-SM.2 86.50 CLOSURE HEAD WASHER 001 B G-1 RPV 179-103 45 0.00 VT-1 93-VT-049 25212-20900-SH.2 86.50 CLOSURE HEAD WASHER 001- B G-1 RPV 179-103-46 0.00 VT-1 93-VT 049 '25212-20900-SM.2 B6.50 CLOSURE HEAD WASHER 001 B-G-1 RPV 179-103-47 0.00 VT 1 93-VT-049 25212-20900-SH.2 86.50 CLOSURE HEAD WASHER 001 B-G-1 RPV 179-103-48 0.00 VT-1 93-VT-049 25212-20900-SH.2 86.50 CLOSURE HEAD WASHER 001 B-G-1 RPV 179-103-49 0.00 VT-1 93-VT-049 25212-20900-SM.2 86.50 CLOSURE HEAD WASHER 001 B-G-1 .RPV 179-103-50 0.00 vi 1 93-VT 049 25212-20900-SH.2 B6.50 CLOSURE HEAD WASHER 001 B-G-1 RPV 179-103-51 0.00 VT-1 93-VT-049 25212 20900-SH.2 B6.50 CLOSURE HEAD WASHER 001 8-G-1 RPV 179-103 52 0.00 VT-1 93-VT-049 25212-20900-SH.2 B6.50 CLOSURE HEAD WASHER Report: aksunery Legend: UIR = Unresolved Indication Report-Fils: (kview Inde::: q-ak93rpt/s-cat / zone /id Page tu ber 17-

L TABLE 5-1 MILLSTONE UNIT 3 1993

SUMMARY

REPORT B-G-1 EXAMINATION CATEGORY ZONE EXAM CAT. COMPONENT OR WELD DWG/P&lD & ITEM NO SYS IDENTIFICATION SIZE EXAM DATA SMEET UIR COMMENTS 001 B-G-1 RPV 179-103-53 0.00 VT-1 93-vi-049 25212-20900-SM.2 B6.50 CLOSURE HEAD WASHER 001 B G-1 RPV 179-103-54 0.00 vi-1 93-VT-049 25212-20900-SN.2 B6.50 CLOSURE HEAD WASHER 011 B-G-1 RCS 03 011-002F-XX 0.00 VT-1 25212-20909-SM.1 B6.190 FLG SURF W/DISASSEM (1" ANNULAR AROUND) Report: akstanary . Legend: UIR = Unresolved Irufication Report Files ekview

 ..Index: q-ak93rpt/s-cat / zone /id Page funber 18
                                              -      _ -.     .-- - -     .__.-_L..       :-.-.-           -_ _ _ _ - - - _ _ _ _ _ - - _ _ _          _ . .    ,_      , .                  - .-
1 T' ALE 5-1 MILLSTONE UNIT 3 - 1993

SUMMARY

REPORT B-G-2 EXAMINATION CATEGORY ZONE EXAM CAT. COMPONENT OR WELD DWG/P11D & ITEM No SYS IDENTIFICAT!ON SIZE EXAM DATA SHEET UIR COMMENTS. 005 B-G-2 RCS 03-005-601 0.00 VT-1 93-VT-018 25212-20903 87.30 S/G 12 INLET MANWAY STUDS (1-16) 005 B-G-2 RCS 03-005-002 0.00 VT-1 93-VT-019 25212 20903 B7.30 S/G 1C INLET MANWAY NUTS (1-16) 005 B-G-2 RCS 03-005-003 0.00 VT-1 vi-020 25212-20903 B7.30 S/G 1C OUTLET MANWAY STUDS (1-16) 005 B-G-2 RCS 03-005-004 0.00 VT-1 93-VT-021 25212-20903 B7.30 S/G 1C OUTLET MANuAY WUTS (1-16) 030 B-G-2 RCS RCS*FE428' O.00 VT-1 93-VT-011 25212-20932 87.50 FLANGE STUDS & NUTS (IN PLACE)

         . Report; aksumery                                                                                                                                                                Legerd: UIR = Unresolved Indication Report Fila: tkview Index: q-ak93rpt/s-cat / zone /id Page number 19

_ _ . _ _ _ . _ _ _ . . _ _ _ _ . _ _ . _ . . _ _ _ _ _ _ _ . _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ m , , , .

T! ALE 5-1 MILLSTONE UNIT 3 - 1993 SUMMART REPORT B-J EXAMINATION CATECORY ZCE EXAM CAT. COMPONENT OR WELD DWG/P&lD & ITEM No SYS IDENTIFICATION SIZE EXAM DATA SHEET UIR COMMENTS 011 B-J CHS~374070-FW-18 2.00 PT 93-PT-036 25212 20917 B9.21 TEE-TO-COUPLING 023 B-J SIL SIL-5-5 SW-E 10.00 UT 93-PT-027 25212-20925 B9.11 TEE-TD-PIPE PT 93-UT-150 023 8-J SIL SIL-5-5-SW-F 6.00 UT 93-PT-027 25212-20925 99.11 TEE-TO-PIPE PT 93-UT-153 023 B-J RCS SIL-5-FW-11 10.00 UT 93-PT-026 25212-20925 89.11 N0ZZLE-TO-PIPE PT 93-UT-155 023 B-J SIL SIL-5-FW-7 10.00 UT 93-PT-054 93-039 PT INTICATIONS NOTED - ACCEPTABLE 25212-20925 B9.11 PIPE-To-VALVE PT 93-UT-156 023 8-J S!L SIL-5-FW-8 6.00 UT 93-PT-045 25212-20925 B9.11 PIPE-TO-VALVE PT 93-UT-154 030 B-J RCS 408023-FW-1 1.50 PT 93-PT-019 25212-20932 B9.21 P!PE-TO-VALVE (V-57) 030 B-J RCS 408023-FW-10 1.50 PT 93-PT-019 25212-20932 89.21 ORIFICE FLANGE-TO-P!PE 030 B-J RCS 408023-FW-19 1.50 PT 93-PT-019 25212-20932 89.21 VALVE-TO-PIPE (V-54)- 030 B-J RCS 408023-FV-22 1.50 PT 93-PT-019 25212-20932. 89.21 VALVE (V-57)-TO-PIPE Report: sksumary LeBend: UIR = Unresolved Indication Report File: 4.kview Index: q-ak93rpt/s-cat / zone /id Page nunber 20 - _ . _ _ _ . _ _ . _ _ . _ . . _ _ . _ _ _ _ . _ _ _ _ _ _ _ _ _ . _ ._.____._i___ ___...__i____. m_ __< _ _ _ .

TABLE 5-1 MILLSTONE UNIT 3

  • 1993 SUMMART REPORT B-J EXAMINATION CATEGORY ZONE EXAM CAT. COMPONENT OR WELD DWG/P&!D & ITEM NO SYS IDENTIFICATION SIZE EXAM DATA SHEET UIR COM TNTS 030 B-J RCS 408023-FW-53 1.50 PT 93-PT-019 25217-20932 89.21 ELBOW-TO-PIPE 030 B-J RCS 408023-FW-54 1.50 PT 93-PT-019 25212-20932 89.21 PIPE-TO-ELBOW 030 B-J RCS 408023 FW-57 1.50 P! 93-PT 019
 .7212-20932               89.21           PIPE TO-ORIFICE FLANGE 038                       B-J        MSI 408045-FW-2                       1.50      PT    93-PT-025 25212-20940               89.21           PIPE To-TEE 038                       BJ         NSI 408045-FW-3                       1.50      PT    93-PT-025 25212-20940               89.21           TEE-TO-PIPE 038                       B-J        MSI 408045 FW-6                       1.50      PT    93-PT 025 25212-20940               89.21           TEE TO-COUPLING 041                       B*J        HSI 408043-FW-1                       1.50      PT    93-PT 048 25212-20943               89.21           PIPE-TO TEE 041                       BJ         RCS 408043-FW-14                      1.50      PT    93-PT-048 25212-20943               89.21           TEE-TO-PIPE 041                       BJ         RCS 408043-FW-17                      1.50      PT    93-PT-039  93 030 PT INDICATIONS NOTEli - ACCEPTABLE 25212-20943               39.21           PIPE-TO-ELBOW 041                       8J         RCS 408043-FW-18                      1.50      PT    93-PT-037 25212-20943               89.21           ELBOW-To-PIPE Report: aksunsry                                                                                                                     Legend: UIR = Unresolved Indication Report Fils: akview

-Index: q-ak93rpt/s-cat /rone/id Pege number 21

TABLE 5-1 MILLSTONE UNIT 3 - 1993

SUMMARY

REPORT B-J EXAMINATI0r4 CATEGORY ZONE EXAH CAT. COMPONENT OR WELD DWG/P&lD & ITEM NO SYS IDENTIFICATION SIZE EXAM DATA SHEET UIR COMMENTS 041 B-J MSI 408043 FW-2 1. PT 93-PT-044 25212-20943 89.21 TEE-TO-PIPE 041 8-J NSI 408043-FW-6-1 1.50 PT 93 PT-044 25212-20943 89.21 PIPE-To-VALVE (V-145) 041 B-J RCS 408043-FW-7 1.50 PT 93-PT-044 25212-20943 89.21 VALVE TO-PIPE 041 8-J RCS 408043-FW-8 1.50 PT 93-PT-048 23212 20943 89.21 PIPE-TO-TEE 041 8-J RCS RCS-20*FW-42 1.50 PT 93-PT-040 93-031 PT INDICATIONS NOTED - ACCEPTABLE 25212-20943 89.21 PIPE-TO-REDUCER 041 8-J RCS RCS-506-1-SW-4 3.00 PT 93-PT-048 25212-20943 B9.21 ELBOW-To-PIPE 041 'BJ RCS RCS-506-1-SW-5 3.00 PT 93-PT-048 25212-20943 87.21 PIPE-To-ELBOW 041 8-J RCS -RCS-506-1-SW-6 3.00 PT 93-PT-038 93-029 PT INDICATIONS NOTED - ACCEPTABLE 25212-20943 89.21 REDUCER-T0-PIPE 042 8-J DRN 407327-FW-7 2.00 PT 93-PT 028 25212-20944 89.21 ' PIPE-TO-N0Z2LE

    -043                      BJ                     DRN 407255 FW-1                         2.00      PT   93-PT 077 25212-20945             B9.21                         P1PE-To-PIPE Reports eksumery                                                                                                                                   .Le9end: UIR = Unresolved Indlcation Report Files akview
   -Inden: q-ek93rpt/s est/rone/td Page ru ber 22

- _ _ . . _ _ . . . _ . . . _ . - - _ . - . . - = _ -- _ _ _ _ . _ _- _ . . . . . I

, = , . mj_ ._ )c 6e b

                                                                                  .E-        u

_5  :

                                                                                  )          I
                                                                                             ^

T_ o

                                                                                  }

5 5 E 6 5 d a E

                                                                                  =
                                                                 .                1, -            ,

S B a i M

                                                                -5
                                                                 =

5 5 9 > I i n.

          -        5                                             $

E

          =        ::: -      m     .,   m     .     .,   e      ~-    .     .

W 3 3 5 8 5 5 5 25 5 5 Tm i-!y h. 2 h 9 h 9 h 9 h 9 h 9 h 9 h 9 hh 99 h 9 h 9

       *RE
       .$ .< :-    $   t      t     t    t     t     t    t      t     t     t sm5
          -g
          ~.

5, N 8 8 8 8 8 8 8 8 8 8 a a a a a 3 a a A A d s-t; 1.

          ~

g 3 N s e e s3 2 B E oS

                                               ~Wser 2     W 8--    ~r     es    vt      ?             y[     ee    er    ee ES      26    27    26   22    2?    2r   2. 27    26    2T
                *2     47     42       7 44    U 2 46      6   42    47    42                   -

gg M $4 W 84 87 7 8W 4

                    =
                    -  .o._.. o. s. .e . s. s~ Hae. se 4     .-
                                                             =
                                                                 .B_g
                                                                    . s v.

4 $e.

                        =     =     =    =

O

                                               =

O

                                                     =

O

                                                          =

Q 5 O O .O M Q Q O

                 *O
                -a K

rW E N E E N s N E E N =

                ;5" 74    74 74 74
                                         .     ?. d. 74   ?. d.  ?. d. 74    ?
                                                                             . d.       g e.

Y t E g g S g g S S ". *

                                                                                  }JE e      ~    $      ~    R     ~     ~    R      R    $     $

re

4 4 4 4 4 4 4 4 4 4 ..

gg ma ma m n- ma ma ma ma ma ma mm- .z

                ~O      80    30. 3A   3N    3N    80   30     3M    3N    30   R 1!

L

i-TABLE 5-1 - MILLSTONE UNIT 3 - 1993

SUMMARY

REPORT B-J EXAMINATION CATEGORT ZONE EXAM CAT. COMPONENT OR WELD DWG/P&lD '& ITEM NO SYS IDENTIFICATICW SIZE' EXAM DATA SHEET UIR COMMENTS 043 -B-J DRN '40B002 FW-8 2.00 PT 93-PT-018 25212-20945 89.21 ELBOW-TO-PIPE 043 B-J DRN 408002-FW-9 2.00 PT 93-PT 018 25212-20945 89.21 P1PE-70-ELB0.8 043 B-J RCs 408005-FW-1 2.00 PT 93-PT-055 25212-20945 B9.21 PIPE-TO-ELBOW 043 8-J RCS 408005-FW-2 2.00 PT 93 PT-055 25212 20945 B9.21 ELBOW-TO-PIPE 043 B-J RCS 408005-FW-3-1 2.00 PT 93-PT-055 25212-20945 89.21 N0ZZLE TO-PIPE 044 B-J DRN RCS-176-FW 1 2.00 PT 93 PT 034 25212-20946 B9.21 P!PE-70 TEE 045 B-J DRN 408004-FW-1 2.00 PT 93-PT-017 25212-20947 89.21 - PIPE-TO-VALVE (V-211) 045 B-J RCS 408004-FW-3 2.00 PT 93-PT-052 25212-20947 89.21 ELBOW-To-PIPE-045 B-J RCS 408004-FW 2.00 PT 93-PT-017 25212-20947 B9.21 PIPE-TO-VALVE (V-210) 045 B-J DRN 408004-FW-5 2.00 PT 93-PT-017 25212-20947 89.21 VALVE-TO-PIPE (V-210) Report: aksumery Legend: UIR = Unresolved Irdicatfori Report File: c.kylew Index: q-ak93rpt/s-cat / zone /fd Page rumber 24

TABLE 5-1' MILLSTONE UNIT 3 - 1993

SUMMARY

REPORT 9-J EXAMINATION CATEGORY ZONE. EXAM CAT. COMPONENT OR WELD DWG/P&lD & ITEM NO SYS IDENTIFICATION SIZE EXAM DATA SHEET UIR COMMENTS 045 BJ DRN 408004-FW-7 1.50 PT 93 PT-017 25212-20947 89.21 TEE *TO-COUPLING 045 B-J DRN 408004-FW-8 2.00 PT 93-PT-017 25212-20947 89.21 TEE T0-PIPE 045 8-J RCS 408007-FW-4 2.00 PT 93-PT-052 25212-20947 89.21 ELBOW TO-PIPE 045 8-J RCS 408007 FW-5 2.00 PT 93-PT-052 25212-20947 B9.21 PIPE-To ELBOW 045 B-J RCS 408007-FW-6 2.00 PT 93-PT-052 25212-20947 89.21 N0Z2LE TO-PIPE 045 B-J DRN RCS-178-FW-1 2.00 PT 93-PT-047 25212-20947 89.21 PIPE-TO-TEE 045 B-J DRN RCS-178-FW-13 2.00 PT 93-PT-017 25212-20947 B9.21 ELBOW-To-PIPE 045 B-J CRN RCS-178-FW-14-1 2.00 PT 93-PT-017 25212-20947 B9.21 PIPE-To-ELBOW 045 BJ DRN RCS-178-FW-15 2.00 PT 93-PT 017 25212-20947 89.21 VALVE-TO-PIPE (V-211) 045 8J DRN RCS-178-FW 18-1 2.00 PT 93-PT-015 25212-20947 89.21 PIPE-TO-ELBOW Report: aksumery Legend: UIR = Unresolved Indication Report

     ' Files (kview Index: q-ak93rpt/s-cat /rone/id Pege rumber 25~

TABLE 5-1. MILLSTONE UNIT 3 - 1993

SUMMARY

REPORT B-J EXAMINATION CATEGORY ZONE EXAM CAT. COMPONENT OR WELD DWO/P&ID & ITEM NO SYS IDENTIFICATION SIZE EXAM DATA $4EET UIR COMMENTS 045 B-J DRN RCS 178-FW-5-1 2.00 PT 93-PT-015 25212-20947 B9.21 ELBOW-TO-PIPE 046 8J DRN RCS-148-FW-11 2.00 PT . 93-PT-035 '25212-20948 B9.21 PIPE-TO-TEE 046 8-J DRN RCS-148-FW-12 2.00 PT 93-PT-035 25212-20948 B9.21 TEE-TO-PIPE 046 8-J DRN RCS-148-FW-13 2.00 PT 93-PT-035 25212-20948 B9.21 PIPE-TO-ELBOW 046 B-J DRN RCS 948-FW-14 2.00 PT 93-PT-035 25212-20948 89.21 - ELBOW-TO-PIPC 046 B-J DRM RCS-148-FW-40 2.00 PT 93-PT-016 25212-20948 89.21 TEE-To-PIPE 046 B-J- DRN-RCS-148-FW-41 2.00 PT 93-PT 016 25212-20948 B9.21 PIPE-TO-TEE 048 B-J RCS 3-CMS 15 FW-10 3.00 PT 93-PT-050 25212-20950 B9.21 PIPE-TO-VALVE (V-148)' 048 B-J RCS 3-CMS-15-FW-11 3.00 PT 93-PT-050 25212-20950 89.21 VALVE-TO-PIPE (V-148) 068 B-J RCS 3-CMS-15-FW-12 3.00 PT 93-PT-050 25212-20950 89.21. PIPE-70-ELBOW Report: aksumery Legend: UIR = Unresolved Indication Report Fils: akview Index: q-ak93rpt/s-cat / zone /id Pege nuder 26

                                                                                                                                                                                                        'T TABLE 5-1 MILLSTONE UNIT 3 - 1993 

SUMMARY

REPORT B-J EXAMINATION CATEGORY IONE EXAM CAT. COMPONENT OR WELD DWG/P&ID E ITEM lto SYS IDENTIFICATION SIZE EXAM DATA SHEET UIR COMMENTS 048 B-J RCS 3-CHS-15-FW-13 3.00 PT 93-PT-050 25212-20950 89.21 ELBOW-TO-PIPE 048 B-J RCS 3-CHS-15-FW-14 3.00 PF 93-PT-050 25212-20950 89.21 PIPE-TO-ELBOW 048 B-J RCS 3-CHS-15-FW-22 3.00 PT 93-PT-050 25212-20950 89.21 PIPE-TO-ELBOW 048 B-J RCs 3-CHS-15-FW-23 3.00 PT 93-PT-029 25212-20950 89.21 ELBOW-TO-PIPE 048 B-J RCS 3-CHS-15-FW-24 3.00 PT 93-PT-029 25212-20950 89.21 PIPE-TO-ELBOW 048 B-J RCS 3-CHS-15 FW-25 3.00 PT 93-PT 029 25212-20950 89.21 ELBOW-To-PIPE 048 B-J RCS 3-CHS-15 FW-26 3.00 PT 93-PT-050 25212-20950 89.21 PIPE-TO-ELBOW

             .048                                     B-J         RCS 3-CHS 15-FW-28                          3.00       PT         93-PT 066 25212-20950                           89.21            ELBOW-TO-PIPE 048                                   B-J         RCS 3-CHS-15-FW-9                           3.00       PT         93-PT-050 25212-20950                           89.21            VALVE-TO-PIPE (V-147).

Report: aksumery Legend: UIR = Unresolved Indication Report File: skview Index: q-sk93rpt/s-cat / zone /id Page ruber 27 _. _. _ _ . _ . . . _ _ _ . _ . . _ _ ._m - _ , . . - _ . , _ _ _ _ . _ . _ _ _ -

TABLE 5-1 MILLSTONE UNIT 3 - 1993

SUMMARY

REPORT B-K 1 EXAMINATION CATEGORY ZCCE EXAM CAT. COMPONENT OR WELD DWG/P&lD & ITEM NO SYS IDENTIFICATION $1ZE EXAM DATA SHEET UIR COMMENTS 029 s K-1 RCS RCS-504A-PSSH509 8.00 PT 93-PT-062 SIDE UNDER CLAMP NOT ACCESSIBLE, 83% OF WELD EXAMINED 25212-20931 B10.10 INTEGRAL ATTACH TO PIPE FOR 3-RMS-1 PSSH509 029 B-K-1 RCS RCS-504A-PSSH510 8.00 PT 93-PT-063 SIDE UNDER CLAMP NOT ACCESSIBLE, 83% OF WELD EXAMINED 25212-20931 810.10 INTEGRAL ATTACH To PIPE FOR 3-RHS-1-PSSH510 030 B-K-1 RCS RCS-5048-PSSH507 8.00 PT 93 PT-053 SIDE UNDER CLAMP NOT ACCESSIBLE, 83% OF UELD EXAMINED 25212-20932 810.10 INTEGRAL ATTACH TO PIPE FOR 3-RMS-1-PSSH507 030 B-K 1 RCS RCS-504B-PSSH508 8.00 PT 93-PT-065 SIDE UNDER CLAMP NOT ACCESSIBLE, 83% OF WELD EXAMINED 25212-20932 810.10 INTEGRAL ATTACH TO PIPE FOR 3-RHS 1-PSSH508 Report: sksumery Legend UIR = Unresolved Indicatf ort Report File: skview .Indet q-ek93rpt/s-cat /rone/id Page rumber 28 '-

TABLE 5-1 MILLSTONE UNIT 3 - 1993

SUMMARY

REPORT B-O EXAMINATION CATEGORY ~ 20NE- , EXAM CAT. COMPONENT OR WELD DWG/P&ID & ITEM NO SYS IDENTIFICATION SIZE EXAM DATA SHEET UIR COMMENTS 002 B-O RPV. 03-002-001 0.00 PT 93-PT-051 25212-20900-SM.3~ B14.10 INCLUDE 001 70 & 73 i

                                                                                                                                                                                                                                                                       +

i Report: aksumery Legend: UIR = Unresolved Indication Report File: aOwiew Inden: q-sk93rpt/s-cat /rone/id Page nunber 29

    . . . . . . - - - . . , , . .        . , - - - . . . .. . . . . . - , - - , - . - ~ ,             - - ~ . - . . . , .            .      . --. ~. . . , , , , , .       . . . . . . . - . - . .             - - - - - - - _ - . . -   .x   - _ - - _ _- - - -

lllll lll!ll t r 0 o p 3 e r R e n bm o u i t n a e g c i a dr P I d e l v o s r e n U

                                                             =

R I U J. u L S T N E M M O C R I T U R O P E T R E 5 9 6 6 0 7 E 0 0 1 0 1 1 Y Y H 0 0 0 0 0 0 R R S - - - - - - A O T T T T T T MG A V- -V -V V V V M E T - - - U T A 3 3 3 3 3 3 S A D 9 9 9 9 9 9 1 C

         - 3 5 9 N                    M    2           2 9 O                 A     -           -

E 1 I X T T L T E V V B - A A N T 3 I M T A I X E 0 0 N E Z 0 0 U I B S 0 0 E - N C O T S L L I M D L E L L WN L L O E E R I H H O T S S A 2 - 7 - T C 0 O 0 o N I 0 T 0 T E F - * - - N I 4 E 4 E O T 7 L 7 L D N 0 Z 0 Z M E - Z - Z O D 3 0 3 0 C I 0 N 0 N S S S Y M M S R R

                            . O T N A

C M E 3 3 M T 3 3 d A I B B i X - 2 - 2 / E & C C C C e n o z

                                                                     /

t a c s

                                                                     /

y t r p e r 4 4 m 3 8 8 u w9 9 s ek 9 k i a D 0 0 e v -

                              !          2          2            k q E            -

P 2 2 s e t  : E / 1 1 r s x N G 4 2 4 2 o e e OW 7 5 7 5 pl d 1 Z D 0 2 0 2 ei n R F I e

T1.BLE 5-1 MILLSTONE UNIT 3 - 1993

SUMMARY

REPORT C-C EXAMINATION CATEGC4Y ZONE EXAM CAT. CCEPONENT OR WELD DWG/P&lD & ITEM No STS IDENTIFICATION SIZE EXAM DATA SMEET UIR COMMENTS 058 CC MS 3-MSS-1-PSSH129 0.00 MT 93-MT-040 93-028 MT INDICATIONS NOTED REMOVED BY CLEANING 25212-20960 C3.20 ' WELDED ATTACH FW-46,FW-47,FW-48 & FW-49 93-MT-048 070 C-C FWS FWS-13-FW-62-1^ 0.00 MT 93-MT-027 25212-20980 C3.20 REINFORCING PAD-TO-BRANCH PIPE 070 C-C FWS FWS-13-FW-63-1^ 0.00 MT 93-MT-030 93-024 MT INDICATIONS NOTED - ACCEPTABLE 25212-20980 C3.20 RE!NFORCING PAD-TO-MAIN PIPE 071 CC FWS FWS-15-FW-60-1^ 0.00 MT 93-MT 0;6 25212-20981 C3.20 REINFORCING PAD-TO-PIPE '071 CC FWS FWS-15-FW-61-1^ 0.00 MT 93-MT-006 25212-20981 C3.20 REINFORCING PAD-TO-PIPE 076 C-C SIL 3-SIL-1-PSSP415 0.00 PT 93 PT-075 25212-20968 C3.20 WELDED ATTCHMENT

.076                       C-C       SIL 3-SIL-1-PSSP420                      0.00       PT     93-PT-020          ROUNDED INDICATION NOTED - ACCEPTABLE 25212-20968               C3.20           kTLDED ATTACHMENT                                    93-FT-021 93-025 Report: aksunary                                                                                                                       Legend: UIR = Unresolved Indication Report Fils: akview Index: q-ek93rpt/s-cat /rone/id Page number 31

T/J,LE 5-1 MILLSTONE UNIT 3 + 1993

SUMMARY

REPORT C-F-1 EXAMINATION CATEGORY ZONE EXAM CAT. COMPONENT OR WELD DWG/P&lD & ITEM NO SYS IDENTIFICATION SIZE EXAM DATA SHEET UIR COMMENTS 076 C-F-1 SIL SIL 158-FW-6 10.00 UT 93-PT-049 23212-20968 C5.11 PIPE-TO-VALVE (V-17) PT 93-UT-149 076 C-F-1 S!L SIL-5-4-SV-B 10.00 UT 93-PT-024 25212-20968 C5.11 PIPE TO-ELBOW PT 93-UT 148 079 C-F-1 SIL SIL-40-FW 1 6.00 UT 93-PT-031

  -25212-20971                   C5.11            VALVE-TO-PIPE                                   PT         93-UT-125 93-UT-142 079                           C F-1       SIL SIL-501-1-SW-10                        6.00      UT          93-PT-031 25212-20971                   C5.11            ELBOW-TO-PIPE                                   PT          93-UT-126 079                           C-F-1       SIL SIL-501+1-SV-2                         10.00     UT          93-PT-067    93-040 PT INTICATIONS NOTED REMOVED BY CLEANING 25212-20971                   C5.11            PIPE-TO-ELBOW                                   PT          93-PT-072 93-UT-163 079                           C-F-1     ' SIL SIL 501-1-SW-3                         10.00     UT          93-PT-031 25212-20971                   C5.11            ELBOW-TO-PIPE                                   PT          93-UT-118 079                           C-F-1       SIL SIL 501-1-SW-4                         10.00     UT          93-PT-031 25212-20971                   C5.11            PIPE-TO-TEE                                     PT          93-UT-117 079                           C-F-1       SIL SIL-501-1-SW-5                         6.00      UT          93-PT-031 25212-20971                   C5.11            TEE-To-PIPE'                                    PT          93-UT 128 079                           C-F-1       SIL SIL-501-1-SW-6                         10.00     UT          93-PT-031 25212-20971                   C5.11            TEE-TO-PIPE                                     PT          93-UT-119 Report: aksunary -                                                                                                                                    Legend: UiR = Unresolved Indication Report File: akview Inde::: q ak93rpt/s-cat / zone /id Page nisber 32

_ ~ _ . ------_--__-..__.._:__-_-_.___-_.

n TABLE 5-1 MILLSTONE UNIT 3 - 1993

SUMMARY

REPORT C-F-1 EXAMINATI0tt CATEGORY ZONE EXAM CAT. COMPONENT OR WELD DWG/P&lD & ITEM NO STS IDENTIFICATION SIZE EXM DATA SHEET UIR COMMENTS 079 C-F 1 s!L SIL-501-1-sU-7 10.00 UT 93-PT-031 25212-20971 C5.11 PIPE-TO-REDUCER PT 93-UT-120 079 C-F-1 $1L s!L-501*1-sW-8 6.00 UT 93 PT 031 25212-20971 C5.11 REDUCER TO-PIPE PT 93-UT-131 079 C-F-1 SIL SIL-501-1-sW-9 6.00 UT 93-PT-031 UT INDICATION DETERMINED TO BE GEOMETRY 25212-20971 C5.11 PIPE-70-ELBOW PT 93-UT-132 93-034 93-UT-147 93-UT-151,2 93-UT-157 079 C-F-1 SIL 51L-502-1-sW-10 6.00 UT 93-PT-032 25212-20971 C5.11 PIPE-TO-ELBOW PT 93-UT-144 079 C F-1 SIL SIL-502-1 SW-9 6.00 UT 93-PT-032 25212-20971 C5.11 ELBOW-To-PIPE PT 93-UT-143 079 C-F-1 5IL $1L 9-FW-1 6.00 ' UT 93-PT-030 93-027 PT IIDICATIONS NOTED - ACCEPTABLE 25212-20971 C5.11 PIPE-To-VALVE (V-7) PT 93-UT 124 93-UT-141 079 C-F-1 SIL SIL 9-FW-2^ 10.00 UT 93-PT-070 25212-20971 C5.11 PENETRATION-TO-PIPE #93 PT 93-UT-162 RELIEF REQUEST: IR-12 079 C-F-1 SIL 51L 9-FV-3 6.00 UT 93-PT-031 25212-20971 C5.11 . PIPE *TO-VALVE (V-6) PT 93-UT-127 Report: akstsery Legend: UIR = Unresolved Indication Report

     'Fils: akview -

Indext q-ak93rpt/s-cat / zone /id Page tuber 33

TABLE 5-1 MILLSTONE UNIT 3 - 1993

SUMMARY

REPORT C-F-1 EXAMINATION CATEGORY ZONE EXAM CAT. COMPONENT OR WELD DWG/P&ID & ITEM NG -STS IDENTIFICATION SIZE EXAM DATA SHEET UIR COMMENTS 091 C-F-1 SIL SIL-38-FW-4 6.00 UT 93-PT-033 25212 20868 C5.11 VALVE-TO-PIPE (V-6) PT 93-UT-121 091 C-F-1 SIL SIL-501-2-SW-2 6.00 UT 93-PT-033 25212-20868 C5.11 PIPE-TO-ELBOW PT 93-UT-122 091 C-F-1 SIL SIL-501-2-SW-3 6.00 UT 93-PT-033 25212-20868 C5.11 ELBOW-T0-PIPE PT 93-UT-123 097 C-F-1 QSS QS$-3-1-LS-1 12.00 UT 93-PT-005 25212-20874 c5.12 P!PE LONG SEAM PT 93-UT-027 097 C-F-1 QSS QSS-3-1-LS-2 12.00 UT 93-PT-005 23212-20874 C5.12 ELBOW LONG SEAM PT 93-UT-028

  '097                         C-F-1      QSS QSS-3-1-LS-3                    12.00    UT     93-PT-005 25212-20874                C5.12            ELBOW LONG SEAM                        PT     93-UT-029 097                        C-F-1      QSS QSS-3-1-LS-4                    12.00    UT     93-PT-005 25212-20874                c5.12             PIPE LONG SEAM                        PT     93-PT 009 93-UT-030 097                        C-F-1      QSS QSS 3-1-LS-5                    12.00    UT     93-PT-009 25212-20874                C5.12             ELBOW LONG SEAM                       PT     93-UT-031 097                        C-F-1      QSS QSS-3-1-LS-6                    12.00    UT     93-PT-009 25212-20874                c5.12             ELBOW LONG SEAM                       PT     93-UT-032 097                        C-F 1      QSS QSS-3-1-LS-7                    12.00    UT     93 PT-009 25212-20874                c5.12             PIPE LONG SEAM                        PT     93-PT-014 93-UT-033 Report: akstanery                                                                                                          Legerd: UIR = Unresolved Irdication Report
 -File: akview Index: q-ak93rpt/s-cat / zone /id-Page ruber 34

. - _ . ~ . . .. _ . , .. . , .- _ _

TABLE 5-1 MILLSTONE UNIT 3 - 1993 SUMMART REPORT C-F-1 EXAMINATION CATEGORY 20NE EXAM CAT. COMPONENT OR WELD DWG/P&lD & ITEM NO STS IDENTIFICATION SIZE EXAM DATA SHEET UIR COMM2NTS 097 C-F-1 QSS QSS-3-1-SW-C 12.00 UT 93-PT-005 71% UT COVERAGE 25212-20874 C5.11 PIPE-TO-ELBOW PT 93-UT-026 097 C-F-1 QSS QSS-3-1-SW-D 12.00 UT 93-PT-006 93-007 76% UT COVERAGE, PT INDICATIONS NOTED - ACCEPTABLE 25212-20874 C5.11 ELBOW-TO-PIPE PT 93-UT-025 097 C-F-1 055 QSS-3-1-SW-E 12.00 UT 93-PT-009 77% UT COVERAGE 25212-20874 C5.11 P!PE-TO-ELBOW PT 93-UT-024 097 C-F-1 055 QSS-3 1-SW-F 12.00 UT 93-PT-009 71% UT COVERAGE 25212-20874 C5.11 EL-TO-PIPE (ADD EXAM REQ: LONG SEAMS 6 & 7) PT 93-UT-023 097 C-F-1 QSS QSS-3 1-SW-G 12.,00 UT 93-PT-014 70% UT COVERAGE 25212-20874 C5.11 PIPE-TO-ELBOW PT 93-UT-041 097 C-F-1 QSS QSS-3 2-LS-10 12.00 UT 93-PT-009 25212-20874 C5.12 ELBOW LONG SEAM PT 93-UT-035 097 C-F-1 055 QSS-3-2-LS-11 12.00 UT 93-PT-011 93-013 PT INDICATIONS NOTED - ACCEPTABLE 25212-20874 C5.12 PIPE LONG SEAM PT 93-UT-036 097 C-F-1 QSS QSS-3-2-LS-9 12.00 UT 93-PT-009 25212-20874 C5.12 ELBOW LONG SEAM PT 93-UT-034 097 C-F-1 QSS QSS-3-2-SW-C 12.00 UT 93-PT-012 93-014 72% UT COVERAGE, PT INDICATIONS NOTED - ACCEPTABLE 25212-20874 C5.11 ELBOW-TO-PIPE PT 93-UT 043 097 C-F-1 QSS QSS-3-4-LS 10 12.00 UT 93-PT-007 25212-20874 C5.12 ELBOW LONG SEAM PT 93-UT-037

                 . Report: aksunary                                                                                                                                                                                     Legend: UIR = Unresolved Indication Report File: akvfew Index: q-ek93rpt/s-cat / zone /id l

Page raaber 35 -

 . _ _ . _ _ _ _            _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ , _ _ _ _ _ . _ .                                     ~ , _ _ . _                .               _                         .                         -

T!.BLE 5-1 MILLSTONE UNIT 3 - 1993

SUMMARY

REPORT C-F-1 EXAMINATION CATEGORY ZONE EXAM CAT. COMPONENT OR WELD DWG/P&ID ' & ITEM NO SYS IDENTIFICATION SIZE EXAM DATA SHEET UIR COMMENTS a -097 C-F-1 QSS QSS-3-4-LS-11 12.00 UT 93-PT-007 25212-20874 C5.12 ELBOW LONG SEAM PT 93-UT-038 097 C-F-1 QS$ QSS-3-4-LS-12 12.00 UT 93-PT-007 25212 20874 c5.12 ELBOW LONG SEAM PT 93-UT 039 097 C-F-1 QSS QSS-3-4-LS-13 12.00 UT 93-PT 007 25212-20874 C5.12 ELBOW LONG SEAM PT 93-UT 040 097 C-F-1 QS$ QSS-3-4-SV-F 12.00 UT 93-PT-007 75% UT COVERAGE 25212-20874 C5.11 PIPE-TO-ELBOW PT 93-UT-044 097 C-F-1 QSS QSS-3-4-SW-G 12.00 UT 93-PT-007 74% UT COVERAGE 25212-20874 C5.11 ELBOW-TO-PIPE PT 93-UT-045 097 C F-1 QSS QSS-3-4-SW-H- 12.00 UT 93-PT 007 76% UT COVERAGE 25212-20874 C5.11 P!PE-TO-ELBOW PT 93-UT-046 097" C-F-1 QSS QSS-3-5-LS-2 12.00 UT 93-PT-008 25212-20874 C5.12 ELBOW LONG SEAM PT 93-UT 069-097 C-F-1 QSS QSS-3-5-LS-3 12.00 UT 93-PT-008 25212-20874 C5.12 ELBOW LONG SEAM PT 93-UT-070 097 C-F-1 ' QSS QSS-3-5-LS-4 12.00 UT 93-F T-008 25212 20874 c5.12 PIPE LONG SEAM - PT 93-UT-071 097 .C-F-1 Q55 QSS-3-5-LS-5 12.00 UT 93-PT-008 25212-20874 c5.12. ELBOW LONG SEAM PT 93-UT-072 Report: eksunary . Legend: UIR = Unresolved Indication Report Fits: akview Index: q-ak93rpt/s-est/ zone /id Page ruber 36

                           ._ .:-_._. _     -.2:____-.--_-   . - - - _ - - _ . - - _ _ . - - - . .                                   .       .                  .                           -

TABLE 5-1 MILLSTONE UNIT 3 1993

SUMMARY

REPORT C-F-1 EXAMINATION CATEGORY

  . 20::E                        EXAM CAT.        COMPONENT OR WELD DWG/P&lD                    & ITEM NO SYS IDENTIFICATION                         SIZE     EXAM DATA SHEET UIR COMMENTS 097                         C-F-1     ' QSS QSS-3-5 LS-6                         12.00    UT     93-PT-008 25212 20874                 C5.12            ELBOW LONG SEAM                              PT     93-UT-073

-- 097 C-F-1 QSS QSS-3 FW-28 12.00 UT' 93-PT-014 78% UT COVERAGE 25212-20874 C5.11 ELBOW-TO PIPE (ADO EXAM REQ: QSS-3-2-LS-8) PT 93-UT-042 097 C-F-1 QSS QSS-3-FW-4J-MR 12.00 UT 93-PT-007 75% UT COVERAGE 25212-20874 C5.11 EL-TO-PIPE (ADO REQ: LONGSEAMS 12 & 13) PT 93 UT-047 097 C-F-1 QSS QSS-3-FW-50R 12.00 UT 93-PT-008 25212-20874 C5.11 ELBOW-TO-PlPE PT 93-UT-081 097 C-F 1 QSS QSS-3-FW-5ER 12.00 UT- 93-PT-008

   .'25212-20874                 C5.11            PIPE-TO-EL (ADD EXAM REQ:LONGSEAMS 4,5,& 6) PT      93-UT-080 098                         C-F -1 '    QSS QSS-1 1-LS-1                       -12.00     UT     93-PT-010
   ,25212-20875                  C5.12_           ELBOW LONG SEAM                              PT     93-UT-074 098                       ' C- F 1. QSS QSS-1 1-LS-2                         12.00    UT . 93-PT-010 25212-20875                 C5.12            ELBOW LONG SEAM                              PT     93-UT-075 093                         C-F-1       QSS QSS-1-1-LS-7                         12.00    UT     93-PT-023 25212-20875                 C5.12            ELBOW LONG SEAM                              PT   ,93-UT-103
    -098                         C-F-1       QSS QSS-1-1-LS-8                         12.00    UT     93-PT-023-25212-20875                 C5.12            ELBOW LONG SEAM .                            PT     93-UT-104
   .098                          C-F 1       QSS QSS-1-1-LS-9                         12.00    UT     93-PT-023
    '25212-20875-                C5.12            PIPE LONG SEAM                               PT     93-UT-105 Report; aksumary-                                                                                                              Legend: UIR = Unresolved Indication Report File: akview Irdex: q-ak93rpt/s-cat / zone /id.

Page tuber 37.'

p-TABLE 5-1 MILLSTONE UNIT 3 - 1993 SUMMART REPORT C-F-1 EXAMINATION CATEGORY 20NE EXAM CAT. COMPONENT OR WELD DWG/Pl!D & ITEM NO STS IDENTIFICATION SIZE EXAM DATA SHEET UIR COMMENTS 098 - C-F-1 QS$ QSS 1-1-SW-C 12.00 UT 93-PT-023 70% UT COVERAGE 25212 20875 C5.11 ELBOW-TO-PIPE PT 93-UT-102 098 C-F 1 QSS QSS-1-2-LS-1 12.00 UT 93-PT-013 23212-20875 C5.12 PIPE LONG SEAM PT 93-UT-076 098 C F-1 QSS QSS-1-2-LS-2 12.00 UT 93-PT-013

   -25212-20875                                     C5.12          ELBOW LONG SEAM                                                                   PT    93-UT-077 098                                            C-F-1     QS$ QSS-1-2-LS-3                                                             12.00     UT    93-PT-013 25212 20875                                    C5.12          ELBOW LONG SEAM                                                                   PT    93-UT-078 098                                            C-F-1     QSS QSS 1-2-LS-4                                                            12.00      UT    93-PT-013 25212-20875                                    C5.12          PIPE LONG SEAM                                                                    PT    93-PT-010 93-UT 079 098                                            C-F-1     QSS QSS-1-2-SV-B                                                             12.00     UT    93-PT-013     75% UT COVERAGE 25212 20875                                    C5.11          ELBOW-TO-PIPE                                                                     PT    93-UT-083 098                                            C-F-1     QSS QSS-1-2 SW-C                                                             12.00     UT    93-PT-013     73% UT COVERAGE 25212-20875                                    C5.11          PIPE-TO-ELBOW                                                                     PT    93-UT-084 098                                            C-F 1     QSS QSS-1 4-LS-7                                                             12.00     UT    93-PT-023 25212-20875                                    C5.12          ELBOW LONG SEAM                                                                   PT    93-UT-107 078                                            C-F-1     03S QSS-1-4-LS-8                                                             12.00     UT    93-PT-023 25212-20875                                    C5.12          ELBOW LONG SEAM                                                                   PT    93-UT-108 098                                      -C-F-1          QSS QSS-1-4-LS 9                                                             12.00     UT    93-PT-023 25212-20875                                    C5,12          TEE LONG SEAM                                                                   - PT    93-UT-109 Report: tksuury .                                                                                                                                                                     Legend: UIR = Unresolved trxfication Report

_ Fits: akview Index: q-ak93rpt/s-cat / zone /fd Page number 38

4-TABLE 5-1 MILLSTONE UNIT 3 - 1993

SUMMARY

REPORT C-F-1 EKAMINATION CATEGORY ZONE EXAM CAT. COMPONENT OR WELD DWG/TRID & ITEM NO SYS IDENTIFICAtt04 SIZE EXAM DATA SHEET UIR COMMENTS 098 C-F-1 QSS QSS-1-4-SW-C 12.00 UT 93-PT-023 74% UT COVERAGE 23212-20875 C5.11 ELBOW-TO-TEE PT 93-UT-106 098 C-F-1 QSS QSS-1-FW 1 12.00 UT 93-PT-010 75% UT COVERAGE 25212-20875 C5.11 PIPE-TO-ELBOW PT 93-UT-082 Reports aksunery Legend: UIR = Unresolved Indication Report File: akview Index: q-ak93rpt/s-cat / zone /id Page number 39 _ . _ _ _ . _ _ _ . _ _ _ _ _ . _ _ _ . _ . _ . __. _ _ . . _ _ - _ _ . _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ . _ _ _ . _ _ . _ _ _ _ _ _ . - _ _ _ . - _ ~_ . - _ _ -_ ~_ _ _ _ _ _ _ _ _ _

TABLE 5-1 MILLSTONE UNIT 3 - 1993

SUMMARY

REPORT C-F-2 EXAMINATION CATEGORY ZONE EXAM CAT. COMPONENT OR WELD DWG/P&lD & ITEM NO SYS IDENTIFICATION SIZE EXAM DATA SHEET UIR COMMENTS 058 C-F-2 MS MSS-503-4-LS-2 30.00 UT 93-UT-111 25212-20960 C5.52 LONG SEAM MT 93-MT-041 058 C-F-2 MS MSS-503-4-LS-3 30.00 UT 93-UT-112 25212-20960 C5.52 LONG SEAM MT 93-MT-041 058 C-F-2 MS mss-503-4-LS-4 30.00 UT 93-UT-110 25212-20960 C5.52 LONG SEAM FROM CIRC WELD MSS-503-FW-4-3M MT 93-MT-041 058 C-F-2 MS MSS-503-FW-4-3M 30.00 UT 93-UT-113 25212-20960 'C5.51 EL-To-P!PE (ADO REQ

  • LONGSEAMS 2,3,8 4) MT 93-MT-041 058 C-F-2 MS MSS 503-FW 6-3M 30.00 UT 93-UT-116 25<212-20960 C5.51 PIPE-TO-PIPE (ADD REQ: LONGSEAMS 11 & 12) MT 93-MT-041 058 C-F-2 MS MSS 503-FW-6-LS-11 30.00 UT 93-UT-115 23212-20960 C5.52 LONG SEAM F/ CIRC MSS-503-FW-6-3M TO FW-29 B,T 93-MT-041 058 C-F-2 MS MSS 503 FW-6-LS-12 30.00 UT 93-UT-114 25212-20960 C5.52 LONG SEAM F/ CIRC MSS-503-FW-6-3M To FW-17 MT 93-MT-041 660 C-F-2 MS MSS 501-FW-6^ 30.00 UT 93 MT-044 25212-20962 C5.51 PIPE-TO-PENETRATION MT 93-UT-129 93-Ur-130 065 C-F-2 FWS FWS-23A-FW-125 16.00 RT 93-RT-027 PSI 25212-20964 C5.51 REDUCING ELBOW-TO-N0ZZLE MT 93-RT-033 93-RT-037 93-MT-091 Report: aksunary legend: UIR = Unresolved Indication Report File: akview index: q-sk93rpt/s-cat / zone /ld Page rueer 40

TABLE 5-1 MILLSTONE UNIT 3 - 1993

SUMMARY

REPORT C-F-2 EXAMINATION CATEGORY ZONE EXAM CAT. COMPCNENT OR WELD DWG/P&ID & ITEM k0 SYS IDENTIFICATION $1ZE EXAM DATA SHEET UIR COMMENTS 065 C-F-2 FWS FWS-23A-FW-126 20.00 UT 93-RT-028 PSI 25212-20963 C5.51 P!PE-TO-REDING ELBOW MT 93-RT-034 RT 93-MT-093 93-UT-177,8 UT-180,1,2 066 C-F-2 FWS FWS-21-FW-49 16.00 UT 93-RT-9,10 PSI 25212-20964 C5.51 PIPE TO-REDUCING ELBOW MT 93-RT-011 RT 93-MT-076 UT-195,7,8 93-UT-201 066 C-F-2 FWS FWS-21 FW-50 16.00 UT 93-RT-5,7,8 PSI 257.12-20964 c5.51 PIPE-TO-N0ZZLE Mi 93-RT-6 RT 93-MT 075 93-UT-196,9 93-UT-200,2 067 C-F-2 FWS FWS-22A-FV-38 16.00 UT 93-MT-073 PSI 25212-20965 C5.51 P!PE-TO-N0ZZLE MT 93 RT-12,13 RT 93-RT-16 93-UT-203,4 UT-206,7,10 067 C-F-2 FWS FWS-22A-FW-39 16.00 UT 93-MT-073 PSI 25212-20965 C5.51 PIPE-TO-PIPE MT 93-RT-014 RT 93-RT-015 93-UT-205,8 UT-209,11 Report: akstanary Legend: UIR = Unresolved Indication Report File: akview Index: q-ek93rpt/s-cat / zone /id Page nunber 41

TABLE 5-1 MILLSTONE UNIT 3 - 1993 SUMMAR7 REPORT C-F-2 EXAMINATION CATEGORY 20NE EXAM CAT. COMPONENT OR WELD DWG/P&lD & ITEM NO SYS IDENTIFICATION SIZE EN'a DATA SHEET UIR CCMMENTS 068 C-F-2 FWS FWS 25-FW-71 16 00 MT 93-RT-030 PSI 23212-20966 C5.51 REDUCING ELBOW TO N0ZZLE RT 93-RT-032 93-RT-035 93-MT-092 068 C-F-2 FWS FWS-25-FW-72 20.00 UT 93-RT 031 PSI 25212-20966 C5.51 PIPE-TO-REDUCING ELBOW MT 93 RT-036 RT 93 MT-094 93-UT-176,9 UT-183,4,5 070 C-F-2 FWS FWS-13-FW-13* 20.00 UT 93-MT-037 23212-20980 C5.51 PIPE *TO-PENETRATION MT 93-UT-064 071 C-F-2 FWS FWS-15-FW-10^ 16.00 UT 93-MT-005 93-008 MT INDICATIONS NOTED ACCEPTABLE 23212-20981 C5.51 VALVE-TO-PIPE MT 93-MT-011 93-UT-094 071 C-F-2 FWS FWS-15-FW-11* 18.00 UT 93-MT-004 25212-20981 C5.51 PIPE-To VALVE (V-34) MT 93-UT-009 071 C-F-2 FWS FWS-15-FW-13* 20.00 UT 93-MT-009 25212-20981 C5.51 PIPE-TO-PENETRATION MT 93-UT-003 071 C-F-2 FWS FWS-15-FW-7-BM* 16.00 UT 93-MT-004 AREA BELOW MIN. WALL - ACCEPTABLE 25212-20981 C5.51 PIPE To REDUCER MT 93-UT 007 93-011 071 C-F-2 FWS FWS 15-FW-7-CM* 18.00 UT 93-MT-004 25212-20981 C5.51 REDUCER-70-PIPE MT 93-UT-008 Keport: skstnery Legend UIR = Unresolved Indicetlan Report Flie: tkview Index: q-ek93rpt/s-cat / zone /id Page nunber 42

TABLE 5-1 MILLSTONE UNIT 3 - 1993

SUMMARY

REPORT C-F-2 EXAMINATION CATEGORY IONE EXAM CAT. COMPONENT OR WELD DWG/P&lD & ITEM kO SYS IDENTIFICATION SIZE EXAM DATA SHEET UIR COMMENTS 072 C-F-2 FWS FWS-17 FW-63 8.00 UT 93-MT 087 PSI, UT INDICATION NOTED - ACCEPTABLE 25212-20982 C5.51 PIPE-TO-ELBOW MT 93-UT 186,8 93-UT-190,2 93-UT-194 93-048 072 C-F+2 FWS FWS 17-FW-64 8.00 UT 93-MT-088 93-045 PSI, UT INDICATIONS ACCEPTABLE, PT REMOVED SY CLEANING 25212-20982 C5.51 ELBOW-TO-PIPE MT 93-MT-089 93-UT-187,9 93-UT-191,3 93-047 93-UT-175 Report: akstenary Legend: UIR = Unresolved Indicat{on Report File: skview index: q-ak93rpt/s-cat / zone /id Page nmber 43 _ _. _ _ . . . ____ _ _ _ _ - . . . - . _ . . . ~ , , ._, _

                                                                                                                                                                                                                                   .1 TABLE 5-1 MILLSTONE UNIT 3 - 1993 SUMMART REPORT F-A EXAMINATION CATEGORY ZONE                                                      EXAM CAT.                                               COMP 0NEUT OR WELD DWG/ PAID                                                  & ITEM NO SYS IDENTIFICATION                                                        SIZE       EXAM DATA SHEET UIR COMMENTS 097                                                        FA                                   QSS QSS-P38* SUPPORT                                     VT-3 93-VT-008 PUMP SUPPORT 098                                                        F-A                                   QSS- QSS-P3A-SUPPORT                                    VT-3 93-VT-008 PUMP SUPPORT Reports aksumery                                                                                                                                                                        Legend: UIR = Unresolved Indication Report-File akview Index: q-ek93rpt/s-cat / zone /fd Page runber 44
                                                                                                                                                                                           ;:q TABLE 5-1 MILLSTONE UNIT 3 - 1993 

SUMMARY

REPORT F-B EXAMINATION CATEGORY ZONE EXAM CAT. COMPONENT OR WELD

~DWG/P&ID                    & ITEM NO SYS IDENTIFICATION                             SIZE       EXAM DATA SHEET UIR            COMMENTS 170H                       F-B        sWP 3 SWP-6-PSR212                            0.00       VT-3 93-VT-007 FB.CL3 176H                       F-B        SWP 3-SWP-4-PSR112                            0.00       VT-3 93-VT-036 FB_CL3

. Report: ekstanary Legend: UIR = Unresolved Indication Report File: akview Index: q-ek93rpt/s-cat / zone /id~

q TABLE 5-1 MILLSTONE UNIT 3 - 1993

SUMMARY

REPORT F-C EXAMINATION CATEGORY ZONE EXAM CAT, COMPONENT OR WELD DWC/7&lD & ITEM NO SYS IDENTIFICATION SIZE EXAM DATA SHEET UIR COMMENTS 068N F-C F'JS 3-FWS-1-PSSH010' O.00 VT-3 93-VT-038 FC_Cl2 VT-4 1TTH F-C SWP 3-SWP 4-PSR126 0.00 VT-3 93-VT-026 ADolTIONAL EXAMINATION FC_CL3 177H F-C SWP 3-SWP-4-PSR132 0.00 VT-3 93-VT-001 93-001 REPAIRED FC CL3 93-VT-039 93-VT-042 177M F-C SWP 3-SWP-4-PSR133 0.00 VT-3 93-VT-025 ADDITIONAL EXAMINATION FC_CL3 1TTH F-C SWP 3-SWP-4-PSSM131 0.00 VT-3 93-VT-027 93-033 ADDITIONAL EXAMINATION, SPRING CAN SETTING - ACCEPTABLE FC_CL3 VT*4

i. Report: akstsnary Luend: UIR = Unresolved Indication Report
  . File: tkview Index: q-ak93rpt/s-cat / zone /id Page ruber 46

_ . . _ _ , . . . . . . _ _ , . . . . . . , , . . . _ . . . _ _ __.m _

i

6. PRESSURE TEST

SUMMARY

6.1 Inservice Inspection. Included in this section is Table 6-1 which identifies those pressure tests that were performed this outage aus delineated in the Millstone Unit 3 Inservice Inspection Program Plan. Included in the table is the Automated Work Order number under which each test was completed. Where corrective action was required, retests were completed satisfactorily. . t 6.2 Preservice Inspection As allowed by ASME Boiler and Pressure Vessel Code, Code Case N-416 the hydrostatic test required by IWA-4400 has been deferred, for the 8 new C-F-2 welds inside containment, until the system hydrostatic test scheduled for the'end of the~ inspection interval. The 2 new welds outside containment received a hydrostatic test as required (see Section 10). ( 1 l I

                                                             'l i

i

TABLE 6-1 MILLSTONE UNIT 3 - 1993

SUMMARY

REPORT B-P EXAMINATION CATEGORY-20NE EXAM CAT. CCMPONENT OR WELD ~AWO

                                                          ~

DWG/P&ID & ITEM No SYS Ir.ENTIFICATION SIZE EXAM NUMBER UIR COMMENTS B-P RCS CLASS 1 PIPING (1) 0.00 VT-2 M3-93-20860 25212-26802 SH 1,2,3 B15.50 PRESSURE RETAINING BOUNDRY - CLASS 1 PIPING B-P RCS CLASS 1 VALVES (1) 0.00 VT-2 M3-93-20860 25212-26802 SH 1,2,3 B15.70 PRESS RETAIN BOUNDARY-RC ISO V1,2,3 & 4 B-P RCS PRESSURIZER (1) 0.00 VT-2 M3-93-20860 25212-26802 SH 1,2,3 B15.20 PRESSURE RETAINING B3JNORY B-P RCS REACTOR COOLANT PUMP (1) 0.00 VT-2 M3-93-20860 25212-26802 SH 1,2,3 815.60 PRESSURE RETAINING BOUNDRY - RC PUMP A & B B-P RCS REACTOR YESSEL (1) 0.00 VT-2 M3-93 20860 25212-26802 SH 1,2,3 B15.10 PRESSURE RETAINING SOUNDRY B-P RCS STEAM GENERATORS (1) 0.00 VT-2 M3-93-20860 25212-26802 SH 1,2,3 815.30 PRESSURE RETAINING BOUNDRY Report: skpress Legend: UIR = Unresolved Indication Report File: akview Index: q-sk93 pres /s-cat /rone/id Page ruber.1

                                                                                                                                                                       -m    --      -

ng TABLE G-1 MILLSTONE UNIT 3 a 1993

SUMMARY

REPORT C-H EXAMINATION CATEGORY-20NE CXAM CAT. COMPONENT OR WELD AWO DWG/P&lD .-& ITEM NO SYS IDENTIFICATION SIZE EXAM NUMBER 'JI R CDHENTS C-H - S!H FUNCTIONAL TEST (1). 0.00 VT-2 M3-93-13754 , 25212-2G813 SH 1,2 C7.30 SYSTEM PRESSURE TEST BOUNDRY C-M R14S FUNCTIONAL TEST (10) 0.00 VT 2 M3-93-13753 25212-26812 Sn 1 C7.30 PRESSURE RETAINING BOUNDRY CH FWA FUNCTIONAL TEST (2) 0.00 VT-2 M3-93-13762 25212-26830 SM 2 C7.30- PRESSURE RETAINING BOUNDRY CM HSI FUNCTIONAL TEST (3) 0.00 vi 2 M3-93 13760 25212-26804 SR 1 C7.30 PRESSURE RETAINING BOUNDRY 25212-26813 SH 13 CH SIL FUNCTIONAL TEST (4) 0.00 VT-2 M3-93-13753 25212-26812 SN 1,2 C7.30 PRESSURE RETAINING BOUNDRY CH QS$ FUNCTIONAL TEST (5) 0.00 VT*2 M3 93-13764 25212 26815 SH 1 C7.30 -PRESSURE RETAINING BOUNDRY

                                        .-       RSS FUNCTIONAL TEST (6)-                         -0.00       VT-2 M3-93-13763 25212 26812 SM 3             CT.30                PRESSURE RETAINING BOUNDRT C-M         CMS INSERVICE TEST (1)                             0.00      VT M3-93-13760 25212-26804 SH 1,2,3,4       C7.30                PRESSURE RETAINING BOUNDRT C-          FWS INSERVICE TEST (2)                             0.00      VT-2 M3 93-13751

. 25212-26830 SR 3,4 C7430 PRESSURE RETAINING BOUNDRY C-H MS INSERVICE TEST (3) 0.00 VT 2 M3-93-14597

    ~25212 26823 SN 1                C7.30                BOUNDARY-MS & TUR9INE DRAINS (DTM) STSTEN
 - Reporti skpress                                                                                                                            Legend: UIR = Unresolved Indication Report:
 'Filo: ahview Irtdem: q sk93 pres /s-cat / zone /id
                                                                                                                                                                        'Page number 2~
 - - - - -._ -..- - - _ __                             _____ __         ___- -          _..-_...,2. .      ..

TABLE 6-1 M!t.LSTchE UNIT 3 - 1993 SLHMARY REPORT

                                                                                      "-A EXAMIR'; ION CATEGORY ZONE                         EXAM CAT.        COMPONENT OR WELD                                         AWO DWG/PEID                     & ITEM No SYS IDENTIFICATION                           SIZE       EXAM   m.MBER    UIR    CCHMENTS
.                               DA           FWA FUNCTIONAL TEST (7)                   0.00       VT-2 M3-93-13762 5212-26830 SH 2             DI.10            PRESSURE RETAINING BOUNDRY Report: skpress                                                                                                                           ~ Legend: UIR = Unresolved Indication Report File: akview index: q-ek93 pres /s-cat / zone /id Page ru6er 3

TABLE 6-1 MILLSTONE UNIT 3 - 1993 Supe %RY REPORT D-B EXAMINATION CATEGORY ZONE EXAM CAT. COP'PONENT OR WELD AWO DW/P&tD & ITEM ko SYS IDENTIFICAft0N $1ZE EXAM NUMBER UIR C09 TENTS DB CCI FUNCTIONAL TEST (8) 0.00 YT-2 M3-93-13797 25212-26814 SH 1- D2.10 PRESSURE RETAINING BOUNDRY D-B CCE FUNCTIONAL TEST (9) 0.00 VT-2 M3-93-13798 25212-26804 SM 2 D2.10 PRESSURE RETAINING BOUNDRY D-B CCP INSERVICE TEST (4) 0.00 VT-2 M3-93-13796 25212-26821 SM 1,2 D1.10 PRESSURE RETAINING BOUNDRY D-B CHS INSERVICE TEST (5) 0.00 VT-2 M3-93-13760

       .25212-26804 SM 2,3             D2.10            PRESSURE RETAINING BOUNDRY D3          SWP INSERVICE TEST (6)                   0.00        VT-2 M3-93-13791
      '25212-26833 SH 1,2              D1.10            PRESSURE RETAINING BOUNDRY Report: ekpress                                                                                                                              Legend: UIR = Unresolved Indication Report File: Ekview Index: q-sk93 pres /s cat /rone/id I

I Page ruber 4.

 . _ _ _ _ _ . . _ _ _ _ _   _ . _ _ .       . . _           ,,    . ~ .             .     ---      . . . . .          .   . , .           . .- . _.,          _ _         . . - . - .

TABLE 6-1 MILLSTONE UNIT 3 - 1993

SUMMARY

REPORT D-C EKAMINATION CATEGORY ZONE EXAM CAT. COMPONENT OR VELD AWO DWG/P&lD & ITEM NO STS IDENTIFICATION SIZE EXAM WUMBER UIR COMMENTS D-C SFC INSERVICE TEST (7) 0.00 VT-2 M3-93-13801 25212-26811 SH 1 D3.10 PRESSURE RETAINING BOUNDRT Report: skpress Legemi: UIR = Unresolved Indicaticn Report File: akview , index: q-ek93 pres /s-cat / zone /id Page ruter 5 _ _ _ . __ _ _______ __.._ __ . . . _ _ _ _ _ . _ _ . _ _ _ _ _ _ _ _ _ _ , ...____......m . . _ . - . . _ . - , . , _ - . . . , . _ . , _ . __ __

7. PROCEDURES Included in'this section is table 7-1 which lists'the NDE procedures used in the conduct of the examinations and tests reported on in this summary report.

TABLE 7-1 < MILLSTONE UNIT 3 - 1993

SUMMARY

REPORT l NDE PROCEDURE LIST i Procedure No Rev No Procedure Title EN 31063 5 Preperation and Performance of Pressure Tests  ! ISI-70 2 Westinghouse Magnetic Particle Examination , Procedure r ISI-8 9 Westinghouse Visual Examination Procedure' , NU-ET-5 0 Eddy Current Examination of 300-Series Stainless NU-LP-1 10 Liquid Penetrant Examination-Color Contrast Solveat Removable NU-MP-1 9 Magnetic Particle Examination Procedure Yoke Method i NU-RT-1 4 Radiographic Examination NU-VT-1 10 Visual Examination RT-002 6 Cramer & Lindell Radiographic Examination Sup. Rev. O UT-1&1l 3 Ultrasonic Examination Procedure for L-Wave. Butt Weld Examinations-UT-1&2 9 Ultrasonic Examination Procedure for Austenitic and Dissimilar Metal Piping Welds UT-1&3 7 Ultrasonic Examination Procedure for Ferritic. Piping Welds UT-1&6 3 Ultrasonic Examination-Reactor Coolant Pump , Flywheels, MP3 l Report: akproc Page number 1

                              ~ .
8. PERSONNEL Included in this section is table 8-1 which provides a. list of personnel and their qualifications for those individuals involved in the examinations and tests reported on in this ,

summary report. i h i f 5 [ i 9 e i i l l i

7 TABLE 8-1 MILLSTONE UNIT 3 - 1993

SUMMARY

REPORT l ABB AMDATA.NDE PERSONNEL LIST ] NAME UT MT PT VT-1 VT-2 VT-3 VT-4 RT ET-ABBOTT, JOHN I II II II. II II  ! BREHLER, MICHAEL I II II , DOTSON, MARK IIR I II GARCIA, ALVARO I II II II II GENTRY, CHARLES II II II II II II II

  'GRIGSBY, JEFFERY            II   II    II    II   II   II   II              !

GUNNELS, WARREN II II II HALL, SCOTT II HECHT, JEFFREY III II II II II II II , HURST, THOMAS II II II II II II II NANCE, KENNETH IIL IIL II II II II NEWBOLD, S. W. I III III II II II II , POOLER, GERALD -II II RHODES, BARRY I SANDEN, BENJAMIN I SCHMALZ, SCOTT II II II II II SHAW, CLAYTON II a SISK, RICHARD I II II II II SMITH, KENNETH II II II II II II SUMMERFORD, DANIEL II II II II TALBOT, PAUL I IIL IIL U'REN, THOMAS II II II II II II II 3 WILLIAMS, STEPHEN II II -

  'WINGFIELD, THIMOTHY         II   II    II    II   II   II   II
                                                                              .i WOLLUM, STEVEN              I    IIL   IIL Report: akpers Page number 1

TABLE 8-l' MILLSTONE UNIT 3 - 1993

SUMMARY

REPORT , CRAMER & LINDELL NDE PERSONNEL LIST i l NAME UT MT PT -VT-1 VT-2 VT-3 VT-4 RT ET. JACOBSON, JOHN I i i

 'KESSINGER, ALTON                                               II-i MALIA, MARK                                                    II i

MCCAUSLAND, DAVID II MOSTOWY,.RAYMOND II NEIDIG, PAUL II SMITHERS, ED II THUOTTE, ROGER III WAITKUS, DAVE II i n r Report: akpers Page_ number.2

. = . . - - TABLE 8'-1 -- MILLSTONE UNIT 3 - 1993

SUMMARY

REPORT , EBASCO SERVICES,.INC. NDE PERSONNEL-LIST , NAME UT MT- PT VT-1 VT-2 VT-3 VT-4 RT ET l l CHABOTTE, WIL J IIR IIR II II II II - 1 CHIEKA,.STAN II II- II- II DUPLANTIS, SCOTT II II II II .II II' II ROBBINS, DONNA III IIR IIIR II- II II II ROBBINS, MIKE III II IIIR III III III III ZIEBER, RICK IIR IIR III III' III III III  ! f l 4 1 Report: akpers Page number 3

TABLE 8-1 l MILLSTONE UNIT 3 -.1993

SUMMARY

REPORT .; NUSCO NDE PERSONNEL LIST-NAME UT .MT PT VT-1 VT-2 VT-3 VT-4 RT ET FULLER, RICH III MACIVER, JOHN II II II II- II II PFANNENSTIEL III III III III WITTFt7 *:OBERT III t 8 I t l Report: akpers .] i

                                                                            ~l Pago number 4    j

TABLE 8-1 MILLSTONE-UNIT 3-- 1993

SUMMARY

REPORT WESTINGHOUSE NDE PERSONNEL LIST , NAME UT MT PT VT-l'VT-2 VT-3 VT-4 RT ET. CASSAT, R. S. II II II II HAIJ2Y, W. G. II i t i i l I l

                                                                                 'I l
                                                                                 'I i i

i i Report: akpers 4 Page number'S

9. EQUIPMENT AND MATERIAL LISTS Included in this section are lists of calibration blocks, equipment and consumable materials used in the conduct of the examinations and tests reported on in this summary report.

The following tables are included: Table Title 9-1 Calibration Block List 9-2 Ultrasonic Instrument List , 9-3 Ultrasonic Transducer List 9-4 Macnetic Particle Instrument List 9-5 Ultrasonic Material List 9-6 Liquid Penetrant Material List 9-7 Magnetic Particle Material List

TABLE 9-1 MILLSTONE UNIT 3 - 1993

SUMMARY

REPORT CALIBRATION BLOCK LIST j Cal Block ID' Diameter Thickness Heat No System Use/ Material M1-UT-30 (P) 6.00 0.459 LO2478 Piping A-106 GR. B M3-UT-22 6.00 0.719 0631-29-2 CLASS 1 PIPING SA-376 TP 316 M3-UT-24 10.00 1.125 1091-5-1-2 CLASS 1 PIPING SA-376 TP 316  ! M3-UT-25 10.00 1.000 1081-44-1 CLASS'1 PIPING SA-376 TP 316 M3-UT-29 4.000 A-0159-5 RCP Flywheel A516 GR 70 ' M3-UT-32 30.00 1.250 89626 Main Steam Piping  ! SA155 CL.1 GR.KC70 M3-UT-35 20.00 1.281 N37344 Feedwater Piping SA106 GR,B M3-UT-36 18.00 1.156 N52510 Feedwater Piping SA106 GR,B M3-UT-37 16.00 1.031 N16677 Feedwater Piping-SA106 GR,B M3-UT-38 8.00 0.594 26737 MS & AUX FW Piping SA106 GR',B i UTLW-3 1.500 Thin Wall C1 2 Piping- l 304 SS l Report: akutblk , Page number 1

                               . _ _ _ .  . .. . . . _ . . - . . _ _ _ . _ . ...... _ . _ .. . _ . . . ....-= . - _            ..

TABLE 9-2' y MILLSTONE UNIT'3 - 1993

SUMMARY

REPORT- o l ULTRASONIC-INSTRUMENT LIST ~ Kanufacturer Model Serial Number Krautkramer 'USK-7D ' 32810-548 Krautkramer USK-7D 32810-821 Krautkramer USK-7D 32810-869 Krautkramer USK-7D 32810-897 Krautkramer USK-7D . 32810-923 Krautkramer USK-7D 32810-924 -l I Krautkramer USK-7D 32810-941 i Krautkramer USK-7D 32810-949

                                                                                                                                  .j i

j

'l  ;
                                                                                                                                         )

1 l 1 4

                                                                                                                                         )

1 1 i

                                                                                                                                     -l Report: akutinst                                                                                                                      l
                                                                                                                                   .i
                                                                                                                                     ' l.

Page number 1: L

                                                               .w.__,-          wr ae, u e , e-                     w t" var e

TABLE 9 MILLSTONE UNIT 3 - 1993

SUMMARY

REPORT ULTRASONIC TRANSDUCER LIST l Transducer S/N Transducer Mfr Element Size Frequencyf(MHz) 24736- KB-A .25.Dia. 2.25 24739 KB-A .25 Dia. 2.25-33736 MSEB .50 Dia. 2.00~ 33755 KB-A .375 Dia. 2.25 33774 KB-A .375 Dia. 2.25 33779 KB-A .375 Dia. 2.25 33781 KB-A .375 Dia. 2.25 33790 KB-A .375 Dia. 2.25-33792 KB-A .375 Dia. 2.25 45032 KB-A .50 Dia. 2.25 45111 KB-A .50 Dia. 2.25 61211 Megasonics .375 Dia. 4.00

 'A1210            Harisonic            1.0 Dia.        5.00 A1212            Harisonic            1.0 Dia.        5.00 A20950           KB                    .50 Dia.       5.00 A3397            Harisonic             .20 x .40      5.00 B11541           KB                    .50 Dia.       2.25' C17331           KB-A                  .25'Dia.       5.00 D30138           KB                    .375 Dia.      2.25 E22645           KB                    .25 Dia.       2.25 F03125'          KB                    .50 x 1.0      2.25 F18229           KB                    .50 Dia.       2.25              !

F18233 KB .50 Dia. 2.25 H20520 KB .50 Dia. 2.25 H30549 KB .50 Dia. 2.25 i Report: akducr Page number 1

TABLE 9-3' MILLSTONE-UNIT 3 - 1993

SUMMARY

REPORT ULTRASONIC TRANSDUCER LIST-

       . Transducer S/N   Transducer-Mfr       Element Size- -Frequency (MHz)

K02116 KB .50 Dia. 2.25 K02124 KB .50 Dia.- 2.25 M09190 KB-A .25 Dia. 5.00 Report: akducr Page number 2

  . .c

-W

TABLE 9-4 MILLSTONE UNIT 3 - 1993

SUMMARY

REPORT MAGNETIC PARTICLE INSTRUMENT LIST , Probe Type- Manufacturer Model Number Serial Number: Yoke Parker B300 4092 Yoke Parker B300 4343 Yoke Parker B300 4344 Yoke Parker B300 6751 4 Yoke Magnaflux Y-6 WO4749 l s l i i

                                                                        )

i l Report: akatinst ~ I Page number 1 l J

- TABLE 9-5
                       -MILLSTONE UNIT 1993 

SUMMARY

REPORT

ULTRASONIC MATERIAL LIST Couplant Type Couplant Mfr Couplant Batch #  :.' i Ultragel II Echo Ultrasound 092101 ,

1 t i l Report: akutmat Page number 1 i

' i TABLE 9-6 MILLSTONE UNIT 3 - 1993

SUMMARY

REPORT , LIQUID PENETRANT MATERIAL LIST Description Penetrant Mfr Type Batch / Spotcheck Cleaner / Remover Magnaflux SKC-NF 91B02K Spotcheck Cleaner / Remover Magnaflux SKC-S 90K04K. Spotcheck Developer Magnaflux SKD-S2 92J05K l Spotcheck Penetrant Magnaflux SKL-HF/S 90LO2K 1 8 i l

                                                                         'l l

Report: akptmat Page number 1

TABLE 9-7

                -MILLSTONE UNIT 3 - 1993 

SUMMARY

REPORT MAGNETIC PARTICLE MATERIAL LIST Material Type Manufacturer Batch # 14AM Prepared Bath Magnaflux 91A03P 20B Magnaglo-Powder Magnaflux 91H050 9CM Red Powder Magnaflux 92LOSK 8A Red Powder Magnaflux 93F013 14AM Prepared Bath Magnaflux- 93F02K

       #1 Gray Powder                  Magnaflux        93F039 20B Magnaglo Powder             Magnaflux        93F066 Report: akatmat Page number 1

P I l

10. FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS f 10.1 INSERVICE INSPE TION REPAIRS AND REPLACEMENTS Any defects noted during ISI with dimensions exceeding the acceptance criteria (see Section 5) were identified for repair in accordance with ACP-QA-9.06A, " Inservice Inspection unresolved Indication Reporting".

The defect removal was performed by NNECO in accordance with the appropriate NNECO procedures and Quality Assurance Requirements. Upon completion of the repair, the area or volume containing ' the defect was reexamined using the same examination method which was employed when the defect was detected. These reexaminations were performed by ISI personnel, j 10.2 ASME, SECTION XI REPAIRS AND REPL.' CEMENTS , When repairs or replacements of pressura retaining components and their supports were required, they were performed in accordance with ACP-QA-2.18, "ASME Section AI Repair / Replacements". Section XI repairs or replacements to IWA-4000 or IWA-7000 are sorted by ASME code class. These include replacements ' and repairs on piping and components conducted since the preceding summary report as shown on the owner's Report, Form NIS-2. All records for repairs and replacements required by IWA-6000 , are maintained at the Millstone Nuclear Power Station. i

                                                                              +

i

,. a. e p e b

                                                                  . 1 i

CLASS 1 l R t i 9 h M b 4

                                                                     )

B

                                                                 'f I

a I l t a 4 0 ) , t

                                                                    'h
                                                                    ?

I 6 I 1

                                                                     ?

i f I

+

d

                                                                     )

5 1 0 1 l l 1 a 4 A i f a

   --ve-r , c -
                ,q- -
                            ~ , -                         -

Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS '

l. OWNER: Northeast Utilities Service Co. Date: 1/14/94  !

P. O. Box 128. Waterford CT

2. PLANT: Millstone Nuclear Power Station Unit O .
3. Work Performed By: Maintenance AWO Numbers Address: P. O. Box 128. Waterford CT M3-9109251
4. SYSTEM: RCS CODE CLASS: 1 ,
5. Applicable Const. Code: ASME III. Edition: J97J Addenda: $12 i Code Edition of Section XI Utilized for work J983.S83 l
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED: i i

Components Name of M frs. Nat'l Board Repair / ASME 10 Number Manufacture S/N. No. Replacement Stamped 3RCS*SV8010C Crosby Valve (N56964 N/A Replacement Yes 0061 l

                                                                                                                          \

s

7. Description of work: Replaced valve witii, snare due to stearn cuttine Renlaced snare valve disk S/N N94210-41-0052
8. Test Conducted:  ;

11ydrostatic < > Pneumatic < > Normal Operating Pressure <X> Other < > f CERTIFICATE OF COMPLIANCE , We certify that the statements made in the report are correct and this renlacement conforms to the rules of

  • ASME Code, Section XI 1

Signed: <<s ( Date: /- /Y- M CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Connecticut and employed by llartford Steam Boiler i Insurance and Inspection during the period 10 '31-91t o 1-17-94 , and state that to the best of my i knowledge and belief, the owner has performed examinations and has taken corrective measures described in this owner's report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, conceming the examinations and corrective measures described in the Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal - l injury, property damage, or loss of any kind arising from or connected with this inspection. Inspector's Signature: E YORK [/ ' Commissions: CI1 W Date: 17 JAN 94

                                                                                                   ., p    7 .y      .y

i ~ -. -- - . . ..

                                                                                       .Y t

Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS ,

1. OWNER: Northeast Utilities Service Co. Date: 1/14/94 P. O. Box 128. Waterford Cr  :
2. PLANT. Millstone Nuclear Power Station Unit 22 l
3. Work Perfonned By: Maintenance AWO Numbers Address: P. O. Box 128. Waterford CT M3-93-19187 l
4. SYSTEM: EQS CODE CLASS: 1
5. Applicable Const. Code: ASME III. Edition: 1971 Addenda: 522 Code Edition of Section XI Utilized for work 1983.583 -

l

6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of Mfrs. Nat'l Board Repair / ASME ID Number Manufacture S/N. No. Replacement Stamped . 3RCS*RV1 Westinchouse S 4/B-98212-337-B N/A Replacement No f

7. Description of work: Replaced Vessel Flance Stud l
8. Test Conducted: ,

Hydrostatic < > Pneumatic < > Normal Operating Pressure < > Other <X> MT,UT I CERTIFICATE OF COMPLIANCE ' We certify that the statements made in the report are correct and this renair / renlacement conforms to the rules of ASME Code, Section XI Signed: 1A C4- Date: l- \4 -U CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and  ; Pressure Vessel Inspectors and the State of Connecticut and employed by Hartford Steam Boiler . Insurance and Inspection during the period $1ff to /,ISW, and state that to the best of my  : knowledge and belief, the owner has perfo'rme'd examinations and has taken corrective measures  ; described in this owner's report in accordance with the requirements of ASME Code, Section XI.  ; By signing this certificate neither the inspector nor his employer makes any warranty, expressed e or implied, concerning the examinations and corrective measures described in the Owner's Report. l Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal  ! injury, property damage, or loss o any k' rising from or connected with this inspection. Inspector's Signature: . [ Commissions: 7//f[ Date: c7 6 h '9 / u l l 1

.~.ee a ., . ..,~e n :s .- - - - . - . < r Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

1. OWNER: 14ortheast Utilities Service Co. Date: 12/13/93 P. O. Box 128. Waterford CT i
2. PLANT: Millstone Nuclear Power Station Unit M
3. Work Performed By: Maintenanc.s AWO Numbers Address: P. O. Box 128. Waterford CT M3-93-13185
4. SYSTEM: RCS CODE CLASS: 1 ,
5. Applicable Const. Code: ASME Ill. Edition: 1914 9 Addenda: S14 Case Edition of Section XI Utilized for work 1983.S83
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of Mfrs. Nat'l Board Repair / ASME ID Number Manufacture S/N. No. Replacement Stamped 3RCS*PI A Westinchouse /-1162E93G01 1 Replacement No I W ,(.,

7. Description of work: Replace Seal Housine B61ts. (8-MRIR 387-116-1L Note: Pumn was Later Removed and is now a Snare Pumn. ,
8. Test Conducted: ,

Hydrostatic < > Pneumatic < > Normal Operating Pressure < > Other < X > VT CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are conect and this replacement conforms to the rules of ASME Code, Section XI  ; Signed: ( 41 Date: lZ Ib' CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and , Pressure Vessel Inspectors and the State of Connecticut and employed by Hanford Steam Boiler Insurance and Inspection during the period f/5 PT to /.3S?, and state that to the best of my knowledge and belief, the owner has performed examinations and has taken corrective measures described in this owner's report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the mspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in the Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury, propeny damage, or loss of any kind arising from or connected with this inspection. Inspector's Signature: Br/M 2 Commissions: /3w?7 Date: % X 4P3 b

b t Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

1. OWNER: - Egrtheast Utilities Service Co. Date: 12/14/93 e P. O. Box 128. Waterford CT i . 2. PLANT: Millstone Nuclear Power Stati9n Unit G
3. Work Performed By: Maintenance AWO Numbers
                         . Address:     P. O. Box 128. Waterford CT                        M3-93-20844
4. SYSTEM: RCS ' CODE CLASS: 1
5. Applicable Const. Code: ASME 111. Edition: 19.7.,1 Addenda: SJ72 Code Edition of Section XI Utilized for work 1983.W85
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of . M frs. Nat'l Board Repair / ASME ID Number Manufacture S/N. No. Replacement Stamped 3RCS*PIC J. Dyson *5 A-1162E93G01 I 19* Replacement Yes

7. Description of work: Replace Cartridce Seal Boltinc
8. Test Conducted:

Hydrostatic < > Pneumatic < > Normal Operating Pressure < > Other < X > VT CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this renlacement conforms to the rules of _ ASME Code, Section XI Signed: mb Date: n - L 'a - 9 S CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Connecticut and employed by ~ Hartford Steam Boiler Insurance and Inspection during the period Ad/ff to //h//q? , and state that to the best of my knowledge and belief, the owner has perfor'med examinations and has taken corrective measures described in this owner's repon in accordance with the requireme.ds of ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in the Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury, property damage, or loss of a y kind, arising from or connected with this inspection. Inspector's Signature: ,N Commissions: Or //I'/ Date: . T/ M

e. . ,
                                                                                                  ,. ,,-._~ _ _ . _ . . _           .'I

u -.

   ... . G o ~ . , . . ,.

i Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

1. OWNER: Eq1heast Utilities Service Co.

Date: J 2/14/93 P. O. Box 128. Waterford CT

2. PLANT:

Milktone Nuclear Power Station Unit g3

3. Work Performed By: Maintenance Address: AWO Numbers P, O. Box 128. Waterford CT M3-91-09407
4. SYSTEM: RCS CODE CLASS: .J.
5. Applicable Const. Code:

A SME III._ Edition: 1971 Addenda: W72 Code Edition of Section XI Utilized for work 1983.S83

6. IDENTIFICATION OF COMPONENTS. REPAIRED OR REPLACED:

Components Name of M frs. Nat'l Board Repair / ID Number Manufacture S/N. ASME No. Replacement 3RCS*SV8010C Croshv Stamped N56964-070-0060 N/A Replacement Yes

7. Description of work:

Renlace Valve with Snare S/N N56964-07-0102

8. Test Conducted:

Hydrostatic < > Pneumatic < > Normal Operating Pressure <X> Other < > CERTIFICATE OF COMPLIANCE We certify ASME that the Code, Section XI statements made in the report are corwct and thisesrenlacement of confo Signed: h ced - Date: I n - # r, - 4 3> CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boile Pressure Vessel Inspectors and the State of Connecticut and employed by Hartford S knowledge and belief, the owner has performed examinat described in this owner's report in accordance with the requirements of ASME Code Section , . or implied, concerning the examinations and corrective m Furthermore, neither the inspector nor his employer shall be liable in any manner fo injury, property damage, or loss of any kind arising from or connected with this inspection . Inspector's Signature: Commissions: /2 -ryM Date: // 9/fT

                                                                                                                       ~

L u ~ 4 i Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACE MENTS ,

1. OWNER: Northeast Utilities Service Co. Dste: 12/14_L93, P. O. Box 128. Waterford Cr
2. PLANT: Milktone Nuclear Power Station Unit #3
3. Work Performed By: Maintenance AWO Numbers Address: P. O. Box 128. Waterford CT M3-91-09398
4. SYSTEM: RCS CODE CLASS: .1 2
5. Applicable Coast. Code:

ASME III. Edition: .L921 Addenda: W72 Code Edition of Section XI Utilized for work 1983.S83

6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of M frs. Nat'l Board Repair / ASME ID Number Manufacture S/N. No. Replacement Stamped 3RCS+SV8010B Crosby 0059 N/A Replacement Yes  ;

7. Description of work: Replace Valve with Sr e. jiff 'vM[ *S/N N56964-07-DOS 1  :
8. Test Conducted: '

Hydrostatic < > Pneumatic < > Normal Operating Pressure < > Other < X > t CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of ' ASME Code, Section XI e Signed: 9k e L.- ____._ pate: - i z, , i < _ 9 3 CERTIFICATE OF INSERVICE INSPECTION .I I, the undersigned, holding a valid commission issued 7 y the National Board of Boiler and Pressure Vessel Inspectors and the State of Connecticut and employed by Hartford Steam Boiler > Insurance and Inspection during the period Kyr.{r to/Apg, and state that to the best of rny knowledge and belief, the owner has performed examinations and has taken corrective measures described in this owner's report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any wstranty, expressed or implied, conceming the examinations and corrective measures described in the Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal-injury, property damage, or loss of any k' d arissg from or connected with this inspection. l l Inspector's Signature: , Commissions: 8n/5'7 Date: /2bf/LT 1

6 Forrn NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS  ;

1. OWNER: Northeact Utilities Serp Co. Date: 12/15/93 l P. O. Box 128. Waterfprd CT  ;
2. PLANT: Milktone Nuclear Power Station Unit f2
3. Work Performed By: Maintenance . AWO Numbers $
  • Address: E, O. Box 128. Waterford CT
                               .                                           M3-93-13889
4. SYSTEM: RCS CODE CLASS: 1 .

t

5. Applicable Const. Code: ASME 1II. Edition: 1921 Addenda: _S]71  !

Code Edition of Section XI Utilized for work 1983.W85 l l

6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED: ,

Components Name of Mfrs. Nat'l Board Repair / ASME , ID Number Manufacture S/N. No. Replacement Stamped -  ; 3RCS* PIA Westinrhouse 1-1162E93G01 1 Replace Yes j

7. Description of work: Replace Mechanical Seal Housine Bolts  ;

t S. Test Conducted: Hydrostatic < > Pneumatic < > Normal Operating Pressure <X > Other < >  ; r CERTIFICATE OF COMPLIANCE , We certify that the statements made in the report are correct and this replacement conforms to the rules of ASME Code, Section XI Signed: k h 7c- Date: I Z- @ " D  ; CERTIFICATE OF I?' SERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the Stats of Connecticut and employed by Hartford Steam Boiler l Insurance and Inspection during the period 83.ff to Ap/qf?, and state that to the best of my  ; knowledge and belief, the owner has performed examinations and has taken corrective measures described in this owner's report in accordance with the requimments of ASME Code, Section XI. - By signing this certificate neither the inspector nor his employer makes any warranty, expressed , or implied, ccmcerning the examinations and corrective measures described in the Owner's Report. j Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal e injury, property damage, or loss f an ind arising from or connected with this inspection.  ! Inspector's Signature: d. Conunissions: 8-ry/ ?,7 //Nv7y' , Date: /)f4fQ'T 7 ) a l 1

, - . - - - .. ---- ~ . ~ , k Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS j

1. OWNER: Northeast Utilities Service Co. Date: 12/14/93 P. O. Box 128. Waterford CT
2. PLANT: Millstone Nuclear Power Station Unit D
3. Work Performed By: Maintenance AWO Numbers Address: P. O. Box 128. Waterford CT M3-93-20946 -
4. SYSTEM: Ef1 CODE CLASS: 1 ,

S. Applicable Const. Code: ASME III. Edition: 1974 Addenda: 324 Code Edition of Section XI Utilized for work 1983.S83 f

6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of Mfrs. Nat'l Board Repair / ASME ID Number Manufacture S/N. No. Replacement Stamped 3RCS*PIC Westinghouse 3-1162E93G01 3 Replacement Yes l

7. Description of work: Replace Reactor Coolant Pumn internals with Snare Intemal S/N 5-1162E03G02 N/8 19
8. Test Conducted:

Hydrostatic < > Pneumatic < > Normal Operating Pressure <X> Other < X > VT CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of ASME Code, Section XI Signed: N ~ Date: 12- l 6 ~ 3 3 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Connecticut and e7 ployed by Hartford Steam Boiler Insurance ana inspection during the period 83d8:No J./ fy . and state that to the best of my ' knowledge and belief, the owner has performed examinations and has taken corrective measures described in this owner's report in accordance with the requirements of ASME Code, Section XI. j i By signing this certificate neither the inspector nor his employer makes any warranty, expressed l or implied, concerning the examinations and corrective measures described in the Owner's Report.  : Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal  ! injury, property damage, or loss of ykl arising from or connected with this inspection. Inspector's Signature: _ Commissions: OT#37# h / Date: CA!nt 'y ,

1 , . . - d a Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

1. OWNER: Northeast Utilities Service Co. Date: '07/07/92. I P.O. Box 128. Waterford CT f
2. PLANT: Millstone Nuclear Power Station Unit fL1
3. Work Performed By: Betterment Const. AWO Numbers Address: P.O. Box 128. Waterford Cr M3-91-09573  ;

i

4. SYSTEM:RCS CODECLASS: 1
.. 5. Applicable Const. Code: ASME III.1971 Edition: 321 Addenda: El.A Case Edition of Section XI Utilized for work 1983.S83
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED: l Components Name of Mfrs Nat'l Repair / ASME f ID Number Manufacture No. Serial Replacement Stamped
  • 3-RCS*SV8010C Crosby Valve N/A 0060 Replacement YES-f
7. Description of work: Reniacement of leakine valve.  :
                                                                                             ~~
8. Test Conducted:

Hydrostatic < > Pneumatic < > Normal Operating Pressure <4> Other < X > (VT-2)  ! Certifice e of Compliance We certify that the statements made .in the report are correct and this - 7 replacement xonform to the rules ASME Code, Section XI  ; i .

                              /         %                                                     l Signed:t v      -
                             '. h                                     Date:vnI    /

v CERTIFJCATE OF INSERVICE INSPECTION , I, the undersigned, holding a valid commission issued by the National-Board of Boiler and Pressure Vessel Inspectors and the state of Connecticut and , amployed by Hartford Steam Boiler Insurance and Inspection -'during the-periodedyfa to /4ur4 and state that to the best of my knowledge and belief,' the - owner has . performed examinations and has taken - corrective measures

      . described in- this owner's report in- accordance with the requirements of ~ ASME      !

Code, Section XI. . By signing this certificate. neither the inspector nor his . employer . [ makes any warranty expressed or implied, concerning the examinations and t corrective measures described in the Owner's - Report. Furthermore, neither-

                           ~

the inspector nor his employer shall be liable in. any manner for ' any personal injury, property damage, or loss of any kind arising from or connected with i this inspection. Inspector's Signature: 8r Cor , ions: 87#J7 Date: /_2 h /ff.3  ;

   ..- ..   ?.-                                     =.     -                  -

t

                       ' Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

+

1. OWNER: Northeast Utilities ' Service Co. Date: 07/07/92 P.O. Box 128. Waterford CT .!
2. PLANT: Millstone Nuclear Power Station Unit fL,.
3. Work Performed By: Betterment Const. AWO Numbers .;

Address: P.O. Box 128. Waterford Cr M3-91-08263  ;

4. SYSTEM: RCS CODE CLASS: .1
5. Applicable Cons:. Code: ASME III.1971 Edition: S23_ Addenda: N/A
  • Case Edition of Section XI Utilized for work 1983.S83
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of Mfrs Nat'l Repair / ASME ID Number Manufacture No. Serial Replacement Stamped 3-RCS*PCV455A A&G Eng. Inc. N/A 8M 5AT Replacement YES , f -+

7. Description of work: . Cut off 2 called studs and 4 called nuts to allow ,

removal of PORV. J7p2 :, Sp/c gu y/,, _ f /,,,,,,./ :s/ y '

8. Test Conducted: * * ' '

Hydrostatic < > Pneumatic < > Normal Operating Pressure. y p Other < X > (VT) g,j,g g Certificate of Compliance

                        .We cenify that the statements made in the repon at:: correct and this replacement conforms to the rules ASME Code, Section XI Signed:                    460                                  Date:   70 CERTIFICATE OF INSERVICE INSPECTION '                                    I I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Connecticut and                   !

employed by Hartford Steam Boiler Insurance and ' Inspection during the . period Mf.tto #2;f3 and state that to the best of my knowledge and belief, the -

          ~

owner has performed examinations and has taken corrective measures described in this owner's report in - accordance with the requirements of ASME'  ; Code, Section XI. -1 By signing this . certificate neither the inspector - nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in the Owner's Report. Furthermore, neither the inspector. nor his employer shall be liable in any manner for ; any personal injury, property damage, or loss of any kind arising from or connected with this inspection. Inspector's Signature: 1 M // e Commissions: b #f1

               . Date: Ah < #f7                                                                              '!

f7 h. Form NIS-2 OnNERS REPORT FOR REPAIRS OR REPLACEMENTS

1. OWNER: Northeast Utilities Service Co. Date: 10/07-92 P.O. Box 128 . Waterford . CT Sheet 1 of 2
2. PLANT: Millstone Nuclear Power Station Unit .2
3. Work Performed By: NNECo AWO Numbers Address: P.O. Box 128. Waterford. CT MP-92-05828
4. SYSTEM: Snubbers (BDG) Code Class 1
5. Applicable Const. Code: ASME III.1971 Edition. S73 Addenda. N/A Case Edition of Section XI Utilized for Work: 1983.S83
6. IDENTIFICATION OF THE COMPONENTS REPAIRED OR REPLACED:

Components Name of Serial Number AWO# Repaired / ASME Ident. Number Manufacturer Replaced Replacement (MP-) - Replaced / Code Replacement Stamned 3BDG1PSSP0493 ITT Grinnell 23844 05691 92-05828 Renlacement Yes

7. Description of Work: Snubber S/N 05691 replaced snuubber S/N 23844; The snubber was replaced because a packinn leak from valve 3BDG'V887 was snravine directiv on the snubber. When the nackine leak was renaired the snubber was renlaced.
8. Test Conducted:

Hydrostatic <_> Pneumatic < > Normal Operating Pressure < > Other < X> (Visual)

9. Remarks: Snubber 05691 was built to ASME III.1974 Edition. W76 Addenda.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules ASME Code, Section XI. Signed:[e [- Date: 44-M CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and tha State or Province of CONNECTICUT and employed by Hartford Steam Boiler Insurance and Inspection during the period February 1,1991 to May 10,1991, and state that to the best of my knowledge and belief, the owner has performed examinations and taken corrective measures described in this owner's report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the inspector nor his employermakes any warranty, expressed or implied, concerning the examinations and corrective measures described in the Owner's R_eport. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury, property damage, or a loss of any kind arising f drp connected with this inspection.

                                                                          /

Inspectors Signature:_

                 /                 -
                                     - /N,s/ ,N       ~

Commissions: /be.7 Date: C,/R/9.f ~

                                                                                                                           'l Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS                                                                    ,
1. OWNER: Northeast Utilities Service Co. Date: 1/14/94 P. O. Box 128. Waterford CT
2. PLANT: Millstone Nuclear Power Station - Unit M
3. Work Performed By: Maintenance AWO Numbers Address: P. O. Box 128. Waterford CT M3-91-01633
4. SYSTEM: CHS CODE CLASS: 1
5. Applicable Const. Code: ASME III. Edition: 1983 Addenda: S83 Code Edition of Section XI Utilized for work 1983.S83
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of Mfrs. Nat'l Board Repair / ASME ID Number Manufacture S/N. No. Replacement Stamped 3CHS*E2 Joesph Oats 2268-3C 947 Replacement Yes .

7. Description of work: Replaced Fiance Studs and Nuts (rnrir 391-042-1)*
8. Test Conducted:
  • Ilydrostatic < > Pneumatic < > Normal Operating Pressure <X> Other < >

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of  ; ASME Code, Section XI Signed: + l i t

                                  .t
                                      /44 -
                                            /                              Date:     I-l O $ d-   6 t

CERTIFICATE OF INSERVICE INSPECTION ' I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Connecticut and employed by Hartford Steam Boiler Insurance and Inspection during the period CB-04-911001-18-94 , and state that to the best of my  !. knowledge and belief, the owner has performed examinations and has taken corrective ~ measures described in this owner's report in accordance with the requirements of ASME Code, Section XL By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and correctivs measures described in the Owner's Report. Furthermore, neither the inspector nor his employer shall be liaW in any manner for'any personal injury, property damage, or loss of any kind arising from or conne J with this inspection. Inspector's Signature: E YORK Commissions: CT1137 __7 Date: 18 JAN' 94 i t - py  ;- - 3mf6 < ,p wp - - p -r -9 g i , j g .; p . ,

Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPl.ACEMENTS

1. OWNER: Northeatt Utilities Service Co. Date: 1/5/94 P. O. Box 128. Waterford CT
2. PLANT: Millstone Nuclear Power Station Unit #3
3. Work Performed By: Generation Construction AWO Numbers Address: P. O. Box 128. Waterford CT M3-93-04980
4. SYSTEM: SIL CODE CLASS: 1
5. Applicable Coust. Code: ASME 111. Edition: 1971 7 Addenda: S_71 Case Edition of Section XI Utilized for work 1983.W83
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of M frs. Nat'l Board Repair / ASME ID Number Manufacture S/N. Serial Replacement Stamped 3SIL-1.PSSP1051 ITF Grinnel N/A N/A Repair No

7. Description of work: Modified End Brackets.
8. Test Conducted:

Hydrostatic < > Pneumatic < > Normal operating Pressure < > Other < X > VT CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this repair / replacement conforms to the rules of ASME Code, Section XI Signed: d74 Date: / 7 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Connecticut and employed by Hartford Steam Boiler Insurance and Inspection during the period FE.93 to /.23N, and state that to the best of my , knowledge and belief, the owner has perfurmed examinat;ons and has taken corrective nieasures described in this owner's report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, conceming the examinations and conective measures described in the Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury, property damage, or loss of any ki, arising from or connected with this inspection. Inspector's Signature: Commissions: [r//77 Date: (/3ks/

Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

1. OWNER: Northeast Utilities Service Co. Date: 1/7/94 P. O. Box 128. Waterford CT
2. PLANT: Millstone Nuclear Power Station Unit g]  ;
3. Work Performed By: Generation Construction AWO Numbers Address: P. O. Box 128. Waterford CT M3-93-04983 & M3-93-04984
4. SYSTEM: RCS CODE CLASS: 1 -
5. Applicable Const. Code: ASME III. Edition: 1971 Addenda: E71 Case Edition of Section XI Utilized for wank 1983.S83
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

s Components Name of Mfrs. Nat'l Board Repair / ASME ID Number Manufacture S/N. Number Replacement Stamped 3.RCS-1-PSSP914 ITT Grinnel N/A N/A Repair No 3-RCS-1-PSSP1068 ITT Grinnel N/A N/A Repair No

7. Description of work: Modified End Brackets.
8. Test Cenducted: ,

Hydrostatic < > Pneumatic < > Normal Operating Pressure < > Other <X> VT . CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct ar,d this renair / replacement conforms to the , rules of ASME Code, Section XI Signed: d c~ Date: /'7'fI I CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and .> Pressure Vessel Inspectors and the State of Connecticut and employed by Hartford Steam Boiler , , Insurance and Inspection during the period Df[ to /1.7f/, and state that to the best of my knowledge and belief, the owner has performed examinations and has taken corrective measures described in this owner's report in accordance with the requirements of ASME Code, Section XI. 1 By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in the Owner's Report. , Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury, property damage, or loss of any kind arising from or connected with this inspection. Inspector's Signature: Commissions: A-r//Jr Date: _/ 1)V ~

       /

1

Form NIS-2 OWNERS REPORT FOR REPAIRS OliREPLACEMENTS

1. OWNER: Northeast Utilities Service Co. Date: 1/7/94 P. O. Box 128. Waterford CT
2. PLANT: Millstone Nuclear Power Station Unit n
3. Work Performed By: Generation Construction AWO Numbers Address: P. O. Box 128. Waterford CT M3 93-04978 M3-93-04979 M3-93-04985
4. SYSTEM: Sill CODE CLASS: 1
5. Applicable Const. Code: ASME III. Edition: 1971 Addenda: S_73 'i Case Edition of Section XI Utilized for work 1983.S83
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of - Mfrs. Nat'l Board Repair / ASME ID Number Manufacture S/N. Number Replacement Stamped 3-SIH-1-PSSP1032 ITT Grinnel N/A N/A Repair No 3-S!H-1-PSSP1031 ITT Grinnel N/A N/A Repair No 3-SIH-1-PSSPI 109 ITT Grinnel N/A N/A Repair No -

7. Description of work: Modified Surinort.
8. Test Conducted: .i Hydrostatic < > Pneumatic < > Normal Operating Pressure < > Other <X > VT CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this repair / renlacement conforms to the rules of ASME Code, Section XI Signed: _
                                           #b              '

Date: /" '7- 7 h CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Connecticut and employed by Hartford Steam Boiler Insurance and Inspection during the period 82'/.s to /729/ , and state that to the best of my' , knowledge and belief, the owner has performed examinations and has taken corrective . measures described in this owner's report in accordance with the requirements of ASME Code, Section XI. I By signing this certificate neither the inspector nor his employer makes any warranty, expressed l or implied, concerning the examinations and corrective measures described in the Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury, property damage, or loss of any ki d arising from or connected with this inspection. Inspector's Signature: Commissions: (7r/87 Date: .5bY t

        -   4- . - - - - - , , -
i
             ' Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS                                                                  -
1. OWNER: Northeast Utilities Service Co. Date: 1/12/94 P. O, Box 128. Waterford CT
2. PLANT: Millstone Nuclear Power Station Unit!3 i
3. Work Performed By: Maintenance AWO Numbers Address: P. O. Box 128. Waterford CT M3-91-19266 9
4. SYSTEM: RCS CODE CLASS:l
5. Applicable Const. Code: ASME III. Edition: 1971 Addenda: S73 ,

Code Edition of Section XI Utilized for work 1983.S83 , q

6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of M frs. Nat'l Board Repair / ASME ID Number Manufacture S/N. No. Replacement Stamped  ; 3RCS*V097 Cardinal N/A 't N/A Replacement No-  ! SPARE....................S/NA3649 * .

7. Description of work: Replaced Bodv Nut on Snare Valve mrir 388-181-181-18
8. Test Conducted:

Hydrostatic < > Pneumatic < > Normal Operating Pressure < > Other < X> VT , CERTIFICATE OF COMPLIANCE -l We certify that the statements made in the report are correct and this repair /renlacement conforms to the rules of ASME Code, Section XI Signed: O 44 A Date: / N '

                                                                                           /                                         _

f CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Connecticut and employed by Hartford Steam Boiler Insurance and Inspection during the period @M to 1M , and state that to the best of my 'I knowledge and belief, the owner has performed examinations and has taken corrective measures. i described in this owner's report in accordance with the requirements of ASME Code, Section XI.  ; By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in the Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal- , injury, property damage, or lo .: of any kind ri/ from or connected with this inspection. ' Inspector's Signature: E YORK _ Commissions: CT1137 Date: 28-94 . l l 1-4 . y . - ,.. y m y -.y , ~.m , - , _ , _ . _ _ . .,.. . _ _ - _

.. -.s.. + , ,,n ..<.e-... -_ , ~ Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

1. OWNER: Northeast Utilities Service Co. Date: 11/23/93 P. O. Box 128. Waterford CT
2. PLANT: Millstone Nuclear Power Station Unit Q
3. Work Performed By: Maintenance AWO Numbers Address: P. O. Box 128. Waterford CT M3-93-22725 ,
4. SYSTEM: RCS CODE CLASS: 1
5. Applicable Const. Code: ASME III. Edition: 1974 Addenda: E74 Code Case N242-1 Case Edition of Section XI Utilized for work 1983.S83 ,
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of Mfrs. Nat'l Board Repair / ASME ID Number Manufacture S/N. Serial Replacement Stamped 3RCS*PID i Westinchouse 4-1162E93601 3 Replacement Yes

7. Description of worie: Replace Pumn Internals with rnrir- 393-479-2 S/N 7-1162E93GO3 NB 86
8. Test Conducted:

Hydros:stic < > Pneumatic < > Normal Operating Pressure < X > Other < X > VP4 per seperate awo f or seal assembly CERTIFICATE OF COMPLIANCE We certify ths.t the statements made in the report are correct and this renlacement conforms to the rules of ASME Code, Section XI Signed: kN % ! , Date: I 7. ~ l 6 ' 9 3 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Connecticut and employed by Hartford Steam Boiler Insurance and Inspection during the period CB-3MBtoO1-3')-94 , and state that to the best of my-knowledge and belief, the owner has performed examinations and has taken corrective measures described in this owner's report in accordance with the requirements of ASME Code, Section XL By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in the Owmer's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury, property damage, or loss of any kind arising from or connected with this inspection. Inspector's Signature: E YORK Commissions: NB9384 CT1137 Date: 01-30-94 this NIS 2 is contingent upon the seal assernbly awo

U-

 .h   -:-                        we- -         %.      _...~% s.. . , , . ~ .         _      .,,__.,,.m..._w,_,m...     .%...Ln.

Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS 1.' OWNER: Northeast Utilities Service Co. Date: 12/15/93

                                                                                                                                    ~

P. O. Box 128. Waterford CT ,

2. PLANT: I Millstone Nuclear Power Station Umt di
3. Work Performed By: Maintenance AWO Numbers Address: P. O. Box 128. Waterford CT M3-93-22421
4. SYSTEM: E.CS CODE CLASS: 1
5. Applicable Const. Code: ASME Ill. Edition: 1271 Addenda: 371 FAB'N74574 G* j Code Edition of Section XI Utilized for work 1983.W85
  • Code Case N242-1
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of M frs. Nat'l Board Repair / ASME ID Number Manufacture S/N. No. Replacement Stamped 3RCS*PIB Westinghouse 2-1162E93G01 3 Replacement Yes

7. Description of work: Renlace Pump Internals: S/N 6-1162E93G03. National Board No. NB85 mrir 393-479-1
8. Test Conducted:

Hydrostatic < > Pneumatic < > Normal Operating Pressure <X> Other <X > VT CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of  ; ASME Code, Section XI - Signed: - UN k Date: I ~ 6 - 9 4' CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid comnussion issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Connecticut and employed by Hretford Steam Boiler Insurance and Inspection during the period E93 o 14M t , and state that to the best of my , knowledge and belief, the owner has performed examinations and has taken corrective measures ' described in thir. owner's report in accordance with the requirements of ASME Code, Section XI. . By signing this certificate neither the inspector nor his employer makes any warranty, expressed

  • or implied, concerning the examinations and corrective measures described in the Owner's Report. i Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury, property damage, or loss of any kind aris~ rom or connected with this inspection.

Inspector's Signature: E YORK _ se Commissions: NB9384 CT1137 Date: 01-30-94 seal mbly G associated bolting addressed awo m3-93-22422

Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

1. OWNER: Northeast Utilities Service Co. Date: 12/16/93 P. O Box 128. Waterford CT
2. PLANT: Millstone Nuclear Power Station Unit !).
3. Work Performed By: Maintenance AWO Numbers Address: P. O. Box 128. Waterford CT M3-93-22422
4. SYSTEM: B.Cji CODE CLASS: 1
5. Applicable Const. Code: ASME III. Edition: 1971 Addenda: SJ7}

Code Edition of Section XI Utilized for work 1983.S83

6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of Mfrs. Nat'l Board Repair / ASME ID Number Manufacture S/N. No. Replacement Stamped 3RCS*PIB Westinghouse N/A N/A Replace Yes 5

7. Description of work: Rer. lace Cartridce Seal Assembly S/N6-1162E93G01 NB85 mrir393-479-1
8. Test Conducted:

Hydrostatic < > Pneumatic < > Normal Operating Pressure < > Other <x> VT CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this rerilacement conforms to the rules of ASME Code, Section XI Signed: . A _ Date: h-I7 ' ) 3 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board cf Boiler and Pressure Vessel Inspectors and the State of Connecticut and employed by Hartford Steam Boiler Insurance and Inspection during the period 9-ES-E3to 01-2D-94, and state that to the best of my knowledge and belief, the owner has perforraed examinations and has taken corrective measures , described in this owner's report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed , or implied, concerning the examinations and corrective measures described in the Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any marmer for any personal injury, property damage, or loss of any kind arising from or connected with this inspection. Inspector's Signature: E YORK [ Commissions. NB9384 CT1137 Date: 01-30-94 swo m3-93-22421 installs replacement pump internals performs required asme XI visual inspections m3-93-22422 l f

  • 9 e

t 4 Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS '

1. OWNER: Northeast Utilities Service Co, Date: 12/15/93 P. O. Box 128. Waterford CT ,
2. PLANT: Millstone Nuclear Power Station Unit gl
3. Work Perfonned By: Maintenance AWO Numbers  !

Address: P. O. Box 128. Waterford CT M3-93-22723 , I

4. SYSTEM: RCS CODE CLASS: 1
5. Applicable Const. Code: ASME III. Edition: 1981 Addenda: E23 *1, .-

Code Edition of &ction XI Utilized for work 1983.W85 (*1--CODE CASE N-242-1hSME III 74 S 74

6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:  !

Components Name of M frs. Nat'l Board Repair / ASME ID Number Manufacture S/N. No. Replacement Stamped 3RCS* PIA Westinghouse 1- 3 Replacement Yes 1162E93G01

7. Description of work: Replace Pumn Internals mrir393-479-3 S/NS-1162E93G03 NB87
8. Test Conducted:

Ilydrostatic < > Pneumatic < > Normal Operating Pressure <X> Other < > CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of ASME Code, Section XI Signed: @ % b _- Date: 12 ' l'7- D - CERTIFICATE OF INSERVICE INSPECTION i I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Connecticut and employed by Hartford Steam Boiler - -! Insurance and Inspection during the period 9-L93 to 1-591 , and state that to the best of my knowledge and belief, the owner has performed examinations and has taken corrective measures described in this owner's report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed j or implied, concerning the examinations and corrective measures described in the Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury, property damage, or loss of any kir J sris;p 'n..a or connected with this inspection. Inspector's Signature: E YORK , ' ff. -/L

                                                       // /                    Commissions: NB9384 CT1137 p,       01-30-94                       !                                                                         '

seal housing bolting replacement addressed under ewo M3-93-13889.

J i Form NIS-2 OWNERS REPORT FOR REPAIRS OR REP'L ACEMENTS i

1. OWNER: Northeast Utilities Service Co. Date: 1/31/94 i P. O. Box 128. Waterford CT
2. PLANT: Millstone Nuclear Power Station Unit O ,

t

3. Work Performed By Generation Construction AWO Numbers j Address: P. O. Box 128. Waterford CT M 3-93-05138 M3-93-05082  ;
4. SYSTEM: RCS CODE CLASS: 1  ;

s

5. Applicable Const. Code: ASME IIL Edition: 19171 Addenda:S73 '[

Code Edition of Section XI Utilized for work 1983.S83 ,

6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of M fts. Nat'l Board Repair / ASME l ID Number Manufacture S/N. No. Replacement . Stamped .i

   . 3RCSIPSSP-914         ITT GRINNEL 20519                 N/A                Replacement     No                                    i N/A                                No 3RCSIPSSP-1068 ITT GRINNEL 20996                                           Replacement
7. Description of work: Snubbers replaced -{
8. Test Conducted Hydrostatic < > Pneumatic < > Normal Operating Pressure < > Other <X > VT j CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and tids renair conforms to the rules of '

ASME Code, Section XI  ; i Signed: dMew I Date: /- 3 : <} </- t I i CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel . Inspectors and the State of Connecticut' and em . Insurance and Inspection during the period Ff.ff _ tothat and state v.3.M , ployed to the best of my by llartford'

                                                                                                                                        +

knowledge and belief, the owner has performed examinations and has taken corrective measures described in this owner's report in accordance with the requirements of ASME Code, Section XI. ,; By signing this certificate neither the inspector nor his employer makes any warranty, expressed ' l or implied, concerning the examinations and corrective measures described in the Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal ' injury, property damage, or loss of any kind arising from or connected with this inspection. Inspector's Signature: Commissions: &//.P/ -  !

     . Date: fjlgt,/fl t
                                                                                                                                      's

J. . Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

1. OWNER: Northeast Utilities Service Co. Date: 1/31/94 P. O. Box 128. Waterford CT
2. PLANT: Millstone Nuclear Power Station Unit D
3. Work Performed By: Oeneration Construction AWO Numbers M3-93-05135 M3-93-05134 Address: P. O. Box 128. Waterford CT '

M3-93-05090

4. SYSTEM: Slk CODE CLASS: 1 F
5. Applicable Const. Code: ASME liL Edition: 1921 Addenda:S73 Code Edition of Section XI Utilized for work 1983.S83
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of Mfrs. Nat'l Board Repair / ASME ID Number Manufacture S/N. No. Replacement Stampe41 3SILIPSSP-459 ITT GRINNEL 3507 N/A Replacement No .L 3SILIPSSP-414 ITT GRINNEL 16548 N/A Replacement No 3SILIPSSP-1051 ITT GRINNEL 29354 N/A Replacement - No

7. Description of work: Snubbers replaced
8. Test Conducted:

Hydrostatic < > Pneumatic < > Normal Operating Pressure < > . Other < X > VT  ; CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this repair conforms to the rules of  ; ASME Code, Section XI Signed: dl Ab - Date: / N , CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Connecticut and employed by Hartford Steam Boiler Insurance and Inspection during the period Rf.pf to).f.fr/ , and state that to the best of my_ knowledge and belief, the owner has performed examinations and has taken corrective measures  ; described in this owner's report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed  ; or implied,- concerning the examinations and corrective measmes described in the Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury, property damage, or loss of any kind arising from or connected with this inspection. Inspector's Signature: Commissions: 8r//P.3 Date: M S/ { F

Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

1. OWNER: Northeast Utilities Service Co. Date: 1/31/94 P. O. Box 128. Waterford CT
2. PLANT: Millstone Nuclear Power Station Unit D
3. Work Performed By: Generation Construction AWO Numbers Address: P. O. Box 128. Waterford CT M3-93-03913' M3-93-03914 '

M3-93-03924 M3-93-03925 M3-93-05585

4. SYSTEM: RCS CODE CLASS: 1
5. Applicable Const. Code: ASME Ill Edition: 1986 Addenda: 36 >

Code Edition of Section XI Utilized for work 1983.S83 Code Case N249-10 r

6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of M frs. Nat'l Bc.vd Repair / ASME ID Number Manufacture S/N. No. Replacement Stamped 3RCSISUP4-19 Paul Monroe 14310-161 N/A Modify No 3RCSISUP4-45 Paul Monroe 14310-187 N/A Modify No 3RCSISUP4-43 Paul Monroe 14310-185 N/A Modify No 3RCSISUP4-39 Paul Monroe 14310-181 N/A Modify No 3RCSISUP4-25 Paul Monroe 14310-167 N/A Modify No

7. Description of work: Install Functional Testine Hardware For Hydraulic Snubbers to Test innlace.
8. Test Conducted:

Ilydrostatic < > Pneumatic < > Normal Operating Pressure < > Other < X > VT CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this renair conforms to the rules of ASME Code, Section XI Signed: . [dfLad Da'.e: I~ 3I'N i t CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and

                                                                      ~

Pressure Vessel Inspectors and the State of Connecticut and e ployed by Hartford Steam Boiler Insurance and Inspection during the period 'f2f.91 to R.3.f4 , and state that to the best of my , knowledge and belief, the owner has performed examinations and has taken corrective measures described in this owner's report in accordance with the requirements of ASME Code, Section XL By signing this certificate neither the inspector nor his employer makes any warranty, expressed - , 4 or implied, concerning the examinations and corrective measures describcd in the Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury, property damage, or loss of any kind arising from or connected with this inspection. Inspector's Signature: q Commissions: dr/d4 Date: 2) /95/_ ,

41 -P & A M r a n kkA & A e H f a CLASS' 2 k e f i r 8 f i F W I l. 3 h t k f i, e f i

                                                                           )
                                                                           )
                                                                       .. I, 1

i i i. J

. l

Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

1. OWNER: Northeast Utilities Service Co. Date: 11/23/93 i L_O. Box 128. Waterford CT
2. PLANT: Millstone Nuclear Power Station Unit g2
3. Work Performed By: Maintenance AWO Numbers ,

Address: P. O Box 128. Waterford CT M3-93-25751 4, SYSTEM: ESS CODE CLASS: 2

5. Applicable Const. Code: ASME IU. Edition: 19]l Addenda: $23 Case Edition of Section XI Utilized for work 1983.S83
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of M frs. Nat'l Board Repair / ASME . ID Number Manufacture S/N. Serial Replacement Stamped 3RSS*MOV23A Tubeco 3RSS-1 N/A Replacement No

7. Description of work: Replace Plue in Encapsulation Rinc
8. Test Conducted:

Hydrostatic < > Pneumatic < > Normal Operating Pressure < X > Other < > i CERTIFICATE OF COMPLIANCE i We certify that the statements made in the report are correct and this replacement conforms to the rules of ASME Code, Section XI Signed: bA Date: I7~ CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Connecticut and. employed by Hartford Steam Boiler Insurance and Inspection during the period //$ff to //./5'ff, and state that to the best of my knowledge and belief, the owner has performed examinations and has taken corrective measures i described in this owner's report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in the Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for.any personal t injury, property damage, or loss of y kind arising from or connected with this inspection. , ,- ! Inspector's Signature: ,. Commissions: 8r//T,'f . Date: A ./S.92

i i

                                                                                                                   ?

Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

1. OWNER: Northeast Utilities Service Co. Date: 07/07/92 '

P. O. Box 128. Waterford CT

2. PLANT. Millstone Nuclear Power Station Unit Q
3. Work Performed By: Maintenance AWO Numbers Address: P. O. Box 128. Waterford CT M3-91-16250
4. SYSTEM: MSS CODE CLASS: 2-c
5. Applicable Const. Code: ASME III. Edition: J_911 9 Addenda: E72 ,

Code Edition of Section XI Utilized for work 1983.S83 ,

6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of Mfrs. Nat'l Board Repair / ASME ID Number Manufacture S/N. No. Replacement Stamped . 3 MSS *SO1B Westinchouse N/A NEOT1775 Replacement Yes d153 3

7. Description of work: Machined Manway. Machined Manwa(y Cover. and Replaced Boltine I
8. Test Conducted:

Hydrostatic < > Pneumatic < > Normal Operating Pressure <X> Other < > > CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of ASME Code, Section XI i Signed:  %  ! _ Date: t ?. i s % CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Connecticut and employed by Hartford Steam Boiler i lasurance and Inspection during the period f//f/ to ///tf 7, and state that to the best of. my knowledge and belief, the owner has perfbrmed enminations and has taken corrective measures _! described in this owner's report in accordance with the requirements of ASME Code, Section XI. l l By signing this certificate neither the inspector nor his employer makes any warranty, expressed j or implied, concerning the examinations and corrective measures described in the Owner's Report. j Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury, property damage, or loss opny kin rising from or connected with this inspection. , inspector's Signature: Commissions: Or NSr h/ Date: 17b; /Gr7 _ l

                                                                                                                   )
                                                                  -     ~

Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

1. OWNER: Nonheast Utilities Service Co. Date: 07/07/92 P. O. Box 128. Waterford CT
2. PLANT: Millstone Nuclear Power Station Unit M
3. Work Performed By: Maintenance AWO Numbers Address: P. O. Box 128. Waterford CT M3-91-16251
4. SYSTEM: MSS CODE CLASS: 2
5. Applicable Const. Code: ASME III. Edition: 192 1 Addenda: 371 Code Edition of Section XI Utilized for work 1983.S83
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of Mfrs. Nat'l Board Repair / ASME [ ID Number Manufacture S/N. No. Replacement Stamped 3 MSS *SG1C Westinchouse N/A NEGT1778 Replacement Yes bl$ \ $$

7. Description of work: Machined Manway. Machined Manwav Cover. and Replaced Boltine i
8. Test Conducted:

Hydrostatic < > Pneumatic < > Normal Operating Pressure <X> Other < > r CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of ASME Code, Section XI Signed: [h Date: / 2- /['f 3 CERTIFICATE OF INSERVICE INSPECITON I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Connecticut and employed by Hartford Steam Boiler Insurance and Inspection during the period r At f> to ///t fE and state that to the best of rny knowledge and belief, the owner has performed examinations and has taken corrective measures described in this owner's repon in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in the Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury, property damage, or loss of any kind arising from or connected with this inspection.

  • Inspector's Signature: Commissions:h/57 df!fsry
                                                 /                                                       '

Date: 12bli/P3

e . . - . . . . . . . - . .-  :. . : -- -- - - _ - . . _ . . _ .

Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS ,

1. OWNER: Nonheast Utilities Service Co. Date: 07/07/92 P. O. Box 128. Waterford CT
2. PLANT: Millstone Nuclear Power Station Unit #1 ,

1

3. Work Performed By: Maintenance AWO Numbers l Address: P. O. Box 128. Waterford CT M3-91-12809 ,
4. SYSTEM: hiss CODE CLASS: 2
5. Applicable Const. Code: ASME III. Edition: 7 1971 Addenda: 312  !

Case Edition of Section XI Utilized for work 1983.S83

6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of Mfrs. Nat'l Board Repair / ASME ID Number Manufacture S/N. Serial Replacement Stamped 3 MSS *SGID Flexonics / N/A NEGT 1777 Replacement Yes Westinrhouse

7. Description of work: Replacement of Boltine to Manway. Weld Renair of manway and Manway I

Cover t

8. Test Conducted:

Hydrostatic < > Pneumatic < > Normal Operating Pressure <X > Other < > ' CERTIFICATE OF COMPLIANCE  ; We certify that the statements made in the repon are correct and this replacement conforms to the rules of } ASME Code, Section XI  ; Signed: MI/7kt Date: /2-(2 'I 3 i CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Connecticut and employed by Hartford Steam Boiler Insurance and Inspection during the period K@ 9/ to /t.h.97, and state that to the. best of my - knowledge and belief, the owner has performed examinations and has taken corrective measures - i described in this owner's report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed , or implied, concerning the examinations and corrective measures described in the Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any perr.onal injury, property damage, or loss of any ki arising from or connected with this inspection. Inspector's Signature: -

                                               ,e      ,

Commissions: Or//I7 MNG/ Date: N'/6 41 i

 .- .   - ~.4,.                                                                                                   . . . ,

I Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

1. OWNER: Northeast Utilities Service Co. Date: 11/23/93 .

P. O. Box 128. Waterford CT l

2. PLANT: Millstone Nuclear Power Station Unit p_1 .[
3. Work Performed By: Maintenance AWO Numbers Address: P. O. Box 128. Waterford CT M3-93-25783
4. SYSTEM: f.liS CODE CLASS: 2
5. Applicabb Const. Code: ASME Ill. Edition:J071 Addenda: $11 Case Edition of Section XI Utilized for work 1983.W85 i
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of M fts. Nat'l Board Repair / ASME ID Number Manufacture S/N. Serial Replacement Stamped 3CHS*FLT5 Pall Trinity 25276 Nfr-* Replacement No i

                                                                          ?NB12609
7. Description of work: Replace Trtmion Boltinc .
8. Test Conducted:

Hydrostatic < > Pneumatic < > Normal Operating Pressure < X > Other < > CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of ASME Code, Section XI Signed: N4b Date: (?' I6 ' 3 3 I E CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission. issued by the National Board of Boiler and l Pressure Vessel Inspectors and the State of Connecticut and employed by Hartford Steam Boiler ,.

                                                                                                                             +

Insurance and Inspection during the period #$/J to /825tB, and state that to the best of my knowledge and belief, the owner has performed examinations and has taken corrective measures described in this owner's report in accordance with the requirements cf ASME Code, Section XI. } By siening this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in the Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal l injury, property damage, or loss of any ki rising from or connected with this inspection. l Inspector's Signature: 1 Commissions: 8 7 // J F # f )2 T M Date: fb7fh

 .   . . . - - . - - .             -            . _                       ..               w -         -_

Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

1. OWNER: Northeact Utilities Service Co. Date: 11/15/93 P. O. Box 128. Waterford CT
2. PLANT: Millstone Nuclear Power Station Unit M
3. Work Performed By: Maintenance AWO Numbers Address: P. O. Box 128. Waterford CT M3-93-09539
4. SYSTEM: MSS CODE CLASS: 2
5. Applicable Const. Code: ASME III. Edition: 1974 Addenda: 324 '

Case Edition of Section XI Utilized for work 1983.S83

6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of Mfrs. Nat'l Board Repair / ASME ID Number Manufacture S/N. Serial Replacement Stamped 3 MSSRV26A Dresser N/A BS00304 Replacement Yes

7. Description of work: Renlaced Safety Valve with Snare S/N BS00310
8. Test Conducted:

Hydrostatic < > Pneumatic < > Normal Operating Tressure < X > Other < > CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of ASME Code Section XI Signed: h heo Date: h- O ' 9.3 CERTIFICATE OF INSERVICE INSPECTION , 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Connecticut and employed by Hartford Steam Boiler Insurance and Inspection during the period //Ettff to /Irer.97, and state that to the best of my knowledge and belief, the owner has performed examinations and has taken corrective measures i described in this owner's report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, conceming the examinations and corrective measures described in the Owner's Report. , Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury, property damage, or loss of any kind arisin . from or connected with this inspection. Inspector's Signature: Md 3 M Commissions:/fr//M ' Date: //,/er/97

I a l Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

1. OWNER: Northeast Utilities Service Co. Date: 12/13 /93  :

P. O. Box 12R. Waterford C_I

2. PLANT: Millstone Nuclear Power Station Unit #_33 [

r

3. Work Performed By: Maintenance AWO Numbers l Address: P. O. Box 128. WaterforJ CT M3-91-07255
4. SYSTEM: BDG CODE CLASS: 2 -[
5. Applicable Const. Code: ASME III. Edition: 1971 Addenda: S73 Case Edition of Section XI Utilized for work 1983.W85  ;
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED: ,

Components Name of M frs. Nat'l Board Repair / ASME ID Number Manufacture S/N. No. Replacement Stamped .; 3BDG*CTV22C Fisher Controls 7329561 6524 Repair Yes

7. Description of work: Machinine of Gasket Surfaces ,
8. Test Conducted: i Hydrostatic < > Pneumatic < > Normal Operating Pressure <X> Other <X> IWV Testing CERTIFICATE OF COMPLIANCE j We certify that the statements made in the report are correct and this renair conforms to the rules of ASME Code, Section XI -j Signed:
                   ~N M1 h b                                        Date: /2- / 4 - 9 3 CERTIFICATE OF INSERVICE INSPECTION                                             !

I, the undersigned, holding a valid commission issued by the National Board of Boiler and + Pressure Vessel Inspectors and the State of Connecticut and employed by Hartford Steam Boiler Insurance e 2d Inspection during the period 92 97 to //b ff , and state that to the best of my > knowledge and belief, the owner has performed examinations and has taken corrective measures described in this owner's report in accordance with the requirements of ASME Code, Section XI.

                                                                                                                ?

By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in the Owner's Report.  ; Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury, propeny damage, or loss of an ' ind arising from or connected with this inspection. ~ Inspector's Signature: F. ' Commissions: d7/M Sf[fld[  ;

                             /

Date: 11 20.91

                 /                                                                                              i
                                                                                                                }

e i

a f Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

                                                                                                            .i
1. OWNER: Northeast Utilities Service Co. Date: 11/23/93 P. O. Bot 128. Waterford CT  ;
2. PLANT: Millstone Nuclear Power Station Unit M AWO Numbers
3. Work Performed By: Maintenance Address: P. O. Box 128. Waterford CT M3-93-05353 -

I

4. SYSTEM: MSS CODE CLASS: 2
5. Applicable Const. Code: ASME IIL Edition: 1971 Addenda: W73 Case Edition of Section XI Utilized for work 1983.W83
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of M frs. Nat'l Board Repair / ASME ID Number Manufacture S/N. Serial Replacement Stamned 3 MSS *CTV27A Sultzer 5425 N/A Repair Yes 3

7. Description of work: Grind Control to Restore Flatness
8. Test Conducted:

Other < > Hydrostatic < > Pneumatic < > Normal Operating Pressure < X > CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this reriair conforms to the rules of ASME Code, Section XI Signed: 3hr b Date: 11"/ & 7 3 s CERTIFICATE OF INSERVICE INSPECTION , I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Connecticut and employed by Hartford Steam Boiler ' i Insurance and Inspection during the period 74 f7 to p)gff, and state that to the best of my. knowledge and belief, the owner has performed examinations and has taken corrective measures described in this owner's report in accordance with the requirements of ASME Code, Section XL' By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in the Owner's Report.'  ; Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal , injury, property damage, or loss of anyX ti arising froin or connected with this inspection. I Inspector's Signature:

                          /,                                     Commissions: [r#77 Date: A.1 2 9 9 2 i

_. ___r -

Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

1. OWNER: Northeast Utilities Service Co. Date: 12/13/93 P. O. Box 128. Waterford CT
2. PLANT; Millstone Nuclear Power Station Unit !J
3. Work Performed By: Maintenance AWO Numbers Address: P. O. Box 128. Waterford CT M3-93-19507
4. SYSTEM: CODE CLASS: 2 IWF
5. Applicable Const. Code: ASME III. Edition: 1971 Addenda: S7,1 7 i!

Case Edition of Section XI Utilized for work 1983.W85

6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of Mfrs. Nat'l Board Repair / ASME ID Number Manufacture S/N. No. Replacement Stamped CP3791001-H003 Stone & N/A N/A Replacement No Webster

7. Description of work: Replace Hancer Fasteners
8. Test Conducted: VISUAL UPON. INSTALLATION Hydrostatic < > Pneumatic < > Normal Operating Pressure < > Other < >(ISI N/R)

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this renlacement conforms to the rules of ASME Code, Section XI  : Signed: [ A Date: I2.-74 O3 l CERTIFICATE OF INSERVICE INSPECTION f 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Connecticut and employed by Hartford Steam Boiler Insurance and Inspection during the period ------ to12-20-93, and state that to the best of my knowledge and belief, the owner has performed examinations and has taken corrective measures . described in this owner's report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed  ; or implied, concerning the examinations and corrective measures described in the Owne-r's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury, property damage, or loss of any kind arising from or connected with this inspection, inspector's Signature: Commissions: CT 1137 Date: 12-20-93 l

l Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

1. OWNER: Northeast Utilities Service Co. Date: 07/07/92 P. O. Box 128. Waterford CT .
2. PLANT: Millstone Nuclear Power Station Unit D
3. Work Performed By: Maintenance AWO Numbers Address: P. O. Box 128. Waterford CT M3-91-16252
4. SYSTEM: MSS CODE CLASS: 2
5. Applicable Const. Code: ASME 111. Edition: 1971 Addenda: $23 -

Case Edition of Section XI Utilized for work 1983.S83 [

6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED: i Components Name of M frs. Nat'l Board Repair / ASME I ID Number Manufacture S/N. Serial Replacement Stamped ,

3 MSS *SGID Westinchouse NEGT 1777 W15215 Replacement Yes j

7. Description of work:W Bolt Heads were Machined Off as a Mainteneance Convenience. Weld Renair of the Manway and Manway Cover p an, , , w .Wy4 ue/.

S. Test Conducted Ilydrostatic < > Pneumatic < > Normal operating I ressure < X > Other < > t a

       . 7f-                                                             CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of ASME Code. Section XI                                                                                                                                  ?

i Signed: U. bs-O Date: / L4kl CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and ' i Pressure Vessel inspectors and the State of Connecticut and employed by Hartford Steam Boiler Insurance and Inspection during the period F//,.9/ to/yLfjf, and state that to the best of my , knowledge and belief, the owner has performed examinations and has taken corrective measures described in this owner's report in accordance with the requirements of ASME Code, Section XI. By signing this cenificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in the Owner's Report. , Furthermore, neither the inspector nor his employer shall be liable in any manner fdr any personal ~ , injury, property damage, or loss o any kin ng from or connected with this inspection. , Inspector's Signature: s, Commissions: 8r//f7//[flFFF

                                                            /, %.                                                                                                           ,

Date: A,d//fh" , .. hm.. _.a.- .wt-. . . , _ - .w e ..m.-.-- ~.am. --

                                                                                                       . _ , ,                          ggg , p,,, g pp .,m,,-g,. g.s,

Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

1. OWNER: Northeast Utilities Service Co. Date: 12/15/93 ,

I P. O. Box 128. Waterford CT

2. PLANT: Millstone Nuclear Power Station Unit #2
3. Work Performed By: Maintenance AWO Numbers Address: P. O. Box 128. Waterford CT M 3-93-20362
4. SYSTEM: MSS CODE CLASS: 2
5. Applicable Const. Code: ASME III. Edition: 1971 Addenda: E22 Code Edition of Section XI Utilized for work 1983.W85
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of Mfrs. Nat'l Board Repair / ASME ID Number Manufacture S/N. No. Replacement Stamped 3 MSS *SGID Westinchouse NEGT1777 W15215 Repair Yes

7. Description of work: Phonocraphie Finish on Handhole Covels 3D G 60 *  ;
8. Test Conducted:  ;

Hydrostatic < > Pneumatic < > Normal Operating Pressure <X > Other < >

                                                                                                                 ~

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this repair conforms to the rules of ASME Code, Section XI Signed: 914k b Date: l 2 - I (. - 9 3 r CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Connecticut and employed by Hartford Steam Boiler Insurance sad Inspection during the period S-3-E3 go12a-93 , and state that to the best of my i krmwledge and belief, the owner has performed examinations and has taken corrective measures described in this owner's report in accordance with the requirements of ASME Code, Section XI.

                                                                                                               ->~

By signing this certificate neither the inspector nor his employer makes any warranty, exprested - or implied, concerning the examinations and corrective measures described in the Owner's Report. Fu.thermore, neither the inspector nor his employer shall be liable in any manner for any persons.1 injury, property damage, or loss of y arising from or connected with this inspection. Inspector's Signature: * / Commissions:CT 1137 NB 9384 Date: 12-22-93 i i

u .. - - . .-

y. - .

Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS ,

1. OWNER: Northeast Utilities Service Co. Date: 12/15/93 P. O. Box 128. Waterford CT i
2. PLANT: Millstone Nuclear Power Station Unit E.33
3. Work Performed By: Maintenance AWO Numbers Address: P. O. Box 128. Waterford CT M3-93 20360
4. SYSTEM: MSS CODE CLASS: 2
5. Applicabic Const. Code: ASME III. Edition: j971 7 Addenda: $J71 ,

Code Edition of Section XI Utilized for work 1983.W85

6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of M frs. Nat'l Board Repair / ASME i ID Number Manufacture S/N. No. Replacement Stamped 3 MSS *SGI A Westinehouse NEGT1776 W13584 Repair Yes P

7. Description of work: Phonorrarihie Finish on Hand Hole Covg's 1A, 4A, S 5A.*
8. Test Conducted:

Hydrostatic < > Pneumatic < > Normal Operating Pressure < X> Other < > r CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this renair conforms to the rules of ASME Code, Section XI Signed: , di % Date: (?-/fc ] 3 , CERTIFICATE OF INSERVICE INSPECTION , I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Connecticut and employed by Hartford Steam Boiler Insurance and Inspection during the period 9-193 to 122-53, and state that to the best of my knowledge and belief, the owner has performed examinations and has taken corrective measures described in this owner's report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in .the Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury, property damage, or loss of y k: arising from or connected with this inspection. Inspector's Signature: * / Commissions:CT 1137 NB 9384 Date: 12-22-93

 ,_                                               ~      _           -

Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

1. OWNER: Nodheast Utilities Sersice Co. Date: 12115/93 P. O. Box 128. Waterford CT
2. PLANT: Millstone Nuclear Power Station Unit g),
3. Work Performed By: Maintenance AWO Numbers Address: P. O. Box 128. Waterford CI M 3-93-20361
4. SYSTEM: MSS CODE CLASS: 2
5. Applicable Const. Code: ASME IIL Ed. tion: 1921 Addenda: S]71 Code Editior of Section XI Utilized for work 1983.W85
6. IDENTIFICATION OF COMPONENTT REPAIRED OR REPLACED:

Components Name of M frs. Nat'l Board Repair / ASME ID Number Manufacture S/N. No. Replacement Stamped 3 MSS *SGlB Westinghouse NEGT1775 W13583 Repair Yes

7. Description of work: Phonocranhic Finish on Handhole Cover's 3B S 68*
8. Test Ccaducted:

Hydrostatic < > Pneumatic < > Normal Operating Pressure <X> Other < > CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this repair conforms to the rules of ASME Code, Section XI Signed: k b=l- Date: I2-/6 9 CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Connecticut and employed by Hartford Steam Boiler Insurance and Inspection during the period 9-3-EG to 12-a-93, and state that to the best of my knowledge and belief, the owner has performed examinations and has taken corrective measures described in this owner's report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in the Owner's Repon. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury, property damage, or loss of any ki rising from or connected with this inspection. Inspector's Signature:

  • Commissions: CT1137 NB9384 Date: 12-22-93
   ~
                                                    "       ~

Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

1. OWNER: Northeast Utilities Service Co. Date: 12/15/93 P. O. Box 128. Waterford CT
2. PLANT. Millstone Nuclear Power Station Unit U
3. Work Performed By: Maintenance AWO Numbers Address: P. O. Box 128. Waterford C1' M3-91-02696
4. SYSTEM: MSS CODE CLASS: 2
5. Applicable Const. Code: ASME III. Edition: 1971 Addenda: $22 Code Edition of Section XI Utilized for work 1983.S83
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of M frs. Nat'l Board Repair / ASME ID Number Manufacture S/N. No. Replacement Stamped 3 MSS *CTV27A Sultzer N/A 1 Repair Yes

7. Description of work: Renair Steam Cuttine on Gasket Surfaces #49 S 55-1/55-2*
8. Test Conducted:

Hydrostatic < > Pneumatic < > Normal Operating Pressure <X> Other < > CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this renair conforms to the rules of ASME Code, Section XI Signed; bec._ - Date: / 2- Ib #/ 3 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Connecticut and employed by Hartford Steam Boiler Insurance and Inspection during the period 8-1~7-93to 12-22-93 , and state that to the best of my knowledge and belief, the owner has performed examinations and has taken corrective ~ measures described in this owner's report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, conceming the examinations and corrective measures described in the Ovmer's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury, property damage, or loss of any kind rising from or connected with this inspection. Inspector's Signature:

  • Commissions: CT1137 NB9384
                                      /

Date: 12-22-93 IST RQMNTS SATISFIED PRIOR TO START-UP.

Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

1. OWNER: Northear.1 Utilities Service Co. Date: 12/14/93 P. O. Box 128. Waterford CT
2. PLANT: Millstone Nuclear Power Station Unit il
3. Work Performed By: Maintenance AWO Numbers Address: P. O. Box 128. Waterford CT M3-93-23069
4. SYSTEM: QSS CODE CLASS: 2
5. Applicable Const. Code: ASME III. Edition: 19171 Addenda: 521 Case Edition of Section XI Utilized for work 1983 W85
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of M frs. Nat'l Board Repair / ASME ID Number Manufacture S/N. No. Replacement Stamped 30SS-1-PSR001 NPSI N/A N/A Replacement No

7. Description of work: Renlace Sunnart Clamn Pin
8. Test Conducted:

Hydrostatic < > Pneumatic < > Normal Operating Pressure < > Other <X > VT CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of ASME Code, Section X1 Signed: k@ Gct L Date: Ut - t 6 - 13 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Connecticut and employed by Hartford Steam Boiler Insurance and Inspection during the period /pyy to Ng/f.f , and state that to the best of my knowledge and belief, the owner has performed examinations and has taken corrective measures described in this owner's report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in the Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury, property damage, or loss of any kin ' sing from or connected with this inspection. Inspector's Signature:

  • Commissions. /kr//J7 Date: /Z 9kg y ., f gg g g

-.i . ~. _ _. . __ . . .. _ _ - 1 - . _ . . _ i i 1 I Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS j

1. OWNER: Northeast Utilities Service Co. Date: 11/12/93 I P. O. Box 128. Waterford CT i
2. PLANT: Millstone Nuclear Power Station Unit U l
3. Work Performed By: Maintenance AWO Numbers Address: P. O. Box 128. Waterford CT M3-93-14755
4. SYSTEM: MSS CODE CLASS: 2  ;
5. Applicable Const. Code: ASME III.1971 Edition: 5272 Addenda: N/A l Case Edition of Section XI Utilized for work 1983.S83  ;

J

6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

i Components Name of Mfrs. Natt- Repair / ASME ID Number Manufacture NM Serial # Replacement Stamned 3RCEaEG4A-- Westinghouse 13584 NEGT1776 Replacement YES

         /        3 MSS *SG1A
7. Description of work: Renlace Secondary Side Manway Bolts
8. Test Conducted:

Hydrostatic < > Pneumatic < > Normal Operating Pressure < X > Other < > , CERTIFICATE OF COMPLIANCE E We certify t'

  • the statements made in the report are correct and this replacement conforms to the rules of ASME Cod, section XI f

Signed: d -- Date: Il i 3 , CERTIFICATE OF INSERVICE INSPECTION

                                                                                                                           +

I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Connecticut and employed by Hartford Steam Boiler Insurance and Inspection during the period 8-2-93 to 12-29-93and state that to the best of my knowledge and belief, the owner has performed examinations and has taken corrective measures described in this owner's report in accordance with the requirements of ASME Code, Section XI. _[ By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, conceming the examinations and corrective measures described in the Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury, propeny damage, or loss of any kind ari rom or connected with this inspection. 7 Inspector's Signature: E YOFlK Commissions. CT1137 NB9384 Date: 12/29/93 4

a u? - a

                                                                                                                                                                                   ?
                                                         . w..   ;.-..~.            :-                               -      -

Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

1. OWNER: Northeast Utilities Service Co. Date: J1/15/93 ,

P. O. Box 128. Waterford CT ,

2. PLANT: Millstone Nuclear Power Station Unit Q
3. Work Performed By: Maintenance AWO Numbers Address: P. O. Box 128. Waterford CT M3-93-14764
4. SYSTEM: MSJ CODE CLASS: 2
5. Applicable Const. Code: ASME 111. Edition: jf.21 Addenda: 37J Case Edition of Section XI Utilized for work 1983.S83
6. IDENTIFICATION OF COMPONEN[S REPAIRED OR REPLACED: ,

Components Name of Mfrs. Nat'l Board Repair / ASME ID Number Manufacture S/N. Serial Replacement Stamped 3RC&t3GJD- Westinghouse W15215 NEGT1777 Replacement Yes , 3 MSS *SG1D *

7. Description of work: Replaced Secondary Side Manway Boltinc
8. Test Conducted:

Hydrostatic < > Pneumatic < > Normal Operating Pressure < X > Other < > CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this renlacement conforms to the rules of - ASME Code, Section XI Signed:' i7e e- Date: / / T 3 CERTIFICATE OF INSERVICE INSPECTION > 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Connecticut and employed by Hartford Steam Boiler Insurance and Inspection during the period 8-2-93 o12-29-93 t and state that to the best of my knowledge and belief, the owner has performed examinations and has taken corrective measures - described in this owner's report in accordance with the requireme :s of ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in the Owner's Report. , Furthermore, neither the inspector nor his emplo er shall be liable in any manner for any personal . injury, property damage, or loss of any kind a ' . g from or connected with this inspection. Inspector's Signature:*E YORK Commissions: CT1137 N99384

                                                                                                           /

Date.12-29-93 ,

i Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS i

1. OWNER: Northeast Utilities Service Co. Date: 12/13/93 .!

P. O. Box 128. Waterford CT

2. PLANT: - Millstone Nuclear Power Station Unit pl <
3. Work Performed By: Maintenance AWO Numbers Addren: P. O. Box 128. Waterford CT M 3-91-09072 j
4. SYSTEM: BDG CODE CLASS: J ,
5. Applicable Const. Code: ASME III. Edition: 1971 Addenda: S2,1 l Case Edition of Section XI Utilized for work 1983.W85
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of M frs. Nat'l Board Repair / ASME , ID Number Manufacture S/N. No. Replacement Stamped 3BDG*CTV22D Fisher Controls 7329562 6525 Repair Yes ,

7. Description of work: Machininc of Gasket Surfaces
8. Test Conducted:

Ilydrostatic < > Pneumatic < > ltormal Operating Pressure <X> Other <X> IWV Testing l 5 CERTTFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this renair conforms to the rules of ASME Code, Section XI Signed: //A [ , Date: /7 9 3 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Connecticut and employed by Hartford Steam Boiler Insurance and Inspection during the period Rf.ff to /J.20.ff, and state that to the best of my . knowledge and belief, the owner has performed examinations and has taken corrective measures described in this owner's report in accordance with the requirements of ASME Code, Section XI. 1 By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in the Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury, property damage, or loss of any kind arising from or connected with this inspection. inspector's Signature: Commissions: [7#.Z7 Asf.5 Date: /.fre 2V /f22 I 1

- _y - . .

   .    . ~-                      ~,

P 9 Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS  ;

1. OWNER: Northeast Utilities Service Co. Date: 12/14/93 P. O, Box 128. Waterford CT l
2. PLANT: hiillstone Nuclear Power Station Unit g2 1
3. Work Performed By: Maintenance AWO Numbers Address: P. O. Box 128. Waterford CT M3-92-17669 & M3-93-25154
4. SYSTEM: GIS CODE CLASS: 2
5. Applicable Const. Code: ASME III. Edition: 1971 Addenda: 373 7 Case Edition of Section XI Utilized for work 1983.W85
6. IDENTIFICATION OF COMPONENTS REF. >n OR REPLACED: .

Components Name of Mfrs. Nat'l Board Repair / ASME  ; ID Number Manufacture S/N. No. Replacement Stamped 3CHS*HCV18 Copes - Vulcan 7620-95379-247X-1 1995 Replacement Yes 4 ,

7. Description of work: Renlace Stem Plue Assembly PLUG S/N 9221-96011-1-1(92_i)*
8. Test Conducted:

Hydrostatic < > Pneumatic < > Normal Operating Pressure < X > Other < > , i CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of ASME Code, Section XI Signed:  %. Date: s 't - t 6 - D i t CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Connecticut and employed by Hartford Steam Boiler Insurance and Inspedon during the period 8-12-93t o12-30-93, and state that to the best of rny knowledge and belief, the owner has performed .examinatic.is and has taken corrective measures described in this owner's report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed  : or implied, concerning the examinations and corrective measures described in the Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury, property damage, or loss of any kind ari from or connected with this inspection. Inspector's Signature: E YCHK Commissions: CT1137NB9384 Date: 12-30-93

d-u -

 . .. .      .           . . _ . ,        _ . . . _ . . ~           . _ . .                      -, _        .

Form NIS-2 OWNERS DEPORT FOR REPAIRS OR REPLACEMENTS i

1. OWNER: Northeast Utilities Service Co. Date: 11/22/93 P. O. Box 128. Waterford CT
2. PL (NT: Millstone Nuclear Power Station Unit U
3. Work Performal By: Maintenance AWO Numbers Address: P. O. Box 128. Waterford CT M 3-92-21643
4. SYSTEM: MSS CODE CLASS: 2
5. Applicable Const. Code: ASME III. Edition: 1971 Addenda: 373 Case Edition of Section YI Utilized for work 1983.S83
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of Mfrs. Nat'l Board Repair / ASME ID Number Manufacture S/N. No. Replacement Stamped 3 MSS *AOV310'O Fisher Controls 8473869 N/A> NB 572 E Repair / Yes Replacement

7. Description of work: Replace Pluc and Stem Asr.embly and Repair Steam Cuttine on Valve .
8. Test Conducted:

Hydrostatic < > Pneumatic < > Normal Operating Pressure < X > Other < > CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this repair /rerlacement conforms to the rules of ASME Code Section XI Signed: 'lA4r Date: II-25 c/3 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel' Inspectors and the State of Connecticut and employed by Hartford Steam Boiler Insurance and Inspection during the period 1-15-9h 12-30-9) and state that to the best of my knowledge and belief, the owner has performed examinations and has taken . corrective measures described in this owner's report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in the Owner's Report. Funbermore, neither the inspector nor his employer shall be liable in any' manner for any personal injury, property damage, or loss of any kind arising from or connected with this inspection. Inspector's Signature: *E YORK Commissions:NB9384 CT1137 i Date: 12-30-93

=

                                                                   ~

i Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

1. OWNER: Northeast Utilities Service Co. Date: 12/13/93 -

E,,,Q. Box 128. Waterford CT

2. PLANT: Millstone Nuclear Power Station Unit n
3. Work Performed By: Maintenance AWO Numbers Address: P. O. Box 128. Waterford CT M3-93-25873 >-
4. SYSTEM: CHS CODE CLASS: 2 I
5. Applicable Const. Code: ASME III. Edition: 1971 Addenda: S]7J1 Case Edition of Section XI Utilized for work 1983.W85  ;
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:  :

Components Name of M frs. Nat'l Board Repair / ASME ID Number Manufacture S/N. No. Replacement Stamped -  ; 3CHS*FLT2 25268 12601 Replacement Yes ,

7. Description of work: Replace Trunnion Bolts  !

i

8. Test Conducted: .

Hydrostatic < > Pneumatic < > Normal Operating Pressure < > Other < X > [,

                                                                                                                   .h CERTIF]CATE OF COMPLIANCE                                                  !

We certify that the statements made in the report are correct and this rentacement conforms to the rules of ASME Code, Section XI Signed M4 m b- - I) ate: '17- I4 #73 CERTIFICATE OF INSERVICE INSPECTION , I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Connecticut and employed by Hartford Steam Boiler Insurance and Inspection during the period //.// f2 to // pp ft, and state that to the best of my knowledge and belief, the owner has performed examinations and has taken corrective measures described in this owner's report in accordance with the requirements of ASME Code, Section XL By signing this certificate neither the inspector nor his employer makes any warranty, expressed  ; or implied, concerning the examinations and corrective measures described in the Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal i injury, property damage, or loss of any kind arising from or connected with this inspection.  ; Inspector's Signature: f, Commissions: 877/27-f/gfggy (

                                /                                                                                    '

Date: /gbkh  ! 1 1 4 l

r .

 -     - ~         .c.             . .-. .

Form NIS-2 OWNERS REPORT FOR REPTRS OR REPLACEMENTS . f

1. OWNER: Northeast Utilities Service Co. Date: 11/22/93 P. O. Box 128. Waterford CT
2. PLANT: Millstone Nuclear Power Station Unit gl ,
3. Work Performed By: Maintenance AWO Numbers
  • Address: P. O. Box 128. Waterford CT M3-91-05047
4. SYSTEM: MH CODE CLASS: 2
5. Applicable Const. Code: ASME Hl. Edition: 1971 97 Addenda: E7]

Case Edition of Section XI Utilized for work 1983.S83

6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED: ,

Components Name of Mfrs. Nat'l Board Repair / ASME ID Number Manufacture S/N. No. Replacement Stamped 3SlH +FE983 Permutit N3604 N/A Repair No t

7. Description of work: Machined a Phonocranhic Finish to Seatine Surface.
8. Test Conducted:

Hydrostatic < > Pneumatic < > Normal Operating Pressure < X > Other < > CERTIFICATE OF COMPLIANCE 9 We certify that the statements made in the report are correct and this repair conforms to the rules of ASME Code, Section XI , i Signed: [4A <cI Date: i f - 2 5 - 9 '~> CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Connecticut and employed by Hartford Steam Boiler Insurance and Inspection during the period 3-10-91o 12-29-97 and state that to the best of my knowledge and belief, the owner has performed examinations and has taken corrective measures described in this owner's report in accordance with the requirements of ASME Code, Section XL By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in the Owner's Report. , Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury, property damage, or loss of any kind ari '. rom or connected with this inspection.

      ' Inspector's Signature: E YORK                                       Commissions:CT 1137 Date: 12/29/93

1

           ,.                                               +      . . _                   .

2

  -.. ~ .-.;                                                                                                . -

t Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS -

1. OWNER: Northeast Utilities Service Co. Date: 11/15/93 P. O. Box 128. Waterford CT l
2. PLANT: Millstone Nuclear Power Station . Unit gl ,
3. Work Performed By: Maintenance AWO Numbers  ;

Address: P. O. Box 128. Waterford CT M3-93-24104 ,

4. SYSTEM: CHS CODE CLASS: 2
5. Applicable Const. Code: ASME Ill. Edition: 1974 7 Addenda: S74 Case Edition of Section XI Utilized for work 1983.S83 i
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of Mfrs. Nat'l Board Repair / ASME ID Number Menufacture S/N. Serial Replacement Stamped 3CHS*FLT3B Paul Trinity 18109 33577 Replacement Yes - ,

7. Description of work: Replace Filter Trunion Bolts and Nuts
8. Test Conducted:

Hydrostatic < > Pneumatic < > Normal Operating Pr.:ssure < X > Other < > > CERTIFICATE OF COMPLIANCE j We certify that the statements made in the report are correct and this replacement conforms to the rules of ASME Code, Section XI > Signed: I44 cur! ~ Date: // h i CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and ~ Pressure Vessel Inspectors and the State of Connecticut and employed by Hartford Steam Boiler. Insurance and Inspection during the period 10-4-93 ot 1E-29-97 and state that to the best of my ' knowledge and belief, the owner has perfonned examinations and has taken corrective measures described in this owner's report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, ccocerning the examinations and corrective measures described in the Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal , injury, property damage, or loss of any kind a ' sing from or connected with this inspection. Inspector's Signature: E YORK ~ Commissions:N89384 CT1137 Date: 12/29/93 ,.

p+ p ada. 4 ae. *+ma.Je' a4 , e. -.wwe

                                                                                                        .*%.  +.-*..e --

h<r,'m, cuh . 4 . haeson - -wp = Form NIS-2 OVINERS REPORT FOR REPAIRS OR REPLACEMENTS

1. OWNER: Nonheast Utilities Service Co. Date: 11/17/93 P. O. Box 128. Waterford CT
2. PLANT: Millstone Nuclear Power Station Unit L33
3. Work Performed By: Maintenanet AWO Numbers Address: P. O. Box 128. Waterford CT M 3-93-09258
4. SYSTEM: MjS CODE CLASS: 2
5. Applicable Const. Code: ASME III. Edition: L9,24 Addenda: E7_4 Case Edition of Section XI Utilized for work 1983.S83
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of M frs. Nat'l Board Repair / ASME ID Number Manufacture S/N. Serial Replacement Stamned 3 MSS *RV23A Dresser BS00299 N/A Replacement Yes

7. Description of work: Replaced Valve with Snare S/N BS00298 Due to Valve Leaked thru Seat
8. Test Conducted:

Hydrostatic < > Pneumatic < > Normal Operating Pressure < X > Other < > CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of ASME Code, Section XI Signed: 9R Date: MM N l CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Connecticut and employed by Hartford Steam Boiler Insurance and Inspection during the period 6 93t o10-29-93..and state that to the best of my knowledge and belief, the owner has performed examinations and has taken corrective measures described in this owner's report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in the Ovmer's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury, propeny damage, or loss of any kind rising from or connected with this inspection. Inspector's Signature: E YORK Commissions:CT 1137

                                                                                     /

Date: 12-29-93

P Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

1. OWNER: Northeast Utilities Service Co. Date: 11/22/93 P. O, Box 128. Waterford CT l
2. PIANT: Millstone Nuclear Power Station Unit #1 -
3. Work Performed By: Maintenance AWO Numbers Address: P. O. Box 128. Waterford CT M 3-92-21643
4. SYSTEM: htSSS CODE CLASS: 2
5. Applicable Const. Code: ASME Ill. Edition: 19171 Addenda: E7}

Case Edition of Section XI Utilized for work 1983.S83

6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of Mfrs. Nat'l Board Repair / ASME ID Number Manufacture S/N. No. Replacement Stamped 3 MSS *AOV310'O Fisher Controls 8473869 N/#NB S72E Repair / Yes

  • Replacement
7. Description of work: Replace Plue and Stem Asrembly and Repair Steam Cuttine on Valve
8. Test Conducted: ,

Hydrostatic < > Pneumatic < > Normal Operating Pressure < X > Other < > CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this repair / replacement conforms to the rules of ASME Code, Section XI Signed: bd i Date: II 9 3 CERTIFICATE OF INSERVICE INSPECTION . I, the undersigned, holding a valid commission issued by the National Board of Boiler _and Pressure Vessel Inspectors and the State of Connecticut and employed by Hartford Steam Boiler Insurance and Ingection during the period 1-15-9h 12-30-9') and state that to the best of my knowledge and belief, the owner has performed examinations and has taken corrective measures described in this owner's report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in the Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury, property damage, or loss of any kind arisin from or connected with this inspection. Inspector's Signature: ?E YORK ./ Commissions: PFJ9384 CT1137 Date: 12-30-93

                                                       .g    . ps

_ ~ _ n..

                          . - , - . - ,       ..s ..

en Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

1. OWNER: Northeast Utilities Service Co. Date: 11/12/93 P. O. Box 128. Waterford CT
2. PLANT.

Millstone Nuclear Power Station Unit p_2

3. Work Performed By: Maintena_nss Address: AWO Numbers P. O. Box 128. Waterford CT M3-93-14761
4. SYSTEM: hiS1 CODE CLASS: 2
5. Applicable Const. Code:

ASME III.1971 Edition: S72 Addenda: N!.,AA Case Edition of Section XI Utilized for work 1983.S83

6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of Mfrs. Nat'l Board Repair / ID Number Manufacture ASME S/N Serial Replacement 3 MSS *SGIC Stamped Westinghouse W15261 NEGT1778 Replacement YES

7. Description of work: Replace Secondary Side Manway Bolting
8. Test Conducted:

Hydrostatic < > Pneumatic < > Normal Operating Pressure < X > Other < > CERTIFICATE OF COMPLIANCE We certify ASME that the Code, Section XI statements made in the report are correct and this rerilacement conforms to t Signed: Nh _ - Date: 1-3 CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Connecticut and employed by liartford Steam Boiler Ins and Inspection during the period j7A 9 7 to /.3

                                                                             , and state that to the best of my knowledge and belief, the owner has performed examinations an[d has taken correc                                                   '

owner's report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expre or implied, concerning the examinations and corrective measures described in the Owner's R Furthermore, neither the inspector nor his employer shall be liable in any manner for any per injury, property damage, or I ss of any d arising from or connected with this inspection. L Inspector's Signature: s , _/ Commissions:#8/TSV &/Cf Date: _b ? fer/ 0

_ . _ - ~ _ ._ , _ i [ l Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS  !

1. OWNER: Northeast Utilities Service Co. Date: 1/11/94 P. O. Box _L28. Waterford CT I
2. PLANT: Millstone Nuclearfower station Unit g2
3. Work Performed By: hLaintenance AWO Numbers Address: P. O. Box 128. Waterford CT M3-93-21024
4. SYSTEM: FWS CODE CLASS: 2 -
5. Applicable Const. Code: ASME III. Edition: 1971 Addenda: Ell-Code Edition of Section XI Utilized for work.L9.83.W85 .[
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED-i Components Name of M frs. Nat'l Board Repair / ASME ID Number Manufacture S/N. No. Replacement Stamped

3FWS-016-073-02 Tubeco N/A N/A Replacement No ,

7. Description of work: Renaired feedwater nozzle-to-nine weld (FW-8-lklue to thermal fatiaue cracks '

weld repair nozzle replace section of pipe eliminate Ew8-1 S FwSdm i gcgd g f g3 g 39. 151 progriam identifies as FW,-22A-FW-38 5 39. Hydrostatic < > Pneumatic < > Normal Operating Pressure <X> Other < X> MT,UT,RT '  ! Code Case N416  :

                                                                                                                                                                                    ?

I CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this renlacement conforms to the rules of _ ASME Code, Section XI Signed: NG'c. - Date: /- //"M < l 1 i i CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and  ; Pressure Vessel Inspectors and the State of Connecticut and employed by Hartford Steam Boiler . Insurance and Inspection during the period _NS3toO1-31-M , and state that to the' best of my _ i knowledge and belief, the owner has performed examinations and has taken corrective measures described in this owner's report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in the Owner's Report.  ! Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal  ; injury, property damage, or loss of any kind. arising from or connected with this inspection. IRSpector's Signature: 4 Commissions; h/d Date: / / r/ i ty'g'O k W F '#M'$'W'-'}.Jgy'O f4 - F 9-r % 9 WF '+ 8. % f di IM Y *DMT'T'M.'t-*' ME M*'tTP't' ""m "'D$T

        , .     . . ~ -                         .                                  -.                                        .              .  ..
                  ,                                                                                        ,.m o                                                          ,

Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS i g j

1. OWNER: Northeast Utilities Service Co. Date: 1/14/94 ,

P. O. Box 128. Waterford CT f i~

2. PLANT: Millstone Nuclear Power Station Unit d
3. Work Performed By: Generation Construction AWO Numbers  ;

Address: ~P. O. Box 128. Waterford CT M3-93-22891 - <

                                                                                                                                                     'I
4. SYSTEM: 935 CODE CLASS: 2 'l ll
5. Applicable Const. Code: ASME Ill. Edition: 1971 Addenda: 173 {

Case Edition of Section XI Utilized for work 1983.W85 .;

6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED: [

Componer ts Name of M fts. Nat'l Board Repair / ASME ID Number Manufacture S/N. Serial Replacement Stamped :1 3QSS-P3B Stone & Webster N/A N/A Replacement No

7. Description of work: Replace numn sunnort boltine j Hydrostatic < > Pneumatic < > .

Normal Operating Pressure < > Other <X > VT ' l

                                                                                                                                                     -I CERTIFICATE OF COMPLIANCE                                                                  .

t , . We certify that the statements made in the report are correct and this repair / replacement coriforms to the rules of ASME Code, Section XI ,; Signed: Of<c Date: / - / I #/ h , ~~ 'i CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure .[ Vessel Inspectors and)he State of Corjnecticut and employed by Hartford Steam Boiler Insurance and Inspection  ! during the period fdy/f3to (/&ffd and state that to the best of my knowledge and belief, the owner has - performed examinafions and has taken corrective measures described in this owner's report in accordance with the requirements of ASME Code, Section XL , By signing this certificate neither the inspector nor his employer makes any warranty, expressed or  ; implied, concerning the examinations and corrective measures described in the Owner's Report. Furthermore,- l neither the inspector nor his employer shall be liable in any manner for any personal injury, property damage, or loss of any kind arising from or connecte vith this inspection. Inspector's Signature: Commissions: d-r//T7 Date: (?/ 8//Qc/~ l, - w.. [

                                                                                                                                                     .t
    + -     ,             ,                  .-                 . , .        a.        . . - , . .            - --                     .   . .
     -                                                           - - :.                    - . .    - . ~

Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

1. OWNER: Northeast Utilities Service Co. Date: 12/16/93 P. O. Box 128. Waterford CT
2. PLANT: Millstone Nuclear Power Station Unitil
3. Work Performed By: Generation Construction AWO Numbers Address: P. O. Box 128. Waterford CT M3-93-22853 & M3-93-22031
4. SYSTEM: M CODE CLASS: 2
5. Applicable Const. Code: ASME Hl. Edition: 1971 Addenda: 5271 Code Edition of Section XI Utilized for work 1983.W85
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of Mfrs. Nat'l Board Repair / ASME ID Number Manufacture S/N. No. Replacement Stamped 3 MSS *SGID Westinghouse NEGT1777 W15215 Repair Yes

7. Description of work: Replaced Feedwater Elbow to S/G and Weld Build-up of Counterbore Area.

Code Case N416.

8. Test Conducted:

Hydrostatic < > Pneumatic < > Normal Operating Pressure <X > Other <X > RT,MT CERTIFICATE OF COMPLIANCE We certify that the statements made in the repon are correct and this repair conforms to the mies of ASME Code, Section XI Signed: Date:

                                                                                 /- 3 /- f CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Connecticut and employed by Hartford Steam Boiler Insurance and Inspection during the period f,p/r3 to o7./.M , and state that to the best of my knowledge and belief, the owner has performed examinations and has taken corrective measures described in this owner's report in accordance with the requirements of ASME Code, Section XI.

By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in the Owner's' Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury, property damage, or loss an 'nd arising from or connected with this inspection. Inspector's Signature: A/ Commissions: 85//1-7 '

                                  /

Date: 2)/9/

   .~

_ . .ww wwww mm - 4

                                 ..+wm.  , < ~ '
                                                                            ,e .

U

                                                                                                             )

Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMEN

1. OWNER:

Northeast Utilities Service Co. Date: 1/14/94 P. O. Box 128. Waterford cr

2. PLANT:

Millstone Nuclear Power Station Unit #3

3. Work Performed By: Generation Construction Address: AWO Numbers P. O. Box 128. Waterford Cr M3-93-22890
4. SYSTEM:

QS.S CODE CLASS: 2

5. Applicable Const. Code:

ASME IL Edition: 1921 9 Addenda: E23 Case Edition of Section XI Utilized for work 1983.W85

6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of Mfts. Nat'l Board ID Number Manufacture Repair / ASME S/N. Serial 3QSS-P3A Replacement Stamped Stone & Webster N/A N/A Replacement No

7. Description of work:

Berlace numn sunnort botting Hydrostatic < > Pneumatic < > Normal Operating Pressure < > Other <X> VT CERTIFICATE OF COMPLIANCE ( We certify ASME that XIthe Code, Section statements made in the report are correct and this reair / rer Iae ement conforms to the rules of Signed: / N'N~[ ~ Date:

                                                                                             /~ /I- 94 CERTIFICATE OF INSERVICE INSPECTION VesselInspectors and the State of Connecticut                                                                         and employe o er and Pressure during the period Mto //p 9/, and state that to the best of                                   o ermy Insurance knowledand Inspection ge and belief, the owner has requirements of ASME Code, Section XI. performed                                                         examinations c r ance with the and has ta implied, concerning the examinations                                        e re        and corrective      n y, expressedmeasures or         d loss of any kind arising from or connected with                                                               thisdamage, ry, property     inspection.neit or Inspector's Signature: _

Commissions: [27//7C Date: S /Cf_ ,h gfp

                                                                                                 ~

. . . - - .a .. _ .. - . . .  :.. . .. t t Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

1. OWNER: Northeast Utilities Service Co. Date: 11/12/93 P. O. Box 128. Waterford CT .
2. PLANT: Millstone Nuclear Power Station Unit #1
3. Work Performed By: M.aintenance AWO Numbers Address: P. O. Box 128. Waterford CT M3-93-14759
4. SYSTEM: MSS CODE CLASS: 2
5. Applicable Const. Code: ASME III.1971 Edition: S21 Addenda: N/A Case Edition of Section XI Utilized for work 1983.S83
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED: .

Components Name of Mfrs. Nat'l Board Repair / ASME ID Number Manufacture S/N No. Replacement Stamped 3 MSS *SGIB Westinchouse NEGT1775 13583 Replacement YES

7. Description of work: Replace Boltine on Secondary Side Manway
8. Test Conducted:

Hydrostatic < > Pneumatic < > Normal Operating Pressure < X > Other < > , CERTIFICATE OF COMPLIANCE , We certify that the statements made in the report are correct and this replacement conforms to the rules of ASME Code, Section XI Signed: k Date: / ' 4'k CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National m. t Boiler and Pressure VesselInspectors and the state of Connecticut and employed by Hartford S. .s E. e t Insurance ; and Inspection during the period 8-2-931o10-28-97 and state that to the best o. < 4 n. .wledge and - belief, the owner has performed examinations and has taken corrective measures uibed in this owner's report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, conceming the examinations and corrective measures described in the Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury, property damage, or loss of any kind arising from or connected with this inspection. Inspector's Signature: E YORK Commissions: NB9383 CT1137

                ~ Date: 01-05-94

i+m ., nen.... ,. ~ - - n- ,.,n - - + ~ -s -- -.- . u-- -

                                                                                                                               .- -+

Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

1. OWNER: Northeast Utilities Service Co. Date: 11/23/93 P. O. Box 128. Waterford CT
2. PLANT: Millstone Nuclear Power Station Unit!1
3. Work Performed By: Maintenance AWO Numbers Address: P. O. Box 128. Waterford CT M 3-93-05354
4. SYSTEM: MSS CODE CLASS: 2
5. Applicable Const. Code: ASME Ill. Edition: 1971 9 Addenda: W73 Case Edition of Section XI Utilized for work 1983.W83
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of Mfrs. Nat'l Board Repair / ASME ID Number Manufacture S/N. Serial Replacement Stamped 3 MSS *CTV27D Sultzer 5679/5683 4 Repair / Replacement Yes

7. Description of work: Replaced Solenoid Block and Machined Seatine Surface. Replace Control Blocks: R 5682. L 5679.
8. Test Conducted:

Hydrostatic < > Pneumatic < > Normal Operating Pressure < X > Other < > CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this renair / renlacement conforms to the rules of ASME Code, Section XI Signed: t- c Cr-Date: /- M"D CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Connecticut and employed by Hartford Steam Boiler Insurance and Inspection during the periodO8-27-93o 10-29-93 and state that to the best of my knowledge and belief, the owner has performed examinations and has taken corrective measures described in this owner's report in accordance with the requirements of ASME Code, Section XI. t-By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in the Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury, property damage, or loss of any kind arisine from or connected with this inspection. inspector's Signature: E YORK Commissions:NS9384 CT 1137 (R-blocic 5682 fr om 'C' viv, r eplap6B 5583. Both R 5682 G L 5579 have been machined. ) Date: JAN 06, 1994 /

      .                                 ~.        ..   .    .               .       -   -       .       ,           - .   -. .
Form NIS'-2 OWNERS REPORT FOR REPAIRS DR REPLACEMENTS'
1. OWNER: Portheast Utilities ' Service Co.~ Date: 07/07/92 -

P.O. Box 128. Waterford Cr 3

2. PLANT: Millstone' Nuclear Power Station Unit il  ;
                                                 @INTENANCE
3. Work Performed By: oriit uncui Cuini. AWO Numbers -

Address: EO. Box 128. Waterford CT M3-91-14691 l

4. SYSTEM: MSS CODE CLASS: 2.  ;
5. Applicable Const. Code: ASME IIL 1971 Edition: S]l_ Addenda: MLA Case Edition of Section XI Utilized for work 1983.S83 j
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED: .l N9 i Components Name of Mfrs M4tJ/ Repair / ASME l Serial #

ID Number - Manufacture No. Replacement Stamped 3 MSS *PV20B Fisher Controls - M# 8659427 Both YES . te6756

7. Description of work: Machine bonnet ' and - b'ody to remove distortion.

Reolace *nlue. G WELD REPAIR LOWER SEAT AREAS .

   *ONE PLUG (provided /w N2 DATA RPTS) INSTALLED. S/N @ recorded in AWD. TR21M314648' issued-to.                                    t determine whiEhTest Conducted:has been installed mrir's 386-101-1 or 385-029-1/2.                                                !

Hydrostatic < >' Pneumatic < > Normal Operating Pressure <K> i Other < X > (VT, LP) ~ i Certificate of Compliance , We certify that the statements made in the report are correct and this { reoair/ replacement confonns to the rules ASME Code, Section XI  ; Signed - Zu_, { Date: lo' M' 9 Y 3 CERTIFICATE OF INSERVICE INSPECTION i I, the undersigned. holding a valid commission issued by' the National j ' Board of Boiler and Pressure Vessel Inspectors and the state of Connecticut and employed - by Hartford Steam Boiler Insurance : and Inspection 'during the . i period 3-a-91to 1-6-99 and state that to the best of my. knowledge and belief, the : .l owner has performed examinations ' and has taken corrective measures - ' l described ' in this owner's report in accordance with the requirements _of ASME Code, Section XL l By signing this certificate. neither the inspector nor his employer  ! makes /any warranty, expressed or L implied, concerning the examinations and; , corrective measures described . in the Owner's Report. Furthermore, neither j the inspector nor his employer shall be liable in any manner for any personal i injury, property damage, or loss of any kind arising from or connected with~' this inspection. Inspector's Signature: <E YORK Commissions: NB9334 CT1137 . i Date: JAN OA 1994 ( ~

                                                                                                                                ,    l 4

j: i

                                                                                                                               .\,

I

                                                                                  ,                                     e y'.

rw-

                                =
                                                             -a                                               _-

i Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

1. OWNER: Northeast Utilities Service Co. Date: 11/17/93 P. O. Box 128. Waterford CT s
2. PLANT: Millstone Nuclear Power Station Unit f.1
3. Work Performed By: Maintenance AWO Numbers Address: P. O. Box 128. Waterford CT M3-93-11944
4. SYSTEM: MSS CODE CLASS: 2
5. Applicable Const. Code: 7 ASME III. Edition: 197.1 Addenda: S71 Case Edition of Section XI Utilized for work 1983.W85
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of Mfrs. Nat'l Board Repair / ASME ID Number Manufacture S/N. Serial Replacement Stamped 3 MSS *PV20D Fisher Controls 19183-2 ttw 673 Replacement Yes

7. Description of work: Replaced Valve Plue / Stem Assen 8v
8. Test Conducted:

Hydrostatic < > Pneumatic < > Normal Operating Pressure < X > Other < > CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of ASME Code, Section XI Signed: 4 ^ Date: 8-El- 7 3 CERTIFICATE OF INSERVICE INSPL. TION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Connecticut and employed by Hanford Steam Boiler Insurance and Inspection during the period 9-M-93 i-6-94 to , and state that to the best of my knowledge and belief, the owner has performed examinations and has taken corrective measures described in this owner's report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in the Owner's Repon. Funbermore, neither the inspector nor his employer shall be liable in any manner for any personal injury, propeny damage, or loss of any kind .' sing from or connected with this inspection. Inspector's Signature?E YORK - Commissions: NB9384 CT1137 Date: JANUARY 05, 1994

Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

1. OWNER: Northeast Utilities Service Co. Date: 11/17/93  :

P. O. Box 128. Waterford CT

2. PLANT: Millstone Nuclear Power Statinn Unit fl
3. Work Perfornal By: Maintenance AWO Numbers Address: P. O. Box 128. Waterford CT M3-93-09550
4. SYSTEM: MSS CODE CLASS: 2
5. Applicable Const. Code: ASME III. Edition: 1921 Addenda: $J7),

Case Edition of Section X1 Utilized for work 1983.W85

6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of M frs. Nat'l Board Repair / ASME ID Number Manufacture S/N. Serial Replacement Stamped  ; 3 MSS *AOV31B Fisher Controls 7311076 5684 Replacement S Yes WELD REPAIR

  • I
7. Description of work: Replaced Body to Bonnet Nuts.mrir386-164-7 markingE26, 2 WELD REPAIR VALVE SEAT.
8. Test Conducted: 3 REPLACE PLUG / STEM ASSEMBLY. mrir386-164-9 /w N2 data rpt '

Hydrostatic <"9beim8[icb N[tbTbperating Pressure < X > Other < > CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this renlacement confonns to the rules of ASME Code. Section XI Signed w - IL{ 4 Date: /^ E ~2 - 7 7 , CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Connecticut and employed by Hartford Steam Boiler i insurance and Inspection during the period 7-14-93toi-7-94 , and state that to the best of my l knowledge and belief, the owner has performed examinations and has taken corrective ' measures .j described in this owner's report in accordrace with the requirements of ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed 1 or implied, concerning the examinations and corrective measures described in the Owner's Report. I Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal j' injury, pre < rty damage, or loss of any kind arisine from or connected with this inspection. laspector's Signature: E YORK [, , Commissions:N89384 CT1137 Date: JANUARY 07, 1994  ; 1 1 l

Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

1. OWNER: Northeast Utilities Service Co. Date: 11/16/93 P. O. Box 128. Waterford Cr
2. PLANT: Millstone Nuclear Power Station Unit #3
3. Work Performed By: Maintenance .

AWO Numbers Address: P. O. Box 128. Waterford CT M3-92-09860

4. SYSTEM: MSS CODE CLASS: 2
5. Applicable Const. Code: ASME III. Edition: 1971 Addenda: 371 Case Edition of Section XI Utilized for work 1983.S83
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of Mfrs. Nat'l Board Repair / ASME ID Number Manufacture S/N. Serial Replacement Stamped 3 MSS *AOV31 A Fisher Controls 7311076 -N//rNB5684* Repair Yes

7. Description of work: Renair Stem Cuttine on Valve Seats WELO-REPAIR *
8. Test Conducted:

Hydrostatic < > Pneumatic < > Normal Operating Pressure < X > Other < > CERTIFICATE OF COMPLIANCE - We certify that the statements made in the report are correct and this renair conforms to the rules of ASME Code, Section XI Signed: A - Date: li ~74 -T 3 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Connecticut and employed by Hartford Steam Boiler Insurance and Inspection during the period 7-14-93 12-30-93,to and state that to the best of my knowledge and belief, the owner has performed examinations and has taken corrective measures described in this owner's report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed

      - or implied, concerning the examinations and corrective measures described in the Owner's Report.

Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury, property damage, or loss of any kind ari from or connected with this inspection. Inspector's Signature: E YORK ~ Commissions:NB9384 CT1137 Date: 12-30-93 7 , 1 1 .. i,.

Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

1. OWNER: Northeast Utilities Service Co. Date: 11/10/93 P. O. Box 128. Waterford CT
2. PLANT: Millstone Nuclear Power Station Unit #1
3. Work Performed By: Maintenance AWO Numbers Address: P. O. Box 128. Waterford CT }{3-93-19494 -
4. SYSTEM: gjS CODE CLASS: 2
5. Applicable Const. Code: ASME III.1971 Edition: S22 Addenda: I!]6 Case Edition of Section XI Utilized for work 1983.W85
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of M fts. Nat'l Repair / ASME ID Number Manufacture No. Serial Replacement Stamped _ i 3CHS*RV8119 lenergan N/A 407487-14-1 Repair Yes

7. Description of work: Renlaced Threaded Body to Nozzle Connection with Fillet Weld.
8. Test Conducted:

Hydrostatic < > Pneumatic < > Normal Operating Pressure < > Other < x > VT, LP CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the mler of - ASME Code, Section XI Signed: bI - Date: ' It'I 2- 9T CERTIFICATE OF INSERVICE INSPECTION , I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Connecticut and employed by llartford Steam Boiler Insurance and Inspection during the period F&ff to /ff/, and state that to the best of my knowledge and belief, the owner has performeil examinations and has taken corrective measures described in this owner's report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in the Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury, property damage, or loss of any kind arising from or connected with this inspection. Inspector's 3ignature: _ Commissions: 87/JF Date: O/.07. 9 / i 1 l 1

i 3 Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

 /~N                                                                                                                      ;
1. OWNER: Northeast Utilities Service Co. Date: 11/17/93 h P. O. Box 128. Waterford CT  ;
2. PLANT: Millstone Nuclear Power Station Unit D
3. Work Performed By: Maintenance AWO Numbers Address: P. O. Box 128. Waterford CT F13-93-14801 '

t 4 SYSTEM: BDG CODE CLASS: 2 ,

5. Applicable Const. Code: ASME !!I. Edition: 1977 Addenda: $29 '!

Case Edition of Section X] Utilized for work 1983.S83  ;

6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of M frs. Nat'l Board Repair / ASME ID Number Manufacture S/N. No. Replacement Stamped 3BDG*V891 Pacific Valve 0728-4 N/A Replacement Yes  ; I

7. Description of work: Replace Valve due to Steam Cuttine of Valve Body. Ilvdrostatic test the Shoo Welds. Inservice Leak Test of Field Welds ner Code Case N416
8. Test Conducted: l Hydrostatic <X> Pneumatic < > Normal Operating Pressure < X > Other < X > RT  ;

O CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of ASME Code, Section XI I Signed: , kt% Date: '11-r2.-$ f 6 CERTIFICATE OF INSERVICE INSPECTION i I, the undersigned, holding a valid commission issued by the National Board of Boiler and '; Pressure Vessel Inspectors and the State of Connecticut and employed by Hartford Steam Boiler lasurance and Inspection during the period SEvff to A7.f/ , and state that to the best of my knowledge and belief, the owner has performe'd examinations and has taken corrective measures described in this owner's report in accordance with the requirements of ASME Code, Section XI. . By signing this certificate neither the inspector nor his employer makes any warranty, expressed J l or implied, concerning the examinations and corrective measures described in the Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury, property damage, or loss of any kind arising from or connected with this inspection. , p- Inspector's Signature: Commissions: b//M, . Date: / ,/9./ g.

                                                                                                           'l Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS
1. OWNER: Northeast Utilities Service Co. Date: 1/5/94 P. O. Box 128. Waterford CT
2. PLANT: Millstone Nuclear Power Station Unit 0
3. Work Performed By: Generation Construction AWO Numbers Address: P. O. Box 128. Waterford CT M 3-93-13710 .t
4. SYSTEM: BSS CODE CLASS: 2 ,
5. Applicable Const. Code: ASME III. Edition: 1974 Addenda: 374 Case Edition of Section XI Utilized for work 198'4.S83
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of M frs. Nat'l Board Repair / ASME ID Number Manufacture S/N. No.1 Replacement Stamped j 3RSS*MOV23B llenry Pratt

  • DDil7-1-1 N/A Replace Yes  ?
7. Description of work: Renlaced Valves
                                                                                                             +
8. Test Conducted:

Ilydrostatic < > Pneumatic < > Normal Operating Pressure <X > Other < > , t CERTIFICATE OF COMPLIANCE  : We certify that the statements made in the report are correct and this repair / renlacement conforms to the l rules of ASME Code, Section XI , Signed: x J Date: I ~ I/ - 1 4 , i

  • NEW REPLACEMENT VLV MRIR-392-1001 '

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and . Pressure Vessel Inspectors and the State of Connecticut and employed by liartford Steam Boiler Insurance and Inspection during the period 6-3-93to 1-11-94, and state that to the best of my , knowledge and belief, the owner has performed examinations and has taken corrective measures described in this owner's report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed .; or implied, conceming the examinations and corrective measures described in the Owner's Report.  ! Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal

                                                                                                  ~

injury, property damage, or loss of any kind ri ingfrom or connected with this inspection.  ; Inspector's Signature:E YORK ^ Commissions: CT1137 Da,e. 41 a N e4 /  ! E

Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS 1 OWNER: Northeast Utilities Service Co. Date: 1/5/94 P. O. Box 128. Waterford CT

2. PLANT: Millstone Nuclear Power Station Unit 0 -
3. Work Performed By: Generation Construction AWO Numbers Address: P. O. Box 128. Waterford CT M3-93-13712
4. SYSTEM: RSS CODE CLASS: 2
5. Applicable Const. Code: ASME Ill Edition: 1974 Addenda: 374 Case Edition of Section XI Utilized for work 1983.S83
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of M frs. Nat'l Board Repair / ASME ID Number Manufacture S/N. No.1 Replacement Stamped 3RSS*MOV23D Henry Pratt

  • DDil7-1-3 N/A Replace Yes
7. Description of work: Reolace<1 Valves
8. Test Conducted:

Ilydrostatic < > Pneumatic < > Normal Operating Pressure <X > Other < > CERTIFICATE OF COMPLIANCE We certify that the statements made i 2 the report are correct and this reoair I renlacement conforms to the rules of ASME Code, Section XI Signed: 41 % I - Date: P ii #M1 CER1FICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and- the State of Connecticui and employed by Hartford Steam Boiler Insurance and Inspection during the period 6-3-93101-11-94, and state that to the best of my - knowledge and belief, the owner has performed examinations and has' taken corrective measures - described in this owner's report in accordance with the requirements of ASME Code, Section XL By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, conceming the examinations and corrective measures described in the Owner's. Report. Furthermore, neiths the inspector not his employer shall be liable in any manner for any personal injury, property damage, or loss of any kind rism om or connected with this inspection. Inspector's Signature: E YORK ' Commissions: CT 1137 , Date: 11 JAN 94 j i i q r

I Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS 1
1. OWNER: Northeast Utilities Service Co. Date: 1/5/94 P. O. Box 128. Waterford Cr
2. PLANT: Millstone Nuclear Power Station Unit #1
3. Work Performed By: Generation Constmetion AWO Numbers f Address: P. O. Box 128. Waterford CT M3-93-13711  ;
                                                                                                                 .}
4. SYSTEM: RSS CODE CLASS: 2 l
5. Applicable C<mst. Code: . ASME 111. Edition: 1974 Addenda: 321 l Case Edition of Section XI Utilized for work 1983.S83 i
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

i Components Name of Mfrs. Nat'l Board Repair / ASME. ID Number Manufacture S/N. No.1 Replacement Stamped 3RSS*MOV23C IIenry Pratt

  • DD I 17-1-2 N/A Replace Yes - i i
7. Description of work: Renlaced Valves {
8. Test Conducted:

Ilydrostatic < > Pneumatic < > Normal Operating Pressure < X > Other < > CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this renair / reolacement conforms to the  : rules of ASME Code, Section XI  ; Signed: /Ok) c>( b'l (n ( Date: 1 - ' l 1 Cl 4- l

  • IS THE NEW REPLACEMENT VALVE MRIR 393-1001 .

CERTIFICATE OF INSERVICE INSPECTION . t I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Connecticut and employed by liartford Steam Boiler l Insurancs and Inspection during the period 6-3-93 t01-11-94, and state that to the best of my. ~! knowledge and belief, the owner has performed examinations and has taken corrective measures , described in this owner's report in accordance with the requirements of ASME Code, Section XI. -i By signing this certificate neither the inspector nor his employer makes any warranty, expressed i I or implied, concerning the examinations and corrective. measures described in the' Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal-  ! injury, property damage, or loss of any kind arising from or connected with this inspection. i Inspector's Signature: E YORK Commissions: .CT1137 , l Date: 11 JAN 94  : a

 ~

4. k @i

                                               .,z .                          ,
 $g q
 ._3 _
    ~

7(3 Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS N C 1. OWNER: Northeast Utilities Service Co. Date: 12/15/93

 ,z                                  P. O. Box 128. Waterford CT
2. PLANT: Millstone Nuclear Power Station _ Unit #1 k 3. Work Performed By: hiaintenance AWO Numbers i il Address: LO. Box 128. Waterford CT
 ;:n                                                                                       M3-93-09547                       i
4. SYSTEM: htSS '

CODE CLASS: 2

5. Applicable Const. Code: ASME III. Edition: 1974 I Addenda: SJ74 Code Edition of Section XI Utilized for work 1983.S83
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of Mfrs. Nat'l Board Repair / ASME ID Number Manufacture S/N. No. Replacement Stamped 3 MSS *RV25A Dresser Ind. BS00303 N/A Replacement Yes

7. Description of work: Renlace Valve with Snare S/N BS00302: replaced disk with snare S/N AAE-87 l
8. Test Conducted:

Hydrostatic < > Pneumatic < > Normal Operating Pressure <X> Other <. > CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of . ASME Code, Section X1 Signed: Date: /L /G 3 CERTIFICATE OF INSERVICE INSPECTION ' I, Ibn undersigned, holding a valid commission issued by the National Board of Boiler and ' ' Pressure Vessel Inspectors and the State of Connecticut and erjn loyed by liartford Steam Boiler c ' lasurance and Inspection during the period Trf8Jto /#fr. and state that to the best of my knowledge and belief, the owner has performed examinations and has taken corrective measures described in this owner's report in accordance with the requirements of ASME Code, Section XI. j By signing this certificate neither the inspector nor his employer makes any warranty, expressed > or implied, concerning the examinations and corrective measures described in the Owner's Report. j Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal i injury, property damage, or loss of any kind arising from or connected with this inspection.' l Inspector's Signature: _ Commissions: /2r//19

         .'    Date: % s /99 o                -

i a Waamm m =~~ m -- l

O, ' f (. s. Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS -( T

)        1. OWNER:           Northeast Utilities Service Co.

P. O. Box 128. Waterford CT Date: 1/10/94

2. PLANT: Millstone Nuclear Power Station Unit gl
3. Work Performed By: Oeneration Construction . AWO Numbers Address: P. O. Box 128. Waterford CT M3-93-26570
4. SYSTEM: MSS CODE' CLASS: 2
5. Applicable Const. Code: ASME Ill. Edition: 1971 ' Addenda: S71 Case Edition of Section XI Utilized for work 1983.S83
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Componenta Name of. Mfrs. Nat'l Board Repair / ASME ID Number Manufacture S/N. Number Replacement Stamped . 3-MSS-4-PSSH001 ITT Grinnel N/A N/A Replacement No i

7. Description of work: Install new sprine can sunnort
8. Test Conducted:

Hydrostatic < > Pneumatic < > Normal Operating Pressure < > Other < > , CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this renair / replacement conforms to the rules of ASME Code, Section XI f4t Signed: / _ Date: / - 1 2. - N CERTIFICATE OF INSERVICE INSPECTION i I, the undersigned, holding a valid commission issued by the National Board of Boiler and - . Pressure Vessel inspectors and e State of Connecticut and employed by Hartford Steam Boiler Insurance and Inspection during tr.e period f oJ/rg to (//A/r/, and state that to the best of my knowledge and belief, the owner has performed examinations and has taken corrective measures described in this owner's report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed ' '! or implied, concerning the examinations and corrective measures described in the Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury, property damage, or loss of any kind arising from or connected with this inspection.

                                                   /                                                                  -l InSpCClor'$ Signature:      /

Commissionst' [ T M,7 Date: ,JAf9Vl 0 (J '

4 - Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

1. OWNER: Northeast Utilities Service Co. Date: 1/10/94 P. O. Box 128. Waterford CT
2. PLANT: Millstone Nuclear Power Station Unit G
3. Work Performed By: Generation Construction AWO Numbers  ;

Address: - P. O. Box 128. Waterford CT M3-93-25232 i

4. SYSTEM: FWS CODE CLASS: 2
5. Applicable Const. Code: ASME 111. Edition: 1971 Addenda: E71 Case Edition of Section XI Utilized for work 1983.S83 ,
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of Mfrs. Nat'l Board Repair / ASME ID Number Manufacture S/N. Number Replacement Stamped 3-FWS-4-PSSP026 Stone & Webster N/A N/A Repair No

7. Description of work: Relocate welded attachments to realien it with snubber clamp.  ;
8. Test Conducted: Hydrostatic < > Pneumatic < > Normal Operating Pressure < > Other < X > VT CERTIFICATE OF COMPLIANCE r We certify that the statements made in the report are correct and this renair / replacement conforms to the rules of ASME Code, Section XI Signed: //// % ^

Date: l > f, 4 CERTIFICATE OF INSERVICE INSPECTION i I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Connecticut and employed by Hartford Steam Boiler Insurance and Inspection during the . period /4/#f.Sto L ag and state that to the best of my knowledge and belief, the owner' has performed - examinations and has taken corrective measures described in this owner's report in accordance with the requirements of

            - ASME Code, Section XI.

By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied,' y conceming the examinations.and corrective measures described in the Owner's Report. Furthermore, neither the _

   ..,       inspector nor his employer shall be liable in any manner for any personal injury, property damage, or loss of any kind arising from or connected with thi inspection.'

Inspector's Signature: ed Commissions: 87//f9 ~~ Date: %ir /L /QV' Cd i 5

P t Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMTNTS *

1. OWNER: Northeast Utilities Sersice Co. Date: 1/12/94 ,

P. O. Box 128. Waterford CT

2. PLANT: Millstone Nuclear Power Station Unit n
3. Work Performed By: Maintenance AWO Numbers Address: P. O. Box 128. Waterford CT ' M3-92-20556 )
4. SYSTEM: B_CS CODE CLASS: 2
5. Applicable Const. Code: ASME III. Edition: 1977 . Addenda: }]79 l Code Edition of Section XI Utilized for work 1983.W85 i
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of Mfrs. Nat'l Board Repais / ASME ID Number Manufacture S/N. No. Replacement Stamped . I 3RCS*PCV455A Croshv Valve P131 N/A Replacement No w

7. Description of work: Replaced PORV and F!ance Studs and Nuts *2 l"
8. Test Conducted:

Hydrostatic < > Pneumatic < > Normal Operating Presure <X> Other < X> IST [ CERTIFICATE OF COMPLIANCE j We certify that the statements made in the report are correct and this repair / replacement conforms to the  ; rules of ASME Code, Section XI  : Signed: [ %b - Date: E!7Y-1

      *1 ASME DATA RPT NPV-1 in ewo doe vlv s/nP131 *2mrir 386-253-152                                                I CERTIFICATE OF INSERVICE INSPECTION                                          -l I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Connecticut and employed by Hartford Steam Boiler Insurance and Inspection during the period 10-PG-92t(01-13-94 and state that to the best of my                ,

knowledge and belief, the owner has performed examinations and has taken corrective measures described in this owner's report in accordance with the requirements of ASME Code, Section XI.' By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, conceming the examinations and corrective measures described in the Owner's Report. l Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury, property damage, or loss of any kind arisin m or connected with this inspection. ( Inspector's Signaturey E YORK Cosssions. CT1137 Date: 13 JAN 1994  ; v

Fortn NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

1. OWNER: Northeast Utilities Service Co. Date: 1/12/94 P. O. Box 128. Waterford CT [

t

2. PLANT: Millstone Nuclear Power Station Unit n i
3. Work Performed By: Generation Construction AWO Numbers Address: P. O. Box 128. Waterford CT M3-934186
4. SYSTEM: f_lLS CODE CLASS: 2
5. Applicable Const. Code: ASME III. Edition: 1971 Addenda:W73 Code Edition of Section XI Utilized for work 1983.S83 6.10ENTIFICATION OF COMPONENTS REPAIRED OR REPl. ACED: i Components Name of Mfrs. Nat'l Board Repair / ASME ID Number Manufacture S/N. No.1 Replacement Stamped 3CilS*V032 ITT Grinnel
  • 77-50880-4-5 N/A Replacement Yes ,

BALANCE OF VALVE IS S/N 77-508880-4-6 }

7. Description of work: Reolaced Valve Bonnet *
8. Test Conducted:

llydrostatic < > Pneumatic < > Normal Operating Pressure < X > Other < > [ CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this renair / replacement conforms to the rules of ASME Code, Section XI Signed: kl A-t. - Date: I[e1[9i- . r CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and , Pressure Vessel Inspectors and the State of Connecticut and employed by Hartford Steam Boiler Insurance and Inspection during the period #9f7 to //J.g. and state that to'the best of my knowledge and belief, the owner has performed examinations and has taken corrective measures-described in this owner's repmt in accordance with the requirements of ASME Code, Section XI.  ! By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implin8 meHr,3 the examinations and corrective measures described in the Owner's Report. Furthermore, neither die inspector nor his employer shall be liable in any ~ manner for any personal injmy, property damage, or loss of any kipd rTsiiig from or connected with this inspection. -t Inspector's Signature: E YORK Commissions: h//'T 7 Date: JANUARY 12, 199

l L Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

1. OWNER: Northeast Utilities Service Co. Date: 1/12/94 P. O. Box 128. Waterford CT
2. PLANT: Millstone Nuclear Power Station Unit D
3. Work Performed By: Maintenance AWO Numbers  !

Address: P. O. Box 128. Waterford CT M3-93-05952 -

4. SYSTEM: MSS CODE CLASS:,2
5. Applicable Const. Code: ASME III. Edition: 1974 . Addenda: 514 Code Edition of Section XI Utilized .' - ork 1983.S83
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:  :

Components Name of M frs. Nat'l Board Repair / ASME ID Number Manufacture S/N. No. Replacement Stamped 3 MSS *RV23D Dresser BS00291 N/A Replacement No

7. Description of work: Replaced Valve with snare S/N 8S00297
8. Test Conducted:

Hydrostatic < > Pneumatic < > Normal Operating Pressure <X > Other < > CERTIFICATE OF COMPLIANCE We cenify that the statements made in the repod are correct and this repair /renlacement conforms to the rules of ASME Code, Section XI Signed: b[8d  ; Date: / /II h velve esme IST TESTED UNDER MRIR 393-191-1 @ CROSBY 2 APRIL '93. set pr es 1195. CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and ' Pressure Vessel laspectors and the State of Connecticut and employed by Hanford Steam Boiler insurance and Inspection during the period 4/1/93 to 1/14/94 and state that to the best of my knowledge and belief, the owner has performed examinations and has taken corrective measures described in this owner's report in accordance with the requirements of ASME Code, Section XI. By signing this cenificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in the Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury, property damage, or loss of any kind ari,sf from or connected with this inspection. , inspector's Signature: E YORK [ Commissions: CT1137 Date: 14 JAN 1994

J D f~~'I Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

1. OWNER: Northeast Utilities Service Co. Date: .L/13/94 P. O. Box 128. Waterford CI
2. PLANT: Millstone Nuclear Power Station Unit U
3. Work Performed By: Maintenance AWO Numbers Address: P. O. Box 128. Waterford CT M3-91-06894
4. SYSTEM: CHS CODE CLASS: 2
5. Applicable Const. Code: ASME II!J Edition: 1974 Addenda: S71 Case Edition of Section XI Utilized for work 1983.S83
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED: ,

Components Name of M frs. Nat'l Board . _Repaird PLUG . ASME ID Number Manufacture S/N. PLUG Serial Replacement Stamped 3CHS*llCV184 Copes Vulcan 8621-96898-1-1 N/A Replacement - -No-YES*- (S/N VALVE NB1955)

7. Description of work: Replace st@d@JMWrp47X-1 ,

s

8. Test Conducted:

Ilydrostatic < > Pneumatic < > Normal Operating Pressure <X> Other < > CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of ASME Code, Section XI ' Signed: ~ Date: /- /3'7 h CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Connecticut and employed by Hartford Steam Boiler Insurance and Inspection during the period G-18-91t o 1-17-94, and state that to the best of my knowledge and belief, the owner has performed examinations and has taken corrective measures described in this owner's report in accordance with the requirements of ASME Code, Section XI. iJ By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in the Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal irijury, property damage, or loss of any kind arising from or connected with this inspection. Inspector's Signature: E YOFlK Commissions: N99384 CT1137 Date: 17 JAN 1994

4 - 4 Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

1. OWNER: Northeast Utilities Service Co. Date: 1/14/94 P. O. Box 128. Waterford CT
2. PLANT: Millstone Nuclear Power Station Unit E3
3. Work Performed By: Maintenance AWO Numbers Address: P. O. Box 128. Waterford CT M3-91-15649

~

4. SYSTEM: MSS CODE CLASS: 2
5. Applicable Const. Code: ASME liL Edition: .1921 Addenda: 373.

Code Edition of Section XI Utilized for work 1983.583

6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of M frs. Nat'l Board Repair / art! A"7E ' ID Number Manufacture S/N. No. Replacement Stamped ' { 3 MSS *SGIB Westinchouse NEGT1775 W13583 mReplacement Yes ,

7. Description of work: Machine manway. machine manway cover. and rentace manway boliinc rnr.

Code XE4) mrir391-374-1

8. Test Conducted:

Hydrostatic < > Pneumatic < > Nonnal Operating Pressure <X> Other < > CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the ndes of ASME Code, Section XI - Signed: k NM Date: / -/in7b , CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and i Pressure Vessel Inspectors and the State of Connecticut and employed by Hartford Steam Boiler

  • Insurance and Inspection during the period &1&91 to 1-17-94 , and state that to the best of.my knowledge and belief, the owner has performed examinations and has taken corrective measures described in this owner's report in accordance with the requirements of ASME Code, Section XI.

By signing this certifi ate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in the Owner's Report. Furthermore, neither the inspector nor_ his employer shall be liable in any manner for any personal injury, property damage, or loss of any k' d arising from or connected with this inspection. Inspector'4 Signature: Commissions: NB9384 CT1137 Date: 17 JAN 94 ' r l An .. m,  :- = l ~

y - 3 .

-t i.

Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS ,

1. OWNER: Northeast Utilities Service Co. Date: 1/14/94 7

P. O. Box 128. Waterford Cr

2. PLANT: Millstone Nuclear Power Station . Unit #2  ;
3. Work Perfm ned By: Maintenance AWO Numbers
..                  AtJress:        P. O. Box 128. Waterford Cr                      M3-91-16258 l
4. SYSTEM: MSS CODE CLASS: 2
5. Applicable Const. Code: ASME lli. Edition: 9 1971 Addenda: $2 Code Edition of Section XI Utilized for work 1983.S83 -
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of M frs. Nat'l Board Repair hnd ASME  ; ID Number Manufacture S/N. No. Replacement Stamped 3 MSS *SG IC Westinchouse NEGT1778 W15216 REPReplacement Yes S

7. Description of work: Machine manway. machine manway cover. and replace manway boltine (HT.

Code XH6F mrir 391-391-1?

8. Test Conducted:

Hydrostatic < > Pneumatic < > Normal Operating Pressure <X> Other < > CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of ASME Code, Section XI i Signed: OM -. --- Date: /- / Y ' b {

                                                                                                                    ~I CERTIFICATE OF INSERVICE INSPECTION L

1, the underrigned, holding a valid commission issued by the National Board of Boiler and - > Pressure Vessel Inspectors and the State of Connecticut and employed by Hartford Steam Boiler Insurance and Inspection during the period SS-91 to 1-17-94 , and state that to the best of my knowledge and belief, the owner has performed examinations and has taken corrective measures - described in this owner's report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, conceming the examinations and corrective measures' described in the Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal - injury, property damage, or loss of any kind arising from or connected with this inspection. ' i Inspector's Signature: Commissions: NB9384 CT1137 Date: 17 JAN 94 l f i

   ~    .                                      . , _ . . _ . . -     -         ,.     --                  -

Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS  ; I. OWNER: Northeast Utilities Service Co. Date: 1/14/94 P. O. Box 128. Waterford CT

2. PLANT: Millstone Nuclear Power Station Unit gl ,  ;
3. Work Performed By: Maintenance AWO Numbers

, Address: P. O. Box 128. Waterford CT M3-91-16249 i

4. SYSTEM: MSS CODE CLASS: 2
5. Applicable Const. Code: ASME 111. Edition: 1971 Addenda: H2}  ;

Code Edition of Section XI Utilized for work 1983.W85

6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED: .

Components Name of Mfrs. Nat'l Board Repair hnd ASME l ID Number Manufacture S/N. No. Replacement Stamped 3 MSS *SGI A Westinghouse NEGT1776 W13584 FEPAIEeplacement Yes

7. Description of work: Machine manway. machine manwav cover. and replace manway boltine (HT.

Code XH6) nrir- a b s ki t

8. Test Conducted:

Hydrostatic < > Pneumatic < > Normal Operating Pressure <X> Other < > CERTIFICATE OF COMPLIANCE  ! l We certify that the statements made in the report are correct and this tenlacement conforms to the rules of ASME Code, Section XI , Signed: ( 9 4c M - Date: /- /9 - 9b , CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid cormnission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Connecticut and employed by Hartford Steam Boiler Insurance and Inspection during the period 9-10-91 to b17-91 , and state that to the best of my > knowledge and belief, the owner has performed examinations and has taken corrective mearaus - described in this owner's report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in the Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury, property damage, or loss of any kind arising from or connected with this inspection. Inspector's Signature: E YORK [g. Commissions: NB9384 CT1137  ;

                                                 /

Date: 17 JAN 94 I 1 l m % 4_ > y. . <

d

                                                                                                                      .i 1

Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

1. OWNER: Nortneast Utilities Service Co. Date: 12/15/93 P. O. Box 128. Waterford CT
2. PLANT: Millstone Nuclear Power Station Unit pl
3. Work Performed By: Maintenance AWO Numbers .

Address: P. O. Box 128. Waterford CT M3-93-17381

4. SYSTEM: MSS CODE CLASS: 2
5. Applicable Const. Code: ASME Ill. Edition: 1971 Addenda: S73 Code Edition of Section XI Utilized for work 1983.W85
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED: i
                                                                                                                        +

Components No.2 of Mfrs. Nat'l Board Repair / ASME ID Number Manufacture S/N. No. Replacement Stamped 3 MSS *CTV27C Sultzer IB* N/A Replacement Yes COMPONENT i

7. Description of wo/ rk: VALVE S/N5437 N"!3 Replace Richt Solenoid Control Block:::
8. Test Conducted: i Hydrostatic < > Pneumatic < > Normal Operating Pressure <X> Other < >

CERTIFICATE OF COMPLIANCE F We certify that the statements made in the report are correct and this replacement conforms to the rules of ASME Code, Section XI - Signed: YA - Date: /~~[Y f b l CERTIFICATE OF INSERVICE INSPECTION . 1, the undersigned, holding a valid commission issued by the National Board of Boiler and + Pressure Vessel Inspectors and the State of Connecticut and employed by Hartford Steam Boiler i Insurance and Inspection during the periodOS-12-93 ta01-18-93 , and state that to the best of my knowledge and belief, the owner has performed examinations and has taken corrective measures described in this owner's report in' accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, conceming the examinations and corrective measures described in the. Owner's Report. i Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal j injury, property damage, or loss of any kind arising from or connected with'this inspection. I Inspector's Signature: E YORK  ! Comr Jssions: M39384 CT1137 Date: 18 JAN' 94 o

 . - ~ . -.           .-           .        ..

e 4 Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

1. OWNER: Northeast Utilities Service Co. Date: 1I/17/93 P. O. Box 128. Waterford CT
2. PLANT: Millstone Nuclear Power Station Unit p_2 -
3. Work Performed By: Maintenance AWO Numbers Address: P. O. Box 128. Waterford CT M3-93-11945
4. SYSTEM: hiss CODE CLASS: 2
5. Applicable Const. Code: ASME IIL Edition: 1.71 9 Addenda: 32}

Case Edition of Seption e XI Utilized for work 1983.S83

6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of Mfrs. Nat'l Board Repair / ASME ID Number Manufacture S/N. Serial Replacement Stamped ' 3 MSS *PV20B Fisher Controls 3659427 N/A Repair / Yes Replacement

7. Description of work: Replaced Valve Stem an[Plue Assembly and Renaired Steam Cuts on Valve Body (rnrir*390-016-2 plug s/nBD3120-2)
8. Test Ce , ducted:

Hydrostatic < > Pneumatic < > Normal Operating Pressure < X > Other < > CERTIFICATE OF COMPLIANCE. We certify that the statements made in the report are correct and this repair / replacement conforms to the rules of ASME Code, Section XI Signed: N A- t r - Date: Il $3 CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and . Pressure Vessel Inspectors and the State of Connecticut-and em loyed by Hartford Steam Boiler Insurance and Inspection during the period 07-23-94 01-13 , and state that to the test of my knowledge and belief, the owner has performed examinations and has taken corrective measures ' described in this owner's report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in the Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury, property damage, or loss of any k' d arising from or connected with this inspection. Inspector's Signature:

  • Commissions: CT1137 r .

d Date: 01-13-94

                                                                                                                                 'l Form NIS-2 OWNERS REPORT FOR' REPAIRS OR REPLACEMENTS                                                                           -

i

                                                                                                                                    ^
1. OWNER: Northeast Utilities Service Co. Date: 1/14/94 P. O. Box 128. Waterford CT i
2. PLANT: Millstone Nuclear Power Station Unit M
3. Work Performed By: Maintenance AWO Numbers Address: P. O. Box 128. Waterford CT M3-93-17880
4. SYSTEM: CHS CODE CLASS: 2 i S. Applicable Const. Code: ASME III. Edition: 1974 Addenda: W75, 5 e Code Edition of Section XI Utilized for work 1983.S83 ,

Y

6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of Mfrs. Nat'l Board Repair / ASME .i S/N. No. Replacement Stamped '1 ID Number Manufacture 3CHS*MV8438A Westinghouse 4284

  • N/A Replacement No -

viv s/n 04000GM88FNSOOOO5W750050 vlv NBW26514  ;

7. Description of work: Replaced Valve Disk ^ rnrir 393 404 .
8. Test Conducted: >

Hydrostatic < > Pneumatic < > Normal Operating Pressure < > Other < X > VT,IST  ! CERTIFICATE OF COMPLIANCE y l We certify that the statements made in the report are correct and this repair / replacement conforms to the rules of ASME Code, Section XI Signed: b 'kcu_I Date: /~ ) Y- N CERTIFICATE OF INSERVICE INSPECTION j I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Connecticut and employed by Hartford Steam Boiler , Insurance and Inspection during the period Ok'D-93to 01-a cA , and state that to the best of my_ .l knowledge and belief, the owner has performed examinations and has taken corrective measures l described in this owner's report in accordance with the requirements of ASME Code, Section XI. l

          ' By signing this certificate neither the inspector nor his employer makes any warranty, expressed -

or implied, concerning the examinations and corrective measures described in the Owner's Report, , Furthermore, neither the inspector _ nor his employer shall be liable ~in any- manner for any personal : l injury, property damage, or loss of any kind arisins rom or connected with this inspection. l

                                                   /.-                                                                             j inspector's Signature: E YORK                                        Commissions: NB9384 CT1137 "l

- / Date: 20 JAN' S4 , l 4 i j  ? s G

                                      = , . w a          4    < ~ ,                                      ,,  -e, y ,      .c--

Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

1. OWNER: Northeast Utilities Service Co. Date: 1/5/94 P. O. Box 128. Waterford CT
2. PLANT: Millstone Nuclear Power Station Unit L3
3. Work Performed By: Oeneration Construction AWO Numbers Address: P. O. Enx 128. Waterford CT M3-93-04981
4. SYSTEM: SIL CODE CLASS: 2
5. Applicable Const. Code: ASME IIL Edition: 1971 Addenda: SJ3 Case Edition of Section XI Utilized for work 1983.W83
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of Mfrs. Nat'l Board Repair / ASME ID Number Manufacture S/N. Serial Replacement Stamped 3Silel-PSSPO459 ITT Orinnel N/A N/A Repair No

7. Description of work: Modified End Brackets.
8. Test Conducted:

Hydrostatic < > Pneumatic < > Normal Operating Pressure < > Other <X> VT CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this renair / renlacement conforms to the rules of ASME Code, Section XI Signed: '[ * --  % Date: bd"f CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Connecticut and employed by . Hartford Steam Boiler Insurance and Inspection during the period f.s 95 to /7AM, and state that to the best of my knowledge and belief, the owner has performed examinations and has taken corrective measures described in this owner's report in accordance with the requirements of ASME Code, Section XL

          ~ By signing this certificate neither the inspector nor his employer makes any warranty,' expressed or implied, concerning the examinations and corrective measures described in the Owner's Report.

Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury, property damage, or loss of an > kind arising from or connected with this inspection. Inspector's Signature: Commissions: 4-#Zf Date: 4h3/9/

l

                                                                                                              ~

Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS -  :

1. OWNER: Northeast Utilities Service Co. Date: 1/7/94 i P. O. Box 128. Waterford CT .I l

1

2. PLANT: Millstone Nuclear Power Station Unit #2
3. Work Performed By: Generation Construction AWO Numbers  :

Address: J'. O. Box 128. Waterford CI M3-93-04986

4. SYSTEM: BDG CODE CLASS: 2
5. Applicable Const. Code: ASME III. Edition: 1971 Addenda: $22 Case Edition of Section XI Utilized for work 1983.S83
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of M frs. Nat'l Board Repair / ASME  ! ID Number Manufacture S/N. Serial Replacement Stamped . CP408051-11001 ITT Grinnel N/A N/A Repair No

7. Description of work: Modified End Brackets.
8. Test Conducted:

Hydrostatic < > Pneumatic < > Normal Operating Pressure < > Other <X> VT i CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this repair / replacement conforms to the rules of ASME Code, Section XI Signed: Cec Date: I' 0 ~ 7h  : 1 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and  ; Pressure Vessel Inspectors and the State of Connecticut and employed by liartford Steam Boiler j Insurance and Inspection during the period F/.f3 to /rf h', and state that to the best of my 3 knowledge and belief, the owner has performed examinations and has taken corrective measures , described in this owner's report in accordance with the requirements of ASME Code, Section XI. -j By signing this certificate neither the inspector nor his employer makes any warranty, expressed . . or implied, concerning the examinations and corrective measures described in the Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal . injury, property damage, or loss of any kind arising from or connected with this inspection.

  • Inspector's Signature: Commissions: /27fft f l Date: f,/f)/

r,

           ~       _                  _                                       .

I Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS f

1. OWNER: Northeast Utilities Service Co. Date: J/5/94 P. O. Box 128. Waterford CT  ;
2. PLANT: Millstone Nuclear Power Station Unit 61  ;
3. Work Performed By: Generation Construction AWO Numbers Address: P. O. Box 128. Waterford CT M 3-93-04987 .

t

4. SYSTEM: RSS CODE CLASS: 2
5. Applicable Const. Code: ASME 111. Edition: 1971 Addenda: 322 Case Edition of Section XI Utilized for work 1981.S83 ,
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED: ,

Components Name of Mfrs. Nat'l Board Repair / ASME ID Number Manufacture S/N. Serial Replacement Stamped CP37970641022 ITT Grinnel N/A N/A Repair No I

7. Description of work: Modified End Brackets. ,

t

8. Test Conducted:

Hydrostatic < > Pneumatic < > Normal Operating Pressure < > Other <X> VT , i CERTIFICATE OF COMPLIANCE , We certify that the statements made in the report are correct and this renair / reolacement conforms to the  ; rules of ASME Code, Section XI ' Signed: h kk a+ !-- _ Date: /'b~lh CERTIFICATE OF INSERVICE INSPECTION  : 1, the undersigned, holding a valid commission issued by the National Board of Boiler and - Pressure Vessel Inspectors and the State of Connecticut and employed by llartford Steam Boiler Insurance and Inspection during the period F2 93_ to /27 fv' , and state that to the best of my knowledge and belief, the owner has performed examinations and has taken corrective measures described in this owner's report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed - , or irr. plied, concerning the examinations and corrective measures described in the Owner's Report. . Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury, property damage, or loss of any kind arising from or connected with this inspection. inspector's Signature: Commissions: /2,ygef f Date: ,/ .7/fr/ t s 8 i

Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS . i

1. OWNER: b'ortheast Utilities Service Co. Date: 1/5/94 P. O. Box 128. Waterford CT
2. PLANT: Millstone Nuclear Power Station Unit L3
3. Work Performed By: Generation Constmetion AWO Numbers Address: P. O. Box 128. Waterford CT M3-93-04989 & M3-93-04990
4. SYSTEM: BES CODE CLASS: 2
i. Applicable Const. Code: ASME IIL Edition: 1971 Addenda: $73 Case Edition of Section XI Utilized for work 1983.S83
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of M frs. Nat'l Board Repair / ASME ID Number Manufacture S/N. Serial Replacement Stamped < CP379707-IIO22 11T Grinnel N/A N/A Repair No CP379707-H025 IIT Grinnel N/A N/A Repair No

7. Description of work: Modified End Brackets.
8. Test Conducted:

Ilydrostatic < > Pneumatic < > Normal Operating Pressure < > Other <X> VT i CERTIFICATE OF COMPLIANCE

                                                                                                                              )

We certify that the statements made in the report are correct and this gpair / rer>lacement conforms to the rules of ASME Code, Section XI Signed: ilA A~  % Date: [" b ' CERTIFICATE OF INSERVICE INSPECTION f 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Connecticut and employed by llartford Steam Boiler Insurance and Inspection during the penod 73f( to Ltg, and state that to the best of my I knowledge and belief, the owner has performed examinations and has taken corrective measures l described in this owner's report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed , or implied, concerning the examinations and corrective measures described in the Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal i injury, property damage, or loss of ny d arising from or connected with this inspection. i Inspector's Signature: Commissions: 8r//fr/

                                                                                             '                                 \
                               '/

Date: . //hlkV _ , 1._.. . -. . _ , _

r f Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS {

l. OWNER: Northeast Utilities Service Co. Date: 1/5/94 P. O. Box 128. Waterford CT ,
2. PLANT: Millstone Nuclear Power Statiori Unit!3 l
3. Work Performed By: Generation Construction AWO Numbers l Address: P. O. Box 128. Waterford CT M3-93-04988 '!
4. SYSTEM: RSS CODE CLASS: 2 l S. Applicable Const. Code: ASME 111. Edition: J971 7 Addenda: S72 Case Edition of Section XI Utilized for work 1983.S83' q
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED: .;

Components Name of Mfrs. Nat'l Board Repair / ASME .; ID Number Manufacture S/N. Serial Replacement Stamped CP379706-H025 ITF Grinnel N/A N/A Repair No a i

7. Description of work: J1odified End Brackets.
8. Test Conducted: [

Ilydrostatic < > Pneumatic < > Normal Operating Pressure < > Other <X> VT j

                                                                                                                  ~

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this repair / replacement conforms to the ' rules of ASME Code, Section XI Signed: 4.4 /A - Date: /-2f- ' s CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and  ; Pressure Vessel Inspectors and the State of Connecticut and employed by Hartford Steam Boiler , insurance and Inspection during the period M-5B o 01-2-94, t and state that to the best of my - - knowledge and belief, the owner has performed examinations and has taken corrective, measures. described in this owner's report in accordance with the requirements of ASME Code, Section XI.  ; I By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in the Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury, property damage, or loss of y kind arising from or connected with this inspection. Inspector's Signature: ~ Commissions: N//31 f /  ; Date: / 4//A/ ( ' i l

                                ._~J 9

Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS 4 1,' OWNER:' Northeast Utilities Savice Co, Date: 1/5/94 l LO. Box 128. Waterford CT l

2. PLANT: Millstone Nuclear Power Station Unit M
3. Work Performed By: Oeneration Construction AWO Numbers Address: P. O. Box 128. Waterford CT M3-93-04982 -r
4. SYSTEM: Sik CODE CLASS: 2
5. Applicable Const. Code: ASME IIL Edition: 1971 Addenda: E7),

Case Edition of Section XI Utilized for work 1983.W83

6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of M frs. Nat'l Board Repair / ASME ID Number Manufacture S/N. Serial Replacement Stamped 3SIL-1-PSSPO414 ITT Grinnel N/A N/A Repair No -

7. Description of work: Modified End Brackets.
8. Test Conducted:

Ilydrostatic < > Pneumatic < > Normal Operating Pressure < > Other <X> VT CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this repair / replacement conforms to the rules of ASME Code, Section XI Signed: YN eo Date: /'d'7 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid conunission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Connecticut and employed by llartford Steam Boiler Insurance and Inspection during the period 7f 9g to jg/g, and state that to the best of my knowledge and belief, the owner has performed examinations and. has taken corrective measures - described in this owner's report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expres.:cd , or implied, conceming the examinations and corrective measures described in the Owner's Report. 'I Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal' I; injury, property damage, or loss of any kind arising from or connected with this inspection. Inspector's Signature:

                                      ,                                 Commissions: [2n/f.f                                   1 Date:  J . 3,/9s/

o i l l l t  ! i N ,

                                                            .-e7%.                                    i           "
                                                                                                                    '%4,

Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

1. OWNER: Northeast Utilities Service Co. Date: 1/5/94 ,

P. O. Box 128. Waterford CT , i

2. PLANT: Millstone Nuclear Power Station Unit!]

i

3. Work Performed By: Generation Construction AWO Numbers Address: P. O. Box 128._Waterford CT M3-9344982 3
4. SYSTEM: Slk CODE CLASS: 2-1
5. Applicable Const. Code: ASME 111. Edition: 1921 Addenda: 372 Case Edition of Section XI Utilized for work 1983.W83
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of M frs. Nat'l Board Repair / ASME ID Number Manufacture S/N. Serial Replacement Stamped 3Silel-PSSPO414 ITT Grinnel N/A N/A Repair No

7. Description of work: Modified End Brackets.
8. Test Conducted: .;

Hydrostatic < > Pneumatic < > Normal Operating Pressure < > Other <X> VT , CERTIFICATE OF COMPLIANCE - We certify that the statements made in the report are correct and this re, air / renlacement conforms to the rules of ASME Code, Section XI Signed: NA Date: /-5') CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and - Pressure Vessel Inspectors and the State of Connecticut and employed by Hartford Steam Boiler Insurance and Inspection during the period 7f f g to /,2f y, and state that to the best of my  ; knowledge and belief, the owner has performed examinations and has taken corrective measures described in this owner's report in accordance with the requirements of ASME Code, Section XL i By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the' examinations and corrective measures described in the Owner's Report. , Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal  : injury, property damage, or loss of any kind arising from or connected with this inspection. Inspector's Signature: Commissions: 8r//M

                            /

Date: _]/!h3/ht/

        /      '

I h i P i

                                                . ~ . a $ s.m . 7            <s.      1                     . I

l 1  : Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS l

1. OWNERS Northeast Utilities Service Co. Dste: 1/13/94 P. O. Box 128. Waterford CT
2. PLANT: Millstone Nuclear Power Station Unit !.1 ,
  '-         3, Work Performed By: Generation Construction                            AWO Numbers Address:           P. O. Box 128. Waterford CT                  M 3-92-00856                                  j l
4. SYSTEM: FWS CODE CLASS: 2 j
5. Applicable Const. Code: ASME III. Edition: 19J71 Addenda: 321 Case Edition of Section XI Utilized for work 1983.W85 - e
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of Mfrs. Nat'l Board Repair / ASME f ID Number Manufacture S/N. Serial Replacement Stamped -! 3-FWS-006-063-02 ' Tioga N/A N/A Replacement No

(
7. Description of work: Replace nine due to erosion / corrosion l

4 8. Test conducted: Normal Operating Pressure < > Other <X>UT,MT G RT I Hydrostatic < X > Pneumatic < > i CERTIFICATE OF COMPLIANCE -! We certify that the statements made in the report are correct and this renair / replacement con'orms to the rules of ASME Code, Section XI l Signed: b N% Date: - b/Ts N-- , 9 ). 4 . CERTIFICATE OF INSERVICE INSPECTION  : 1, the undersigned, holding a. valid commission issued by the National Board of Boiler and rressure - Vessel Inspectors and the State of Connecticut and employed by Hartford Steam Boiler Insurance and Inspection ~ during the period 01-10-5E'to 01-22-94, and state that to the best of my knowledge and belief, the owner has ..

  -          performed examinations and has taken corrective measures described in this owner's report in accordance with the         ,

i requirements of ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or } 4 implied, concerning the examinations and corrective measures described in the Owner's Report. Furthermore, ' neither the inspector nor his employer shall be liable in any manner for any personal injury, property damage, or loss of any kind arising from or connected with his' ins tion.  ; Inspector's Signature: E YORK A. ' Commissions: CT1137-d Date: 22 JANUARY 1994 j I i

                           ._               .=. - _            . .                  .                             ._

C G r Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS . i

1. OWNER: Northeast Utilities Service Co. Date: 1/10/94 P. O. Box 128. Waterford CT
2. PLANT: Millstone Nuclear Power Statiort Unit U
3. Work Performed By: Generation Construction AWO Numbers Address: P. O. Box 128. Waterford CT M3-93-26277
4. SYSTEM: MSS CODE CLASS: 2
5. Applicable Const. Code: ASME 111. Edition: 1971 7 Addenda: S_7]

Case Edition of Section XI Utilized for work 1983.S83

6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:'

Components Name of M frs. Nat'l Board Repair / ASME ID Number Manufacture S/N. Number Replacement Stamped , 3-MSS-4-PSSP009 ITT Grinnel N/A / + N/A Replacement No *

7. Description of work: Install new snubber and modified sunnort -
8. Test Conducted:

Ilydrostatic < > Pneumatic < > Normal Operating Pressure < > Other <X > VT - - CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this renair / replacement conforms to the rules of ASME Code Section XI Signed: [MA! Date: / ~~ / I ~

    ~M % //m G/V 2S M 4 :% AI>r/

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and' Pressure Vessel Inspectors and the State of Connecticut and employed by Hartford Steam Boiler  ; Insurance and Inspection during the period /t ze.h to /.77.W, and state that to the best of my knowledge and belief, the owner has performel examinations and has taken corrective measures .! described in this owner's report in accordance with the requirements of ASME Code, Section XI. , i By signing this certificate neither the inspector nor his employer makes any warranty, expressed 1 j or implied, concerning the examinations and corrective sneasures described in the Owner's Report. j Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury, property damage, or loss of an .kihd arising from or connected with this inspection. Inspector's Signature: y,~ 7 Commissions: / 7//7[ Date: /.27, 9/

                                                                                                                     .)

l i i

3 D 'Qm  ; l l Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS  ! l

1. OWNER: Northeast Utilities Service Co. Date: :/10/94 i P. O. Box 128. Waterford CT I
2. PLANT: Millstone Nuclear Power Station Unit D l l
3. Work Performed By: Generation Construction AWO Numbers Address: P. O. Box 128. Waterford CT M 3-93-22536
4. SYSTEM: FWS CODE CLASS: 2 ,
5. Applicable Const. Code: ASME IIL Edition: 1971 Addenda: $271 l Code Edition of Section XI Utilized for work 1983.S83 Code Case N416
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:
                                                                                                                                           ]

Components Name of M frs. Nat'l Board Repair / ASME  ; ID Number Manufacture S/N. Number Replacement Stamped  ; 3.FWS-020-018-02 TUBECO N/A N/A Repair /Replacemenf' No i!

7. Description of work: Renair nine crackine due to thermal faticue
8. Test Conducted: Hydrostatic < > Pneumatic < > Normal Operating Pressure < X > Other < X > MT,RT '

CERTIFICATE OF COMPLIANCE { We certify that the statements made in the report are correct and this renair / replacement conforms to the rules of ASME , Code, Section XI ' i Signed: k f.- Date:

                                                                                      /- 7 Yf h                                            ,

s

               ,                                                                                                                           r

( 'IGp /c c er/ KNcw CERTIFICATE OF INSERVICE INSPECTION , r 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel i inspectors and the State of Connecticut and employed by Hartford Steam Boiler Insurance and Inspection during the ' period 9/5.f3 to /. 27M, and state that to the best of my knowledge and belief, the owner has performed i examinations and has tak'en corrective measures described in this owner's report in accordance with the requirements of '

        - ASME Code, Section XI.

1 By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, , concerning the examinations and corrective measures described in the Owner's Report. Furthermore, neither the .  : inspector nor his employer shall be liable in any manner for any personal injury, property damage, or loss of any kind . 3 arising from or connected with this inspection. - n-[//m, M Commissions: 87//17 Inspector's Signature: Date: / M f*/ c -

                                                                                                                                          -i
                                                                                                                                         .i
 , r       ,,                                                  .
                                                                      -     ~~

n t:rmy >mm ~ v~ ~ , < 1: * -- : - 1 +

               'T       %
                                                                                        }

i Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS t

1. OWNER: NoI_theast Utilities Service Co. Date: 1/14 r94 P. O. Box 128. Waterford CT
2. PLANT: Millstone Nuclear Power Station Unit fl
3. Work Performed By: Maintenance AWO Numbers Address: P. O. Box 128. Waterford CT M 3-93-151 RO '
4. SYSTEM: Epfq CODE CLASS: 2  ;
5. Applicable Const. Code: Addenda: $]7}

ASME 111. Edition: 1971 Case Edition of Section XI Utilized for work 1983.S83

6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

t Components Name of M frs. Nat'l Board Repair /. ASME ID Number Manufacture S/N. Serial- Replacement Stamped 3-BDG-1-PSSH490 Stone & Webster N/A N/A Replacement No

7. Description of work: Replaced clamn bolt (mrir 391- 083-1)
8. Test Conducted:

Hydrostatic < > Pneumatic < > Normal Operating Pressure < > Other < X > VT CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this repair / renlacement conforms to the rules of ASME Code, Sxtion X1 Signed: ~ dk A b Date: /^M-97 l l CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and t Pressure Vessel Inspectors and the State of Connecticut and employed by Hartford Steam Boiler ' Insurance and Inspection during the period 9.6ff to /,897, and state that to the best of my knowledge and belief, the owner has performed examinations' and has taken corrective measures  ; described in this owner's report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed l or implied, concerning the examinations and corrective measures described in the Owner's Refort. 7 Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal ' injury, property damage, or loss of y ki d arising from or connected with this inspection. l Inspector's Signature: Commissions: &#3r/ . Date:l.?e /9t/ , l t

Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

1. OWNER: Northeast Utilities Service Co. Date: 1/12/94 P. O. Box 128. Waterford CT
2. PLANT: Millstone Nuclear Power Station Unit Q
3. Work Performed By: Maintenance AWO Numbers Address: P. O. Box 128. Waterford CT M3-93-13684
4. SYSTEM: HQG CODE CLASS: 2
5. Applicable Const. Cod - ASME Ill. Edition: 1977 Addenda: 179 Coole Case ition of Section XI Utilized for work 1983.S83 N4&
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of Mfrs. Nat'l Board Repair / ASME-ID Number Manufacture - S/N. No.1 Replacement Stamped ,

 ,t p *V887             Pacific Valve      0734-4         N/A             Replacement           No
7. Description of work: Renlaced Valves with S/N 0935-0
8. Test Conducted:  !

Hydrostatic < > Pneumatic < > Normal Operating Pressure <X > Other < X > LP.RT Code Case N416 CERTIFICATE OF COMPLIANCE , We certify that the statements made in the report are correct and this repair / renlacement conforms to the , rules of ASMU Code, Section XI Signed: R Oh I Date: /

                                                                                   /Y CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Connecticut d employed by Hartford Steam Boiler Insurance and Inspection during the period [#.f/ to /g                , and state that to the best of my knowledge and belief, the owner has performed examinations and has taken corrective measures described in this owner's report in accordance wi;h the requirements of ASME Code, Section XI.

By signing this certificate neither the inspector nor his employer snakes any warranty, expn %ed ' or implied, concerning the examinations and corrective measures described in the Owner's Rt ,. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal e property damage, or loss of any kind arising from or connected with this inspection. Inspector's Signature: s Commissions: 87//.I7 , Datc: //hB/i/

I Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS  :

                                                                                                                    )

i

1. OWNER: Northeast Utilities Service C2 Date: 11/17/93 '

P. O. Box 128. Waterford CT l t

                                                                                                                 .1
2. PLANT: Millstone Nuclear Power Station Unit pl

{

3. Work Performed By: hi_aintenance AWO Numbers Address: P. O Box 128. Waterford CT hi3-93-09549 .

i

4. SYSTEM: MSS CODE CLASS: 2  !
5. Applicable Const. Code: ASME IIL Edition: 1974 Addenda: S]73 Case Edition of Section XI Utilized for work 1983.S83 ~!

i

6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED: ,

i I Components Name of Mfrs. Nat'l Board Repair / ASME ID Number Manufacture S/N. Serial Replacement Stamped j 3 MSS *RV23B Dresser BS00296 N/A Replacement Yes  ! i

7. Description of work: Replaced Valve with Spare S/N BS00301 Due to Seat Leakar: Snare Valve l fBS00301) had a Disk Replaced. via mrir 393-091-3 l

i

8. Test Conducted: '

liydrostatic < > Pneumatic < > Normal Operating Pressure < X >. Other < > l CERTIFICATE OF COMPLIANCE i We certify that the statements made in the report are correct and this replacement conforms to the mies of.  : ASME Code, Section XI i oigned: q<s h N (e Date: /'I'7f'" l i CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and l Pressure Vessel Inspectors and the State of Connecticut and employed by llartford Steam Boiler  ; Insurance and Inspection during the period 7-27-S3t o 14M , and state that to the best of my i knowledge and belief, the owner has performed examinations and has taken corrective measures  ! described in this owner's report in accordance with the requirements of ASME Code, Section XL . I By signing this certificate neither the inspector nor his employer makes any warranty, expressed  ; or implied, conceming the examinations and corrective measures described in the Owner's Report. i Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal. ) injury, property damage, or loss of any kind arising from or connected with this inspection. , inspector's Signature: E YORK Commissions: CT 1137 Date: 01-28-94 i I l 1

                                                                   ,.e      s -

2 -

                                                                                                   , .~    ,- ;w

O f

                                                                                                                        ?

Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

1. OWNER: Northeast Utilities Service Co. Date: 11/12/93 P. O. Box 128. Waterford CT
2. PLANT: Millstone Nuclear Power Station Unit #3
3. Work Performed By: Maintenance AWO Numbers Address: P. O. Box 128. Waterford CT M3-93-09551 1
4. SYSTEM: MSS CODE CLASS: 2
5. Applicable Const. Code: ASME III. Edition: 1974 Addenda: S14 Case Edition of Section XI Utilized for work 1983.S83
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED: t i

Components Name of Mfrs. Nat'l Board Repair / ASME ID Number Manufacture S/N. Serial Replacement Stamped i 3 MSS *RV24D Dresser N/A B50029f Replacement Yes ,

7. Description of work: Replaced Valve with Relief Valve S/N B500291 *  :
8. Test Conducted:

Ilydrostatic < > Pneumatic < > Normal Operating Pressure < X > Other < > CERTIFICATE OF COMPLIANCE i We certify that the statements made in the report are correct and this renlacement conforms to the rules of _ ASME Code, Section XI f Signed: 61 A - Date: h"2 2 -7 7 cv1v s/nBSOD294 remoggggggggECNbY [hrn v 9 I, the undersigned, holding a valid commission issued by the National Board of Boiler and  ! Pressure Vessel Inspectors and the State of Connecticut and employed by liartford Steam Boder Insurance and Inspection during the period 4/23/93to1/13/94 , and state that to the best of my knowledge and belief, the owner has performed examinations and has taken corrective measures described in as owner's report in accordance with the requirements of ASME Code, Section XL Dy signing this certificate neither the inspector nor his employer makes any warranty, expressed .I or implied, concerning the examinations and corrective measures described in the Owner's Report. l Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal , injury, property damage, or loss of any kind arisir from or connected with this inspection. I Inspector's Signature: E YORK. Commissions: CT1137

                                                  -         ~

Date: 13 JANUARY 1994 7 l 1 b

                                               ,a  w--*   e                    w ,         4 c                          j

o , Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

1. OWNER: Northeast Utilities Service Co. Date: 1/11/94 P. O. Box 128. Waterford cr  :

I

2. PLANT: Millstone Nuclear Power Station Unit il
3. Wut; Performed By: Maintenance AWO Numbers Address:  ?. O. Box 128. Waterford CT M3-93-20850 l
4. SYSTEM: M CODE CLASS: 2
5. Applicable Const. Code: ASME Ill. Edition: 1911 Addenda: $22 Code Edition of Section XI Utilized for work 1983.W85 e
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:  ;

Components Name of Mfrs. Nat'l Board Repair / ASME  : ID Number Manufacture S/N. No. Replacement Stamped 3FWS 016-074-02 Tubeco N/A N/A Replacement No

7. Description of work: Renaired feedwater nozzle-to-nine wefd%NMdue to thermal fatiaue cracks FEEDWATER PIPE 3FWS-016-74-2 CUT DUT AND REPLACED PER DCN DM3-0937-93. NEW FW 49G50. '
8. Test Conducted:

Hydrostatic < > Pneumatic < > Normal Operating Pressure <X> Other < X> MT,UT,RT Code Case N416 i CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this renlacement conforms to the rules of , ASME Code, Section XI  ; Signed: 7h L Date: /~ H' N .. l CERTIFICATE OF INSERVICE INSPECTION .! I 1, the undersigned, holding a valid commission issued by the National Board of Boiler and .! Pressure Vessel Inspectors and th' State of Connecticut and employed by ' artford Steam Boiler Insurance and Inspection during the period 03&-93t oO1-31-M , and state mat to the best of my l knowledge and belief, the owner has performed examinations and has taken corrective measures'  ! described in this owner's report in accordance with the requirements of ASME Code, Section XI. l By signing this certificate neither the inspector nor his employer makes any warranty, expressed - , or implied, conceming the examinations and corrective measures described in the Owner's Report. j Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal  ; injury, property damage, or loss of any kin arising from or connected with this inspection. Inspector's Signature: E YDRK m Commissions: CT117 Date: 01-31-94 , l i I

   " = ~ - - - - ., _ , , ,

l N f CLASS 3

p Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS Northeast Utilities Service Co. .Date: 07/07/92

1. OWNER:

P.O. Eox 128. Waterford CT '

2. PLANT: Millstone Nuclear Power Station Unit _ fL3
3. Work Performed By: Bettermen.t Const. AWO Numbers M3-91-02359 Address: P.O. Box 128. Waterford Cr
4. SYSTEM: Sy2 CODECLASS: 3 ~
5. Applicable Const. Code: ASME III.1971 Edition: S23_ Addenda: N/A Case Edition of Section XI Utilized for work 1983.S83
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Mfrs Nat'l Repair / ASME Components Name of Replacement Stamped M anuf acture No. Serial ID Number Repair YES 3-SWP*EJ 1C Flexonics N/A 11-4343

7. Description of work: Modification of lower tie rod to ocrmit installation.

8, Test Conducted: Pneumatic < > Normal Operating Pressure < _> Hydrostatic < >

                               . Other < >

Certificate of Compliance We certify that the statements made in the report are correct and this repair conforms to the rules ASME Code, Section XI id Date:_ lo - D " S 3 Signed: CERTIFICATE OF INSERVICE INSPECTION - I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Connecticut and ' employed by Hartford Steam Boiler Insurance and Inspection during the , period MfRio /I(>!r, and state that to the best of my knowledge and belief, the and has taken corrective measures owner has performed examinationsin accordance with the requirements of ASME described in this owner's report Code, Section XI. By signing . this certificate neither the inspector nor his employer makes any warranty, expressed or implied,- concerning the examinations and corrective measures described . in the Owner's Report. Furthermore. -neither the inspector nor his employer shall be liable .in any manner for any personal injury, property damage, or loss of any kind arising from or connected with this inspection. Inspector's Signature: W Commissions: 85WJf Date:c-he /; Iff3

    ***%?'C-   ._.446.%,g        .
                                                                                                        .-         L  _
                                                                                                                        ;. . . . ..   .]

e;w _'-. , Y'" - ,> i I

s Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS i i
  • 1. OWNER: Northeast Utilities Service Co. . Date: 07/07/921 4

P.O. Box 128. Waterford CT

2. PLANT: Millstone Nuclear Power : Station Unit jL1-- j I
3. Work Mformed By: Betterment Const. AWO Numbers .i Address: . 20. Box 128. Waterford CT M3-91-21090 'I
4. SYSTEM: SE CODE CLASS: 3 j i
5. Applicable Const. Code: ASME III.1971 Edition: 323 Addenda:JIA  !

Case Edition of Section XI Utilized for work 1983.S83

6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

I Components Name of. Mfrs Nat'l Rep air / ASME ID ' Number Manufacture No. Serial Replacement Stamped ' 3-SWP*V069 PEPCO N/A N/A Replacement YES

                                                                                                     -i
7. Description of work: Reolace studs with studs of the oroner material. .
8. Test Conducted-Hydrostatic < > Pneuriatic < > Normal Operating Pressure <K>-

Other < ' > Certificate cl Compliance We certify that the statements made in the report are correct and this replacement conforms to the rules ASME Code, Section XI Signed: da Date: [6# b1 CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Connecticut and. employed by liartford Steam Boiler Insurance and Inspection during the periodA2dft to/uff and state that to the best of my knowledge and belief, the owner has performed examinations and has taken corrective measures

       ,  described in this owner's report in accordance with the requirements of ASME Code, Section XI.

By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in _ the Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury, property damage, or loss of any kind arising from or connected with' this inspection. Inspector's Signature: Commissions: [r#17 ' f: Date: /_ ,,D_ft /f97 -

                                                                                              'l l

Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS. t================================================================================ l

1. OWNER Northeast Utilities Service Co. Date 21-01-91 P.O. Box 128 , Waterford , Conn. Sheet _1 of _1 ,
2. PLANT HJ11 stone Nuclear Power Station Unit 1.

AWO Numbers  !

3. Work Performed By Generation Const. M3-91-01125 Address P.O. Box 128 Waterford Conn.

CODE CLASS 3

4. SYSTEM Service Water System 5.-Applicable Const. Code _ASME III ,1971 Edition, S,73 Addenda,N/A Case Edition of Section XI Utilized for work 1983,S83
6. IDENTIFICATION OF THE COMPONENTS REPAIRED OR REPLACED:

Component Name of DRAWING Year Repaired / ASME NUMBER Built Replaced / Code Ident. Manufacturer Stamped Number Replacement CP-319731' Sh 6 1985 -REPAIRED YES >SWP-150-105-03 STONE AND WEBSTER REP".Inv9 YES SWP-150-064-03 STONE AND WEBSTER CP-319733 Sh 1 1985 , CP-319733' Sh 1 1985 -REF AI RID- YES . SWP-150-071 STONE AND WEBSTER YES g4, CP-319716 Sh 1 1985 REFAIRE9 SWP-002-146-03 STOliE AND WEBSTER

7. Description of Work:

aerwer PDCR MP3-90-010, "SMALL BORE SERVICE WATER PIPING y- i REPAIR PLAN RFO3" replaces small bore einino (3" or less ), that has suffered erosion / corrosion attack . This PDCR also replaces the adiacent elbow with a -l I bent eine l' larce radius bend f four time theIn nominal Dice size as a minimum locations where this is not t'ossible becayse of the same material (Cu-Ni) . of ceometric constraints, the cooper-nickle pipe f ASME SB-165 i has beeC l replaced with Monel-400 (ASME SB-165 ) that is resistant to erosion / corrosion. l In addition, a 3" full nort ball valves was added to the supp1v line of the HVO and CCI heat exchancers. .

8. Test Conducted:

Hydrostatic /XXX/ Pneumatic / / Nominal Operating Pressure /XXX Other / /

9. Remarks: HYDROSIATIC TEST PER'M3-91-00620 b

1

                                                                                                                 -Page 2 of 2
                                                                                                                                                   -)
  -====c===========================================================================                                                                  '

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct.and this;  :

   =r"rAIIb              conforms to the rules ASME Code =, Section XI.-                                                                              ,

OfLMGJ1G+' T~ Signed / w - 6-r" Eev M/ Date 3 --41_- T/ , U_ '  ;

   ================================================================================                                                                   ,

CERTIFICATE OF INSERVICE INSPECTION A3- 9/-0// 25 i I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel-Inspectors and the State or. Province of- . Connecticut and employed by Hartford Steam Boiler Insurance and Inspection  : i- during the period -FM 2 . /N to Ar# /V /f9/ , and state that to the best of my knowledge and belidf , the owner has performed examinations and taken corrective. measures described in this owner's report in accordance with the , requirements of ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes  ; any. warranty, expressed or implied, concerning the examinations and corrective measures described in the Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal. ' . injury, property damage, or a loss of any kind arising from or' connected- j with this inspection. Inspectors signature . /h/ed M commissions /Vd7&# 87//If Date '7 / 26 // 9.2,. /

   ====================== ====== _=================================================- -i                                                              ?

h a l [ s 9 5 P V b t

i 1 F'orm NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

====================u==================================================,.:                                                                                                   .

1.. OWNER: No.r__t.h._e_a a r t_ U_ t _i _l _i t .i.e_. s_._S_ e_r_v _i.c_e.__.C_o_ ._ Date: _0_6_/_._12_./9_.1._ _ P_. _. O_ _. _ _D _o12_8_ _x

                                                               -      x _ W_ a.t_.e..r _f o.r d- i- C _T ._

Sheet _._1_ of _2_ .

2. PLANT: .M.i .l _l .s_.t _o.n .e_-N u .c_ .l_ e _a .r _ _P _o w e. .r _ S.t .a .t _i o.n
                                                                                           . _ _                     -                           Unit 4_3                                                                  )

- 3. Work Performed'By: .M. _i .1_ .1_s _t. _e a .n_ e _ _ _. - ._ _ _ _ _A_ W

                                                                                                                                                     . . D_ _N u m.b e_
                                                                                                                                                                  .              _ r.s Address: .P_ _. O. .B _o. .x_ ._ _1.2_8. _ s _ _W.a _t. .e _r.f _o _r.C_T__

_ . .d _ x .M _3_ _8_9_ _ _ _- _ . 2 O O .3 3

4. SYSTEM: D._ _i e_._s e _l _ _G_ .e.n_ _e _r a .t o.r_.J_ a_.c_ __h .e.t_ _ _W a t .e_.r_

CODE CLASS _.3___

5. Applicable Const. Code ASME III Edition 973 Addenda ~N/A Case Edition of Section XI UU UzeId No~1971 t ~W o r k _ _1 9.8 _3 x._.5.5.5.5. ~3._
6. IDENTIFICATION OF THE COMPONENTS REPAIRED OR REPLACED: .

Components Name of Mfrs. Nat'1. Year Repaired / ASME

  • Ident. Manufacture Serial Dd. Built Repleced/ Code Number No. Replacement Stamped 3 E__ G .S _* .E.1. _B -- .A m e .r.i_ .c.a. .S. _n _t _a __-- n d a r.d_ _ _N _/ _A _ _ ._ _ _ _2_9_6.17 - _ _ _.1_.9 8 _0_.R_ _ _ e L>.1_ a.c.e_ .. m_ e._n.t - Y _ _.e_.s - _ _ .

_____-_______________________-________+_7h

  • __M__2_/_.TZ .22._.__uldhf/ W. ' '

_ _ _ _ _ _ _ _ _._ ._ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.. _ _ _ _ _ Vp.".det_ _ _ _ _.Kee /.Sd:.Q,2._.M_dh z y R . 7 ., Deceription of Work:_ _F _i v .e_ _ _s _t _u .d_ __s _ .a _n _d. ._ _n u_ _t .s _ _w _e _r.e _.r _e L>.1.a .c .e d. _ o _n. _ _t _h .e._ _" .B ." _ _ f D,i g g g l _ {.} e g g r a ,t g r _ i g t e r g g g l e r heat exchanner cover. T h e y _ w g r g _ _ .,,,,,,_ , _ _r e,.Li.l_ _a c _e d _ _d L t .o_._._ t o.._ Jr .a.l l _i n Jt d_

                                                                            .     .. u.. .r.i__ n Jt
         .d._ .i_ _s a s_ .s _e _m

_. & . .b.i v _. ___ _..______ _________ 1 t

8. Test Conducted:

Hydrostatic ( ) Pneumatic (_) Normal Operating Pressure (X)  : t Other (_) ( below) L

9. Remarks: _ _ L _e -.a k t e.s..t_ _ L> _e _r.f o.r _m..e. d 2 e _r_..A W D r_ e t. .e.s.._t.. .s. _e c _t.i o.n . __ __ _ _ _ _ _____ _

____________________________________________________________________ j r i

                                                                 .PAGE _E_ OF _g
========================================================================

CERTIFICATE OF COMPLIANCE We certify that the' statements made'in the report-are correct and this REE'L AG[tl,EL.lT conforms to the rules ASME Code, Section XI. Signed: yee_,, ks , p ,,_,,h_3_hf td /._I] Date: _ ddT/,,, _ _ _ _,,,

============================================================.============

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid' commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of GQUBEGIlgyI and employed by 1jartigrd,_Stean)_Bgiler,,,Inggrange_and. Ingnention during the period Eehrgary_l,__1221. to t!ay_,103 ._1221, and state that to the best of my knowledge and belief, the owner has performed ' examinations and taken corrective measures described in this owner's report.in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied,.concerning the examinations and corrective measuras described in the , Owner's Report. Furthermore, neither the Inspector nor his employer shall be' liable in any manner for any personal injury, property damage, or a loss of any kind arising from or connected with..this inspection. Inspectors Signature: _4 hl. - _ ,__ Commissions: gh[G_pfdj/fl7 Date: [23/f.L. Atw cset-koa fA4skuW. m============================================================s==========

n

                                            )
                                     . Form NIS-2. OWNERS REPORT FOR REPAIRS OR-REPLACEMENTS W=='===e======u=======================================n==================
      -1.        OWNER: Northeast Uti},ities
                                   -- ---------                                         Service Co.
                                                                           ----------------                                     Date: ----       06/1 2/91 P.Q_. Dox 128 x-----_r Wate f---      or_d t-CT      ---

Sheet of - 2 -__ 2.- PLANT: Millstone Nuclear

                                   --------------- -----------     ---             Power Station                                Unit 413      --
3. Work Performed BY: -Mi llstone -------------- AWD dumbers Address: P. O. Box 128 x-------
                                        ------------                             Waterfo Ld          --x-CT--                  --------- LM3-90-11787
4. SYSTEM: - EJinineer_inE -----_ - Safety-Fea_tures CODE CLASS' 3 --__

Duildina JiVAC ----- SXstem -----------

5. A)plicable F Const. Code ASMFa---III x-_1271- Edition s ---S73 Addenda, M/8-Case-Edition of Section XI Utilized for Work._1203,_QQ3_
6. IDENTIFICATION OF THE COMPONENTS REPAIRED OR REPLACED:

Components Name of Mfrs. Nat'1. ' Year Repaired / ASME Ident. Manufacture Serial Bd. Duilt Replaced / Code Number No. Replacement Stamped 3HVO* ACUt;PD t Grah am JP _fJr _ C_o_. - 290 _.-- - _4_ _ 3 _0_6_9 5_--- ' -8_0 _6 6_ - - - - ~ Rer .l a c e _m _e n t-----_Yes-----_

      .7.       Description of Work:                                 --

laced studs and nuts on horizontal h' eat Rep-------------------------------------------- gxghanggr_ inlet / outlet head. Studs and nuts werg_d_pmaggd__dt j ring ___ l { d s--

                -_i   a _s _s _e -m _b.)_ X .

i

                --------------------------------------------------------------------                                                                                               .I 1i s

b t f 0.. Test Conducted: Hydrostatic (_) Pneumatic (_) Normal Operating Pressure (X) h Other (->(below) s i I

9. Remarks:-_I n_ cie r _v_i c e_ L_e_a- -k- -Test

_ -- - - - - Li_e _r _f o----------------------_---_------- rmed.  ;

                --------------p---M-------------------------------*--------------                                                                                             --

t

                --------------------*--------------------~~--------------a                                                                                    --m-------

q----------we------------------------ ----------------pm,mwmegg --- 4 t l 1 l i l 6

                                                                                                         'PAGE _E_ 0F _E_                ,

======================================================================== .; CERTIFICATE OF COMPLIANCE. j

We certify that the statements made in the report are correct and this t REPLAg[M[BT conforms c'o the rules ASME Code, Section XI.

Signed: __ ,___ ____ ."__ C.. _a_ hYlDate:_ hrN1_____ i i ========================================================================  ; CERTIFICATE OF INSERVICE INSPECTION' .{ I,-the undersigned, holding a valid commission. issued by the National Board of Boiler and Pressure Vessel Inspectors and the State.or. Province  ! of G9ddEGIlgyI and employed by Ugrtfgrd_ Steam _Bgilgn_Insurgngg_and f ID2EEGli9D during the period Fgbruary_1t_1221 to May_10t_1221, and state  : that to the best of my knowledge and' belief, the owner has performed examinations and taken corrective measures described in this owner's report in accordance with the requirements of ASME Code, Section XI.. By signinD this certificate neither the inspector nor his employer. makes any warranty, expressed or implied, concerning the examinations 1 and corrective measures described in the Owner's Report. Furthermore,. ., neither the Inspector nor his employer shall be liable in any. manner for any personal injury, property damaDe, or a loss of any kind arising from  ; or connected with this-inspection. i Inspectors Signature: ,,g f/( [_____ Commissions: [f"//f7_g/j8[ . map aw _ ese

= = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = , = = = = = = = = a= = = =__= A_k_a__ E=7_1_-J_b__4_ _2_5_ z_ o = -

I p 4

                                                                                                                                         ?

T i e 1 I

r - U i tI l-

Form: NIS_2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS. - .,
g. ,*

iI m aa n m a a n a n a s u ss m a n n en = n u s: c cu = u su ca n n n = = = = c n = m a n t: n n = u s a m s= =: t= = = a n e :::: = =: :: = = n n = = = n e n

                                                                                                                                                                                                                                ')
                                                                                                                                                                                                                                  ?
                ~~ OWNER: N o r t --h_ e_ .a s_ t_ _U .t i _l _i t_ _i n_ g _ S e r v .i c.e C o_. _.                                            Date: _0_6_./_P:4/91.                                                         -!
1. - -

P _. O_ _ _.B_9_x _. _12. _8_ s ._.W a t_._e_r _. _ .t__f o d z_ _ C _T _._ Sheet _.1__ of _2__

2. PLANT: Dills.t g p e_ d y gl ge r_ E g s g r _ sj $ 311 p n Unit !Q l
                                                                                                                                                                                                                               'i i f
3. Work. Performed By: Millstone ~ AWD Numbers l
                , Address:                      P. _ O_ _ _B_o.x 1 E_.5_.~
                                                .                                    x          7_. 5.t_ _e.r .f _$.~U.~1_.C...T
                                                                                                .           _ _ _                                i~15~55.~.0.U_5_5
                                                                                                                                                                                                                             'I
                                                                                                                                                                                                                                  ?

t

      .4.            SYSTEri: _ _C.h a_..r.n.i.n_ _n _ S y _s_ t._e     .          .        m____                                                CODE CLASS                      __3   ._                                      ..

b 5

5. Applicable Const. Code ASME III 1971 Edition S73 Addenda ~N/A Case  !

Edition of Section XI UtI5ize5 for~ ~I[o r k , 1 9 8 3 s 5 5 5._ _. . i _ _ _ _ _ . _ . _ _ . _ . - _ _ . _ - . _ _ _ . _ _ - - . _ . _ _ _ . _ _ _ _ _ . _ . _ . _ _ _ . _ _ _ . . _ _ _j

                                                                                                                                                                                                                                  +
      -6.              1DENTIFICATION OF THE COMPONENTS REPAIRED OR REPLACED:                                                                                                                                                    ;

7 t Components Name of Mfrs. Nat'l. Year Repaired / ASME Ident. Manufacture Serial Bd. Built Replaced / Code  : Number No. Replacement Stamped k b p55. .c. e.Nb. b.t._._ _ E b[._ _~~  ! 3 C U E_ U_ E_.5.b _~_ ~._I_I e.c $_ ~ 5.N b_ _ _ ~_ k C N 2 E 0_ _5.~

                                                                                                                                                               .~. 5 0_ b h 5 ~ ~ 5 3 b 3 ~ ~~

1

7. Description of Work:_.R.e_ p.l _a _c.e _d. .b.o _l _t..i n_ g
                                                                                                                          . m._ _a _t. _e.r. .i..a_o.n .l     _3.C.- H  S _* T _K 5 B_ _m.a. n w. a y _. _

j

8. Test Conducted:

r Hydrostatic ( ) Pneumatic (,) Normal Operating Pressure ( ) Other (X) ( below) t

9. . Remarks: __T -a n.k_ _ .i_- s .v_ .e n_t _e .d_ _a n __d _ m _a .n. w_ .a .X _ _i. .s_ _ _o n. _.t_ _o.o._ _o .f..__t _a. _n

_k _.- .N_ _o _1i. r,

                   . o.,.n- _.t._._h e _.m _a n___ w a X _. _ _          _ _ _ _ _ _ _ _ _ _ _ _ _._ _ _ _ _ _ _ _ _ _ _ - - - - -                                         -.          =--______

I e.pp.q.. lip.a_ge_gb_--gP188_"I'*

                                                                                                                       -        - _ ____- _                                   --            ____                             >a
  \
                                                                                                                                                                                                                           ,a

e PAGE._E_ OFM_g_

        .m=======================================================================.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the. report.'are, correct 'and'this

         $gPLACEMENT conforms'to the rules ASME Code, Section XI.

Signed: _ _ _th f_ _ _ ,_ __ _k.A g_[_$ _ _ Date: __k(fjl_t______

        .========================================================================

CERTIFICATE OF-INSERVICE INSPECTION I, the undersigned, holding a valid commission. issued by the National' 1 Board'of Boiler and Pressure Vessel Inspectors and the. State or Province of GQUBEGIIGU!I. and employed by ljartigrd__ Steam _Bgilgr_Inggrgngg_a,ng Inseggtign during the period Egbruary_1t_1221_ to ljar_19t_1221,'and state. that to the best~of my knowledge and belief, the owner: bas performed

        -examinations and taken corrective measures described in this-owner's report.in accordance with the' requirements of PSME' Code, Section:XI.
           -By'si UninD this certificate neither the inspector nor his employer r       Lmakes any.' warranty, expressed or implied, concerning the examinations and corrective measures described in the Owner's Report.                    Furthermore, neither the Inspector nor his employer shall be liable in any manner for-any personal. injury, property damage, or a loss of any kind arising-from or connected-with this inspection.

Inspectors Signatures._ _/_p jd. _ _ _____ Commissions: 7f/$f_M9' - Date: 8/fd__

         = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = == = = = = = = = = = = = d_ e_ _a=

Form'HIS-2' OWNERS REPORT FOR REPA' IRS'OR REPLACEMENTS 'f i

  ===========_============================================================
                                                                                                                                                                                                                       "{
1. . OWNER: .M _o..r _t. .h_ .e.a._s .t. . U_ .t _i _l _i .t _i._e _s _ _ S. .e _r.v.i.. c.._e _ C o_ _.
                                                                                                        .                                      Date:_0.6./.20 / _9.1 r        __                                        -

P_ _. O _._.___._._s.___.___._s_._ _ Box 128 Waterford CT Sheet __1 of _2_ . i

                                                                                                                                                                                                                          ," ,    y+*                                    M Description of Works _$ppor5h were addedCto'                                                                                 . enh ay}ce_,thg_gg"ignjin,_, __
                                                                                                                        .        . , .             i,,.,

t

7. ' '

iDtegrit[cif' 3CCE*E14 and tfCGG*E1B.~ ' - a i b

8. Test Conducted: -l Hydrosta, tic (_.) Pneumatic (-) Normal Operating Pressure-( )- f Other (X) (No retest required) +
                                            .s    in                                                                                                                                                                       9
9. Remarks: __'No.ne_._'s____ _ - ____ _ .___________._____ _._ _____.___ __.____. ,

_________ ____________________________________________h_____________ i fue_.peqeai.e.d.*.l.II.._4.'..l'..b..II._'. i

4 PAGE _g_ OF _g_

   ========================================:.c===============================

CERTIFICATE OF COMPLIANCE , We certify that the statements made in the report are correct-and this- . if eel: bCEDEdl[ conforms to the rules ASME Code, Section XI. ~! __ h,[_t_I_I '! Signed: __ _ __Mh ' p_pC1 7 s_s,,,,,,,, Date:

   ========================================================================                                     3 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National                                     ,

Board of Boiler and Pressure Vessel Inspectors and.the State or Province R of GQUUEGIIQU,,,T and employed by : ljgrt f grd ,,,gte am,,,Bg i l gE_lDEMrdDER_ AD!! IDEDEGt19D during the period Eghrgartilss122F to Ug E 19id1221, and State that-to the best'of my knowledge and belief, the owner has performed ,- examinations and taken corrective measures described in this owner's report in accordance with.the requirements of ASME Code, Section.XI. By signinD this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in the Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury, property damage, or a loss of any kind arising from or connected with this inspection. i Inspectors Signatur . _ Mff[ ,, _ ,,, _ _ _ _ _,, _ C o m m i s s i o n s : [yf/fg_ _,,,,,_ Date: d[;2p_./Z_,

  =========================.===========e================:n==================

I t

                   . Form NIS-2. OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

================================================================================ , i

1. OWNER Northeast Utilities Service Co. Date Q6-12-32  :

P.O. Box 123 , Waterford , Conn. Sheet _1 of _1

2. PLANT Millstone Nuclear Power Station Unit 1
 -3.- Work Performed By Millstone Maintenance                               AWO     Numbers Address P.O. Box 128 Waterford Conn.                               _M3-88-16683                     ]
4. SYSTEM Service Water System CODE' CLASS 3
5. Applicable Const. Code ASME III ,1971__ Edition, S,73 Addenda,N/A. Case Edition of Section XI Utilized for work 1983 S83
6. IDENTIFICATION OF THE COMPONENTS REPAIRED OR REPLACED:

Component Name of Mfrs. Nat'1. Year Repaired / ASME i Ident. Manufacturer Serial Bd. Built Replaced / Code

  • Number Number No. Replacement Stamped See Comments Colt 25 N/A N/A REP 1 ACED YES
7. Description of Work: The 8" 'U' bend between the "B" diesel jack weter and Intercooler heat exchangers was reolaced.

Q1% Hydrostatic

8. Test Conducted:'/ /_k Pneumatic / / Nominal Operating Pressure-/ZZZ/p p Other h is ur 4 q , j g.9 7
9. Remarks:(d PDCR M3-89-32 chanced the material form Carbon steel to Stainless

========= Lt)

                  = =haCs
                       = = = = =uer
                                 = = =-cm
                                       = = = = = = = = = = g_ _Be_r163e_= f,qCE% y=c 2 % XR M=d=T= #!AMh Ad CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this                               ,

vm kas-~A conforms to the rules ASME Code , Section XI. 4 Signed Y + ,_ % /~ % /ia fs ll/ Date L Y- 7 ) j c- <  ;

====================================================================

CERTIFICATE OF INSERVICE INSPECTION ^ l I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of , Connecticut and employed by Hartford Steam Boiler Insurance and InspectiRD ' during the period 05-03-89 to 05-16-89 & 6-lhMMd state that to the best of my knowledge and belief , the owner has performed examinations and taken corrective measures described in this owner's report in accordance with the requirements of ASME Code, Section XI. , By signing this certificate neither the inspector nor his employer makes any warranty,. expressed or implied, concerning the examinations and i corrective measures described in the Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal  ; 4 injury, property damage, or a loss of any kind arising from or connected with this inspection. ,

  ' Inspectors Sihnature7                bd                                      CommissionsCT 1137 Date 09 /28- / 2
==================s=[q=======

[

                                               =================================================

Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS -!

 ================================================================================
    .1. OWNER Northeast Utilities Service Co.                                 Date      25-12-89 P.O. Box 128 , Waterford , ConDa _                               Sheet _1 of            _1..
    '2.-PLANT Millstone Nuclear. Power Station                                  Unit 3                                           l
3. . Work Performed By Millstone Maintenance AWO Numbers i Address P.O. Box 128 Waterford Conn. M3-91-06774/07766/0755F l ' J
4. SYSTEM Service -Water System CODE CLASS 3
5. Applicable Const. Code ASME III ,1971 Edition, S,73 Addenda,HLhi Case Edition of Section XI Utilized for work 1983,S83 t
6. IDENTIFICATION OF THE COMPONENTS REPAIRED OR REPLACED: j
     . Component       Name of                    Mfrs.            Nat'l. Year         Repaired /               ASME           ;

Ident. Manufacturer Serial Bd. Built Replaced / Code  :

        -Number                                   Number             No.                  Replacement              Stamped      .l SWP*V069          Henry Pratt                 D-0056-3-4          N/A     N/A          REPLACED                  YES           I
7. Description of Work: Reolacement of the SWP*V069 with by a fabricated i apoolpiece to facilitate the installation of SWP*V069 in SWP*M050B location.  ;
8. Test Conducted: ,

Hydrostatic /ZX3/ Pneumatic / / Nominal Operating Pressure /XKZ/-  ! Other / X / PVC Q M 943*f2 ,

9. Remarks: AME - /hes .c a c r one 7Y. PM uy d e L YNd M nd
                                                                                                    $ 4 A CE~ne u >

I , ou m r 'p-Zio O, i

 ===============================]================================================

_ i CERTIFICATE OF COMPLIANCE  : We certify that the statements made in.the report are correct and thisL ,

  .VA L %. M conforms to the rules ASME Code , Section XI.                                                                        l s                                                                                                                           2 Signed Y[m~.            u   du y u-          /~   4 b III Date      l,        W T/                             1 x__   -

1

 ================================================================================                                                  ;

CERTIFICATE OF INSERVICE INSPECTION 1

                                                                                                                                -i I, the undersigned, holding a valid commission issued by the National                                                 l Board of Boiler and Pressure Vessel Inspectors and the State or Province of Connecticut and employed by Har1 Lord Steam Boiler Insurance and Inspection 1 during the period 03-27-92            to 09-14-91               ,   and state that to the best of my knowledge and belief , the owner has performed examinations and taken corrective measures described in this owner's report in accordance with the requirements of ASME Code, Section XI.

By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in the Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal. injury, property damage, or a' loss of any kind arising from or connected with this inspection. Inspectors Si o )2$d 4 Commissions CT 1137 Date 09-/ 28 fNature _ f ( m==================g=========== _=============================================== 7

Form NIS-2 OWNERS REPORT l'OR REPAIRS OR REPLACEnENTS

   ===- : . u : e r u = = = = r = = = = = = ,. = = = = = = c :: .:. u = = = = = = = = z 2 :u . : = c e r e. = = = = r r . c :                                                                   ===.:..e.,.
1. OWNER: N o...__ r t h e_ a.<s _t U. _t _i _l _i t _i e s. _ S_ e._ _r v_ .i.c_ e.

_ . . C_ o_. Date: 0,6,/_.2.. 0.. /.9. 1.- P.. - _---t O. .- D .o .x.. - .1. 2.8 W-.a t e r f o r d...

                                                                                         - - . - - - - - .               1. C T---

Sheet .3. o f - .2 -

2. PLANT: Dillgigne_.UyglegI_f.' geer _Digt,3go Unat 4.0
3. Work P e i o y m e d By: tj s.l l s t g p e _ _ _._ _ _ _ _ B WD_ Nu rg tser g Addresn: P. O. Dor 128 t._Welerfgrd_3_C1,_ 03:21;L'[l0Z6 4 SYSTEM: Au x i 'J i ary Fleec)weier_ CODE CLASS _3__

CL", J $ ~14 E" bi b o J c'l/ % et-2f M .

5. App)icable Const. Code 00M.f;_lll3 2' '
                                                                                                                                                                 ..          , s             u.,,       Nf D Ca t.e Editaon of Section XI Utilized f ccr Work                                                                                      19831_,983 G.           1 DEN 1]F1CAI10N OF Tile COMPONENTS REPAIRED OR REPLACED:

Components Name of Mfrs. Nat'l. Year Repaired / ASME Ident. Manufacture Seria) Dd. Built Rep 3 aced / Code Number No. Replacement Stamped 2EW0tYO6Z_ ._Ontb91 Darl1Dn_20:600_ 620____._1220.____.Bepair Yes

7. Descript2on of Worn: The hinne pig, dine and hu ch i nn_were_ rep.t a ced
m. 3 E W O f Y O 6 Z z _ - _ _ - _ _ _ _ _ - _ - - - _ _ _ _ _ - - _ _ _ _ _ _ - _ _ _ _ -- _ _ _ _ _ _ _ _ _ _ _ _ _ - - - -
8. Tout Conducted:

Hydrootat3e < _) Pneumatic <_> Norma) operatinn Pressure <x) Other <_) ( below)

9. Remarks: - -T.h- e. v. .a. .l. .v e- d. a m.- a .n..e..- w a.t.- .3. d e.n. .t .i f 3. e -d-
                                                                .                  . .                       . -                -      ---       - dur                 - - -- ans
                                                                                                                                                    -. - .i.. n o- -.a.n         - L> e .c t .i.. o n---.----

e.5_Deri._01.1be_I Dl_cbett_velve nI9nra m-

                             .uspp w.    -fi.sWe         -.i-b4      won      --.G.a                           G._.W.M'M----We                  .m---.--                 -.b     i. - m.- p     -   ----he-a
                .mhaD.h b

e PAGE _ M ,,,, O r ,,, g ,,, uz-n==  : = = . :. - ====.====:=.====:.2===.- -.,=c..  : m==:..  :== ========:;=========. CERTIFICATE. OF CONPLIANCE We certify that the statements made in the report are correct and this REPLACEMEN1 conforms to the r u .l e s ASME Code, Section XI. Sioned: ,,: _ ; _ a d,_, _, M, . . __ ._ ,..t[_ i j,/h Date: , _k[d [_ T/_ . .,,_ _ w_ _ =. _ _=r  :=. - _ = n- _ - == 2 e_  :==.==.r==:===_. == ==u-- CERTIFIChlE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Doafd of Doiler and Pressure Vessel Jnspectors and the State or Province of GOUSEG,[lGUI and employed by lja,r t f o r d ,, S t e a m _ Do tl er_, Insurance ag(1

 .Insnectloui                during the period Eg h tsg ry _lu1221 to May_10uJ221, and state that to the best of my knowledge and belief, the owner has performed examinations and taken corrtntive measures described in this owner's report in aCCordance With the requirements of ASME Code, Section XI.

By signing this certificate neither the inspector nor his employer maket any warranty, expressed or implied, concerning the examinations s and corrective measures d n s c r i tie d in the Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal J. n j u r y , property damage, or a .l o s ' of any kind arising from or Connected With this inspection. Inupectors R3gnature: g s g..}[ , , , _ , , _ _ Commissions: [-r/[,fK _,, ,,, _ ,,,, r / Date: h/5gffj:t '

                                                ~

_. = _ _2 .

                                                                    - . _ - _        - . _ . . = = , - = . . _ .                       = = = _ = = , = =
                                             ,. ..                         . .~     .

3

                                                                                                  'i Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS
1. OWNER: Northeast Utilities Service CL Date: 07/07/92 P.O. Box 128. Waterford CT -
2. PLANT: Millstone Nuclear Power Station Unit fL1 .;

Maintenance -

3. Work Performed By: Ikiim um ui Conmi. AWO Numbers Address: P.O. Box 128. Waterford CT M3-91-06374 ' f
4. SYSTEM: QIS CODE CLASS: 2 .
5. Applicable Const. Code: ASME III. '1971 Edition: S2L Addenda: N/A Case Edition of Section XI Utilized for work 1983.S83 l
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED: [

Components Name of Mfrs Nat'l Repair / ASME. ID Number Manufacture No. Serial Replacement Stamped Flow Plate 3CHS*FT Permutit N/A N-3568 Repair- YES 139 ,4

7. Description of work: Machininc of a chMoerachic finish ' on t'd- ,

cancake style orifice flow plate. ,

8. Test Conducted: .

Hydrostatic < ' > Pneumatic < > Normal Operating Pressure p

            - Other < LP >                                                                            ,

Certificate of - Compliance We certify that the statements ' made in the report - are correct and this TI. pair conforms to the rules ASME Code, Section XI q Signed: - AI - ~ Date: /c - / 8 d 3 CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a ' valid commission issued by the National . /! Board of Boiler' and Pressure Vessel Inspectors and the state of Connecticut and

                                                                 ~

employed by Hartford Steam Boiler Insurance and . Inspection during the periodEn-91to1Gres3and state that to the best of my knowledge and' belief, the owner has performed examinations and has - taken - corrective measures . described in this' owner's report in accordance with the requirements of ASME , Code, Section XI. . By - signing .this. certificate neither tho lnspector nor his employer makes any warranty, expressed or implied,; concerning the examinations - and corrective measures described in 'the Owner's Report. Furthermore, neither the inspector nor; his employer shall be liable ' in any manner for any personal' injury, property. damage, or loss of any kind arising from or connected with j this inspection. Inspector's Signature: M <~ m Commissions: CT 1137 10-25-M Date:

x: , n . - -- ~ . ~ ~ - - - - -- - y Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS j L OWNER: Northeast Utilities ' Service Co. Date: 07/07/92 l P.O. Box 128. Waterford Cr

2. PLANT: Millstone ' Nuclear Power Station Unit p1
l'
3. Work Performed 'By: ' Betterment Con st. AWO ' Numbers Address: P.O. Box 128. Waterford Cr M3-91-16531 ,

i 4, SYSTEM: Service Water System- CODECLASS: 3 [ f

5. Applicable Const. Code: ASME III.1971 Edition: 321.: Addenda: ElA Case Edition of Section XI Utilized for work 1983.S83 ' -i t
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED: j Components Name of. Mfrs Nat'l Repair / ASME ID Number Manufacture No. Serial Replacement Stamped  :

3-SWP-21-8-2 3 - Tioga N/A N/A- Replacement YES

                                                                                                       .]
7. Description of work: Addition of a onir of slio-on flances. to facilitate ' .j i

access. ,

8. Test Conducted: .:

Hydrostatic < > Pneumatic < > Normal Operating Pressure < X > -l Other < X > (LP) Certificate of Compliance We certify that the statements made in the report .are correct and this O reolacement conforms to the rules ASME Code, Section XI  ; Signed: 4~ Date: /d" /FM m x CERTIFICATE OF INSERVICE INSPECrlON l 1 the undersigned, holding a valid commission issued by_ the National Board of Boiler and Pressure Vessel Inspectors and the state of Connecticut and , employed by Hartford Steam Boiler Insurance and Inspection during the -  ;

                                                                                                          ~

period & & to a4p and state that to the best of my knowledge and belief, the owner has performed examinations and has taken corrective measures . .i described. in this. owner's report in accordance with the requirements of ASME , Code, Section XI. 1 By - signing this certificate neither the inspector nor his employer . i makes . any warranty, expressed or - implied, concerning trie examinations and  ? corrective measures described in the Owner's Report. Arthermore, neitherf the inspector nor his employer shall- be liable in any manner for any ~ personal injury, property _ damage, or loss of any kind arising from or connected with' '! this inspection. .i Inspector's Signature: _ /M.a Commissions: AffffW Date: /2l4 /,97 3

J i Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

1. OWNER: Nonheast Utilities Service Co. Date: 11/23/93 P. O. Box 128. Waterford CT
2. PLANT: Millstone Nuclear Power Station Unit !)
3. Work Perfonned By: Maintenance AWO Numbers Address: P. O. Box 128. Waterford CT M3-92-17587
4. SYSTEM: SWf CODE CLASS: 2
5. Applicable Const. Code: ASME HI. Edition: 191 9 1 Addenda: SH Case Edition of Section XI Utilized for work 1983.S83
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of Mfrs. Nat'l Board Repair / ASME Senal Replacement Stamped ID Number Manufacture S/N. Pacific Southern 0531-2 N/A Replacement N/A 3SWP*V768

7. Description of work: Replace Valve Bonnet
8. Test Conducted:

Hydrostatic < > Pneumatic < > Normal Operating Pressure < X > Other < > CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this reniaceme,_ul conforms to the rules of ASME Code, Section XI Signed: _

                                   /4       -                        Date:    II N CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Connecticut and employed by Hartford Steam Boiler                    '

Insurance and Inspection during the period /d / 9.I _ to /1%f3, and state that to the best of my knowledge and belief, the owner has performed examinations and has taken corrective measures described in this owner's report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in the Owner's Report. Furthermore, neitber the inspector nor his employer shall be liable in any manner for any personal or connected with this inspection. injury, property damage, or loss of any kind arisin AM,e/ Commissions: 8-ray 9 Inspector's Signature: . Date: I;b/rc O la n<1 W NW7 fib ~IIE-2fd*-0 Z - t a amen +

's Form NIS ,2OWNERS REPORT FOR REPAIRS OR REPLACEMENTS . I. OWNER: Northeast Utilities Service Co. Date: 11/30/93 P. O. Box 128. Waterford CT i 2

2. PLANT: Millstone Nuclear Power Station Unit g2
3. Work Performed By: Maintenance AWO Numbers [

Address: P. O. Box 128. Waterford CT M3-93-22892 .

4. SYSTEM: SWP CODE CLASS: 2 ,
5. Applicable Const. Code: ASMEIII. Edition: J9.24 Addenda: F767 Case Edition of Section XI Utilized for work 1983.S83
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of Mfts. Nat'l Board Repair / ASME  ! Manufacture S/N. Serial Replacement Stamped ID Number , 3SWP*P2A Gould N773B921-1 695 Replacement Yes

7. Description of work: ]Lenlaced Pumn with Snare
8. Test Conducted:

Hydrostatic < > Pneumatic < > Normal Operating Pressure <X> Other <X> Pump Curve j CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of ASME Code, Section XI Signed: lA A [ e Date: ( t- To - 9 3 7 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Connecticut and employed by Hartford Steam Boiler Insurance and Inspection during the period 930.fito /4//,[pl and state that to the best of.my knowledge and belief, the owner has performeil examinations and has taken corrective measures  ; described in this owner's report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed I or implied, concerning the examinations and corrective measures described in the Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury, property damage, or loss of any kind arising f . or connected with this inspection. Inspector's Signature: OX Commissions: /89.39t/ Or-//87 Date: /.4I/PI

~ - Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS t

1. OWNER: Northeast Utilities Service Co. Date: 07/07/92 P. O. Box 128. Waterford CT
2. PLANT: Millstone Nuclear Power Station Unit fl
3. Work Performed By: Maintenance AWO Numbers Address: P. O Box 128. waterford CT M3-91-17764
4. SYSTEM: CCP CODE CLASS: }
5. Applicable Const. Code: ASME IIL 1971 Edition: S22 Addenda: NM Case Edition of Section XI Utilized for work 1983.S83
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of Mfrs. Nat'l Repair / ASME ID Number Manufacture No. Serial Replacement Stamped 3CCP*V005 11enrv Pratt N/A D-0055-3-19 Replacement YES 3CCP*V006 Henry Pratt N/A D-0055-3-21 Replacement YES

7. Description of work: Exchance Locatiom of 3CCP*V005 and 3CCP*V006
8. Test Conducted:

Hydrostatic < > Pneumatic < > Normal Operating Pressure < X > Other < > CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this gplacement conforms to the rules of ASME Code, Section XI Signed: _

                                   /c~                           _Date:       E-7-93' CERTIFICATE OF INSERVICE INSPECTION r

I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Connecticut and employed by liartford Steam Boiler Insurance and Inspection during the period // vf f/ to /:7 7 9f, and state that to the best of my knowledge and belief, the owner has performed examinations ani! has taken corrective measures described in this owner's report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in the' Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal , injury, property damage, or loss of any kind arising fro r connected with this inspection. Inspector's Signature: //d// s eA Commissions: M//37 Date: J2/7/97

                                              , .- ..                               .~ .
                                                                                                            .j i

I i J Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS  ; t

1. OWNER: Northeast Utilities Service Co. Date: 07/07/92 P. O. Box 128. Waterford CT
2. PLANT: Milktone Nuclear Power Station Unit ,#,1 .l
3. Work Performed By: Maintenance AWO Numbers
  • Address: P. O. Box 128. Waterford CT M3-91-17553
4. SYSTEM: SWP CODE CLASS: 2
                                                                                                            -l S. Applicable Const. Code:             ASME 111.1971 Edition: $71         Addenda: N/A                         ,.

Case Edition of Section XI Utilized for work 1983.S83 l

6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:
                                                                                                            'i Components            Name of                M frs. Nat'l           Repair /           ASME          .j ID Number             Manufacture            No.      Serial          Replacement        Stamped         1 3SWP*V068             Henry Pratt            N/A      D4)055-5-4      Replacement        YES             i
7. Description of work: Replacement of 35WP*V036 with 35WP*V068. j
                                                                                                              ?
8. Test Conducted:

Hydrostatic < > Pneumatic < > Normal Operating Pressure < X > Other < > CERTIFICATE OF COMPL1ANCE We certify that the statements made in the report are correct and this rentacement conforms to the rules of ASME Code, Section XI . Signed: [ De- Date: /o-82-9 3 CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Connecticut and emplopd by Hartford Steam Boiler Insurance , and Inspection during the period /gf;ft to g.r, 9f, and state that to the best of my knowledge and belief, the owner has performed examinations an,d has taken corrective measures described in this  ; owner's report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed  ; or implied, concerning the examinations and corrective measures desenbed in the Owner's Report. ' Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal iajury, property damage, or loss of any d arising from or connected with this inspection. i -Inspector's Signature: Commissions: hMp  ! Date: R os .93  : t

     ~

Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

1. OWNER: Northeast Utilities Service Co. Date: 07/07/92 P. O. Box 128. Waterford CT t
2. PLANT: Millstone Nuclear Power Station Unit!3
3. Work Performed By: Maintenance AWO Numbers Address: P. O. Box 128. Waterford CT M 3-91-22198
4. SYSTEM: SWP CODE CLASS: 2
5. Applicable Const. Code: ASME IIL 1971 Edition: 573 Addenda: N/A Case Edition of Section XI Utilize <! for work 1983.S83
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of M frs. Nat'l Repair / ASME  ; ID Number M anufacture No. Serial Replacement Stamped e 3SWP*V036 Henry Pratt N/A D-0056-3-1 Replacement YES

7. Description of work: Replace 35WP*V068 with 3SWP*V036
8. Test Conducted:

Hydrostatic < . > Pneumatic < > Normal Operating Pressure < X > Other < > CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of ASME Code, Section XI l Signed: Nc4 Date: / o ~2 9.13 L 4 CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vesse! Inspectors and the state of Connecticut and employed by Hartford Steam Boiler Insurance and Inspection during the period //g 9/ to /fy_fj , and state that to the best of my knowledge and belief, the owner has performed examinations and has taken corrective measures described in this owner's report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in the Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any numner for any personal injury, property damage, or loss of any Ljud ansing from or connected with th iinspection. Inspector's Signature: Commissions: /2rg/Jr Date: g/M'M7 .

t Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS {

l. OWNER: Northeast Utilities Service Co. Date: 07/07/92 P. O. Box 128. Waterford CT .L
2. PLANT: Millstone Nuclear Power Stati20 Unit il 1
3. Work Performed By: Maintenance AWO Numbers Address: P. O. Box 128. Waterford CT M 3-91-21754
4. SYSTEM: CHS CODE Cl).SS: 1 j
5. Applicable Const. Code: ASME 111.1974 Edition: N/A . Addenda: N/A Case Edition of Section XI Utilized for work 198's.S83
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:
                                            ~

Components Name of M frs. Nat'l Repair / ASME - i ID Number Manufacture No. Serial Replacement Stamped 3CHS*P2B Crane N/A 21927-29 Replace nent YES

                                                   ~A ascription of work: Renlace Pumn. Held Renair at Westinchouse. Snartanbure. S.C.                          'f
8. Test Conducted:

Hydrostatic < > Pneumatic < > Normal Operating Pressure < X > Other < > l CERTIFICATE OF COMPLIANCE l We certify that the n.tatements made in the report are correct and this replacement conforms to the rules of ASME Code, Section XI , i

                                                                                         ~7 5:- 7 3
                                                            ~

i Signed: _ A Date: /o l CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Connecticut and employed by Hartford Steam Boiler Insurance - , and Inspection during the period 6 /7 9g to //f f' ' und state that to the best of my knowledge and. p belief, the owner has performed examinations and nas taken corrective measures described in this - . owner's report in accordance with the requirements of ASME Code, Section XI. , By signing this certificate neithe.- the inspector nor his employer makes any warranty, expressed - -i or implied, concerning the examinati&is and corrective measures described in the Owner's Report. l Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal i injury, property damage, or loss of any rising from or connected with this inspection.  ! Inspector's Signature: \ f;,_ Commissions: 8r/A-/ h Date: ki , I i f h

                                                       -      2 Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS                                                                l
1. OWNER: Northeast Utilities Service Co, Date: 09/08/93 P. O. Box 128. Waterford CT
2. PLANT: Millstone Nuclear Power Station Unit 23
3. Work Performed By: Maintenance AWO Numbers
  • Address: P. O. Box 128. Waterford CT M 3-92-04573 I
4. SYSTEM: S)W.E CODE CLASS: 2  ;
5. Applicable const. Code: ASME III.1971 Edition: 521 Addenda: N/A Case Edition of Section XI Utilized for work 1983 S83
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED: .

Components Name of Mfrs. Nat'l Repair / ASME  : ID Number Manufacture No. Serial Replacement Stamped .i 3SWP*EJ1 A Flexonics. Inc. N/A N/A Replacement N/A , r

7. Description of work: Install Renlacement Ext,ansion Joint S/N H4341
8. Test Conducted:

Hydrostatic < > Pneumatic < > Normal Operating Pressure < X > Other < > CERTIFICATE OF COMPLIANCE We certify that the statements made in the repon are correct and this replacemen,1 conforms to the rules of ASME Code, Section XI 5 Signed: i4 7 Date: /o - Ed 3 l

                                                                                                                       'I CERTIFICATE OF INSERVICE INSPECTION
1. the undersigned, holding a valid commission issued by the National Board of Boiler and . )

Pressure Vessel Inspectors and the state of Connecticut and employed by Hartford Steam Boiler Insurance , and Inspection during the period WJ to , and state that to the best of my knowledge and belief, the owner has performed examinations and has taken corrective measures described in this '  ; owner's report in accordance with the requirements of ASME Code, Section XI. ] By signing this certificate neither the inspector nor his employer makes any warranty, expressed - i or implied. concerning the examinations and corrective measures described in the Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal .; injury, property damage, or loss of any kind arising from or connected with this inspection. Inspector's Signature: .. . . _ /,M / Commissions: [w/sf s 3 Date: // 6!f3< , 9

I L Form NIS-2 OWNERS REPORT FOR REPA1RS OR REPLACEMENTS *

1. OWNER: Northeast Utilities Service Co. Date: 07/07/92 P. O. Box 128. Waterford CT l

r

2. PLANT: Millstone Nuclear Power Station Unit 21
3. Work Performed By: Maintenance AWO Numbers j Address: P. O. Box 128. Waterford CT M3-91-17557
                                                                                                                                         -l
4. SYSTEM: SWP CODE CL/.SS: 2  ;

i

5. Applicable Const. Code: ASME III.1971 Edition: S73 Addenda: N/A . '

Case Edition of Section XI Utilized for work 1983.S83 :

6. IDENTIFICATION OF COMPONENTS REPAlRED OR REPLACED:

Components Name of M frs. Nat'l Repair / ASME ' ID Number Manufacture No. Serial Replacement Stamped 3SWP*V041 Henry Pratt N/A D-0055-5-3 Replacement YES

            -7. Description of work: Renlacement of 3SWP*V041 With 3SWP*V071.
8. Test Conducted:

Hydrostatic < > Pneumatic < >. Normal Operating Pressure < X > Other < > CERTIFICATE OF COMPLIANCE  ; We certify that the statements made in the report are correct and this renlacement conforms to the rules of. ASME Code, Section XI Signed: w kt, - ty Date: b-2M6 CERTIFICATE OF INSERVICE INSPECTION I,' the undersigned, holding a valid.conunission issued by the National Board of Boiler andL Pressure Vessel Inspectors and the state of Connecticut and employed by Hartford Steam Boiler Insurance and Inspection during the period &f.fz to//.y 97, and state. t, hat to the best of my knowledge and i  ; belief, the owner has performed examinations and has taken corrective measures described in this i owner's report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes ' any warranty, expressed - or implied, concerning the enminations and corrective measures described inithe Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury, property damage, or loss of any kind arising from or connected with this inspection.- ' Inspector's Signature: Commissions: 87-#33f Date: _/d[7/d 1 i a e .g. y,n. p .mm - m.,m;3.p.,,, m , ,.n.. l n,.+ n.,, . . . _ . ,

                                                                                                                                      .y

l Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

1. OWNER: Northeast Utilities Service Co. Date: 07/07/92 P. O. Box 128. Waterford CT
2. PLANT: Millstone Nuclear Power Station Unit p_1  !
3. Work Performed By: Maintenance AWO Numbers i Address: P. O. Box 128. Waterford CT M3-91-17556
4. SYSTEM: .S W P CODE CLASS: 2 )
5. Applicable Const. Code: ASME li: 1911 Edition: S72 Addenda: N/6 )

Case Edition cJ Section XI Utilized for work 1983.S83

6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

1 Components Name of M fts. Nat'l Repair / ASME I ID Number Manufacture No. Serial Replacement Stamped 'l 3SWP*V040 Henry Pratt N/A D-0055-5-2 Replacement YES

7. Description of work: Replacement of 35WP*V040 With 3SWP*V070.
8. Test Conducted:

Hydrostatic < > Pneumatic < > Normal Operating Pressure < X > Other < > 1 CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of ASME Code, Section XI Signed: *<- Date: /d' 2 N _.5 CERTIFICATE OF INSERVICE INSPECTION 1 i I, the undersigned, holding a valid commission issued by the National BoarJ of Boiler and i Pressure Vessel Inspectors and the state of Connecticut and employed by Haf' d Steam Boiler lasurance and Inspection during the period /f4 9/ top / f r , and state that to the best of my knowledge and . belief, the owner has performed examinations and has taken corrective measures stescribed in this owner's report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or. implied, concerning the examinations and corrective measures described in the Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury, property damage, or loss of any kind arising frot or connected with this inspection. , inspector's Signature:

                                                      -/                        Commissions: 8///J,L Date:  Jh7/97 i
  • d e #. .s ,-- %._-.~.. < -- . __ ,, , , , , , , , . . . _ __ . _ . _ _

r Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

1. OWNER: Northeast Utilities Service Co. Date: 07/07/92 P.O. Box 128. Waterford Cr
2. PLANT: Millstone Nuclear Power Station Unit !L1
3. Work Performed By: Betterm ent Const! AWO Numbers ,

Address: P.O. Box 128. Waterford CT M 3-91 -23439

4. SYSTEM: SWE CODE CLASS: 3
5. Applicable Const. Code: ASME 111.1971 Edition: S23 Addenda: N/A Case Edition of Section XI Utilized for work 1983.S83
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of Mfts N at'l Repair / ASME ID Number Manufacture No. Serial Replacement Stamped -; 3SWP*V3326 N/A N/A N/A Repair YES l

7. Description of work: Increase weld thickness on sunoort.
8. Test Conducted:

Ilydrostatic < > Pneumatic < > Normal Operating Pressure < _> Other <>c> g-3 Certificate of Compliance We certify that the statements made in the report are correct and this repair confonns to the rules ASME Code, Section XI l Signed: x <<4 ! __. _ Date: /#-244 3 CERTIFICATE OF INSERVICE INSPECTION  : 1 1, the undersigned, holding a valid commission issued by the National l Board of Boiler and Pressure Vessel Inspectors and the state of Connecticut and employed by llartford Steam Boiler Insurance and Inspection during the period.#v // toaq/r and state that to the best of my knowledge and belief, the owner has performed examinations .and has taken corrective measures described in this owner's report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the inspector nor his employer  ; makes any warranty, expressed or implied, concerning the examinations and l corrective measures described in the Owner's Report. Furthermore, neither the inspector nor his employer shall be liable 'in any manner for any personal injury, property damage, or loss of any kind arising from or connected with this inspection. Inspector's Signature: Commissions: [7W7f

                                     /

Date: Bh /.c1 1

                                                                                                 ,i

m

]

1 t

Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS I. OWNER: Northeast Utilities Service Co. Date: 07/07/92 l P.O. Box 128. Waterford CT '

i'

2. PLANT: Millstone Nuclear Power Station Unit #3. 1
3. Work Performed By: B etterment Con st. - AWO Numbers - /;

Address: P.O.' Box 128. Waterford CT M3-91-07216 i

4. SYSTEM: SHE CODE CLASS: 3 l
5. Applicable Const. Code: ASME 111.1971 Edition:. S23_ Addenda: HlA Case Edition of Section XI Utilized for work 1983.S83 .
 ,                                                                                                     .i
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of Mfrs Nat'l Repair / ASME - .! ID Number Manufacture No. Serial Replacement Stamped ,! 3SWP*PI A GUYON N/A N/A- Replacement YES:

7. Description of work: Bra 7e on new flance to SWP*P1 A; Old one leaked. ,
8. Test Conducted: 'i Hydrostatic < > Pneumatic < > Normal Operating Pressure <>q> .

Other < X > (VT) Certificate of Compliance .I l We certify that the statements made in the report are correct and this . renlacement conforms to the rules ASME Code, Section XI l

                                                                                                     ~!

Signed: - 4~ ~ Date: M ~ II ' CERTIFICATE OF INSERVICE INSPECTION q I, the undersigned, holding ~ a valid commission issued by the National l Board of Boiler and Pressure Vessel Inspectors and the state of Connecticut and 7 employed by Hartford Steam Boiler Insurance 'and Inspection during the i period M/f.f/ to/a s,N and state that to the best of my knowledge and belief, the j owner has performed .' examinations and has taken corr %tive measures .. 1 described in this owner's report in accordance with Ge. requirements of ASME-._  ! Code, Section XI. . j By signing this certificate neither the inspector nor his: employer - G makes 'any warranty expressed or implied, concerning the examinations and i corrective measures described in the Owner's Report. Furthermore. : neither -j the inspector nor his employer shall be> liable in any manner for any personal j injury, property damage, or loss of any- kind arising from or connected with ~r this inspection . j Inspector's Signature: Commissions: ArwW Date: 47 F 9 t , i 5

                                                                                                       -t
   .,                                                                                                -5

Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

1. OWNER: Northeast Utilities Service Co. Date: 07/07/92 >

P.O. Box 128. Waterford CT

2. PLANT: Millstone Nuclear Power Station Unit il MAltRENAtCE
3. Work Performed By: Ikiit no t ni Cuni AWO Numbers Address: P.O. Box 128. Waterford CT M3-91-17336
4. SYSTEM: SWE CODE CLASS: 3
5. Applicable Const. Code: ASME ITI.1971 Edition: S21_ Addenda: N/A Case Edition of Section XI Otilized far work 1983.S83
6. IDENTIFICATION OF COh&ONENTS REPAIRED OR REPLACED:

Components Name of Mfrs Nat'l R e p air / ASME ID Number Manufacture No. Serial Replacement Stamped 3-SWP*MOV50B Nova & Lone Star N/A N/A Replacement YES

7. Description of work: Replacement of boltine in 3-SWP*MOV50B. AND *EY INSTALLED VLV S/N D-0057-5-1.
8. Test Conducted:

Ilydrostatic < > Pneumatic < > Normal Operating Pressure <X> > Other < X > (VT) Cenificate of Compliance We certify that the statements made in the report are correct and this replacement conforms to the rules ASME Code, Section XI Signed: kwl Date: ID ' 20~ b 3 CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pres.;ure Vessel Inspectors and the state of Connecticut and , employed 1pl liartford Steam Boiler Insurance and Inspection during the  ; period 11- S lo 12-%nd state that to the best of my knowledge and belief, the owner has performed examinations and has taken . corrective measures described in this owner's report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in the Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal

  • injury, property damage, or loss of any kind arising from or connected with  !

this inspection. Inspector's Signature: Commissions: m1137 Date: 12/14/93 /

p

   .. _m . .; _      _                                                                     ,   .                             ;

1 , Fonn NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS -l

1. OWNER: Northeast Utilities Service Co. Date: 07/07/92 P.O. Box 128. Wate ford CT  ;

I

2. PLANT: Millstone Nuclear Power Station Unit 1.1 '
3. Work Performed By: $f![hnn.. Cor: . AWO Numbers Address: P.O. Box 128. Waterford CT . M3-91-21454 j
4. SYSTEM: SWE CODEaASS: 1 .
                                                                                                                         .I
5. Applicable Const. Code: ASME III.1971 Edition: $2L Addenda: N/A l Case Edition of Section XI Utilized for work 1983.S83 1 ii
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Mfrs Nat'l Components Name of R ep ai r/ . ASME ID Number Manufacture No. Serial - Replacement Stamped  ! 3.SWP*V069 PEPCO N/A N/A Replacement YES-  !

7. Description of work: Replace studs with studs of the n coer lencth. .;
8. Test Conducted: l Hydrostatic < > Pneumatic < > Normal Operating Pressure <><> j Other < >

Certificate of Compliance We certify that the statements made in the report are correct and this , reolacement conforms to the rules ASME Code, Section XI  : Signed: Mc ' Date: /0 - D d } CERTIFICATE OF INSERVICE INSPECTION

                                                                                                                          -{

I, the undersigned, holding a valid commission' issued by the National , Board of Boiler and Pressure Vessel Inspectors and the state of _ Connecticut and-  ! employed by Hartford Steam Boiler Insurance and Inspection ' during the _ period #M/ tod.o g, r and state that to the best of my knowledge and belief, the ~  ; owner has performed examinations and has taken corrective measures _.  : described in this: owner's report 'in accordance with ' the requirements of ASME~ l Code,' Section XI.  ; By signing _ this certificate neither the inspector nor his ' employer makes any warranty, expressed or implied, concerning the- examinations and corrective measures described in the Owner's Report. Furthermore, neither

  • 6e inspector nor his employer ~ shall be--liable in any manner for _any personal  ;
                ' injury, property damage, or loss ~ of any kind arising from or connected with-                             i this inspection.                                                                                           'f Inspector's Signature:             A                              Commissions: 87#3'r  '
                                                  - j/                                                                   J Date: M */V 9_'E'                                                                                           )
q i
                                                                                                                            .l
                                                                                                                    .. ,: I

a . .

                                                                                                  +

l i Fonn NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS i

1. OWNER: Northeast Utilities Service Co. . Date: 07/07/92 i P.O. Box 128. Waterford CT I
2. PLANT: Millstone Nuclear Power Station Unit jL3. f
3. Work Performed By: -Beiin e m Con si.# AWO Numbers Address: P.O. Box 128. Waterford CI M3-91-21659
4. SYSTEM: S_WE CODE CLASS: 1 ,

i

5. Applicable Const. Code: ASME'III.1971 Edition: Sl3_ Addenda: HlA Case Edition of Section XI Utilized for work 1983.S83
6. IDENTIFICA'IlON OF COMPONENTS REPAIRED OR REPLACED: '!

r Components Name of Mfrs Nat'l Rep air / ASME ID Number Manufacture No. Serial Replacement Stamped 3-SWP*V673 Contromatics N/A N/A Replacement YES  !

7. Description of work: Addition of a valve to orovide sunolv side isolation of the service water system.
8. Test Conducted:

Hydrostatic < > Pneumatic < > - Normal Operating Pressure M> Other < > Certificate of Compliance We certify that the statements made in the report are correct and this reolaccruni conforms to the rules ASME Code, Section XI Signed: '74 + - Date: O-3" O CERTIFlCATE OF INSERVICE INSPECTION 1, the. undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Connecticut and employed by liartford Steam Boiler Insurance and Inspection during the period /dct/ to /1/qp and state that to the best of my knowledge-and belief,: the owner has perforttied examinations and has taken ~ corrective measures described in - this owner's report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the inspector nor his. employer , makes any warranty, . expressed or -implied, concerning the. examinations and corrective measures described in the Owner's Repor' . Furthermore, neither the inspector nor. his employer shall be liable in any manner for any personal injury, property damage, or loss of any kind arising from or connected with this inspection.

    . Inspector's : Signature:                                       Commissions: Or#11
                                    /
                                              ~
                                                                                        /

Date: sd- /g /ffX

                                                                  'e Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS
1. OWNER: Northeast Utilities Service Co. Date: 07/07/92 P.O. Box 128. Waterford CT
2. PLANT: Millstone Nuclear Power Station Unit 13.
3. Work Performed By: Bette rment Const. AWO Numbers Address: P.O. Box 128. Waterford CT M3-91-17337
4. SYSTEM: SE CODE CLASS: 3
5. Applicable Const. Code: ASME III.1971 Edition: 323_ Addenda: ElA Case Edition of Section XI Utilized for work 1983.S83 ,
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of Mfrs Nat'l Repair / ASME ID Number Manufacture No. Serial Replacement Stamped 3-SWP*V070 Nova & Lone Star N/A N/A Replacement YES

7. Description of work: Reolacement of boltine in 3-SWP*V070. and VALVE S/N 0-0056-3-2 HAS BEEN INSTALLED AT THIS LOCATION,*EY
8. Test Conducted:

Hydrostatic < > Pneumatic < > Normal Operating Pressure <<> Other < X > (VT) Certificate of Compliance We certify that the statements made in the report are correct and this > replacement conforms to the rules ASME Code, Section XI Signed: b "* Date: lo-2l'73 CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure' Vessel Inspectors and the state of Connecticut and employed by llartford Steam Boiler Insurance and Inspection during the period 11-a-91012-14-S3and state that to the best of my knowledge and belief, the owner has performed examinations and has taken corrective measures described in this owner's report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and , corrective measures described in the Owner's Report. Furthermore, 91,it?r  ! the inspector nor his employer shall be liable in any manner for any psonal - injury, property damage, or loss of any kind arising from or connecteu with  ! this inspection. l Inspector's Signature: ::EY lod Commissions: CT 1 W y- 1 Date: 12-14-93 y i i

Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

1. OWNER: Northeast Utilities Service Co. Date: 12/8/93 P. O. Box 128. Waterford CT
2. PLANT: Millstone Nuclear Power Station Unit 21
3. Work Performed By: Maintenance AWO Numbers Address: P. O. Box 128. Waterford CT M 3-93-26896
4. SYSTEM: SWP CODE CLASS: 1
5. Applicable Const. Code: ASME III. Edition: 1.971 9 Addenda: 371 Case Edition of Section XI Utilized for work 1983.S83
6. IDENTIFICATION OF COMPONENTS REFAIRED OR REPLACED: .

Components Name of Mfrs. Nat'l Board Repair / ASME ID Number Manufacture S/N. Serialf Replacement Stamped - 3SWP*P2A Gould N773B921-1 695/r/g/A5 Repair Yes

7. Description of work: Machined Stuffine Box Cover and Impellar Backinc Plate
8. Test Conducted: N/A Hydrostatie < > Pneumatic < > Normal Operating Pressure < > Other < >

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this renair conforms to the rules of ASME Code, Section XI Signed: A Date: I 2' N "#} i CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the Natienal Board of Boiler and Pressure Vessei Inspectors and the State of Connecticut and employed by Hartford Steam Boiler l Insurance and Inspection during the period ///ffy to,gf/ f f.g. and state that to the best of my knowledge and belief, the owner has performed examinations and has taken corrective measures described in this owner's report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed , or implied, concerning the examinations and corrective measures described in the Oner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury, property damage, or loss of any. ind arising from or connected with this inspection. Inspector's Signature: Commissions: Mn/T,v'Eg/S7f! . Date: /o2 /[fT

m . Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

1. OWNER: Northeast Utilities Service Co. Date: 12/11/93 P. O. Box 128. W::terford CT
2. PLANT. Millstone Nuclear Power Station Unit fl
3. Work Performed By: Maintenance AWO Numbers Address: P. O. Box 128. Waterford CT M3-93-25248
4. SYSTEM: SWP CODE CLASS: J.
5. Applicable Const. Code: ASME III.1971 Edition: S_73 7 Addenda: b'!6 Case Edition of Section XI Utilized for work 1483.W85
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of M frs. Nat'l Repair / ASME ID Number Manufacture No. Serial Replacement Stamped 35WP*V696 Stone & Webster N/A N/A Replacement No

7. Description of work: Renlace Flance Boltine
8. Test Conducted:

liydrostatic < > Pneumatic < > Normal operating Pressure <X > Other < > CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of ASME Code, Section XI Signed: A / Date: /2- i2- $3 CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Connecticut and employed by 11artford Steam Boiler Insurance and Inspection during the periodg.gf3 to/gg, and state that to the best of my knowledge and ' belief, the owner has performed examinations and has taken corrective sneasures described in this owner's report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in the Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal_ injury, property damage, or loss of any kind arising from or connected with this inspection. Inspector's Signature:

                                        ~

Commissions: [r//37 i Date: /A/S.9S 7

 .. ~ .                . .

Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

1. OWNER: Northeast Utilities Service Co. Date: 11/23/93 P. O. Box 128. Waterford CT
2. PLnNT- Millstone Nuclear Power Station Unit il l
3. Work Performed By: Maintenance AWO Numbers Address: P. O. Box 128. Waterford cr My-92-03629
4. SYSTEM: FWA CODE CLASS: 2
5. Applicable Const. Code: ,adME ill. Edition: 1911 Addenda: Sl3 Case Edition of Section XI Utilir.ed for work 1983.S83
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of M frs. Nat'l Board Repair / ASME ID Number Manufacture S/N. Serial Replacement - Stamped 3FWA*V017 Anchorrtarling 3N-696 N/A Replacement No

7. Description of work: Hinee Pin Replacement
8. Test Conducted:

Hydrostatic < > Pneumatic < > Normal Operating Pressure < X > Other < > CERTIFICATE OF COMPLIANCE , We certify that the statements made in the report are correct and this replacement conforms to the niles of ASME Code, Section XI Signed: Cf% c% ( Date: / 2-/7. -D CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel inspectors and the State of Connecticut and employed by Hartford Steam Boiler Insurance ard Inspection during the period f!Af5 to / t/rf_r , and state that to the best of my knowledge and belief, the owner has performed examinations and has taken corrective measures described in this owner's report in accordance with the requirements of ASME Code, Section XI. , By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in the Owner's Report. Funhermore, neither the inspector nor his employer shall be liable in any manner for any personal injury, property damage, or loss of any kind arising from or connected with this inspection. Inspector's Signature: // Commissions: g2fjfy7 Date: /.2 A f?

3, . Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

1. OWNER: Northest Utilities Service Co. Date: 12/12/93 P. O. Box 128. Waterford CT ,
2. PLANT: Millstone Nuclear Power Station Unit (2
3. Work Performed By: Maintenance AWO Numbers Address: P. O. Box 128. Waterford CT M3-93-25231
4. SYSTEM: SWP CODE CLASS: 2
5. Applicable Const. Code: ASME 111.1971 Edition: 373 Addenda: N/A Case Edition of Section XI Utilized for work 1983.S83
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of Mfrs. Nat'l Repair / ASMS  ; ID Number Manufacture No. Serial Replacement Stamped 3SWP*V697 Stone & Webster N/A N/A Replacement No i

7. Description of work: Reolace Flance Bolting .
0. Test Conducted:

Hydrostatic < > Pneumatic < > Normal Operating Pressure <X > Other < > CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this reolacement conforms to the rules of ASME Code, Section XI Signed: ./4,4 % [ _ Date: / 2 9 3 t CERTIFICATE OF INSERVICE INSPECTION  ; I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Connecticut and employed by Hartford Steam Boiler Insurance and Inspection during the period /#.#ff to /gyjg, and state that to the best of my knowledge and belief, the owner has performed examinations and has taken corrective measures described in this owner's report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed

    . or implied, concerning the examinations and corrective measures described in the Owtier's Report.                 j Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal          ,

injury, property damage, or loss of any ind arising from or connected with this inspection. Inspector's Signature: . f/ rp A/f Commissions: dwf,f Date: /h/5f[  ? l 1

                                                                                                                      -1 H

G,-- L.- .- . , L'~ . . - . _ - - ~ . . Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

1. OWNER: Northeast Utilities Service Co. Date: 12/02/93 P. O. Box 128. Waterford CT
2. PLANT: Millstone Nuclear Power Station Unit il
3. Work Performed By: Maintenance AWO Numbers Address: P. O. Box 128. Waterford CT M 3-93-08095
4. SYSTEM: C.CJ CODE CLASS: 1
5. Applicable Const. Code: ASME Ill. Edition: 1971 Addenda: SJJ Case Edition of Section XI Utilized for work 1983.S83
6. IDENTIFICATION OF COMPON:!NTS REPAIRED OR REPLACED: -

Components Name of M fts. Nat'l Board Repair / ASME i ID Number Manufacture SIN. Serial Replacement Stamped 3CCE*EIA Stone & N/A N/A Modification No Webster

7. Description of work: Modified Sunnort on Heat Exchancer P
8. Test Conducted:

Hydrostatic < > Pneumatic < > Normal Operating Pressure < > Other < X > VT L CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this modification conforms to the rules of ASME Code, Section XI Signed: t, - Date: I1'9' , CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and 3 Pressure Vessel Inspectors and the State of Connecticut and employed by Hartford Steam Boiler Insurance and Inspection during the period f../.@ to/1./7.ff, and state that to the best of my knowledge and belief, the owner has per ormed examinations and has taken corrective measures described in this owner's report in accordance with the requirements of ASME Code, Section XI. By. signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in the Owner's Report. Furthermore, neither the inspector nor his employer s, hall be liable in any manner for. any personal injury, property damage, or loss o any)i arising from or connected with this inspection. Inspector's Signature: - . f Commissions: N//Jf Date: JLh/7bK '

Form NIS-2 OWNERS REPORT FOR REPmAS OR REPLACEMENTS j

1. OWNER: Northeast Utilities Service Co. Date: 07/07/92 P. O. Box 128. Waterford CT
2. PLANT: Millstone Nuclear Power Station Unit il  ;
3. Work Performed By: Maintenance AWO Numbers Address: P. O. Box 128. Waterford cr M3-91-11786
4. SYFTEM: $WE CODE CLASS: 2
5. Applicable Const. Code: ASME TU. Edition: 1971 Addenda: 371 7 ,

Code Edition of Section XI Utilized for work 1983.S83 1

6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED: i Components Name of Mfrs. Nat'l Board Repair / ASME ,

ID Number Manufacture S/N. No. Replacement Stamped ' 3SWP*EJ6C Flexonics N/A N/A Replacement Yes ,

7. Description of work: Modification of Tie Rod Flances t
8. Test Conducted:

Hydrostatic < > Pneumatic < > Normal Operating Pressure <X> Other <X> VT t l CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this reolacement conforms to the rules of ASME Code, Section XI Signed: t  ! Date: 1 T'!6 ' 9 3 i CERTIFICATE OF INSERVICE INSPECrlON q 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Connecticut and employed by Hartford Steam Boiler [ Insurance and Inspection during the period [/0,92 to /,7 //;,ff, and state that to the best of my -  ! knowledge and belief, the owner has performed examinations and has taken corrective measures described in this owner's report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed ' j or implied, concerning the examinations and corrective measures described in the Owner's Report.- Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal  ; injury, property damage, or loss of any kind arising from or connected with this inspection.  ; Inspector's Signature:

                                   ,o                                  Commissions: //r ,v_7.7 Date: lo1.t& . 92                                                                                                     ;

E Fonn NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

1. OWNER: Northeast Utilities Service Co. Date: 07/07/92 P.O. Box 128. Waterford CT
2. PLANT: Millstone Nuclear Power Station Unit 13 MAINTENANCE DE,PT y
3. Work Performed By: m iiu muii t er.m AWO Numbers Address: P.O. Box 128. Waterford CT M3-91-01811
4. SYSTEM: SWE CODE CLASS: 3
5. Applicable Const. Code: ASME III.1971 Edition: S23_ Addenda: N/.A Case Edition of Section XI Utilized for work 1983.S83
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of Mfrs Nat'l Repair / ASME ID Number Manufacture No. Serial .t e pl ace m en t Stamped 30" Exp. Joint Flexonics N/A SW6f Replacement YILS

                                                      " HKIV.5          f   /2./r  97    e-
7. Description of work: Monel icint reolaced by Inconel 625 for increased p_ittin c/ corrosion resistance.
8. Test Conducted:

Ilydrostatic < > Pneumatic < > Normal Operating Pressure <54> Other < > Certificate of Compliance We certify that the statements made in the report are correct and this Itplace m ent conforms to the rules ASME Code, Section XI Signed: - b b Date: /0 - ZI- O CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Connecticut and employed by Hartford Steam Boiler Insurance and Inspection . during the periodi-ili-ge to 12-15-5Ihnd state that to the best of my knowledge and belief, the owner has performed examinations and has taken corrective. measures described in this owner's report in accordance with the requirements of ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and , corrective measures described in the Owner's Report. Furthermore, neither l I the inspector nor his employer shall be liable in any manner for any personal iajury, property damage, or loss of any k.ind arising from or connected with l this inspection. l Inspector's Signature: 4 _ 4Mdl . Commissions: cT 1137 nu. n -n [ __ - ___ _. ___

p L. Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

1. OWNER: Northeast Utilities Service Co. Date: 1/12/94  !

l',, O. Box 128. Waterford Cr  ; i '

2. PLANT: Millstone Nuclear Power Station Unit pl
3. Work Performed By: Maintenance AWO Numbers -

Address: P. O. Box 128. Waterford CT M3-92-24035 -

                                                                                                                                                -i
4. SYSTEM: CIIS CODE CLASS: 3 _;

i

5. Applicable Const. Code: ASME III. Edition: 197i Addenda: E73 Case Edition of Section XI Utilized for work 1983.S83 <
6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

r Components Name of Mfrs. Nat'l Board Repair / ASME ' ID Number Manufacture S/N.8/M' Serial Replacement Stamped 3CHS-TK5A RECO WA + -N/A L pA Replacement No

7. Description of work: Rerilace manway bolt and (2) nuts -
8. Test Conducted:
  • Hydrostatic < > Pneumatic < > Normal Operating Pressure < > Other < > ';

i CERTIFICATE OF COMPLIANCE 4 We certify that the statements made in the report are correct and this replacement conforms to the rules of ASME Code, Section XI ' Signed: * ^ Date: /'/Z'9 h . CERTIFICATE OF INSERVICE INSPECTION i I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Connecticut and employed by Hartford Steam Boiler Insurance and Inspection during the period Maff to ///.g/, and state that to the best of my , knowledge and belief, the owner has performed examinations and has taken corrective measures - _ described in this owner's report in accordance with the requirements of ASME Code, Section XI.-  ; i j By signing this certificate neither the inspector nor his employer makes any warranty, expressed ' or implied, conceming the examinations and corrective measures described 'in. the Owner's Report. Furthermore, neither the inspector nor_ his employer shall be liable in' any manner for any. personal- j injury, property damage, or loss of any k' 'd arising from or connected with this inspection. Inspector's Signature:* Commissions:Mr#T,/ 7 Date:  %,, /f/My' C > ' a ^* , 9

                             'y',                                         s    _          e , .
  • e e"-+ 8h e - .+ cv---n = vv ' ac e- +
  • s Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS
1. OWNER: Northeast Utilities Service Co. Date: 1/14/94 P. O. Box 128. Waterford CT  :
2. PLANT: Millstone Nuclear Power Station Unit g3 ,
3. Work Performed By: Maintenance AWO Numbers M3-93-07787  :

Address: P. O. Box 128. Waterford CT

4. SYSTEM: EW_6 CODE CLASS: a ASME III. Edition: 1971 7 Addenda: S71
5. Applicable Const. Code:

i Code Edition of Section XI Utilized for work 1983.S83

6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of Mfrs. Nat'l Board Repair / ASME l Stamped '  ! ID Number Manufacture ' S/N. No. Replacement 3FWA*RV64B Stone & Webster N/A- N/A Replacement No

7. Description of work: Replaced inlet Flance Boltine meir 493-125-1 S 391-253-1 ,
8. Test Conducted:

Hydrostatic < > Pneumatic < > Normal Operating Pressure < > Other <X > VT,IST  ::

                                                                                                                        'i i

CERTIFICATE OF COMPLIANCE i We certify that the statements made in the report are correct and this renair / renlacement conforms to the rules of ASME Code, Section XI .

            ,- m O                                                                                                          i
                                                                                                                            ~

Signed:.' D k ,./ 76M Date: N/6'N l 1 h CERTIFICATE OF INSERVICE INSPECTION -1 1, the undersigned, holding a valid commission issued by the National Board of Boiler and .l ' Pressure Vessel Inspectors and the State of Connecticut and employed by Hartford Steam Boiler Insurance and Inspection during the period 2 93ta01-1M ,. and state that to the best of my - < knowledge and belief, the owner has performed examinations and has taken corrective measures described in this owner's report in accordance with the requirements of ASME Code, Section XI. (- 1 By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implie4 concerning the examinations and corrective measures described in the Owner's Report.-  ; Furthermore, neither the inspector nor his employer shall be liable in~any manner for any personal .  ; injury, property damage, or loss of any kind arisi _ from or connected with this inspection. .l

                                               /                                                                         .j Inspector's Signature: E YORK fi                   .

Commissions: CT 1137

                                                                                                                          .I
                                             /                                                                               l Date: 20 JAN '94
                                                                                                                             )

1 1 I

                                                                                                                         .. l

C ' i L i l l Form NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS t- j

1. OWNER: Date: 1/12/94  !

Northeast Utilities Service Ca P. O. Box 128. Waterford CT

    <       2. PLANT:           Millstone Nuclear Power Station Unit !J
3. Work Performed By: Maintenance AWO Numbers Address: P. O. Box 128. Waterford CT M3 92-14164
4. SYSTEM: fllS CODE CLASS:]  ;
5. Applicable Const. Code: ASME III. Edition: 1974 Addenda:

Code Edition of Section XI Utilized for work 1983.S83  ;

6. IDENTIFICATION OF COMPONENTS REPAIRED OR REPLACED:

Components Name of Mfrs. Nat'l Board Repair / ASME  ! ID Number Manufacture S/N. No. Replacement Stamped 3CilS*P2A Crane 21927-18 N/A Replacement No

7. Description of work: Renlaced Boric Acid Transfer Pumn with snare
8. Tes: Conducted:

h ' ilydrostatic < > Pneumatic < > Normal Operating Pressure <X> Other < X> IST CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this repair /renlacement conforms to the rules of ASME Code, Section XI Signed: f Ad Date: ) 4t[jp a 1 CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Connecticut and em Insurance and Inspection during the period K///fp to and A/7.M, ployed state that by Hartford to the best of my. Steam Boile knowbdge and belief, the owner has performed examinations and has taken corrective measures described in this owner's report in accordance with the requirements of ASME Cnde, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed ' or implied, concerning the examinations and corrective measures described in the Owner's Report.- Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal

         . injury, property damage, or loss of any kind arising from or connected with this inspection.