ML20063F426

From kanterella
Jump to navigation Jump to search
Responds to NRC Re Violations Noted in IE Insp Rept.Corrective Actions:Licensed Operators Retrained on Sp 1105.17 & Seismic Monitoring Sys Procedure to Be Completed 820813
ML20063F426
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/11/1982
From: Crouse R
TOLEDO EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20063F418 List:
References
1-287, NUDOCS 8208310238
Download: ML20063F426 (1)


Text

.

s o

Docket No. 50-346

. TOLEDO License No. NPF-3

- EDISON Serial No. 1-287 ncanoP cnoust vu em.a.m August 11, 1982 (4191 PS9 5221 James G. Keppler, Regional Administrator United States Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Mr. Keppler:

This letter responds to your report of July 28, 1982 (Log 1-654) on the July 13, 1982 announced innpection of Emergency Preparedness items at the Davis-Besse Nuclear Power Station, Unit 1.

The inspection report identifies that two items from the original February 23, 1982 Emergency Prepsredness Appraisal Confirmation of Action Letter (Log 1-591) remain open. Both items involve training of personnel.

Item (c) referr to Item lb of the Appraisal Report Confirmation of Action Letter on retraining of licensed operators on SP 1105.17, Seismic Monitoring System Procedure.

This training is scheduled to be completed on August 13, 1982.

Item (e) discuss'es the development and training on Emergency Action Levels (EAL's) for the main steam line radiation monitors.

In its response to the Appraisal Report, Item ld (April 20, 1982, Serial 1-261), Toledo Edison committed to develop EAL's and provide training to appropriate radiation assessment personnel. This item has been completed. The EAL's were developed and included in Revision 4 of the Davis-Besse Emergency Plan, submitted to you on June 23, 1982 (Serial 1-275). Training for per-sonnel was completed July 21, 1982, through the use of the Nuclear Training Department Required Reading for operations personnel.

If you have any questions on these items, please contact Judith Hirsch, Emergency Planning Supervisor, directly.