ML20063F077

From kanterella
Jump to navigation Jump to search
Forwards Pilgrim Nuclear Power Station Updated FSAR
ML20063F077
Person / Time
Site: Pilgrim
Issue date: 07/21/1982
From: Howard J
BOSTON EDISON CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20063F080 List:
References
82-198, NUDOCS 8207230055
Download: ML20063F077 (2)


Text

EOSTON EDisDN CO MPANY BOO govLaTON ETREET -

scsTON, MA55ACHUSETTe 02199

. CDWARD HOWARO viss ensaiss=v nu nsam enesassaine July 21,1982 BECo. Ltr. #82-198 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D. C.

20555 License No. DPR-35 Docket No. 50-293 I

Dear Sir:

q Pursuant to the requirements specified in 10 CFR 50.71(e), one signed original and twelve (12) copies of the Pilgrim Nuclear Power Station Unit I Final Safety Analysis Report Update are hereby submitted.

Every effort has been made to capture and incorporate into this document, verifiable and operable plant changes that have been generated since the previous submittal, basically an examination of ten (10) years of plant history.

However, there are certain items which are believed to be correctly described in the FSAR but require further verification.

If any deviations are found as a result of Boston Edison Company's review of the above information, the NRC will be promptly notified.

An errata which can be found at the end of the Table of Contents in Volume 1 of the updated FSAR is also submitted in an effort to identify last minute additions or mistakes discovered in this document. Replacement sheets will be

)

submitted shortly.

o5 3 s

8207230055 820721 l

f PDR ADOCK 05000293 K

PDR

1M CDMTON EcH2ON COMPANY

-e r

' Mr. Harold R. Denton, Director July 21, 1982 Page 2 We believe that the requirements as specified in 10 CFR 50.71(e) have been j

satisfied with submittal of these documents.

Very truly yours, l

i I

Attachments l

-1 signed original and 12 copies v

t i

Commonwealth of Massachusetts)

County of Suffolk

-)

1

' ()

Then personally appeared before me J. Edward Howard, who, being duly sworn, did j

state that he is Vice President - Nuclear Engineering of Boston Edison Company, the applicant herein, and that he is duly authorized to execute and file:the sub-mittal contained herein in the name and on behalf of Boston Edison Company and that the statements in said submittal are true to the best of his knowledge and bel ief.

My Commission expires: Tuly (o, /qfy b MAT $a Y w J)

Notafy Public

/

r I

t f

I i

i I

3 t

i

..._ ___