ML20063E708

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for June 1982
ML20063E708
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 07/08/1982
From: Mcbride L
PUBLIC SERVICE CO. OF COLORADO
To:
Shared Package
ML20063E692 List:
References
NUDOCS 8207130510
Download: ML20063E708 (5)


Text

sr-3 Atttchment-35 Issue 2 50-267 oruAr sc oAn error: oocxzt so.

Dart July 8, 1982 cc m .z:ta 3r L. M. McBride

sttraoxe (303) 785-2224 OPERATING STATUS sor s
1. enit .sme: Fort St. Vrain
2. Reporting Period: 820601 throuah 820630
3. Liceesed Ther .a1 Power (We): 842
4. Nameplate Rating (Cross We); 342
3. Design Electrical Rating (Net We): 330
6. Maximum Cependable Capacity (Gross We): 342
7. :'azimum Dependable Capacity (Net We): 330
8. If Changes occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Cive Reasons:

None

9. Power Level To Which Restricted, If Any (Net We): 231 to. Reasons for Restrictions. If Any: NRC restriction of 70% oendina resolution of

_, tomnprature fluctuations.

This Month Year to Date Cumulative

'~

11. aours in Reporting rariod 720 4,343 26,304
12. sueer of nours Reactor was critical 659.5 1.986.5 16,564.9
13. Reactor 74 serve Shutdown Hours 0 0 0
14. nours cenerator on-Line 484.3 1,108.6 11,016.9 t5. Unic Reserve Shutdown Hours 0 0 0
15. cross : hemat energy cenerated (wn) 284,971.5 604,510.2 5,538,455.0
17. cross risetrical enerar enerated c (wa) 98,183 186,147 1,877,503 tS. Net Electrical Energy Generated (WH) 90.818 159,262 1,713,521 l 19.  ::nic service ractor 67.3 25.5 41.9
o. enic Availability ractor 67.3 25.5 41.9
1. Unit capacity raetor (using src set) 38.2 11.1 19.7
. Unit Capacity ractor (Using OER Net) 38.2 11.1 19.7
23. enic roceed oucu e Race 32.7 23.6 33.1 l
4. shutdowns scheduled ever next 6 sonens crype. cace, and ourstion of each): 821101 through l 821114 - surveillance testing - 336.0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> 25 If Shut Down at End af Report Period. Estir. aced Oate of Startup: N/A
26. Units In *est Status (Prior to Cor=ercial Operation): rotecast Achieved l
sn:AL cRIncAL:n N/A N/A
InAt Encn:c:n N/A N/A 8207130510 820708

"" "M "M PDR ADOCK 05000267 R PDR _ _ _ _ _ _

e 0

TSP-3 Attachrent-3A AVERAGE DAILY UNIT POWER LEVEL Iss ue 2 Page 1 of 1 Docket No. 50-267 Unie Fort St. Vrain ,

Date July 8. 1982 Completed By L. M. McBride Telephone (303) 785-2224 Month June, 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL.

(MWe-Net) (MWe-Net) 1 120.8 17 193.2 2 197.3 18 198.6- ,

3 198.5 19 201.5 4 163.5 20 200.8 5 0.0 21 200.5 6 0.0 22 200.1 7 0.0 2 3. - 199.9 8 0.0 24 200.4 9 0.0 25 200.0 to 0.0 26 200.5 11 0.0 27 200.0 12 0.0 28 200.7 13 0.0 29 201.4 14 19.7 30 200.6 15 150.9 31 N/A 16 189.7

  • Generator on line but no net generation.

_._ . . . _ . . - . . _ _ _ _ _ - . _ _ . . . _ . . _ . _ . _ _ _ . .. . _ . . m - . __ ..- _ _ _ . . . . . _ . _ m. _ - . .

.e TSP-3 l

Attachment-10 leier 2 rage I eif I t' NIT Siftr!TR1WNS AND POWER RF.tWC10NS n.cxET in. 50-26] ,

UNIT Nane Fort St. Vrain i naTE _Ju1L 8._1982 cmrinrn n L. M,_._M.cB_ tide  ;

nEroRT tR m n June; 1982 ininionc _(3_03) 785-2224 J

FIEllion or SIllrITING IUWN SYSTfH COPFONFNT NO. DA1E TYPE IIURATION RfASON REACTOR IIR f n)DE 01DE CAUSE AND CORRECTIVE ACTION 10 l'REVENT RRTRRffH:E 82-011 820604 F 235.7 H 2 82-024-L-03 IBH. INSTRU Loop 1 shutdown from spurious steam rupture signal. Reactor manually I , scrammed next day due to loss of '

j s 480 volt essential busses.  :

I i

l l

y 1 i

. i i

4 4

d 1

i

3.PJTG I: TIC?2A**CN

1. Name of Taci'.1:r. I Tor St. Vesin Uni: No. 1
2. Scheduled da:e f:: tex: rafueli 3 shuedevn. Oc::bar 1. 1983  ;
3. Scheduled date fi:r :ssear:

follow 1:sr :sfueli:2. nee,e er 1. to23

4. ' Jill :sfueling or :ssu=p:1:n of ,,

opera:1:n thersaf:ar :squirs a

  • c ac M ' '_ specifica .1== char.ge

. i er other lies:se a=e=d=ent? Yes -

If answer is yes, sha:, is .

te ers1. vill :hese be? Use of :yee H-451 .trachite.

e l If a=svar is :c, has :he :slead I fuel design a:d care c:=figura-

ion been :srieved by 7 cur Plan:

Saf a 7 Ra'riav Cc=ni::se :s datar- __

=ise whether any u=rsviewed safec7 questi::s are associa:ad vi:h :he :::a :slead (Refersace 10C71 Sec _1:n 50.591 ?

. If =a such :eview has :akes --- --

eLace. when is 1: scheduled?

5. Scheduled da:e(s) for submi::ing proposed lies sing action and succorting i=f:r=ati:n. Not scheduled at this ti=e: to be determined.

t .

s.  :=poriant licsus1:g censidera-1ons associa:sd vi.h ref eling, e.g. , new or diff erent fuel de-si p or supplier, unreviewed destg oe ;erf=r:4:ee analysis

=echods, sig ificas: cha=ges 1:

fuel desip, ew operating pre- i esdurss.

7. The cu=ber of fuel asse=blias 1432 3 GR fuel ela=en:s (a) 1: :he cc:s and ('s) 1,

.%.e seen: ., uni sestasts ecol. 233 spen: 2._GR :.uel e.3.e=en:s l

l 3.

l

~he prssen lies = sed spes: fuel  ;

pool s :: age capaci:7 and .he Capaci:7 is li=1:ed in size :s a':cu: c:e- i ,

size of a:7 i= crease is lies sed :hird of :: e (approxi=a:aly 5C0 3:0R i'  !

s:m:sge capaci.7 :ha: has been ele =e::3). No cha=gs is planned.

squestad or is plassed, is

-+er :f fuel asse=blies . - -

I i

I

. _ _ . _ . ._ _ . ._. _ ._ _-. ._ . ~ . ... . - . __ _ _

REFUELING INFORMATION (CONTINUED) i i

i

9. The projected date of the 1992 under Agreements AT(04-3)-633 and 3

last refueling that can be DE-SC07-791D01370 between Public Service discharged to the spent fuel i Company of Colorado, General Atomic '

pool assuming the present Company, and DOE.*

licensed capacity.

i

  • The 1992 estimated date is based on the understanding that spent fuel discharged during the term of the Agreements will be stored by DOE.at the Idaho Chemical Processing Plant. The storage capacity has evidently
been sized to accomodate eight fuel segments. It is estimated that the i eighth fuel segment will be discharged in 1992.

1 l

8e

  • J J

,I i

1

- , . . - - . . . .- - , - - - - - - - - , , . - . ..,---l _ . . - . . +.  ? - , - , . - - , , , - .