From: Borgmann E
CINCINNATI GAS & ELECTRIC CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
REF-PT21-82-666-000 PT21-82-666-000, QA-1836, NUDOCS 8207130324
Download: ML20063E169 (2)


Text

4

~g e ~s M, THE CINCINNATI GAS & ELECTRIC COMPANY

[.

^ ~~

CINCINN ATI. OHIO 45201 June 25, 1982 OA-1836 E. A. BORGMANN SENCR VICE PRESIDENT U. S. Nuclear Regulatory Cm mission Region III 799 Roosevelt Poad Glen Ellyn, Illinois 60137 Attention: Mr. J. G. Keppler Regional Administrator RE:

NM. H. ZI1HER NUCLEAR POhTR STATION UNIT I 10TR50.55(e) - ITEM E-20, INADEQUATE CABLE TRAY HANGER INSPECTION - DOCKET NO. 50-358, CONSTRUCTION PERMIT NO. CPPR-88, W. O. #57300 JOB E-5590, FILE NO. NBC-7, ITEM E-20 Gentimen:

This letter constitutes an interim report concerning the subject condition reported under the requircments of 10TR50.55(e).

As noted in the previous interim report, QA-1783 dated May 26, 1982, a review of inspection records of electrical cable tray hangers on various elevations of the Auxiliary Building, revealed that inspections performed by sme inspectors did not properly assess field welds for empliance with AWS inspcx: tion requirments and were not in cmpliance with procedure re-quirements.

A Management Corrective Action Peport was initiated forevaluation and assessment of electrical cable tray hanger inspections previously performed. Evaluationand assessment of corrective action has been ecm-pleted. Henry J. Kaiser Cmpany (HJK), the principal constructor, will rein-spect 100% of all accessible cable tray hanger field weids to the current requirments, except for those in the main control rocm, which will be inspected by CG&E to the current requirements.

In addition, CG&E will per-form dual inspection or inspection surveillance, of IUK reinspection at the time of IUK's reinspection. The results of this reinspection and rework required will be evaluated to determine the further corrective action to be performed for those field welds which are inaccessible due to fire-proofing or physical constraints. New documentation will be generated to detail the inspection results. This reinspection is expected to be empleted by Deceber 31, 1982, at which time a final report will be subnitted.

>h 8207130324 820625

~

'/

PDR ADOCK 05000358 S

o q' RL 6 22

Mr. J. G. Keppler Begional Administrator U. S. Nuclear Regulatory Ccanission Begion III June 25,1982 - QA-1836 Page 2 We trust the above will be found acceptable as an interim report under 10CFR50.55(e).

Very truly yours,

'IHE CINCINNATI GAS & ELECI'RIC COMPAhY By E. A. BORGMANN SENIOR VICE PRESIDENT GNW:as cc: NRC Office of Inspection & Enforcenent Washington, D.C. 20555 NFC Senior Besident Inspector Attn:

W. F. Christianson 0