Requests That CPPR-114 Be Amended to Extend Latest Date for Const Completion from 831231 to 891231.Check for Fee Encl
ML20063D904
Person / Time
Site: North Anna Dominion icon.png
Issue date: 07/08/1982
From: Spencer W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Harold Denton, Tedesco R
Office of Nuclear Reactor Regulation
References
320, NUDOCS 8207130205
Download: ML20063D904 (8)


Text

_ . . -

VIHOINIA ELucTHIc Axn POWEH COMi%NY Hrcnwonn,vinoixrr caus July 8, 1982 WsuJAM C.SPENCRB v........,

i fir. Harold R. Denton, Director Serial No. 320 Office of fluclear Reactor Regulation ' PSE&C/HJF/btw Attn: fir. Robert L. Tedesco Division of Licensing

, U. S. Iluclear Regulatory Conaission Docket Nos: 50-404 liashington, D. C. 20555 50-405 CONSTRUCTION PERMIT EXTENSION NORTH ANNA UNIT 3 Pursuant to the provisions of 10CFR50.55(b), Virginia Electric and Power Company hemby mquests that the subject Constrection Permit (CP), flumber CPPR-114, be amended by extending the latest date for coupletion fma December 31, 1983 to December 31, 1989. This request is based on the following:

1. Delay Due to Reduced Load Growth Attachment 1 shows Vepco's load forecast as it was projected in 1978, the year of our previous extension mquest of November 21, 1978. This projection was based on an anticipated annual growth rate of 5.5 percent. As indicated, North Anna Units 3 and 4 were scheduled to be in concercial operation in 1984 and 1985, respectively.

These dates cormspond to the 1983 and 1984, mspective, fuel load dates stated in our November 21,1978 CP Extension Request.

Attachment 2 shows Vepco's current 1982 load forecast based on an anticipated annual growth rate of

' l approximately 2.5 percent. This rate is considerably less QQO1 U

than the annual gmwth rate anticipated in 1978, and reflects continued energy conservation by our customers

and the sluggish gmwth of the econoqy. As indicated, the b need for power from florth Anna 3 now occurs in 1990, d rather than 1984, and this is consistent with a 1989 Fuel O .Og 'oad-

2. Delay for Feasibility Study and Design Evaluation As you are aware, the Three Mile Island accident occurmd approximately a conth and a half before the llay 14, 1979 NRC onfer extending the construction completion dates for the North Anna Power Station, Units 3 and 4.

~

B207130205 820708 PDR ADOCK 05000404

, A PDR

VlltutNIA Es.zcTarc Axn Powra COMPANY TO Mr. Denton 2 Based on the anticipated design f ryact of the THI accident on Units 3 and 4, and other considerations, a Feasibility Study was initiated in October 1979, to determine the best course of action that Vepco should take relative to the construction of the two units.

This study was completed in November 1980, and it concluded that for the benefit of both Vepco and its custaaers, the most prudent approach to take would be to cancel Unit 4 and complete Unit 3 as a nuclear unit, in time to meet the forecasted load in 1990. It should be noted that during the period of the Feasibility Study, construction activities were reduced to a " caretaker" status and very little engineering was perforned.

Following the decision to complete the construction of Unit 3, an Engineering Design Evaluation was initiated.

The purpose of this evaluation was to deteroine, in detail, those design changes and their associated costs, necessary to meet, where at all practicable, current regulatory criteria. This evaluation was completed in iby 1982.

An integrated construction / engineering / start-up schedule is being finalized, and we are planning for a Fuel Load date of April 1989. This date is considered to be realistic considering the amount of redesign involved.

In view of the foregoing, we believe that our request for extension is for a reasonable period of time and reflects a proper and prudent reaction to events and circunstances beyond Yepco's control and that good cause exists for the extension.

The extension of the Construction Penait will not caapromise the public health and safety and does not involve a significant hazards consideration. Therefore, it is requested that the Commission dispense with the advance notice of the requested CP amendment.

The extension of the construction time period will not change the environrental impact already identified in the Environnental Impact Stateaent as issued and maended for the North Anna Power Station.

The Construction Permit for Unit 4 (CPPR-115) should be alloted to expire. Due to the increased land area required by Unit 3, there idll be no reclanation of the Unit 4 areas except for the renoval of any coupleted construction to raake room for the expanded needs of Unit 3.

}

Vamotuta EtscTasc awn POwza COMPANY TO Mr. Denton 3 i

i Enclosed is a check in the amount of $1,200.00 submitted in j accordance with the fee schedule defined in 10CFR170.22.

I Very tru yours,  ;

! ' 'e'W I W. C/ Spencer

  • Attachr.ents
1) 1978 Forecast
2) 1982 Forecast
3) Check No. 33997 in the amount.of $1,200.00 i

i l

4 1

a

}

l i

I i

r l

. . - . _ - , . ~ . . . . . . . , , - . ._._.--.,_.,....-...._...m .,..._.-..,..-,..__,_...._,,,...,._.m-._.s._ ...-.-,_._,..._,-,....c,._.-.-

l

. . . . ;. .  : .. . N .

~- ~ ~~-'-- --- -

-vinoimii risernic amo Powan dokramY l

curca voucwen SANK NO 25 cuect no 33997 o.Ti 07/02/AP vemoon no PPar4L l e ssue l l

UNE DATE INVOICE NO/OR DESCRIPTION GROSS AMOUNT DISCOUNT NET AMOUNT 1 07/01/82 -NORTH ANNA 3 CONST PRMT 1,200.00 0.00 1,200.00 l 4

l I_

h j..w we, A

..TTACHED.

u.

CHECKI

. .m,SSUED,,AS

. ~. ... PAYMENT OF ITEMS #.USTED ABOVE . PLEASE DETACH STUB AND CASH CHECK PROMPTLY.

.-~.:~.. . .,,.-.s... ,,,

YlRGiltla EirirRic ANo Power CouraNy

~

RICHMOND. WRGINIA

( ,;

, SANK 08-viA0ndeA - ., -

,. .. e .' y VotD IF NOT CASNS IN 90 DAYS. 4

. . . , . . , .' 22936 25 0033197 00000120000 ...,. -:'

, PAY ONE THOUSAND TWO HUreRED ANDJO/100 DOLLARS y _ . . , ,, . . , _ , . , _ . . , . . , , , ,

~

Wh - h@' 4,.

d e W ', & W& '4d&s- ~ 't w 4,*, / ' ' ' J. A P/pf 7@f; r gg - CHECK NO.' DATE WENDOR MO. AMOUNT '

% US NUCLEARiREGLA.ATORY COMM $ .

<. . < 2.. .< . . . .

oao" DFFICE OF THE;A. CONTROLLER /gi 25 ,,33917 ',07/02/82 229 % $1,200.00 ATT DIVISION .0F ACCOUNTINGW NUCLEAR REG C. 6Cjj20555 , Jp %f .-

s.

Ks-

&;:($v, ns N. o s vy ,g4 6%

ofh e r;d.)%p', '

.,, p " a,$M e

  • T

. >&,j@}\ - '

Q 4..,y- l . 's ' _ 3.

.1,,

. f;4pg:f 'l ~-

22936 25 0033997 00000120000 - -

QO y]

8 co e97ao se ~i:a su;o saqui: ss?-? nosnoe ~M .

C0iOl0NWEALTH OF VIRGINIA)

)

CITY OF RICENOND )

The foregoing document was acknowledged before me, in and for the City and Commonwealth aforesaid, today by W. C. Spencer, who is Vice President, Power Station Engineering and Construction Services, of the Virginia Electric and Power Company. He is duly authorized to execute and file the foregoiong document in behalf .of that Company, and the statements of the document are true to the best of his knowledge and belief.

Acknowledged before me this 1M day of dd , I M.

My Commission expires $72,n 26 , 19 h .

0 T ~/k dim NotgPy Public y afu dowrxderor<d a 7' h&'7 ff -

(SEAL)

i, d

COMMONWEALTH OF VIRGINIA)

)

CITY OF RICIN 0ND )

The foregoing document was acknowledged before me, in and for the City and Commonwealth aforesaid, today by W. C. Spencer, who is Vice President, Power Station Engineering and Construction Services, of the Virginia Electric and Power Company. He is duly authorized to execute and file the foregoiong document in behalf .of that Company, and the statements of the document are true to the best of his knowledge and belief.

Acknowledged before me this 1M day of duA. , 19fdE..

My Commission expires [7m 26 ,19h.

0 diat T ~/flau Notqfy Public l H/A4 /$7X#XLE:W/XLW d [

h/Its.- Alf (SEAL)

- _ _ . , - - . _ - - . .~. . - - - - . .- - . - _ ..

ATTACHMENT 1-

! VIRGINIA ELECTRIC AND POWER COMPANY -

LOAD, CAPACITY AND RESERVES

! 16000 - 1978 FORECAST. y' '

i 15000 - .

O EXISTING CAPACITY e' P,9 CAPACITY ADDITIONS ' -

14351' 14421 14000 ~ ' 14260 j ESTIMATED A0 JUSTED PEAK LOAD ,e'

-- - CAPACITY REQUIREMENTS , , ' 13222 907 ,

13000 - 13550 f -

12469 12809 NA3 ' /12550 12000 - d -

907

/

/

,/ BC - 11860 v 1500 /

./ 11200 11000 - -

- 10897 10933 10969' /

10000 - 9999

"^ '

898 -

l 9000 -

m /8760 A -

U" #

1 '

/

l $

8000 - 8170 I

7000 _ -

'6000 _

5000 -

4000 .

. 3000 _ ,

2000 _

1000..

78 79 .80 81 82 83 84 85 86 87 ,

. NA= North Anna Power Station -

YEAR BC= Bath County Pumped Storage- -

e

ATTACHMENT 2 4

VIRGINIA ELECTRIC AND POWER COMPANY LOAD, CAPACITY AND RESERVES i 16000 _ 1982 FORECAST 15000 _ O ExiSTiNo CAPACITY i @ CAPACITY ADDITIONS - ,"

14000 - -

550 ESTIMATED ADJUSTED PEAK LOAD' 13149

' I 9 13000 _ - -- CAPACITY REQUIREMENTS ~ , - 550

, 12634 - 12639 -

12639 550 i i2000 _ -

7 11727 11727 NA3 p '

11703

! 11000 - - 10848 10340 "~~~~ ' #

10000 ._ -

10342'

'10352 h -

g 10483 wrr

- ^

m 9000 _

p - g[5

$ - g 8714

- g "

I g'n8000 _ _

g -

7000 _

6000 _ '

5000 _

4000 _

3000 _ -

2000 _

4 l

1000 _

i

~

82 83 84 85 . 86 87 88 89 90 91 92 .93 94 95 96 -

YEAR

  • Bath County Pumped Storage

_ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _