.z NORTHEAST UTILITIES o ne,,, ome... seioon 31,e,1 so,nn, ccnnectico,
' YSU:UdUNr$,#$
E 1
P O. box 270 -
U
- 5. $ 5N$
H ART FORD, CONNECTICUT 06141-0270 k
k J
(203) 665-5000 o e4.c ua
,.emn ew.m prnLur)n. Mill.ER, Jr Sn70R F1CTFRESIDLAT-ADLLSTONE Re: 10CFR50.71(a) '
February 4, 1994 MP-94-91 U.S. Nuclear Regulatory Commission Document Control Desk
- Washington, D.C. 20555
Reference:
Facility Operating License No. NPF-49 Docket No. 50-423 Dear Sir; In accordance with reporting requirements of Technical Specifications Section 6.9.1.5, the -
Millstone Nuclear Power Station - Unit 3 Monthly Operating Report 94-2 covering operation for the month of January 1994 is hereby forwarded.
Very truly yours, NORTIIEAST NUCLEAR ENERG OMP NY Donald B. Miller Jr.
Senior Vice President, Millstone Station - NNECO Attachment cc: T, T. Martin, Region I Administrator P. D. Swetland, Senior Resident Inspector, Millstone Unit Nos.1,2 & 3 V. L. Rooney, NRC Project Manager, Millstone Unit No. 3 9402080352 940131 T.'
.PDR ADOCK 05000423 D
R_
.PDR.
E
/'f {
OS342/ AEV 4-86 l
I a
.J 9
- NRC OPERAT!NG STATUS REPORT COMPLETED BY REACTOR ENGINEERING *******
1.
DOCKET.... 50-423 OPERATING STATUS 2.
REPORTING PERIOD... JANUARY 1994 OL,TAGE + ONLINE HOURS...
0.0
+ 744.0
= 744,0 3.
UTILITY CONTACT.................L. C. Doboe 203-447-1791 x 6076 4
4 LICENSED THERMAL P0WER.........................................
3411
- MILLSTONE
- 5.
NAMEPLATE RATING (GROSS MWE)...................................
1,253 MW
- UNIT 3 6.
DESIGN ELECTRICAL RATING (NET MWE).............................
1,153.6 7.
MAXIMUM DEPENDABLE CAPACITY (CROSS MWE)......................... 1,184.2 8.
MAXIMUM DEPENDABLE CAPACITY (NET MWE)..........................
1,137.0 9.
IF CHANGES OCCUR ABOVE SINCE LAST REPORT, REASONS ARE...........
N/A
- 10. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)...............N/A
- 11. REASON FOR RESTRICTION, if ANY....W/A MONTH YEAR TO DATE CUMULATIVE TO DATE
'I
=
==
s=============
- 12. HOURS IN REPORTING PERIOD 744.0 ~
744.0 68,184.0
- 13. NUMBER OF HOURS THE REACTOR WAS CRITICAL 744.0 744.0 50,057.9
- 14. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 6,466.5
- 15. HOURS GENERATOR ONLINE 744.0 744.0 48,981.6
- 16. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 -
- 17. GROSS THERMAL ENERGY GENERATED (MWH) 2,418,781.0 2,418,781.0 159,703,887.1
- 18. CROSS ELECTRICAL ENERGY GENERATED (MWH) 834,190.5 834,190.5 55,001,835.6
- 19. NET ELECTRICAL ENERGY GENERATED (MWH) 799,563.2 799,563.2 52,266,168.9
- 20. UNIT SERVICE FACTOR 100.0 100.0 71.8
- 21. UNIT AVAILABILITY FACTOR 100.0 100.0 71.8
- 22. UNIT CAPACITY FACTOR (USING MDC NET) 94.5 94.5 67.3
- 23. UNIT CAPACITY FACTOR (USING DER NET) 93.2 93.2 66.4
- 24. UNIT FORCED OUTAGE RATE 0.0 0.0 17.0
- 25. UNIT FORCED OUTAGE HOURS 0.0 0.0 10,004.9 SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, AND DURATION OF EACH)...
N/A If CURRENTLY SHUTDOWN, ESTIMATED STARTUP DATE......W/A
. i A VE R A G E D AILY U NIT -POW E R LEVEL DOCKET NO: 50-423 UNIT:
MILLSTONE UNIT 3 DATE:
February 3.1994 COMPLETED BY:L. C. Doboe 203-447-1791 x (476' MONTH Januan 1994 f
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL '
(MWE-NET)
(MWE-NET) 1 1185 16 1187 2
1185 17 1164 3
1186 18 1054 4
1184 19 1025 5
1185 20 1029 6
1182 21 1019 7
1187 22 1025 8
1185 23 1024 9
1184 24 1015 10 1184 25 1008 11 1175 26 999 12 1174 27 1180~
13 1181 28 948 14 1183 29 957 15 1187 30 ligg 31 1188 9
t E'
ae J
e.
U N I T S II U T D O W N S A N D POWER REDUCTIONS DOCKET NO:
50-423 2
UNIT:
MILLSTONE UNIT 3 DATE:
February 3.1994 COMPLLmiD BY: L. C. Doboe TELEPHONE:
203-447-1791 x 6076 Number Date Type Duration Reason Method of-Licensee System Component Cause and Correctist Action to Parvent (1)
(Hours)
(2)
Shutting Event Report Code Code Recurrence s
Down the Number (4)
(5)
Reactor.
j (3)
None 1; Twe:
2; I(casons:
1 Method 4:
IEEE Standard 805-1984 F: Forced A Equipment Failure (Explain) 1 Manual S: Scheduled B Maintenance or Test 2 Manual Scram 5:
IEEE Standard 803A-1983 C Refueling
.3 Automatic Scram D Regulatory Restriction 4 Continued from Presions Month
-i E Operator Training - A License 5 Power Reduction Exam (Duration = 0)
F Administrative 9 Other (Explain)
G Operational Error (Explain)
H Other t
,m v
-m-e
,w
,-,a v-w
,u
-,--e n
n
--e
.n s-
.--e-
A R E F tJ E I,I N G I N F O R M A TI O N R E O U E S T January 199-1 '
- l. Name of facility: Millstone 3.
- 2. Scheduled date for next refueling shutdown: May. 27.1995
- 3. Scheduled date for restart following refueling: August 10.1995
- 4. Will refueling or resumption of operation thereafler require a technical specification change or other license amendments?
No
- 5. Scheduled date for submitting licensing action and supporting information.
NLA
- 6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design of performance analysis methods, significant changes in fuel design, new operating procedures:
Hans
- 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a): 193 (b): 332
- 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
Present size - 756.
No incrque requchtrIL
- 9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
End of cycle 5.