Revised Application for Amend to Licenses DPR-44 & DPR-56, Re Main Control Room Intake Air Radiation Monitors & Administrative Changes to Seismic Monitoring Instrumentation Section
ML20063D088
Person / Time
Site: Peach Bottom  
Issue date: 01/26/1994
From: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20063D091 List:
References
NUDOCS 9402070329
Download: ML20063D088 (3)


Text

st2iser, support or,strim,it 10 CFR 50.90 y

PECO ENERGY

==gt ::"6 965 ChesterbrooN Boulevard Wayne, PA 19087-5691 January 26,1994 Docket Nos. 50-277 50-278 Ucense Nos. DPR-44 DPR-56 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

SUBJECT:

Peach Bottom Atomic Power Station, Units 2 and 3 Technical Specification Change Request

REFERENCE:

Letter from G. A. Hunger, Jr. (PECO) to NRC dated November 1,1993

Dear Sir:

In the above referenced letter, PECO Energy Company (PECO) submitted, in accordance with 10 CFR 5G.90, Technical Specification Change Request (TSCR) 91-06, which requested changes to Appendix A of the Peach Bottom Atomic Power Station (PBAPS) Operating Ucenses. The proposed changes concemed the Main Control Room Intake Air Radiation Monitors, and an administrative change to the Seismic Monitoring Instrumentation section.

PECO hereby requests that our original submittal be revised such that the submitted Units 2 and 3 pages 59,84,233a and 235 be deleted and replaced with the attached revised Units 2 and 3 pages 59,84,233a and 235. These pages are being revised to incorporate a recently approved amendment and minor administrative changes. This issue was discussed between Ken Graff (PECO) and Steve Dembek (NRC) on January 24,1994.

We have determined that this revision does not alter our evaluation of any of the -

10 CFR 50.59 standards, and therefore, does not affect our conclusion that TSCR 91-06 does not constitute an unreviewed safety question. Also, we have concluded that the proposed revision does not affect the information supporting a finding of No Significant Hazards Consideration and the information supporting an EnvironmentalImpact Assessment.

I 0

0 310023 u g 94o2o7o329 94o126 PDR ADOCK 0500 7

P

January 26,1994 -

Page 2

'If you have any questions concerning this submittal, please contact us.

Sincerely, b.

G. A. Hunger, Jr., Director Ucensing Section

Enclosures:

Affidavit, Attachment cc:

T. T. Martin, Administrator, Region I, USNRC i

W. L Schmidt, Senior Resident inspector, PBAPS, USNRC W. P. Dornsife, Commonwealth of Pennsylvania

.__,____-_.__________.._______m.

COMMONWEALTH OF PENNSYLVANIA :

ss.

COUNTY OF CHESTER D. M. Smith, being first duly sworn, deposes and says:

That he is Senior Vice President of PECO Energy Company; the applicant herein; that he has read the attached reviced Technical Specification Change Request (TSCR 91-06) for changes to the Peach Bottom Facility Operating Ucenses DPR-44 and DPR-56, and knows the contents thereof; and that the statements and matters set forth therein are true and correct to the best of his knowledge, information and belief.

[_0 M

Senior Vice Preside'nt Subscribed and sworn to before me this N day of 1994.

I

<c

-ru

/

h Notary Public En A.

it ry Pulk Myco,/nnTvc CtweOcyt/viescA E.x;xes July 10,1995 Trec I-4