Amend to Motion Re Third Litigable Issue on Increased Probability of Tube Failures Due to Sleeving,Per ASLB Direction During 820601 Conference.Change Adds Contention F on Sleeves in Corroded Tubes.W/Certificate of Svc
ML20063D013
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 08/20/1982
From: Patricia Anderson
WISCONSIN'S ENVIRONMENTAL DECADE
To:
Atomic Safety and Licensing Board Panel
References
NUDOCS 8208270448
Download: ML20063D013 (3)


Text

.

. t /

f

, 00: .TED USNRC UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION 'Sh[}, [;.]

ERANCH Before the Atomic Safety and Licensino Board Wisconsin Electric Power Company POINT BEACH NUCLEAR PLANT UNITS 1 & 2 DOCKET NOS. 50-266 AND 50-301 Operating License Amendment (Steam Generator Tube Sleeving Program)

DECADE'S AMENDMENT TO MOTION CONCERNING LITIGABLE ISSUES Pursuant to the direction of the Atomic Safety and Licensing Boa rd (" Board") during the June 1,19 82, pre-hearing telephonic conterence, Wisconsin's Environmental Decade, Inc. (" Decade")

  • hereby submits its Amendment to Motion Concerning Litigible Issues in order to set forth new contentions not included in the original Motion which arise out of the Safety Evaluation Report.

THIRD LITIGIBLE ISSUE Increased Probability of Tube FailLres Due to Sleeving Contention (f) Sleeves in Corroded Tubes. If the expansion at the upper joint of the sleeve is located where the tube is corroded, a

tne expansion process may weaken tne tube such that it will fall during operating or accident conditions and create a leakage patnway.

i

/)

8208270448 820820 PDR ADOCK 05000266 ~ ~

.-]!,# b C PDR WED-PA-08/20/82-P3:50266NRC.P49-1

. c Basis "Han Onofre 1 "A number of sleeves were plugged as a result of post process inspections and tests. ***

"An unreported number of tubes were plugged as a result of the expansion joints being formed outside the specified locations or as a result of the expansions being formed at a location where IGA was present on the outer tube. These unacceptable conoitions were identified as a result of the baseline ECT examination." NRC Staf f's Answer to Decade's Interrogatories Relative to the Save Evaluation Report on Full Scale Sleeving, dated August 6,1982, at p. 6.

DATED at Madison, Wisconsin this 20 th day of August, 1982.

WISCON ' S ENVIRONMENTAL DECADE, INC.

by .

)

PETER NDERSON Director of Public Affairs 114 North Carroll Street, Suite 208 s Madison, Wisconsin 53703 (608) 251-7020 e

    • e

R

, e CHI'IED STA'IES OF NERICA O D ETED" Ntr'TFAR REGUIA'IDICf CI)tfGSSIQi v' # EC M 23 P.

Wisconsin Electric Power Cbnpany POINT BEACl! NLCIEAR PIANT UNIIS 1 & 2 0FFICE Of 3ggj,t 73 Ibcket Nos. 50-266 and 50-301 00CnE,im; 6 SERY CERI'IFICA'IE OF SERVICE 6 RANCH I mrtify that true and correct copies of the foregoing cbetment will be served this day by depositing copics of the same in the first class nai.ls, postage pre. %. and correctly addressed, to the following:

Peter B. Bloch, Chairman Atomic Safety & Licensing Board U. S. Ntclear Ibgulatory Ccmnission Washington, D. C. 20555 Dr. Hugh C.*Paxton 1229 -41st Street Ios Alanos, New I4exico 87544 Dr'. Jerry R. Kline

! Atmuc Safety & Licensing' Board U. S. Nuclear Ibgulatory Cbunission Washington, D. C. 20555 Docketing & Service U. S. Ntclear Ibgulatory Comnission Washingtal, D. C. 20555 '

Mr. Richard Bachnunn Office of E>ncutive Icgal Director U. S. Nuclear Ibgulatory Comnission

,t Washington, D. C. 20555 Mr. Bruce W. Churchill l Shaw Pittnan Potts and Towbridge 1800 M. Street N.W.

Washington, D. C. 20036 Barton Ccuan 42nd Floor 600 Grant Street Pittsburgh, PA 15219

']

.,d/L(k(b ' c M Carol Pfeffdrkorg l Date: 0 -E1

. .