Provides Summary of Discrepancies Identified During GL 92-08 Safe Shutdown Analysis & as-built Installation of Thermo-Lag Fire Barriers
ML20063B886
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 01/25/1994
From: Vonk M
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
References
GL-92-08, GL-92-8, NUDOCS 9402030135
Download: ML20063B886 (2)


Text

, _ _ m

/ g

~ C::mmonwntth Edicen 4

E" 4 1400 Opus Place

. Downers Grove, liknos 00515 o

er January 25,1994 U.S. Nuclear Regulatory Commission Oflice of Nuclear Reactor Regulation I Washington, DC 20555 Attention: Document Control Desk -

Subject:

Braidwood Station Units 1 and 2-Additional Information on Fire Barrier Qualifications t Dpocket Numbers 50-456 and 50-457

References:

(1) Letter from M.A. Jackson to U.S. NRC dated July 23,1992 (2) Letter from-M.A. Jackson to Dr. T.E. Murley dated September 29,1992.

(3) Letter from D.J. Chrzanowski to Dr. T.E. Murley dated April-16,1993.

As a result of, and in preparation for, addressing Generic Letter 92-08, Braidwood Station has been in the process of evaluating the station's Safe Shutdown Analysis as it applies to cabling protected by TSI Thermo-Lag 330-1 material. It is anticipated that this evaluation, in conjunction with detailed in-plant walkdowns, will result in an overall reduction in the quantity of fire barrier materials needed in order to be in compliance with 10CFR50, Appendix R.

During the evaluation process, several discrepancies have been identified with the Safe Shutdown Analysis and the as-built installation of the Thermo-Lag fire barriers. The following is a summary of the discrepancies identified listed by fire zone. ,

i FIRE' ZONE DISCREPANCY ,

1 Zone 3.2A-1 Cable risers not wrapped with a fire barrier.

Zone 11.3-0 Conduit not wrapped with a fire barrier.

i k: dave:brupd:1 010f>92 9402030135 940125 _?

j((jhlbj '0 x

PDR ADOCK-05000456 6 P PDR jf.

J

'1 s e: l 4

Document Control Desk . January 25,1994

- In each case, the appropriate compensatory action (one hour fire watches) )

- had been implemented for each discrepancy. These discrepancies pose a minimal 1 challenge to the station's ability to achieve and maintain the plant in a safe l shutdown condition. Each discrepancy has been documented and is being tracked I to resolution.  ;

Please direct any questions regarding this response to A. Haeger at -l 815/458-2801 ext.2702.  !

Sincerely, hhYhA Ma tin ..Vonk Generic Issues Administrator i Nuclear Regulatory Services - 1 cc: J. Martin, Regional Administrator - RIII  ?

. J. Dyer, Director of Directorate III - 2 R. Assa, Braidwood Project Manager - NRR/PDIII - 2.