ML20063B079

From kanterella
Jump to navigation Jump to search
Potential Part 21 Rept Re Defect in Containment Bldg Structural Steel Framing.Results of Framing Connection Flexibility Tests Will Be Available by 820830.Status Rept on Design Review Will Be Submitted by 821030
ML20063B079
Person / Time
Site: Washington Public Power Supply System
Issue date: 08/13/1982
From: Sarsten G
UNITED ENGINEERS & CONSTRUCTORS, INC.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
REF-PT21-82-693-000 PT21-82-693, PT21-82-693-000, NUDOCS 8208250190
Download: ML20063B079 (2)


Text

~

W 0$nMm a constructore.nc.

ocsro~

^

30 South 17th Street C E ON Post Office Box 8223 nuoxvitte Philadelphia, PA 19101 PHILADELPHIA V ALLEY FORGE August 13, 1982 Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D.C.

20555 10CFR21 Report of a Potential Defect Related to Washington Public Power Supply System -

WNP-1 and 4

Reference:

(1) UE&C to NRC dated 4/20/82 (2) UE&C to NRC dated 1/29/82

Dear Sir:

In reference letter (1), UE&C informed the Commission of the status of analysis, at that time, pertaining to a reportable condition under 10CFR21 regarding the structural steel framing in the Containment as identified in reference letter (2).

This is to inform you that the tests being conducted to determine the flexi-bility of the framing connections were not concluded by the expected date of July 30, 1982 and, consequently, the final design will not be completed by the committed date of Aogust 28, 1982.

Based on the analysis and testing done to date, it is apparent ths.t modifications to the existing structures are required. The modifications will consist of a minimum of removal of certain bracing members and providing of " sliding" joints for main framing members. The present analysis is based upon an assumed flexi-bility of the framing connections, therefore, upon interpretation of the test results, certain reanalysis may be required.

It is now expected that the test results will be available by August 30, 1982.

The status of the design review and possible reanalysis will be reported by October 30, 1982.

JV/

8208250190 820813 PDR ADOCK 05000460

{ ^ *v"**" C" )

PDR

g U. S. Nuclear Regulatory Commission Page 2 i

As the program continues, the Commission will be kept informed. The next report pertaining to the status of the work will be submitted to the Commission by October 30, 1982.

Very truly yours,

. h r/f' -

G. E rsten Vi e President - Power ANDA:na ec: Regional Director USNRC - Region 1 Regional Director USNRC - Region 5 R. Root - Washington Public Power Supply System 1

4 g