ML20063A958

From kanterella
Jump to navigation Jump to search
Forwards Revised Physical Security Plan,Safeguards Contingency Plan,Plant Security Personnel Training & Qualification Plan.Encls Withheld (Ref 10CFR73.21)
ML20063A958
Person / Time
Site: Peach Bottom  
Issue date: 01/11/1994
From: Rainey G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9401270169
Download: ML20063A958 (1)


Text

'

C t:Id R. Rainty Vice President Peach Bottom Atomic Power Station

+

PECO ENERGY gg ga- "

Delta. PA 17314-9739 717 456 7014 January 11,1994 U. S. Nuclear Regulatory Commission ATTENTION: Document Control Desk Mail Station Pl-137 Washington, DC 20555 10CFR 50.54(p)

Docket Nos.:

50-277 50-278

Subject:

Peach Bottom Atomic Power Station Unit 2 and Unit 3 Revisions to the Physical Security Plan, Safeguards Contingency Plan and Plant Security Personnel Training and Qualification Plan

Dear NRC Officials:

This letter submits, in accordance with 10CFR 50.4(b)(4)(iii), four (4) controlled copies of the revised Peach Bottom Atomic Power Station (PBAPS) Physical Security Plan, Safeguards Contingency Plan and Plant Security Personnel Training and Qualification Plan. The revisions are detailed for each Plan in their respective Summary of Plan Revisions.

The revisions are being submitted in accordance with 10CFR 50.54(p)(2), and have been determined not to decrease the effectiveness of the PBAPS Physical Security Plan, Safeguards Contingency Plan and/or Plant Security Personnel Training and Qualification Plan. The changes were made to reflect organizational / title changes; and, changes made in an effort to increase the effectiveness and efficiency of PECO Energy Company's, Nuclear Security Program at Peach Bottom Atomic Power Station.

in accordance with 10CFR 73.21,we request that the enclosed revisions to the PBAPS Physical Security Plan, Safeguards Contingency Plan and Plant Security Personnel Training and Qualification Plan, which contain Safeguards Information, be withheld from public disclosure and protected, as described in 10CFR 73.21.

Sincerely, AGP ~

GRR/ GAB:saj Enclosures (12) cc: T. T. Martin, Administrator, Region 1, USNRC (Enclosures - 6)

W. L. Schmidt, Senior Resident Inspector, USNRC (Enclosures - 3)

W. P. Dorsife, Bureau of Radiation Protection (w/o Enclosures)

R.1. Mclean, Department of Natural Resources (w/o Enclosures)

/

.q C. D. Schaefer, Delmarva Power & Light Co. (w/o Enclosures) y R. A. Burricelli, Public Service Electric & Gas (w/o Enclosures)

)p

11. C. Schwemm, Atlantic Electric (w/o Enclosures)

(.,

g, 00 ENCLOSURES CONTAIN SAFEGUARDS INFORMATION, UPON SEPARATION, THIS

  • A LETTER IS DECONTROLLED 9401270169 940111 CCN: 94-1402 PDR ADOCK 0500 7

F

-