Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217L0421999-10-21021 October 1999 Forwards Insp Rept 50-382/99-20 on 990815-0925 & Notice of Violation.Two Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20217N2111999-10-19019 October 1999 Forwards Insp Rept 50-382/99-14 on 990913-17 & 1004-08.No Violations Noted.Licensed Operator Requalification Program, Effective,Utilized Systems Approach to Training & Showed Continued Improvements Over Previous Insp Findings ML20217L0101999-10-18018 October 1999 Provides Update of Waterford 3 Effort for Review of Ufsar. Info Listed Includes Background Mgt Expectations,Review Status & Results,Clarifications Re Review & Conclusions ML20217L0141999-10-18018 October 1999 Submits Update to NRC Staff Re Circumstances & Plans for Submitting Certification Rept on Waterford 3 Plant Specific Simulator ML20217G7051999-10-14014 October 1999 Forwards Comments on Four of NRC RO Examination Questions for Exam Administered During Week of 991004 05000382/LER-1999-014, Forwards LER 99-014-00,providing Details of Reactor Shutdown Due to Loss of RCP Controlled bleed-off Flow.Attached Commitment Identification/Voluntary Enhancement Form Identifies All Commitments Contained in Submittal1999-10-12012 October 1999 Forwards LER 99-014-00,providing Details of Reactor Shutdown Due to Loss of RCP Controlled bleed-off Flow.Attached Commitment Identification/Voluntary Enhancement Form Identifies All Commitments Contained in Submittal ML20217D5151999-10-0707 October 1999 Forwards Application for Renewal of SRO License for C Fugate License SOP-43039-3,IAW 10CFR55.57.Without Encls ML20217C6251999-10-0505 October 1999 Informs That NRC Reviewed Util Ltr & Encl Exercise Scenario Package for Waterford 3 Emergency Plan Exercise Scheduled for 991013.Based on Review,Nrc Determined That Exercise Appropriate to Meet Objectives ML20212J6921999-09-29029 September 1999 Forwards Insp Rept 50-382/99-18 on 990830-0902.One Noncited Violation Identified Re Failure to Follow Procedural Instructions to Ensure That Members on Fire Brigade Shift Were Qualified ML20216G2441999-09-27027 September 1999 Forwards Insp Rept 50-382/99-19 on 990830-0903.No Violations Noted 05000382/LER-1999-013, Forwards LER 99-013-00,providing Details of Exceeding TS Limits for RCS Cooldown Rates.All Commitments Contained in Submittal Are Identified on Encl Commitment Identification/ Voluntary Enhancement Form1999-09-23023 September 1999 Forwards LER 99-013-00,providing Details of Exceeding TS Limits for RCS Cooldown Rates.All Commitments Contained in Submittal Are Identified on Encl Commitment Identification/ Voluntary Enhancement Form IR 05000382/19993011999-09-21021 September 1999 Informs That NRC License Exam Previously Associated with NRC Insp Rept 50-382/99-301 Will Be Incorporated Into NRC Insp Rept 50-382/99-14 ML20212D8761999-09-16016 September 1999 Informs That on 990818,NRC Staff Completed Midcycle PPR of Waterford 3.During Assessment Period,Number of Personnel Errors Occurred,Which Demonstrated Lack of Attention to Detail by Plant Personnel.Historical Listing of Issues,Encl ML20212C2471999-09-16016 September 1999 Forwards Five Final Applications for RO Licenses for G Esquival,Jm Hearn,Md Lawson,Re Simpson & PI Wood.Written Exam & Operating Test to Be Administered,Is Requested. Encls Withheld ML20212C2391999-09-16016 September 1999 Requests Cancellation of SRO Licenses for Bn Coble,License SOP-43835,due to Job Assignment Location & CA Rodgers, License SOP-43537-1,due to Resignation from Company, Effective 990901 ML20212C5881999-09-14014 September 1999 Forwards Insp Rept 50-382/99-15 on 990719-23 with Continuing in Ofc Insp Until 0819.No Violations Noted ML20211Q4421999-09-0909 September 1999 Forwards Insp Rept 50-382/99-07 on 990601-11.Three Violations Being Treated as Noncited Violations ML20211P4121999-09-0707 September 1999 Requests NRC Staff Review & Approval of Integrated Nuclear Security Plan (Insp) & Integrated Security Training & Qualification Plan (Ist&Q), for Use by All Entergy Operations,Inc.Encl Withheld,Per 10CFR2.790(d) ML20211M8391999-09-0303 September 1999 Forwards Revised Epips,Including Rev 25 to EP-001-020,rev 24 to EP-001-030,rev 25 to EP-001-040,rev 30 to EP-002-100,rev 22 to EP-001-010,rev 27 to EP-002-010,rev 26 to EP-002-102 & Rev 16 to EP-002-190.Listed Proprietary Revs to Epips,Encl ML20211L3681999-09-0202 September 1999 Forwards Five Preliminary Applications for Reactor Operator Licenses for Individuals Listed,Iaw 10CFR55.31.Encls Withheld ML20211K9741999-09-0101 September 1999 Forwards Insp Rept 50-382/99-16 on 990704-0814.Two Severity Level IV Violations Identified & Being Treated as Noncited Violations,Consistent with App C of Enforcement Policy 05000382/LER-1999-011, Forwards LER 99-011-00,providing Details of Reactor Shutdown Due to Loss of Controlled bleed-off Flow.All Commitments Contained in Submittal Identified on Attached Commitment Identification/Voluntary Enhancement Form1999-08-31031 August 1999 Forwards LER 99-011-00,providing Details of Reactor Shutdown Due to Loss of Controlled bleed-off Flow.All Commitments Contained in Submittal Identified on Attached Commitment Identification/Voluntary Enhancement Form ML20211M3641999-08-30030 August 1999 Forwards Written Examination,Operating Tests & Supporting Ref Matl Identified in Attachment 2 of ES-210,in Response to NRC .Encl Withheld ML20211G5751999-08-27027 August 1999 Forwards RAI Re IPEEE Submittal.Please Provide RAI within 60 Days of Receipt of Ltr,Per Util Response to GL 88-20,suppl 4 ML20211E3281999-08-26026 August 1999 Forwards fitness-for-duty Performance Data for Period of 990101-0630,IAW 10CFR26.71(d).Ltr Does Not Contain Commitments 05000382/LER-1999-009, Forwards LER 99-009-00 Re Discovery of Condition of Noncompliance with App R Involving Inadequate Separation of Essential Cables Routed in Fire Area RAB-30 in Rab. Compensatory Measures Were Established Immediately1999-08-26026 August 1999 Forwards LER 99-009-00 Re Discovery of Condition of Noncompliance with App R Involving Inadequate Separation of Essential Cables Routed in Fire Area RAB-30 in Rab. Compensatory Measures Were Established Immediately 05000382/LER-1999-010, Forwards LER 99-010-00,providing Details of Inadequate Pumping Capacity in Dry Cooling Tower Area.All Commitments Contained in Submittal Are Identified on Attached Commitment Identification Voluntary Enhancement Form1999-08-26026 August 1999 Forwards LER 99-010-00,providing Details of Inadequate Pumping Capacity in Dry Cooling Tower Area.All Commitments Contained in Submittal Are Identified on Attached Commitment Identification Voluntary Enhancement Form ML20211F5421999-08-24024 August 1999 Forwards Proposed marked-up TS Page Xviii, Index Administrative Controls, Correcting Page Number Re TS Change Request NPF-38-220.Editorial Changes for TS Change NPF-38-221 Discussed ML20211F3561999-08-24024 August 1999 Forwards CTS Pages & TS Proposed marked-up Pages for Insertion Into TS Change Request NPF-38-207 Re Efas, Originally Submitted on 980702.Original NSHC Determination Continues to Be Applicable ML20211F4611999-08-24024 August 1999 Informs That NRC Reviewed Ltr & Encl Objectives for Waterford 3 Emergency Plan Exercise Scheduled for 991013.Exercise Objectives Appropriate to Meet Emergency Plan Requirements ML20211G1731999-08-23023 August 1999 Informs That Info Submitted in ,B&W Rept 51-1234900-00,will Be Withheld from Public Disclosure,Per 10CFR2.790 ML20211C5101999-08-19019 August 1999 Forwards Certified Copies of Liability Insurance Policy Endorsements Issued in First Half of 1999 for Each Entergy Operations,Inc Nuclear Unit,Per 10CFR140.15 ML20210T9791999-08-18018 August 1999 Discusses Which Responded to Reconsideration of Violation Denial (EA 98-022) Enforcement Action Detailed in .Concludes That Violation Occurred as Stated ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210S0561999-08-12012 August 1999 Submits Voluntary Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for NRC Fys 2000 & 2001 for Waterford 3 ML20210Q6161999-08-12012 August 1999 Forwards Corrected Copy of Monthly Operating Rept for July 1999 for Waterford 3.Original Rept,Submitted with ,Contained Typos ML20217F2661999-08-12012 August 1999 Forwards Copy of 1999 Waterford 3 Biennial Exercise Package to Be Performed Using Waterford 3 CR Simulator ML20210R9231999-08-11011 August 1999 Forwards Insp Rept 50-382/99-10 on 990719-23.Violations Noted.Nrc Has Determined That One Severity Level IV Violation of NRC Requirements Occurred ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams 05000382/LER-1999-008, Forwards LER 99-008-00,re Failure to Perform Testing of ESF Filtration Units Per TS Srs.Commitments Made by Util Also Encl1999-07-29029 July 1999 Forwards LER 99-008-00,re Failure to Perform Testing of ESF Filtration Units Per TS Srs.Commitments Made by Util Also Encl ML20210H4291999-07-29029 July 1999 Forwards Response to NRC Rai,Associated with TS Change Request NPF-38-208,proposing to Replace Ref to Supplement 1 with Ref to Supplement 2 of Calculative Methods for CE Small Break LOCA Evaluation Model, in ACs Section of TSs ML20210F9451999-07-27027 July 1999 Forwards Proprietary & non-proprietary Version of Rev 29 to EPIP EP-002-100, Technical Support Ctr Activation,Operation & Deactivation. Proprietary Info Withheld,Per 10CFR2.790 ML20210D3171999-07-23023 July 1999 Submits Proposal for Final Resolution of Reracking Spent Fuel Pool at Plant,Per License Amend 144,issued by NRC in .No New Commitments Are Contained in Ltr 05000382/LER-1999-007, Forwards LER 99-007-00,providing Details of Operation Outside Tornado Missile Protection Licensing Basis for turbine-driven Emergency Feedwater Pump Exhaust Stack & Steam Supply Piping.All Commitments Identified on Attached1999-07-23023 July 1999 Forwards LER 99-007-00,providing Details of Operation Outside Tornado Missile Protection Licensing Basis for turbine-driven Emergency Feedwater Pump Exhaust Stack & Steam Supply Piping.All Commitments Identified on Attached ML20210D8701999-07-23023 July 1999 Forwards Safety Evaluation Re First 10-yr Interval Inservice Insp Plan Requests for Relief ISI-018 Through ISI-020 for Entergy Operations,Inc,Unit 3 ML20210B1521999-07-15015 July 1999 Forwards Insp Rept 50-382/99-13 on 990523-0703.Three Violations Being Treated as Noncited Violations ML20209G9771999-07-13013 July 1999 Forwards Objectives & Guidelines for Waterford 3 Emergency Preparedness Exercise Scheduled for 991013.List of Objectives cross-referenced Where Applicable to Relevant Sections of NUREG-0654 IR 05000382/19990081999-07-12012 July 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-382/99-08 Issued on 990503 ML20209E5231999-07-0909 July 1999 Informs That as Result of NRC Review of Util Responses to GL-92-01,rev 1 & Suppl 1,staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2.This Closes Staff Efforts Re TAC MA0583 ML20209D4051999-07-0707 July 1999 Forwards Revised TS Pages to Replace Attachment C,Entirely in Original TS Change Request NPF-38-207,per 990519 Discussion with C Patel of Nrc.Changes to Action 20 Delete Word Requirement & Revise Word Modes to Mode 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217L0101999-10-18018 October 1999 Provides Update of Waterford 3 Effort for Review of Ufsar. Info Listed Includes Background Mgt Expectations,Review Status & Results,Clarifications Re Review & Conclusions ML20217L0141999-10-18018 October 1999 Submits Update to NRC Staff Re Circumstances & Plans for Submitting Certification Rept on Waterford 3 Plant Specific Simulator ML20217G7051999-10-14014 October 1999 Forwards Comments on Four of NRC RO Examination Questions for Exam Administered During Week of 991004 05000382/LER-1999-014, Forwards LER 99-014-00,providing Details of Reactor Shutdown Due to Loss of RCP Controlled bleed-off Flow.Attached Commitment Identification/Voluntary Enhancement Form Identifies All Commitments Contained in Submittal1999-10-12012 October 1999 Forwards LER 99-014-00,providing Details of Reactor Shutdown Due to Loss of RCP Controlled bleed-off Flow.Attached Commitment Identification/Voluntary Enhancement Form Identifies All Commitments Contained in Submittal ML20217D5151999-10-0707 October 1999 Forwards Application for Renewal of SRO License for C Fugate License SOP-43039-3,IAW 10CFR55.57.Without Encls 05000382/LER-1999-013, Forwards LER 99-013-00,providing Details of Exceeding TS Limits for RCS Cooldown Rates.All Commitments Contained in Submittal Are Identified on Encl Commitment Identification/ Voluntary Enhancement Form1999-09-23023 September 1999 Forwards LER 99-013-00,providing Details of Exceeding TS Limits for RCS Cooldown Rates.All Commitments Contained in Submittal Are Identified on Encl Commitment Identification/ Voluntary Enhancement Form ML20212C2391999-09-16016 September 1999 Requests Cancellation of SRO Licenses for Bn Coble,License SOP-43835,due to Job Assignment Location & CA Rodgers, License SOP-43537-1,due to Resignation from Company, Effective 990901 ML20212C2471999-09-16016 September 1999 Forwards Five Final Applications for RO Licenses for G Esquival,Jm Hearn,Md Lawson,Re Simpson & PI Wood.Written Exam & Operating Test to Be Administered,Is Requested. Encls Withheld ML20211P4121999-09-0707 September 1999 Requests NRC Staff Review & Approval of Integrated Nuclear Security Plan (Insp) & Integrated Security Training & Qualification Plan (Ist&Q), for Use by All Entergy Operations,Inc.Encl Withheld,Per 10CFR2.790(d) ML20211M8391999-09-0303 September 1999 Forwards Revised Epips,Including Rev 25 to EP-001-020,rev 24 to EP-001-030,rev 25 to EP-001-040,rev 30 to EP-002-100,rev 22 to EP-001-010,rev 27 to EP-002-010,rev 26 to EP-002-102 & Rev 16 to EP-002-190.Listed Proprietary Revs to Epips,Encl ML20211L3681999-09-0202 September 1999 Forwards Five Preliminary Applications for Reactor Operator Licenses for Individuals Listed,Iaw 10CFR55.31.Encls Withheld 05000382/LER-1999-011, Forwards LER 99-011-00,providing Details of Reactor Shutdown Due to Loss of Controlled bleed-off Flow.All Commitments Contained in Submittal Identified on Attached Commitment Identification/Voluntary Enhancement Form1999-08-31031 August 1999 Forwards LER 99-011-00,providing Details of Reactor Shutdown Due to Loss of Controlled bleed-off Flow.All Commitments Contained in Submittal Identified on Attached Commitment Identification/Voluntary Enhancement Form ML20211M3641999-08-30030 August 1999 Forwards Written Examination,Operating Tests & Supporting Ref Matl Identified in Attachment 2 of ES-210,in Response to NRC .Encl Withheld ML20211E3281999-08-26026 August 1999 Forwards fitness-for-duty Performance Data for Period of 990101-0630,IAW 10CFR26.71(d).Ltr Does Not Contain Commitments 05000382/LER-1999-010, Forwards LER 99-010-00,providing Details of Inadequate Pumping Capacity in Dry Cooling Tower Area.All Commitments Contained in Submittal Are Identified on Attached Commitment Identification Voluntary Enhancement Form1999-08-26026 August 1999 Forwards LER 99-010-00,providing Details of Inadequate Pumping Capacity in Dry Cooling Tower Area.All Commitments Contained in Submittal Are Identified on Attached Commitment Identification Voluntary Enhancement Form 05000382/LER-1999-009, Forwards LER 99-009-00 Re Discovery of Condition of Noncompliance with App R Involving Inadequate Separation of Essential Cables Routed in Fire Area RAB-30 in Rab. Compensatory Measures Were Established Immediately1999-08-26026 August 1999 Forwards LER 99-009-00 Re Discovery of Condition of Noncompliance with App R Involving Inadequate Separation of Essential Cables Routed in Fire Area RAB-30 in Rab. Compensatory Measures Were Established Immediately ML20211F3561999-08-24024 August 1999 Forwards CTS Pages & TS Proposed marked-up Pages for Insertion Into TS Change Request NPF-38-207 Re Efas, Originally Submitted on 980702.Original NSHC Determination Continues to Be Applicable ML20211F5421999-08-24024 August 1999 Forwards Proposed marked-up TS Page Xviii, Index Administrative Controls, Correcting Page Number Re TS Change Request NPF-38-220.Editorial Changes for TS Change NPF-38-221 Discussed ML20211C5101999-08-19019 August 1999 Forwards Certified Copies of Liability Insurance Policy Endorsements Issued in First Half of 1999 for Each Entergy Operations,Inc Nuclear Unit,Per 10CFR140.15 ML20210Q6161999-08-12012 August 1999 Forwards Corrected Copy of Monthly Operating Rept for July 1999 for Waterford 3.Original Rept,Submitted with ,Contained Typos ML20210S0561999-08-12012 August 1999 Submits Voluntary Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for NRC Fys 2000 & 2001 for Waterford 3 ML20217F2661999-08-12012 August 1999 Forwards Copy of 1999 Waterford 3 Biennial Exercise Package to Be Performed Using Waterford 3 CR Simulator 05000382/LER-1999-008, Forwards LER 99-008-00,re Failure to Perform Testing of ESF Filtration Units Per TS Srs.Commitments Made by Util Also Encl1999-07-29029 July 1999 Forwards LER 99-008-00,re Failure to Perform Testing of ESF Filtration Units Per TS Srs.Commitments Made by Util Also Encl ML20210H4291999-07-29029 July 1999 Forwards Response to NRC Rai,Associated with TS Change Request NPF-38-208,proposing to Replace Ref to Supplement 1 with Ref to Supplement 2 of Calculative Methods for CE Small Break LOCA Evaluation Model, in ACs Section of TSs ML20210F9451999-07-27027 July 1999 Forwards Proprietary & non-proprietary Version of Rev 29 to EPIP EP-002-100, Technical Support Ctr Activation,Operation & Deactivation. Proprietary Info Withheld,Per 10CFR2.790 ML20210D3171999-07-23023 July 1999 Submits Proposal for Final Resolution of Reracking Spent Fuel Pool at Plant,Per License Amend 144,issued by NRC in .No New Commitments Are Contained in Ltr 05000382/LER-1999-007, Forwards LER 99-007-00,providing Details of Operation Outside Tornado Missile Protection Licensing Basis for turbine-driven Emergency Feedwater Pump Exhaust Stack & Steam Supply Piping.All Commitments Identified on Attached1999-07-23023 July 1999 Forwards LER 99-007-00,providing Details of Operation Outside Tornado Missile Protection Licensing Basis for turbine-driven Emergency Feedwater Pump Exhaust Stack & Steam Supply Piping.All Commitments Identified on Attached ML20209G9771999-07-13013 July 1999 Forwards Objectives & Guidelines for Waterford 3 Emergency Preparedness Exercise Scheduled for 991013.List of Objectives cross-referenced Where Applicable to Relevant Sections of NUREG-0654 ML20209D4051999-07-0707 July 1999 Forwards Revised TS Pages to Replace Attachment C,Entirely in Original TS Change Request NPF-38-207,per 990519 Discussion with C Patel of Nrc.Changes to Action 20 Delete Word Requirement & Revise Word Modes to Mode ML20209B6081999-06-30030 June 1999 Submits Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Disclosure Encl 05000382/LER-1999-005, Forwards LER 99-005-00,providing Details of Discovery of Untested Electrical Contacts in safety-related Logic Circuits1999-06-24024 June 1999 Forwards LER 99-005-00,providing Details of Discovery of Untested Electrical Contacts in safety-related Logic Circuits ML20196G5731999-06-24024 June 1999 Forwards Operator Licensing Exam Outlines Associated with Exam Scheduled for Wk of 991004.Exam Development Is Being Performed in Accordance with NUREG-1021,Rev 8 ML20212J4121999-06-23023 June 1999 Responds to NRC Re Reconsideration of EA 98-022. Details Provided on Actions Util Has Taken or Plans to Take to Address NRC Concerns with Ability to Demonstrate Adequate Flow Availability to Meet Design Requirements ML20196E9371999-06-22022 June 1999 Forwards Revs Made to EP Training Procedures.Procedures NTC-217 & NTC-217 Have Been Deleted.Procedure NTP-203 Was Revised to Combine Requirement Previously Included in Procedures NRC-216 & NTC-217 ML20196A1021999-06-17017 June 1999 Provides Supplemental Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, Per 990513 Request of NRC Project Manager ML20195F3671999-06-0909 June 1999 Forwards Rev 21,Change 0 to EP-001-010, Unusual Event. Rev Reviewed in Accordance with 10CFR50.54(q) Requirements & Determined Not to Decrease Effectiveness of Emergency Plan ML20195C7801999-06-0303 June 1999 Submits Response to Violations Noted in Insp Rept 50-382/99-08.Corrective Actions:All Licensee Access Authorization Personnel Were Retrained Prior to Completion of Insp ML20195C2951999-05-28028 May 1999 Forwards Annual Evaluation of Changes & Errors Identified in Abb CE ECCS Performance Evaluation Models Used for LOCA Analyses.Results of Annual Evaluation for CY98 Detailed in Attached Rept,Based Upon Suppl 10 to Abb CE Rept ML20195C0241999-05-28028 May 1999 Notifies NRC of Operator Medical Condition for Waterford 3 Opertaor Sp Wolfe,License SOP-43723.Attached NRC Form & Memo Contain Info Concerning Condition.Without Encls ML20196L3281999-05-24024 May 1999 Informs That Entergy Is Withdrawing TS Change Request NPF-38-205 Re TS 3.3.3.7.1, Chlorine Detection Sys & TS 3.3.3.7.3, Broad Range Gas Detection Submitted on 980629 ML20206S4691999-05-17017 May 1999 Requests Waiver of Exam for SRO Licenses for an Vest & Hj Lewis,Iaw 10CFR55.47.Both Individuals Have Held Licenses at Plant within Past Two Year Period,But Licenses Expired Upon Leaving Util Employment.Encl Withheld 05000382/LER-1999-004, Forwards LER 99-004-00 Re Discovery That Response Time Testing Had Not Been Performed for ESFAS Containment Cooling Function,As Required by TS SR 4.3.2.31999-05-14014 May 1999 Forwards LER 99-004-00 Re Discovery That Response Time Testing Had Not Been Performed for ESFAS Containment Cooling Function,As Required by TS SR 4.3.2.3 ML20206N1921999-05-10010 May 1999 Provides Revised Attachment 2 for Alternative Request IWE-02,originally Submitted 990429 Re Bolt Torque or Tension Testing of Class Mc pressure-retaining Bolting as Specified in Item 8.20 of Article IWE-2500,Table IWE-2500-1 ML20206J1471999-05-0606 May 1999 Requests That Implementation Date for TS Change Request NPF-38-211 Be within 90 Days of Approval to Allow for Installation of New Monitoring Sys for Broad Range Gas Detection Sys ML20206J1721999-05-0606 May 1999 Notifies That Proposed Schedule for Plant 1999 Annual Exercise Is Wk of 991013.Exercise Objective Meeting Scheduled for 990513 at St John Baptist Parish Emergency Operations Ctr ML20206G8021999-05-0404 May 1999 Provides Revised Response to NRC Re Violations Noted in Insp Rept 50-382/99-01.Licensee Denies Violation as Stated.Change Made Is Denoted by Rev Bar & Does Not Materially Impact Original Ltr ML20206E7811999-04-29029 April 1999 Proposes Alternatives to Requirements of ASME B&PV Code Section XI,1992 Edition,1992 Addenda,As Listed.Approval of Alternative Request on or Before 990915,requested ML20205T2531999-04-22022 April 1999 Forwards LER 99-S02-00,describing Occurrence of Contract Employee Inappropriately Being Granted Unescorted Access to Plant Protected Area ML20205R2611999-04-20020 April 1999 Forwards Rev 19 to Physical Security Plan,Submitted in Accordance with 10CFR50.54(p).Plan Rev Was Approved & Implemented on 990407.Rev Withheld,Per 10CFR73.21 ML20205Q3241999-04-16016 April 1999 Submits Addl Info Re TS Change Request NPF-38-215 for Administrative Controls TS Changes.Appropriate Pages from New Entergy Common QA Program Manual Provided as Attachment to Ltr 1999-09-07
[Table view] Category:LEGAL/LAW FIRM TO NRC
MONTHYEARML19354E4191990-01-25025 January 1990 Comments Re Issuance of OL Amends & Proposed NSHC Determination Re Transfer of Operational Mgt Control of Plants & Views on anti-trust Issues Re Application for Amend for Plants ML19332D8511989-11-30030 November 1989 Forwards Antitrust Comments W/Exhibits & One Copy of Comments Sans Exhibits of Cities of Benton,Conway,North Little Rock,Osceola,Prescott & West Memphis,Ak & Farmers Electric Cooperative Corp ML19325E3711989-10-30030 October 1989 Forwards 891027 Ltr to Counsel for NRC for Filing on Appropriate Dockets & Legal Issues Re Antitrust Aspect of NRC Review of Consolidation of License Amend Application ML19325E3741989-10-27027 October 1989 Lists Three Legal Issues Re Antitrust Aspects of NRC Review of Consolidation of License Amend Application for Facilities.Licensee Supplemental Info Filed W/Nrr ML19325E8661989-09-20020 September 1989 FOIA Request for Document Re Plans for Plant Security Sys of Util ML20247G0991989-05-17017 May 1989 Requests That Address Be Changed as Listed ML20206S2701986-09-17017 September 1986 Notifies of Address Change Effective on 860927.Requests Address on Encl List of Dockets Be Changed ML20133E0951985-05-0404 May 1985 Forwards Certificate of Pollution Control Facilities,For Review & Execution.Completed Certificate Requested by 840531 ML20116J0321985-04-30030 April 1985 Advises of Joint Intervenor Request for Extension of 2 Wks to Respond to ALAB-801 If Repts Submitted by Applicant Will Be Considered by Aslab.Objects to Repts as Unauthorized Supplemental Argument ML20115G5701985-04-18018 April 1985 Discusses Applicant 841130 Answer to Joint Intervenors 841108 Motion to Reopen Record.Applicant 850131 Prelicensing Issues Final Rept & Task Force Rept Encl for Aslb,Per NRC Suggestion.Svc List Also Encl ML20112A9221985-03-14014 March 1985 Discusses Re Schedule for Considering & Implementing Full Power Operating Authority.Rp Barkhurst Affidavit Re Power Ascension Testing Program & Delay of Operating Authority Encl.Related Correspondence ML20111C6961985-03-14014 March 1985 Forwards Affidavit of RP Barkhurst Re Power Ascension Testing Program to Be Performed at Levels Above 5% of Rated Power ML20209G8721985-02-28028 February 1985 Forwards Quality Technology Co Investigative Repts QI-84-057 & QI-84-057-1,per Region IV Request ML20112B4681985-01-0404 January 1985 Forwards Listed Documents Re Facility Basemat Cracking.Svc List Encl.Related Correspondence ML20101K0791984-12-20020 December 1984 Forwards Rev 1 to Issues 1 & 10 in Staff .Util Initial Responses to Issues Attached to 841130 Answer to Joint Intervenors Motion to Reopen Record & Admit Three New Contentions.Related Correspondence ML20101D0721984-12-18018 December 1984 Forwards Affidavit of Mk Yates Which Revises Applicant 841130 Answer to Joint Intervenor Item A(7)(e) ML20100J8421984-12-0707 December 1984 Forwards List of Corrections & Amend Pages to Applicant 841130 Response to Joint Intervenors 841107 Motion to Reopen Record in Proceeding.Svc List Encl ML20107M0521984-11-0909 November 1984 Forwards Util s Forwarding Rev 1 to Summary Evaluation Structural Significance of Basemat NDT Results & NDT Evaluation of Basemat Concrete.Related Correspondence ML20094A4481984-11-0202 November 1984 Forwards 841031 Response to Issues 10 & 20 of Staff Re Qualifications of Inspectors & Test Personnel for Concrete & Soil Backfill.Applicant Confirming Readiness for Fuel Loading Encl.Related Correspondence ML20107B0021984-10-29029 October 1984 Forwards Responses to Aslab Request for Addl Info Re Joint Intervenors Pending Motion to Reopen Proceedings on Basemat & Backfill Issues.Related Correspondence ML20095G8461984-08-24024 August 1984 Responds to Re Work Done by Gunnar Harstead at Facility.Affidavits of Kw Cook & G Harstead & Svc List Encl ML20126E8541984-08-0101 August 1984 FOIA Request for Document Authored by G Hill Submitted in Connection W/Nrc Proceedings Re Facility ML20197H4571984-06-14014 June 1984 Requests That City of New Orleans,La Be Added to Svc List for Substantive Orders & Notices of Opportunity for Hearing for Listed Dockets.Related Correspondence ML20090L2151984-05-24024 May 1984 Forwards Ebasco & Harstead Engineering Assoc Npis Wall Hairline Crack Evaluation. Rept Concludes That Cracks Are Drying Shrinkage Cracks & Not Result of Loading Mechanism. Related Correspondence ML20088A7551984-04-12012 April 1984 Raises No Opposition to NRC 840411 Request for Extension of Time.Fuel Load Expected by 840531.W/svc List.Related Correspondence ML20086R7941984-02-28028 February 1984 Advises That NRC Request for Extension of Time to 840413 to Respond to Joint Intervenors 831212 Motion to Reopen Record Unopposed.Target Fuel Load Set for 840430.Certificate of Svc Encl ML20117D0121984-02-23023 February 1984 FOIA Request for Five Categories of Documents,Including Info Re Mercury Co of Norwood,Inc in Connection W/Const of Nuclear Powered Steam Electric Generating Installation & Ebasco in Connection W/Const of Facility ML20083C0481983-12-20020 December 1983 Discusses Pages 12-13 of ALAB-753 Re Use of Watertight in Section 3.4.1 of Fsar.Licensee Agrees W/Assumption That Inconsistencies Arising Are Semantic & Inadvertent.Applicant Will Submit Clarifying Amend to FSAR Per Aslab Direction ML20083D3601983-11-18018 November 1983 FOIA Request for Background Matls Used to Prepare Recent SALP Nuclear & Agency Reviews of QA Activities & Adequacy of Staffing at Plant ML20081C2971983-10-26026 October 1983 Informs That Dr Lewis,Formerly ASLB Participant in OL Proceeding,Began Working for Author on 831024.DR Lewis Will Not Participate in OL Proceeding.Certificate of Svc Encl ML20078K7181983-10-14014 October 1983 Forwards Harstead Engineering Assoc,Inc Rept Re Design Adequacy of Foundation Basemat.Applicant Has Not Yet Reviewed Rept.Design of Foundation Mat Conservative.Cracking Insignificant.W/O Rept.Svc List Encl.Related Correspondence ML20078J6281983-10-12012 October 1983 Forwards Revised App a Notes to Harstead Engineering Assoc Rept,Distributed on 830920.Svc List Encl ML20078F9901983-10-0404 October 1983 Forwards Util Application for Amend to CP to Extend Latest Const Completion Date from 831030 to 840930.Target Date for Fuel Load Date Is 840331 ML20078B6821983-09-22022 September 1983 Forwards App M to Harstead Engineering Assoc Rept Distributed on 830920.Svc List Encl.W/O App M.Related Correspondence ML20078A3791983-09-20020 September 1983 Forwards Harstead Engineering Assoc,Inc Rept Re Subj Matter of Joint Intervenor Motion to Reopen Contention 22.App M to Rept Will Be Transmitted Upon Receipt.Response to Rept Forthcoming.W/O Encl.Certificate of Svc Encl ML20082Q9931983-08-25025 August 1983 FOIA Request for Five Categories of Documents Re Facility ML20076L6681983-07-13013 July 1983 Notifies of Vr Harding Employment at Law Firm.Harding Will Not Participate in Any Case Currently Pending Before NRC ML20076L6771983-07-13013 July 1983 Notifies of Employment at Law Firm.Vr Harding Will Not Participate in Any Case Pending Before Nrc.Svc List Encl ML20072G5521983-06-16016 June 1983 Advises That Author Appointed Joint Intervenors Counsel. Procedures Necessary to Reopen Contention 22 Re Cracked Slab Requested ML20071P3181983-06-0303 June 1983 Forwards Util 830524 News Release Postponing 830525 Emergency Planning Exercise.State of La Requested Postponement Due to Actual Emergency Conditions Caused by Flooding.Svc List Encl ML20074B0821983-05-16016 May 1983 Advises That All Sirens within Emergency Planning Zone Will Be Tested by Parish Officials for Rotational Function,Output & Audibility at Perimeter of Each Siren Effective Range.Svc List Encl ML20069K2431983-04-22022 April 1983 Forwards Applicant Reply to Joint Intervenors & NRC Proposed Findings of Fact & Conclusions of Law on Contention 17/26(1) 17/26(1)(a),per 830405 Order Granting Joint Intervenor Requests for Extension of Time.W/O Encl ML20072T5531983-04-0404 April 1983 Responds to Re Fuel Load & Commercial Operation Dates.Currently Scheduled Dates Cannot Be Met.Util Schedule.Slippage Expected.Svc List Encl ML20072R7481983-04-0101 April 1983 Responds to Informing That NRC Will Be Represented by Turk During Site Visit.Joint Intervenors Will Not Attend.Applicant Counsel at Site Will Be DA Ridgway & Bw Churchill.Svc List Encl ML20072N2471983-03-28028 March 1983 Advises That JB Hamlin & Bw Churchill Will Represent Util at 830419 Oral Argument.Hamlin to Address Synergism Issue & Churchill to Address Emergency Planning Issue.Svc List Encl. Related Correspondence ML20069C0881983-03-14014 March 1983 Forwards Proposed Findings of Fact,Conclusions of Law & Brief in Form of Proposed Partial Initial Decision on Joint Intervenors Contention 17/26(1)(a) ML20028F6011983-01-31031 January 1983 Advises That Applicant May Present Rebuttal Testimony to Joint Intervenors Witness SM Hunter.Principle Rebuttal Witness Would Be Ds Mileti.Prof Qualifications & Svc List Encl ML20028E9191983-01-26026 January 1983 Forwards Rj Perry & Gr Klare Testimony on Emergency Public Info Brochure ML20067C5141982-12-0707 December 1982 Memorializes 821012 Telcon W/Aslb,Applicant,Joint Intervenors,Nrc & FEMA Re ASLB Rulings on Applicant 820923 Filing & Joint Intervenor 820929 Motions.Svc List Encl ML20069L0141982-11-12012 November 1982 Forwards Printer Proof of Public Info Booklet to Be Distributed to General Public as Part of Offsite Emergency Preparedness Plan.Color Sketch Indicating Color Coding for Protective Action Section Encl.W/O Encl 1990-01-25
[Table view] |
Text
_
. b
. r 1
0 F'"'" T E D SHAW, PITTMAN, PoTTs & TROWBFitlDGE J C A PARTNERSMIP OF PROFESS *CNAL CORPORATIf.sNS 1800 M STRECT. N. W. or g p%}~ Q] { 3 WA$r41NGTON. D. C. 20036 RAMaar D POTTS. P C. 1MOMAs A. sAxTER. P C. JOMN H. 0 NCrLL. JR p, DAyiD LAWRENCE; M4LLER STEu ART L PrTTM AN. P C. JAMES M eURGER. P C- stCas saa-eOOO JAY A. EPSTIEN _
, ANNE M MRAUSMQAF GEORGE F TROwsRiDGE P C. SMELDON J WEISCL P C.
- RAND L. ALLEN I' gFREDER4CM L MLE#hL ST[PME N D. POTTS. P C. JOMN A. McCULLOUGM P C. - TIMOTHY 3. McsRfDE GORDON R. MANOFSKY I
GE RALD CMARNCFF. P C. J. PATRICK MtCF EY. P C. ELISABETH M PE NDLETON JEFFREYS.GRANCOLA etMILLip D. 90STwtCK. P C. GEORGE P. MICHAELY. JR., P.C. TELECOPs E R PAUL A. MAPLAN HANN AM E. M. LICBERMAN R. TIMOTMY MANLON. P C. J. TMOM AS LENH ART. P C* It02t 422-409* & S22-p99 MARRY M. GLASSpiMEL SANDRA E. FOLSOM CEOWGE M. ROGERS. JR P C. STEVEN 6. MELTZER. P C. THOMAS M. McCORMICK MARCIA R. NIRENSTEIN FLED A. LITT' E. P C. DEAN D. AVLICK. P.C. - WILLIAM P. BARR JUDITM A. SANDLER JOHN B RMIN ELANDER. P C. JOMN ENGEL P.C. SUSAN M. FREUND EDWARD D. YOUNG. tal CRvCE W. CMURCHILL. P C. CH AR6ES 3. TEMMIN. P C. TELEX JOHN L.. CARR. JR. ROSERT L WILLMORE LEFAIE A. NICHOLSON JR P C. STEPHEN B. MUTTLER. P C. 8 PMILIP J. MARVEY WENCELIN A WHITE MAffflN D MRALL. P C. WINTHROP N. BROWN. P C. 388338"A* LAW *8MI RosERT M. GORDON STANLEY M. MMO FWICH ARD .a. MENDALL. P.C. JAMES 3. HAMLIN. P C. CABLE **SMAWLAW*. SARBARA J. MORGEN KRISTI L. LIMBO JAY E. SILBERG. P C. MANDAL S RELL PC. BONNIE 5. GOTTLIEB LESLIE K. SMITM CAEARA M ROSSOTTI. P C. RosERT E. 2AMLER - MOWARD M. SMAFFERMAN VIRGtNIA S. RUTLEDGE GEORGE V. ALLEN. JR . P C. RICH ARD E. GALEN DEBORAM a. sAUSER MATMERsNE P. CHEEK FRED ORASN ER. P C. SJOSERT S. ROSBsNS WRITER'S DeRECT DIAL he.sMBER SCOTT A. ANENBERG JANICE LEMNER-STEIN R. ME NLY WE WSTER. P C. STEVEN M LUCAS s CAMPBELL MILLEFER TRAVIS T. 940wN. JR N ATM ANIEL P. BREED. JR. P C. DAVID M. RUSENSTEIN g202) 822-1051 SETM M. HOOGAS AN Gait E. CURRE, MARM AUGENS6tCR. P C. LYNN WHITTLESEY WILSON SMEILA McC. HARVEY RICHARC M. MRONTHAL EF. NEST L RLANE. JR P C. MATI AS F. TRAV6ESO-OtAZ DELISSA A. RIDGWAY STEPMEN 3. HEIM ANN CATdLETON S. JONES P.C. VICTORIA J. PERMINS MENNETM J. MAUTMAN August 19, 1982 Sheldon J. Wolfe, Esquire -
Dr. Harry Foreman Administrative Judge Administrative Judge Chairman, Atomic Safety and Atomic Safety and Licensing Licensing Board Panel Board Panel U.S. Nuclear Regulatory Director, Center for Commission Population Studies Washington, D.C. 20555 Box 395, Mayo University of P.innesota Minneapolis, hN 55455 Dr. Walter H. Jordan Administrative Judge Atomic Safety and Licensing Board Panel 881 West Outer Drive Oak Ridge, TN 37830 In the Matter of Louisiana Power & Light Company, (Waterford Steam Electric Station, Unit 3), Docket No. 50-382 Gentlemen: ,
In accordance with the Licensing Board's August 17, 1982 Memorandum and Order, I am enclosing copies of the printer's proof of the public information brochure which will be dis-tributed to the general public as part of the off-site emer-gency preparedness plan. As instructed by the Board, the brochure has been marked " Applicant Exhibit 11."
0) 8208240350 820819 '
PDR ADOCK 05000382 G PDR
o SHAw, PITTMAN. PoTTs & TROWBRIDGE
. ...r r .. or ..o, c... .t co..o..r.o . .
Administrative Judges Page Two August 19, 1982
, The exhibit is being served as' indicated on the attached service list, with the three additional copies to be served on the Board being transmitted directly to Judge Wolfe.
The exhibit (undated) was received from the printer on August 17, 1982, and reflects the comments of FEMA (letter .
dated June 23, 1982 from John Benton, Region VI to L. V. Maurin, attached) and telephone comments of Donald J. Perrotti, NRC Staff', to Robert G. Azzarello.
The final printed brochure will be in full color. The color highlights will include a. color photograph of the Waterford 3 Nuclear Plant on the front of the brochure, color diagrams of the reactor and containment, yellow background for emphasis of the sections entitled "What To Do If Sirens Are Activated" and "Some Important Phone Numbers," and a full-color map with different colors to identify the 16 proteccive action sectors within the plume exposure pathway Emergency Planning Zone (" plume EPZ") . The full-color brochure will not be available until the final edition is printed in volume, and is therefore not available as an exhibit. However, Applicant has made arrangements for full-color reproductions of the artist's proof of the map, which will be submitted within a day or two as an additional exhibit.
Sincerely you: s, NI I
\s__su
. ce h u rchill Counsel for Applicant l
Enclosures cc: Service List attached i
i >
l
\
l i
. ~ .
.; Federal Emergency Management Agency
< : y Region VI 3 y Federal Center Denton, Texas 76201 c
June 23, 1982 o 4 f .'
Mr. L. V. Maurin r' E-3 M; /Cu g i(S l' Vice President, Nuclear Operations '
Ff [$ @
Louisiana Power & Light Co. [ -
M P. O. Box 6008 >l . 'O t New Orleans, Louisiana 70174 f. .
Dear Mr. Maurin:
In accordance with your request, the Public Information Brochure for Water-ford 3 SES has been. reviewed and the following comments are offered for your consideration.
(1) While the evaluation criteria for the'public information program requires annual updating, it does not require that the public infor-mation brochure be reprinted annually. Since this could become quite.
expensive, we would suggest that._ dales not be used on the brochure. d'.
Pictures, as are implied, also date documents butTo a lesser extiint.
(2) Nuclear Energy Glossary:
It may not be understood that the F.aximum Permissible Dose fis 5-15 mrem per year above background.
% Under the definition of ' Maximum Permissible Dose', it is noted that the dose from Waterford 3 (above background) would
.be less than 1 mrem per year. Under the definition of 'Back-ground Radiation', both .01 mrem and 1 mrem per year values are
. cited. While both are technically correct, to minimize the
- chance of confusion, the same value could be used throughout l
(less than 1 mrem per year). .
(3) Emergency Action Plan:
(ai Under ' Ad Hoc Respiratory Protection', if some examples of limiting the outside air intake were given, such as '
. closing windows and doors and turning off external ventila-tion devices, it would clarify the definition.
(b) Under ' School Children', the word "do" (hi-lited) appears twice unnecessarily. If.known, it would be helpful if the brochure indicated how and when the school board would notify people of the centers where their children could be picked up.
2 These comments are rather minor and even trivial in some cases, but may serve to further clarify what we feel the intent of the brochure is.
If we can be of further assistance regarding the "off-site" portion of the Radiological Emergency Preparedness Plans, let us know.
Sincsrely,
. ; ll
, -QC '
. gll_ '[Y- llhvI *!
. ohn Benton '
Emergency Management Specialist Technical Hazards -
. Technological and Natural Hazards Division O 9 e
l 4
l m . , , , . - - - -
, -m,--.., . , - - w.--. .- - - - --- . - , , m. -
,,m ,,--,-..-,--w-~-- -, , ,. . _ , .
r- 1,~
e UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board In the Matter of )
) .
LOUISIANA POWER & LIGHT COMPANY )
Docket No. 50-382
)
(Waterford Steam Electric Station, )
Unit 3) )
CERTIF'ICATE OF SERVICE This is to certify that copies of.the foregoing letter dated August 19, 1982 from Bruce W. Churchill to the Licensing Board and " Applicant Exhibit 11" were served, by deposit in the U.S. Mail, first class, postage prepaid, to all those on the attached service list, on the 19th day of August, 1982.
C Jl J s .
M ce C Churchill Dated: August 19, 1982 i
i l
e UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board In the Matter of ,
)'
)
LOUISIANA POWER & LIGHT COMPANY )
Docket No. 50-382
)
(Waterford Steam Electric Station, )
Unit 3) ) .
SERVIC$ LIST Sheldon J. W o'l f e , Esquire (4) Spence W. Perry, Esquire Administrative Judge Federal Emergency Management Chairman, Atomic Safety and Agency Licensing Board Panel Office of General Counsel U.S. Nuclear Regulatory 500 C Street, S.W., Room 840 Comnission Washington, DC 20472 Washington, D.C. 20555 Mr. Gary Groesch Dr. Harry Foreman 2257 Bayou Road Administrative Judge New Orleans, LA 70119 Director, Center for Population Studies Luke B. Fontana, Esquire Box 395, Mayo 824 Esplanade Avenue University of Minnesota New Orleans, LA 70116 Minneapolis, MN 55455 Atomic Safety and Licensing Dr. Walter H. Jordan Board Panel Administrative Judge U.S. Nuclear Regulatory 881 West Outer Drive Commission Oak Ridge, TN 37830 Washington, D.C. 20555 Sherwin E. Turk, Esquire (2) Atomic Safety and Licensing Office of the Executive Appeal Board Panel Legal Director U.S. Nuclear Regulatory U.'S. Nuclear Regulatory Commission Commission Washington, DC 20555 Washington, D.C. 20555 g
- Docketing and Service Section Brian Cassidy, Esfaire Office of the Secretary Federal Emergency: Management U.S. Nuclear Regulatory Agency Commission Region I Washington, DC 20555 442 J. W. McCormack Boston, MA 02109