ML20063A352
| ML20063A352 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 01/11/1994 |
| From: | Mccoy C GEORGIA POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20063A354 | List: |
| References | |
| LCV-0251, LCV-251, NUDOCS 9401250248 | |
| Download: ML20063A352 (2) | |
Text
_-
C Ge w Pw7 rr rw
, c;, e
,t s t e r Pa > cn P. : o y s: e s e<
m A-x m,a y 201
' ' 5 [' ?
'( y,.p s,>
n Georgia Power C. K. McCoy
-W
January 11, 1994
- c. 2%,,
,,,c s a.,
LCV-0251 Docket Nos. 50-424 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen:
VOGTLE ELECTRIC GENERATING PLANT MONTHLY OPERATING REPORT Enclosed are the December 1993 monthly operating repons for Vogtle Electric Generating Plant (VEGP) Units 1 and 2. These repons are submitted in accordance with Technical Specification 6.8.1.5.
Also enclosed are revised pages only, which are for the July 1993 monthly operating repon for the VEGP Unit 1. This report was previously submitted in accordance with Technical Specification 6.8.1.5 by our letter dated August 11,1993 (LCV-0109). Each revised entry is denoted by an asterisk. These revisions to both the Gross and the Net Electrical Energy Generated were required to correct discrepancies in electrical generation accounting. The cumulative carryover effect on the Net Electrical Energy Generated and the Unit Capacity Factors has been reflected in the current monthly report to document the actual operating history of VEGP Unit 1.
Sincerely, O ml '
C. K. McCoy CKM/JLUgmb Enclosure l
cc: (See next page) c r.^ a (htJ ej 9401250248 940111 I
PDR ADOCK 05000424 i
i R
PDR g
a.
i 1
Georg. Power h ia U. S. Nuclear Regulatory Commission Page 2 cc: Georeia Power Comnany Mr. J. B. Beasley, Jr.
hir. hi. Sheibani NORMS U. S. Nuclear Reculatory Commission Mr. S. D. Ebneter, Regional Administrator Mr. D. S. Hood, Licensing Project Manager, NRR Mr. B. R. Bonser, Senior Resident Inspector, Vogtle I
LC%0251 1
700776
'