- Northcm States Power Company _
414 Nicollet Mall Manneapolis, Minnesota 55401 1927 Telephone (612) 330-5500 January 5, 1994 Prairie Island Technical Specifications Section 6.7.A.3 US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket Nos. 50-282 License Nos. DPR-42 50-306 DPR-60 Monthly Operating Report December 1993 Attached is the Monthly Operating Report for December 1993 for the Prairio Island Generating Plant.
-l if JM Roger O Anderson Director Licensing and Management Issues c
Director, Office of Resource Management Regional Administrator-III, NRC NRR Project Manager, NRC NRC Resident Inspector State of Minnesota - Kris Sanda' Attachment 130002
//
u I 9401210064 931231 gDR ADOCK 05000282
,\\
_G.
+
i
- s,
4,
- t l
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE
- t
' l DOCKET NO'.
50-282' UNIT P~RAIRIE ISLAND NO.1-DATE' JANUARY 3~,
1994 COMPLETED BY DALE DUGSTAD TELEPHONE 612-388-1121-4376 i
-MONTH: DECEMBER 1993-4 The Unit was base loaded this month, there were no shutdowns or-
- i power reductions.
7
- F t
i I
I
. 1 CURRENT CONTINUOUS OPERATING RUN OF 316 DAYS.
1 ll l
- I
.-j
.. ~...
. -. i n.,
+ -.
+
r y
__ ~
l l
AVERAGE DAILY UNIT POWER ~ LEVEL M
~
.i
. DOCKET NO. 50-282 i
UNIT ERATRTE ISLAND NO.1 l
DATE JANUARY 3, 1994 j
COMPLETED BY DALE DUGSTAD TELEPHONE 612-388-1121-4376
-l MONTH: DECEMBER 1993 j
.l DAY AVERAGE DAILY POWER LEVEL-(MWE-NET) l 1
526 2
530 3
528 4
527 5
528 1
6 525 7
524
'I 8
527 i
9 528 l
10 527 11 532 12 527 i
13 530 l
14 529 15 528 16 530 f
17 530 18 533 19 527 20 530 21 533 t
22 528 t
23 529 24 530 25 529 26 529 27 529 28 530 29 532 l
30 528 31 529 4
AVERAGE LOADS ABOVE 513 MWE-NET ARE DUE TO COOLER. CONDENSER CIRCULATING WATER i
e
.;, -. ;.^
i
d u
p i
OPERATING DATA REPORT Y
DOCKET NO. 50-282 UNIT FRAIRIE ISLAND NO.1
~
-DATE JANUARY 3, 1994 1
COMPLETED.BY DALE DUGSTAD TELEPHONE'612-388-1121-4376 s'!
OPERATING STATUS
-l
- 1. UNIT NAME:
PRAIRIE ISLAND NO. 1 2.
REPORTING PERIOD: DECEMBER 1993 3.
LICENSED THERMAL POWER (MWT):
1650 4.
NAMEPLATE RATING (GROSS MWE):
593
- 5. DESIGN ELECTRICAL RATING (NET MWE):
530.
6.
MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 545
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
513 8.
IF CRANGES OCCUR IN CAPACITY RATINGS (ITEMS' NUMBER 3 THROUGH.7)'
SINCE LAST REPORT GIVE REASON:
NONE i
9.~ POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE) :
NONE
- 10. REASONS FOR-RESTRICTIONS, IF ANY:
NONE THIS MONTH
.YR-TO-DATE CUMULATIVEl
- 11. HOURS IN REPORTING PERIOD 744 8760
'175704' 11 2. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 8507.9 150306.9
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 5571.1
- 14. HOURS GENERATOR ON-LINE 744.0 8480.7 148681i9
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0-
- 16. GROSS THERMAL ENERGY GENERATED (MGI) 1223693 13815304 235213148
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH)' 413930 4628120 77424070
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 393404-4377993 72739784-
- 19. UNIT SERVICE FACTOR 100.0 96.8 84.6
.I 20.' UNIT AVAILABILITY FACTOR 100.0 96.8 84.6
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 103.1 98.9 82.3
- 22. UNIT CAPACITY FACTOR (USING DER NET) 99.8 94.3 78.1
- 23. UNIT FORCED OUTAGE RATE 0.0 0.2 5.1:
- 24. FORCED OGTAGE HOURS 0.0 15.3 7960.6
-25.
SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH):
Refueling & maintenance to start in-May 1994.
- 26. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE: N/A i
l
.\\
-)
i
UNIT-SHUTDOWNS AND' POWER REDUCTION' DOCKET NO 50-282 UNIT NAME PTAIRIE ISLAND NO. 1 DATE JANUARY-3, 1994 COMPLETED BY DALE DUGSTAD TELEPHONE 612-388-1121-4376 MONTH: DECEMBER 1993 DATE TYPE HOURS REASON METHOD LER-NUMBER SYSTEM COMPONENT
~ YY/MM7DD 000.0 93/12/00 None.
I i
l i
l]
q
,j i
'l I
TYPE-REASON METHOD SYSTEM CODE 1F-FORCED A-EQUIPMENT FAILURE 1-MANUAL-DRAFT-IEEE STD~.
'S-SCHED B-MAINTENANCE OR TEST 2-MANUAL. TRIP 8 05-1984 (P8 05-D5) i C-REFUELING 3-AUTO TRIP i
D-REGULATORY RESTRICTION 4-CONTINUED E-OPERATOR TRAINING &
5-REDUCED LOAD COMPONENT CODE' LICENSE EXAMINATION 9-OTHER' F-ADMINISTRATIVE IEEE STD 803A-1983 t
G-OPERATIONAL ERROR d
I H-OTHER Q
- 1 1
a
.~
A.
L NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE-DOCKET NO. 50-306 UNIT PRAIRIE ISLAND NO.2 DATE JANUARY 3, 1994 COMPLETED BY DALE DUGSTAD '
TELEPHONE 612-388-1121-4376 MONTH: DECEMBER 1993 For'the first part of December, Unit 2 continued with cycle 16 refueling and maintenance outage. The end_of the outage began-when the Unit started to leave cold shutdown at 1349 of the 10th.
The reactcr went critical at 1021 of the 15th and the generator was' connected to the grid at 1728 of the 16th.
During the ramp'up, on Dec 19, control valve (CV-2) oscillated a few times causing the operators'to place the turbine control in manual and reducing power to allow repair to CV-2. The problem was identified and corrected on the 20th and the Unit returned-to ramp up to full power. On the 21st at 2130 the Unit' reached full power operation.
The outage, from breaker to breaker, was 48 days, 18 hours2.083333e-4 days <br />0.005 hours <br />2.97619e-5 weeks <br />6.849e-6 months <br /> and 11 minutes.
i CURRENT CONTINUOUS OPERATING RUN OF 15 DAYG.
.i.......,.._
4 AVERAGE DAILY UNIT POWER LEVEL 4
DOCKET NO. 50-306 UNIT PRATRTE ISLAND NO.2 -
~
DATE JANUARY 3, 1994 COMPLETED BY DALE DUGSTAD.
[
TELEPHONE 612-388-1121-4376 MONTH: DECEMBER 1993 DAY AVERAGE DAILY POWER LEVEL (MWE-NET) s 1
-2 2
-2 3
0 i
4 0
5 0
6 0
7 0
8 0
9 0
i 10
-11 11
-14
)
12
-15 i
13
-15 l
14-
-14 15
-15 16 8
17 229 18' 338 19 438 20 432 4
21 508 l
22 530 23 534 i
24 534 25 534 l
26 533 27 532 i
28 535 29 534 1'
30 533 31 532 AVERAGE LOADS ABOVE 512 MWE-NET ARE DUE TO COOLER CONDENSER CIRCULATING WATER D
s 3
i
,e yy v-w 2
- 1 b
0 4
OPERATING DATA REPORT
=i DOCKET NO. 50-306
~
'I UNIT PRAllifE ISLAND NO.2 DATE JANUARY 3, 1994 COMPLETED BY DALE DUGSTAD TELEPHONE 612-388-1121-4376
.i
. OPERATING STATUS l
- 1. UNIT NAME:
PRAIRIE ISLAND NO. 2
-2.
REPORTING PERIOD: DECEMEER 1993 3.
LICENSED THERMAL POWER -(MWT) :
1650
- 4. NAMEPLATE RATING (GROSS MWE) :
593
- 5. DESIGN' ELECTRICAL RATING (NET MWE):
530
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE) : 544
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
512.
8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER.3 THROUGH 7)-
SINCE LAST REPORT GIVE REASON:
NONE 9.LPOWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE) :
NONE
- 10. REASONS FOR RESTRICTIONS, IF ANYi NONE i
i THIS MONTH YR-TO-DATE CUMULATIVE-a 11 HOURS IN REPORTING PERIOD 744 8760 166822 146367.0 i
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 397.6 7381.4 i
- 13. REACTOR RESERVE SHUTDONN HOURS 0.0 0.0-1516.1:
'14.
HOURS GENERATOR ON-LINE 366.5 7339.7 ~
144988.4-~
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0-
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 546080 11849318 229955639.
'17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 184780 3965470 74905170-
- 18. NET ELECTRICAL ENERGY GENERATED (16 01) 172743 3745055 70804536
- 19. UNIT-SERVICE FACTOR 49.3 83.8 86.9
- 20. UNIT AVAILABILITY FACTOR 49.3~
83.8 86.9-
- 21. ' UNIT CAPACITY FACTOR (USING MDC NET) 45.3 85.0 84.9
- 22. UNIT CAFACITY FACTOR (USING DER NET) 43.8 80.7 80.1 1
- 23. UNIT FORCED OUTAGE RATE 0.0 0.0 2.7
- 24. FORCED OUTAGE HOURS 0.0 0.0 3964.0'
-f
- 25. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH):
N/A i
26.LIF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:
N/A l
a 1
i l
k l
.. ~ '
b r
UNIT SHUTDOWNS AND POWER-REDUCTION j
l DOCKET NO 50-306 UNIT NAME-PRAIRIE ISLAND NO. 2' DATE JANUARY 3, 1994 COMPLETED BY DALE DUGSTAD TELEPHONE-612-388-1121-4376 e
MONTH: DECEMBER 1993 I
YY7RM7DD 000,0
' REASON METHOD LER NUMBER SYSTEM - COMPONENT' l
DATE TYPE HOURS 93/10/28 S
377.5 C
4 N/A N/A N/A-Refueling outage cycle 116.
6 93/12/19 F
0.0 A
5 N/A FCV Control valve (CV-2), replace the valve position servo card.
i f
t i
.i i
f
'I C
TYPE REASON METHOD SYSTEM CODE F-FORCED A-EQUIPMENT FAILURE 1-MANUAL DRAFT IEEE STD S-SCHED B-MAINTENANCE OR TEST 2-MANUAL TRIP 805-1984 (P8 05-D5) ~
C-REFUELING 3-AUTO TRIP
'i D-REGULATORY RESTRICTION 4-CONTINUED E-OPERATOR TRAINING &
.5-REDUCED LOAD COMPONENT CODE LICENSE EXAMINATION.
9-OTHER F-ADMINISTRATIVE IEEE STD'803A-1983 G-OPERATIONAL ERROR H-OTHER I
l
.1