1 e
Entergy Operations,Inc.
- = ENTERGY mma Kii v.a, Us 70006 1,15J4 730 67 74 R. F. Dursiti I
I n, e - -.
Nux 1
A4.05 PR January 14, 1994 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555
Subject:
Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report Gentlemen:
Attached is the subject monthly report which covers the-operating i
statistics for the month of December,1993.
This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.
i Very truly yours, r
g - %e j
R.F. Burski Director Nuclear Safety
.i i
RFB/TSB/ssf l
Attachment I
cc:
J.L. Milhoan, (NRC Region IV), R.B. McGehee, N.S. Reynolds, F. Yost (Utility Data Institute, Inc.),
J.T. Wheelock (INP0 Records Center), NRC Resident inspectors Office f6W 9401210037 931231 M
///
PDR ADOCR 05000392 0 R
PDR a_
i 1
NRC MONTHLY OPERATING REPORT
SUMMARY
OF OPERATIONS i
i WATERFORD 3 DECEMBER 1993
)
=i The unit operated at an average reactor power of 99.8% and experienced no shutdowns or significant power reductions during the period.
j e
i t
t i
?
.i
'll i
+
~!
3 i
i i
)
i 1
1 e
i i
l f
. )
i PRESSURIZER SAFETY VALVE i
i j
FAILURES AND CHALLENGES l
WATERFORD 3
- i During the month of December 1993, there were no pressurizer safety valve failures or challenges.
l I
i i
't i
t i
i i
I i
I i
1 4
i
' I t
I i
)
- (
- i
?
4 l
t A
k*
w w
w w-,.
l OPERATING DATA REPORT DOCKET NUMBER: 50-382 I
UNIT NAME: WATERFORD 3 DATE OF REPORT: JANUARY,1994 COMPLETED BY:
E.G. WlEGERT l
TELEPHONE: 504-739-6446 l
l OPERATING STATUS i'
1.
Reporting Period: December,1993 Gross Hours in Reporting Period: 744 2.
Currently Authorized Power Level (MWt): 3390 i
Maximum Dependable Capacity (Net MWe): 1075 Design Electrical Rating (Net MWe): 1104 3.
Power Level to which Restricted (if any) (Net MWe): N/A i
4.
Reasons for Restriction (if any): N/A THIS MONTH YR TO DATE CUMULATIVE l
S.
Number of Hours Reactor was Critical i
744.0 8,707.0 61,100.0 I
6.
Reactor Reserve Shutdown Hours l l
7.
Hours Generator was On-line 744.0 8,692.0 60,288.2 P
B.
Unit Reserve Shutdown Hours ;
9.
Gross Thermal Energy Generated (MWH) 2,517.986 29,361.424 199.028.477
- 10. Gross Electrical Energy Generated (MWH) 819.970 9,559,310 66,420,780
- 11. Net Electrical Energy
)
Generated (MVM) 785,799 9,138,828 63,310.445 l
J
' 12. Reactor Service Factor 100.0 99.4'
- 84.3
..l
- 13. Reactor Availability Factor 100.0 99.4 84.3
- 14. Unit Service Factor 100.0' 99.2 83.2 1
- 15. Unit Availability Factor 100.0 99.2
~ 83.2
'l
- 16. Unit Capacity Factor (using MDC) 98.2
-97.0 81.2
- 17. Unit Capacity Factor (Using DER) 95.7 94.5 79.1
- 18. Unit Forced Outage Rate 0.8' 3.5 i
)
~..
.i
~
k e
n OPERATING DATA REPORT i
DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: JANUARY,1994 1
COMPLETED BY; E.G. WlEGERT 2
TELEPHONE: 504-739-6446 i
OPERATING DATA REPORT (Con'n 19.
Shutdowns Scheduled over next 6 Months (type, date and duration of each):
i Refueling - March 4,1994. Planned duration - 52 days.
l 20.
If Shutdown at end of report period, estimated date of startup: N/A 21.
Unitin Commercial Operation l
i THIS MONTH YR TO DATE CUMULATIVE
- 22. Hours in Reporting Period 744.0 8,760.0 72,505.0-23.-
Unit Forced Outage Hours 0.0 68.0 2,178.7 24.
Nameplate Rating (Gross MWe): 1200 25.
If Changes Occur in Capacity Ratings (Items Number 2 and 24) Since Last Report,.
l Give Reasons: N/A 1
1
-I I'i
)
i AVERAGE DAILY UNIT POWER LEVEL j
DOCKET NUMBER: ~50-382' UNIT NAME: WATERFORD 3 -
DATE OF REPORT: JANUARY,1994 i
COMPLETED BY:
E.G. WlEGERT TELEPHONE: 504-739-6446 MONTH DECEMBER.1993 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DA!LY POWER LEVEL (MWe-NET)
(MWe-NET) l
{
1 1053 17 1064 2
1033 18 1063 3
1051 19 1064 l
t 4
1053 20 1065 i
5 1051 21 1064 6
1042 22 1063 7
1043 23 1063 j
t 8
1050 24 1063
[
l 9
1051 25 1063
?
10 1051 26 1063 j
i 11 1053 27 1064 12 1052 28 1064 1
-l' 13 1052 29-1063 14 1052 30 1062 15 1052 31 1062 16 1054 i
INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
f Compute to the nearest whole megawatt.
(
4 a
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: JANUARY,1994 COMPLETED BY:
E.G. WlEGERT TELEPHONE: 504-739-6446 REPORT FOR DECEMBER.1993 Type Metnod of Shutting F = Forced Duration Down the Reactor or Cause, Comments and Number Date S = Scheduled (Hours)
Reason (1)
Reducino Power (2)
Corrective Actions NONE (1) REASON (2) METHOD A=
Equipment Failure (explain) 1=
Maneal B=
Maintenance or Test 2=
Manual Scram C=
Refueling 3=
Regulatory Restriction 4=
Continuation from Previous Period E=
Operator Training and.
5=
Power Reduction License Examination 6=
Other(explain)
F=
Administrative G=
Operational Error (explain)
H=
Other(explain)
~.
...~..
-