Monthly Operating Rept for Dec 1993 for Waterford 3
ML20062N738
Person / Time
Site: Waterford Entergy icon.png
Issue date: 12/31/1993
From: Burski R, Wiegert E
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
W3F1-94-0003, W3F1-94-3, NUDOCS 9401210037
Download: ML20062N738 (7)


Text

1 e Entergy Operations,Inc.

- = ENTERGY mma

  • Kii v.a, Us 70006 1,15J4 730 67 74 .

R. F. Dursiti I n, e - -. I Nux -',

l 1

W3F1-94-0003 i A4.05  :!

PR ,

January 14, 1994  !

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555  !

Subject:

Waterford 3 SES Docket No. 50-382  ;

License No. NPF-38  ;

Monthly Operating Report  !

Gentlemen:

Attached is the subject monthly report which covers the- operating i statistics for the month of December,1993. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38. i Very truly yours, r

g - %e j R.F. Burski Director Nuclear Safety  ;

.ii RFB/TSB/ssf l Attachment I

cc: J.L. Milhoan, (NRC Region IV), R.B. McGehee, '

N.S. Reynolds, F. Yost (Utility Data Institute, Inc.),

J.T. Wheelock (INP0 Records Center), NRC Resident ,

inspectors Office 9401210037 931231 M f6W '

PDR R

ADOCR 05000392 0' PDR

///

a_

_l i

1 NRC MONTHLY OPERATING REPORT

SUMMARY

OF OPERATIONS i i

WATERFORD 3  ;

DECEMBER 1993 .

)

=i The unit operated at an average reactor power of 99.8% and experienced no shutdowns or significant  !

power reductions during the period. j e

i l

t t

i

?

.i 'll i

+

~!

3 i

l i

i

)

i 1

l 1

e . __ _ . _ _ . . _ _ _ _ _ _ _ _ . - .

i i

l f

.)

i PRESSURIZER SAFETY VALVE i i

j FAILURES AND CHALLENGES l WATERFORD 3

-i During the month of December 1993, there were no pressurizer safety valve failures or challenges.

l I

i i

't i

t i

i i

I i

I i

4 1i

'I t

I

i

)

(

-i

?

4 l

t A

- w-,.

l OPERATING DATA REPORT DOCKET NUMBER: 50-382 I UNIT NAME: WATERFORD 3 DATE OF REPORT: JANUARY,1994 COMPLETED BY: E.G. WlEGERT l TELEPHONE: 504-739-6446 l l

OPERATING STATUS i

1. Reporting Period: December,1993 Gross Hours in Reporting Period: 744  :
2. Currently Authorized Power Level (MWt): 3390 i Maximum Dependable Capacity (Net MWe): 1075 ,

Design Electrical Rating (Net MWe): 1104

3. Power Level to which Restricted (if any) (Net MWe): N/A ,

i

4. Reasons for Restriction (if any): N/A .!

THIS MONTH YR TO DATE CUMULATIVE l S. Number of Hours Reactor was Critical i 744.0 8,707.0 61,100.0 l I

6. Reactor Reserve Shutdown Hours l l
7. Hours Generator was On-line 744.0 8,692.0 60,288.2 P

B. Unit Reserve Shutdown Hours  ;

9. Gross Thermal Energy Generated (MWH) 2,517.986 29,361.424 199.028.477
10. Gross Electrical Energy Generated (MWH) 819.970 9,559,310 66,420,780
11. Net Electrical Energy )

Generated (MVM) 785,799 9,138,828 63,310.445 l J

' 12. Reactor Service Factor 100.0 99.4' :84.3 .

..l

13. Reactor Availability Factor 100.0 99.4 84.3
14. Unit Service Factor 100.0' 99.2 83.2 1
15. Unit Availability Factor 100.0 99.2 ~ 83.2 'l
16. Unit Capacity Factor (using MDC) 98.2 -97.0 81.2
17. Unit Capacity Factor (Using DER) 95.7 94.5 79.1
18. Unit Forced Outage Rate 0.8' 3.5 i

)

~ . . .i

- . . - . . . . . . . . . - . . . . - . - . . . .. . .. . ~ . , - _

k e n OPERATING DATA REPORT i DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: JANUARY,1994 1 COMPLETED BY; E.G. WlEGERT 2

TELEPHONE: 504-739-6446 i

OPERATING DATA REPORT (Con'n

19. Shutdowns Scheduled over next 6 Months (type, date and duration of each):

i Refueling - March 4,1994. Planned duration - 52 days.

l

20. If Shutdown at end of report period, estimated date of startup: N/A ,
21. Unitin Commercial Operation l i

THIS MONTH YR TO DATE CUMULATIVE

22. Hours in Reporting Period 744.0 8,760.0 72,505.0-23.- Unit Forced Outage Hours 0.0 68.0 2,178.7
24. Nameplate Rating (Gross MWe): 1200 .
25. If Changes Occur in Capacity Ratings (Items Number 2 and 24) Since Last Report, . l Give Reasons: N/A  ;

1 1

-I I

'i

)

' i AVERAGE DAILY UNIT POWER LEVEL j DOCKET NUMBER: ~50-382'  !

UNIT NAME: WATERFORD 3 -  !

DATE OF REPORT: JANUARY,1994 i COMPLETED BY: E.G. WlEGERT TELEPHONE: 504-739-6446 MONTH DECEMBER.1993 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DA!LY POWER LEVEL -

(MWe-NET) (MWe-NET) l 1 1053 17 1064

{

2 1033 18 1063  ;

3 1051 19 1064 l t

4 1053 20 1065 i 5 1051 21 1064 6 1042 22 1063 7 1043 23 1063 j t

8 1050 24 1063 [

l 9 1051 25 1063

?

10 1051 26 1063 j i

11 1053 27 1064  !

12 1052 28 1064 1!

-l' 13 1052 29- 1063 14 1052 30 1062  ;

15 1052 31 1062 16 1054 i INSTRUCTIONS l

On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. f Compute to the nearest whole megawatt. '

(

l l

4 a

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER: 50-382 .

UNIT NAME: WATERFORD 3 DATE OF REPORT: JANUARY,1994 COMPLETED BY: E.G. WlEGERT TELEPHONE: 504-739-6446 REPORT FOR DECEMBER.1993 Type Metnod of Shutting F = Forced Duration Down the Reactor or Cause, Comments and Number Date S = Scheduled (Hours) Reason (1) Reducino Power (2) Corrective Actions NONE (1) REASON (2) METHOD A= Equipment Failure (explain) 1= Maneal B= Maintenance or Test 2= Manual Scram C= Refueling 3= Automatic Scram D= Regulatory Restriction 4= Continuation from Previous Period E= Operator Training and. 5= Power Reduction License Examination 6= Other(explain)

F= Administrative G= Operational Error (explain)

H= Other(explain)

. _ . . _ . . . _ . . . _ . _ - _ . _ - _ . _ - _ . . . _ . . . _ . . , _ _ _ . . , . . . _ . _ , . . . . . , . _ _ _ . . _ . . _ - _ _ . . . . _ . . - _ . . _ . . . _ ~ . _ . _ . . . . _ _ ...~ . . _ _

-