Monthly Operating Rept for Dec 1993 for Waterford 3
ML20062N738
Person / Time
Site: Waterford Entergy icon.png
Issue date: 12/31/1993
From: Burski R, Wiegert E
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
W3F1-94-0003, W3F1-94-3, NUDOCS 9401210037
Download: ML20062N738 (7)


Text

1 e

Entergy Operations,Inc.

- = ENTERGY mma Kii v.a, Us 70006 1,15J4 730 67 74 R. F. Dursiti I

I n, e - -.

Nux 1

W3F1-94-0003 i

A4.05 PR January 14, 1994 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

Subject:

Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report Gentlemen:

Attached is the subject monthly report which covers the-operating i

statistics for the month of December,1993.

This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.

i Very truly yours, r

g - %e j

R.F. Burski Director Nuclear Safety

.i i

RFB/TSB/ssf l

Attachment I

cc:

J.L. Milhoan, (NRC Region IV), R.B. McGehee, N.S. Reynolds, F. Yost (Utility Data Institute, Inc.),

J.T. Wheelock (INP0 Records Center), NRC Resident inspectors Office f6W 9401210037 931231 M

///

PDR ADOCR 05000392 0 R

PDR a_

i 1

NRC MONTHLY OPERATING REPORT

SUMMARY

OF OPERATIONS i

i WATERFORD 3 DECEMBER 1993

)

=i The unit operated at an average reactor power of 99.8% and experienced no shutdowns or significant power reductions during the period.

j e

i t

t i

?

.i

'll i

+

~!

3 i

i i

)

i 1

1 e

i i

l f

. )

i PRESSURIZER SAFETY VALVE i

i j

FAILURES AND CHALLENGES l

WATERFORD 3

- i During the month of December 1993, there were no pressurizer safety valve failures or challenges.

l I

i i

't i

t i

i i

I i

I i

1 4

i

' I t

I i

)

(

- i

?

4 l

t A

k*

w w

w w-,.

l OPERATING DATA REPORT DOCKET NUMBER: 50-382 I

UNIT NAME: WATERFORD 3 DATE OF REPORT: JANUARY,1994 COMPLETED BY:

E.G. WlEGERT l

TELEPHONE: 504-739-6446 l

l OPERATING STATUS i'

1.

Reporting Period: December,1993 Gross Hours in Reporting Period: 744 2.

Currently Authorized Power Level (MWt): 3390 i

Maximum Dependable Capacity (Net MWe): 1075 Design Electrical Rating (Net MWe): 1104 3.

Power Level to which Restricted (if any) (Net MWe): N/A i

4.

Reasons for Restriction (if any): N/A THIS MONTH YR TO DATE CUMULATIVE l

S.

Number of Hours Reactor was Critical i

744.0 8,707.0 61,100.0 I

6.

Reactor Reserve Shutdown Hours l l

7.

Hours Generator was On-line 744.0 8,692.0 60,288.2 P

B.

Unit Reserve Shutdown Hours ;

9.

Gross Thermal Energy Generated (MWH) 2,517.986 29,361.424 199.028.477

10. Gross Electrical Energy Generated (MWH) 819.970 9,559,310 66,420,780
11. Net Electrical Energy

)

Generated (MVM) 785,799 9,138,828 63,310.445 l

J

' 12. Reactor Service Factor 100.0 99.4'

84.3

..l

13. Reactor Availability Factor 100.0 99.4 84.3
14. Unit Service Factor 100.0' 99.2 83.2 1
15. Unit Availability Factor 100.0 99.2

~ 83.2

'l

16. Unit Capacity Factor (using MDC) 98.2

-97.0 81.2

17. Unit Capacity Factor (Using DER) 95.7 94.5 79.1
18. Unit Forced Outage Rate 0.8' 3.5 i

)

~..

.i

~

k e

n OPERATING DATA REPORT i

DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: JANUARY,1994 1

COMPLETED BY; E.G. WlEGERT 2

TELEPHONE: 504-739-6446 i

OPERATING DATA REPORT (Con'n 19.

Shutdowns Scheduled over next 6 Months (type, date and duration of each):

i Refueling - March 4,1994. Planned duration - 52 days.

l 20.

If Shutdown at end of report period, estimated date of startup: N/A 21.

Unitin Commercial Operation l

i THIS MONTH YR TO DATE CUMULATIVE

22. Hours in Reporting Period 744.0 8,760.0 72,505.0-23.-

Unit Forced Outage Hours 0.0 68.0 2,178.7 24.

Nameplate Rating (Gross MWe): 1200 25.

If Changes Occur in Capacity Ratings (Items Number 2 and 24) Since Last Report,.

l Give Reasons: N/A 1

1

-I I'i

)

i AVERAGE DAILY UNIT POWER LEVEL j

DOCKET NUMBER: ~50-382' UNIT NAME: WATERFORD 3 -

DATE OF REPORT: JANUARY,1994 i

COMPLETED BY:

E.G. WlEGERT TELEPHONE: 504-739-6446 MONTH DECEMBER.1993 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DA!LY POWER LEVEL (MWe-NET)

(MWe-NET) l

{

1 1053 17 1064 2

1033 18 1063 3

1051 19 1064 l

t 4

1053 20 1065 i

5 1051 21 1064 6

1042 22 1063 7

1043 23 1063 j

t 8

1050 24 1063

[

l 9

1051 25 1063

?

10 1051 26 1063 j

i 11 1053 27 1064 12 1052 28 1064 1

-l' 13 1052 29-1063 14 1052 30 1062 15 1052 31 1062 16 1054 i

INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

f Compute to the nearest whole megawatt.

(

4 a

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: JANUARY,1994 COMPLETED BY:

E.G. WlEGERT TELEPHONE: 504-739-6446 REPORT FOR DECEMBER.1993 Type Metnod of Shutting F = Forced Duration Down the Reactor or Cause, Comments and Number Date S = Scheduled (Hours)

Reason (1)

Reducino Power (2)

Corrective Actions NONE (1) REASON (2) METHOD A=

Equipment Failure (explain) 1=

Maneal B=

Maintenance or Test 2=

Manual Scram C=

Refueling 3=

Automatic Scram D=

Regulatory Restriction 4=

Continuation from Previous Period E=

Operator Training and.

5=

Power Reduction License Examination 6=

Other(explain)

F=

Administrative G=

Operational Error (explain)

H=

Other(explain)

~.

...~..

-