ML20062N724
| ML20062N724 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 11/30/1993 |
| From: | Mike Williams WOLF CREEK NUCLEAR OPERATING CORP. |
| To: | |
| Shared Package | |
| ML20062N720 | List: |
| References | |
| NUDOCS 9401210026 | |
| Download: ML20062N724 (1) | |
Text
. _
g...
.i 4. *
- Attachment.2 to WO 94-0003-i i
j
(
l OPERATING DATA REPORT
. 50-482 lj DOCKET NO.
WOLF CREEK GENERATING STATION.;
WOLF CREEK NUCLEAR OPERATING CORPORATION, DATE 12-01-93"
-i COMPLETED BY M. Williams TELEPHONE 316-364-8831
-l OPERATING STATUS 1.
Reporting Period:
November, 1993 Gross Hours in Reporting Period:
-720
{
2.
Currently Authorized Power Level (MWt):
3565 Max. Depend. Cape.'ity(MWe-Net):
1134 Design Electrical Rating (MWe-Net):
1170 3.
Power Level to Which Restricted (If Any) (MWe-Net) :
N/A I
4..
Reasons for Restriction (If Any):
N/A j
This Month
~ Yr. to Date Cumulative 5.
Number of Hours Reactor was Critical 720.0 6315.8 57,618.3 6.
Reactor Reserve Shutdown Hours 0.c 0.0 339 8' 7.. Hours Generator on Line 720.0 6,257.6 56,9'09.4-8.
Unit Res2rve Shutdown Hours 0.0 0.0 0.0 j
9.
Gross Thermal Energy Generated (MWH) 2,435,990' 21,177,812
'186,706',947-10.
Gross Electrical Energy Generated (MWH) 851,111 7,371,148
'64,963,765 11.
Het Electrical Energy Generated (MWH) 817,529 7,043,073 61,989,202 i
12.
Reactor Service Factor 100.0 78.8 79.7 t
'13.
Reactor Availability Factor 100.0 78.8 80.2
)
.?
14.
Unit Service Factor 100.0 78.1 78.8<
15.
Unit Availability Factor 100.0-78.1 7 8'. 8 '
l 16.
Unit Capacity Factor (Using MDC) 100.1 77.6 75.8
-I
' 17..
Unit Capacity Factor (Using Design MWe) 97.0 75.1 73.3
-1 18.
Unit Forced Outage Rate 0.0 0.0 5.8-
-l 19.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of each).:
N/A
_ ]
'20.
If Shut Down at End of Report Period, Estimate Date of Startup:
.N/A
);
Wolf Creek Generating Station Monthly operating Report-November 1993
^9*
9401210026 940114 r
PDR ADOCK 05000482 y
.