Milling Addre:s Alabar-a Power Company 600 No 'fi 18th Street Post Office Box 2641 Birmmgham, Alabama 35291 Telephons 205 783-6081 F. L Clayton, Jr.
SO' ll%lg"'
AlabamaPower g
the southem electrc system August 18, 1982 Docket Nos. 50-348 50-364 Director, Nuclear Regulatory Regulation U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Attention:
Mr. S. A. Varga Joseph M. Farley Nuclear Plant - Units 1 and 2 NUREG-0737 Item II.B.3 Post Accident Sampling System Gentlemen:
We have reviewed the NRC letter of July 22, 1982 requesting a schedule for providing additional information concerning NUREG-0737 Item II.B.3 Post Accident Sampling System.
Based on this review a response will be provided by April 1, 1983.
The basis for this e.chedule is that Alabama Power Company is currently performing detailed outage planning for the upcoming refueling outages on both l
Farley units.
These refueling outages will start in the near l
future and extend into March, 1983.
In addition, tests will be required to verify the accuracy of selected sampling procedures and instrumentation; these tests will not be performed until September l
30, 1982.
l
)
If you have any questions, please advise.
e Yours very truly, L
C ayto Jr.'
FLCJ r/RGW:l s h-D25
[
cc:
Mr. R. A. Thomas Mr. G. F. Trowbridge p'
.Mr. J. P. O'Reilly Mr. E. A. Reeves Mr. W. H. Bradford r20823031b 520818 PDR ADOCK 05000348 P