Interim Deficiency Rept Re Centrifugal Charging Pump Operation Following Secondary Side High Energy Line Ruptures.Westinghouse 811013 Proposed Corrective Action Being Reviewed.Next Rept Will Be Submitted by 820806
ML20062N112
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 12/10/1981
From: Foster D
GEORGIA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
10CFR-050.55E, 10CFR-50.55E, GN-153, NUDOCS 8112180414
Download: ML20062N112 (2)


Text

.

o e o

Georgia Power Company b (

CIA Post Offee Box 4545 O-Attanta, Georgia 30302 Telephone 404 522 4 60 A8 3I VOgtle Project Southern Company Sennces, Inc.

Post Office Box 2625 Birmingham, Alabama 35202 Telephone 205 870-60t1 December 10, 1981 United States Nuclear Regulatory Commissior. File: X7BG03-M9 Office of Inspection and Enforcement Log: GN-153 Region II - Suite 3100 '"

101 Marietta Street O Atlanta, Georgia 30303 s( q h

Attention: Mr. James P. O'Reilly C2/7fgg ,

Reference:

Vogtle Electric Generating Plant - Units 1 and 2 e '" 2 7198 4 50-424, 50-425, Interim Report Dated 4/1/81 \ c , 3 g/

Potential 10CFR50.55(e) (Charging Pumps)

( r Wr?#

Gentlemen: [

Georgia Power Company has previously reported a significant deficiency to the NRC concerning centrifugal charging pump operation following secondary side high energy line ruptures. Corrective action for this problem has not been reported to the NRC.

Westinghouse, in a letter dated October 13, 1981, submitted a proposed corrective action to resolve this problem. The action proposed by Westinghouse is being reviewed by Georgia Power Company since it would impact the control logic for the Chemical and Volume Control System (CVCS); motor control center design; the piping layout in various areas of the plant, and the main control board design and layout.

Because of the potential impact on plant systems, Georgia Power Company has instructed its architect / engineer to pursue alternate design modification. Georgia Power Company will inform the NRC of the corrective action that will be taken on or before August 6, 198?.

This response cc:;tains no proprietary information and may be placed in the NRC Public Document Room upon receipt.

Yours truly, l

D. 0. Foster Project General Manager D0F:CWH:tlp , .gg g PD AO OO j df I. /

Mr. J. P, O'Reilly [ , ' s "')

Charging Pumps

  • December 10, 1981 '

v- .

, page 2 e

xc: U. S. Nuclear Regulatory Conmission .,

, N Attn: Victor J. Stello, Jr., Director . , \,

Office of Inspection and Enforcement , ' ' ~

c. ,

Washington, DC 20555 .- ,

" ~\ At J. H. Miller, Jr. ^

'J' -

R. J. Kelly

\

R. E. Conway -

G. F. Head R. H. Pinson .

+ L .'" .

C. F. Whitmer '

-L D. L. McCrary '

R. A. Thomas -

D. E. Dutton '

J. A. Bailey _

^

O. Batum H. H. Gregory, III s

E. D. Groover 9s \

L. T. Gucwa  : +

B. L. Lex 4 C. R. Miles, Jr.

" "c , Y "+v.

H. C. Nix  %* "*

R. W. Staffa '

^ -

J. L. Vota , , ',

s ~

a e P W .f rf

~

+.**%.,

- - Q te

~

  • . s

, 5 's. A-s ** '

+

  • !*4 %., $ 4

, .3

\ M 2 s ,  ; ,

N

/**'

.- s ,

me '

g i P 4 g d , / %D 3,  ;. .s- . .

~

. g ,

.. d, A

)

\,I s

\

n

' ,, _