Advises That SER Confirmatory Open Item Re Completion of GE Evaluation of Potential Fuel Assembly lift-off Due to Dynamic Loadings from SSE & LOCA Resolved.Evaluation Submitted to NRC on 820727 as Amend 3 to NEDE-21175-P
ML20062M470
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 08/18/1982
From: Tauber H
DETROIT EDISON CO.
To: Kintner L
Office of Nuclear Reactor Regulation
References
EF2---59-182, NUDOCS 8208200111
Download: ML20062M470 (1)


Text

HIrry Tcuber gY?!,e na constr cum u

Ckeht)it i

Edison R?!!! 5'"

August 18, 1982 EF2 - 59,182 j

Mr. L. L. Kintner U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Division of Licensing Washington, D. C.'20555

Dear Mr. Kintner:

Referenec:

Enrico Fermi Atomic Power Plant, Unit 2 NRC Docket No. 50-341

Subject:

Seismic and LOCA Loadings on Fuel The Fermi 2 Safety Evaluation Report (SER) prepared by the NRC indicates that there is a confirmatory open item concerning the completion of a GE evaluation of potential Fuel Assembly lift-off due to dynamic loadings from SSE and LOCA (Page 4-6 of the SER).

This evaluation has been completed and has been sub-mitted to the NRC as Amendment 3 to NEDE-21175-P, "BWR Fuel Assembly Evaluation of Combined SSE and LOCA Loadings (Amendment No. 3)", in GE to NRC letter MFN-099-82 from J. F. Quick to Mr. Hal Bernard, Acting Chief, Standardization and Special Projects Branch, dated July 27, 1982.

The evaluation is applicable to Fermi 2 and shows the fuel response is within accep-table limits.

Appropriate FSAR changes will be made to reference the topical repart in a forthcoming amendment.

Detroit Edison believes that this information provides adequate resolution for the SER confirmatory item.

Should you have any further-que tions, please contact L. E. Schuerman, (313) 649-7562.

Sincerely, N,