s 1
\\
h"t SHAW. PITTMAN. PoTTs & TROWBRIDGE' A pamTut asw'a 'NcLuowo paorE55c=AL commonatcNs 2300 N sTatET. N. w 93 T 23 ' ' 'M -
- v t tr a'ec a ELE.
- ASHINGTON, D. C. 20037 vieneena orrict i 3501 ramm carDrr OWNE "
89 2693 (SMAwLAW *SM) wettAw vinois.ia aziot s rELEPMo=E.
1703t ?90-7900 trortees-es42
,a
. p y}
t t Ltcopir e l202) 223 3760 & 223 3761 -
t
..[
MARGARET S. SPENCER
-i June 18, 1991
'I BY FEDERAL EXPRESS t
Marshall E. Miller, Chairman I
19201 South Creek Boulevard Spruce Creek Fly-In
.l Daytona Beach,' Florida 32124
'BY MESSENGER
- }
- Charles Bechhoefer Atomic. Safety.and Licensing Board Panel U.S. Nuclear Regulatory Commission Washington, D.C..
20555 f
t !.
John H. Frye, III Atomic Safety and Licensing Board Panel U.S.. Nuclear Regulatory Commission Washington, D.C.-
20555
.1, Re:
Application of Ohio Edison Company;to: Suspend Antitrust; j
License Conditions (Perry Nuclear Power Plant,: Unit.1l','
l!
NRC Docket No. 50-440A 1
Dear Sirs:
]
Enclosed.as. requested is a copy of. Ohio Edison's Application Conditions. Insofar As They Apply to Ohio Edison Company,,which:
j to Amend the Perry. Operating License to' Suspend the Antitrust:
}
'was filed in the above-captioned proceedingLon Septemberil8,.
.i 1987.
d Sincerely,-
,t 9401070124 910610 PDR ADOCK 05000440
=!
M PDR Margar t S.
Spencer _
Enclosure t I i
O
.'j 1
l UNITED STATEb OF AMERICA NUCLEAR RFG::LATORY COMMISSION BEFORE THE DIRECTOR, NUCLEAR REACTOR REGULATION In the Matter of
)
)
OHIO EDISON COMPANY
)
Docket No. 50-440A
)
(Perry Nuclear Power Plant,
)
Unit 1)
)
APPLICATION TO AMEND THE PERRY OPERATING LICENSE TO SUSPEND THE ANTITRUST CONDITIONS INSOFAR AS THEY APPLY TO OHIO EDISON COMPANY i
i SUBMITTED BY. OHIO EDISON COMPANY CO-OWNER OF THE PERRY NUCLEAR POWER PLANT OHIO EDISON COMPANY SHAW, PITTMAN,'.POTTS & TROWBRIDGE Russell J. Spetrino Gerald Charnoff Thomas A. Kayuha Robert E. Zahler Deborah B.
Bauser M. Thurman Senn j
2300 N Street, N.W.
1 Washington, D.C.
20037 (202) 663-8000 j
September 18, 1987
, s, >
i l
l
4 k
al~
+
r 2.
Table of Contents Page I.
INTRODUCTION &
SUMMARY
WHY THE ANTITRUST LICENSE CONDITIONS. IMPOSED ON OELMUST BE SUSPENDED......
2.
II.
THE NRC'S PREDICATE FOR ANTITRUST-1 REVIEW 4
A..
The Legislative History of Section 105(c) 7 1.
The Cost of Nuclear Power.....................
'7-2.
The Role of Other' Agencies
~
'i
.................... 13
' ~
B.
Judicial and Administrative Applica-tions of Section 105(c)
............................ 15-t 1.
Judicial Applications......................... 15 2.
Administrative Decisions
......................E16 3.
Summary of Judicial and; Administrative Decisions.......................
25 III. THE BASIS FOR~ RELIEF.................................... 26 J
A.
Why Conditions Were Imposed on OE.................. 29' 1.
The Decisions Below........................... 29 2.
The Evidentiary Record
.........................'33f a
a.
Economic Studies 35 j
3 b.
Expert Testimony......................... 37.
c.
Demands for Access to i
Nuclear Power............................'39' 2
d.
Other Factors
.t
............................ 41 B.
The Legal Standard for Suspending The Conditions..................................... 47
- 1. -
The Section 105(c) Changed c
Circumstances Test............................. 48'
'i.
Y I
't I
t
+
1.
Page 2.
The Position of the Appeal Board on Changed Circumstances 50 C.
The Circumstances Today............................ 53 1.
OE Compliance with the Conditions............. 53 Nuclear Access........................... 54 a.
b.
Other Conditions
......................... 55 2.
The Unachieved Promise of Nuclear Power....... 60 a.
The Cost of Nuclear Power................ 60 (1)
The Regulatory and Economic Morass of the 1970's and 1980's 60 (ii)
OE' s Costs f or Perry................ 69 b.
The Shrunken CAPCO Nuclear Program.................................. 72 c.
The Termination of the CAPCO Pool..................................... 73 3.
The Actual Economic Impact of Perry on OE......................................... 76~
IV.
CONCLUSION
.............................................. 80 Proposed License Condition Modifications A Summary of LBP-77-1, The Licensing Board Decision A Summary of ALAB-560, The Appeal Board Decision A Summary of the Positions of the Parties in the CAPCO Antitrust Proceeding,
.I11 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE DIRECTOR, NUCLEAR REACTOR REGULATION In the Matter of
)
)
OHIO EDISON COMPANY
)
Docket No. 50-440A
)
(Perry Nuclear Power Plant,
)
Unit 1)
)
APPLICATION TO AMEND THE PERRY OPERATING LICENSE TO SUSPEND THE ANTITRUST CONDITIONS INSOFAR AS THEY APPLY TO OHIO EDISON COMPANY Pursuant to 10 C.F.R. 55 50.90 and 2.101, Ohio Edison Com-pany ("OE"), a co-owner of the Perry Nuclear Power Plant, Unit _1
(" Perry"), requests the Director of Nuclear Reactor Regulation to amend the Perry Operating License No. NPF-58 ("OL") by suspending the antitrust license conditions insofar as they apply to OE.
The Perry antitrust license conditions are included in the Perry OL as Appendix C.
OE's proposed modifications to those condi-tions are attached hereto as Attachment 1.
i I
I I.
INTRODUCTION &
SUMMARY
WHY THE ANTITRUST LICENSE CONDI-TIONS IMPOSED ON CE MUST BE SUSPENDED The operating license for the Perry plant contains eleven conditions that limit the business activities of Perry's owners, including OE.
These license conditions were imposed on CE pur-suant to Section 105(c)(S) of the Atomic Energy Act of 1954, as amended (the " Atomic Energy Act" or the "Act"), 42 U.S.C.
5 2135(c)(5).
Section 105(c)(5) requires the Nuclear Regulctory Commission ("NRC") to determine whether, in licensing a proposed nuclear facility, activities under a license would " create or maintain a situation inconsistent with the antitrust laws."1/
At the time Perry was licensed, the NRC, the Department of Justice ("DOJ"), and others were concerned about the potential anticompetitive impact of nuclear-powered facilities generally, and the Perry plant, specifically.
This concern was based on the anticipated economic superiority of nuclear power, a universally-held anticipation, and the impact on the electric supply market-place of that superiority.
Legislative history reflects this ge-neric expectation; judicial and administrative decisions affirm 1/
Section 105(c)(6) of the Act, 42 U.S.C. 5 2135(c)(6).
The antitrust laws covered by this provision encompass the an-ticompetitive conduct that is the subject of the Sherman Act, 15 U.S.C. 55 1-7; the Wilson Tariff Act, 15 U.S.C.
55 8-11; the Clayton Act, 15 U.S.C. 55 12-27; and the. Federal Trade Commission Act, 15 U.S.C.
55 41-49.
See Alabama Power Co. v. NRC, 692 F.2d 1362, 1364 (11th Cir. 1982).,
i m
- m..
I it.
This national expectation similarly pervaded the CAPCO2/-
antitrust proceeding; moreover, the experts testified and spe-cific studies indicated that the Perry plant in particular would provide to its owners, the CAPCO companies, an otherwise unattainable economic advantage.
The antitrust license condi-tions placed on the CAPCO companies, including OE, were institut -
ed in order to obviate or mitigate that anticipated effect.
In hindsight, it is now evident that the expectations of all concerned have not materialized.
Nuclear facility ownership, and particularly CE's ownership interest in Perry, is not competi-tively advantageous.
Circumstances are radically different from those anticipated; yet those anticipated circumstances were the exclusive basis for imposing the license conditions at issue here.
The NRC Staff is authorized to amend the Perry antitrust license conditions when the circumstances that led to their impo-sition have changed significantly.
Moreover, if the statutory purpose of Section 105(c) is no longer being served by the con-tinued imposition of restrictive conditions on OE's business be-havior, the NRC Staff is compelled by law to lift the conditions.
2/
CAPCO stands for Central Area Power Coordination Group, a
power pool of public utilities, including OE.
See generally Toledo Edison Co. (Davis-Besse Nuclear Power Station, Units 1, 2 and 3 ), ALAB-560, 10 N.R.C. 265, 273-74 (1979) (hereinafter "ALAB-560").
II Circumstances have changed significantly.
The relative cost of nuclear power has increased dramatically from the cost assumed and relied upon by the Licensing and Appeal Boards when they im-posed antitrust license conditions on OE.
This change, and others incidental to it, make it neither necessary nor appro-priate for the NRC to continue to restrict OE's business activi-ties.
Suspension of the subject license conditions therefore is required.
II.
THE NRC'S PREDICATE FOR ANTITRUST REVIEW Section 105 of the Atomic Energy Act was amended in 1970 to clarify and revise the NRC3/ procedure for prelicensing antitrust review.4/
The dispositive language of the amendment, for 3/
At the time, it was the NRC's predecessor agency, the Atomic Energy Commission ("AEC"), that regulated commercial nuclear fa-cilities.
In 1974, this authority was transferred to the NRC.
Section 201 of the Energy Reorganization Act of 1974, 42 U.S.C.
6 5841.
In this Application, references to these agencies are interchangeable.
4/
Pub. L. No.91-560, reprinted in 1970 U.S. Code Cong. &
Admin. News 4981.
Prior to the passage of Pub. L. No.91-560, the AEC had issued no commercial licenses under Section 103 of the Act, instead licensing facilities pursuant to Section 104, which provided for the licensing of research and developmental.
This was because c Section 103 license required a de-reactors.
termination by the AEC that the type of reactor to be licensed had been sufficiently developed to be of " practical value" for industrial or commercial purposes.
The AEC had repeatedly con-sidered and declined to make such a finding.
The controversy-surrounding the distinction between these two types of licenses was due to the fact that a Section 103 license was subject to an-antitrust review by the Attorney General, the nature and scope of (Continued Next Page) 1
1l purposes of determining the need for agency action, was subsec-tion (c) of Section 105.
This provision was modified to require
.the NRC, with the advice of the Attorney General, to "make a finding as to whether the activities under the license would cre-ate or maintain a situation inconsistent with the antitrust laws
."5/
A review of the legislative history of this statutory provi-sion, as well as its interpretation by the NRC, makes clear that the interest of the NRC in antitrust matters is an interest inexorably linked to the agency's purpose, that of regulating the-construction and operation of nuclear power plants.
General fed-eral antitrust policing authority, residing in DOJ, was and con-tinues to be unaffected by the passage of the 1970 amendment.
Potential antitrust violations in the public utility industry simply fall within the scope of NRC's purview as well if, and only if, the licensing of a nuclear facility causes, or makes some contribution to, an extant anticompetitive situation in the relevant marketplace.
(Continued) which "were described in a broad-brush clause of inexact import."
Id. at 4990.
The 1970 legislation was enacted to remedy this situation by allowing for the commercial licensing of nuclear fa-cilities with an antitrust review process that did not constitute a " roadblock" to licensure.
Id. at 4994.
5/
Section 105(c)(5) of the Act, 42 U.S.C. 5 2135(c)(5).
1 1 i
I In short, Section 105 of the Atomic Energy Act was. designed-to ensure that.the United States government, through its regula-tion of nuclear power, did not unwittingly facilitate the perpet-uation of anticompetitive market conditions.
If that outcome is anticipated, the NRC is authoriced to condition its arant of li-censing authority so as to counteract that effect.g/
If, on the other hand,.the licensing of a nuclear power plant does not facilitate the perpetuation or creation of anticompetitive market' conditions, the business conduct of the license applicant is not subject to NRC scrutiny.
Of course, the utility's conduct never-theless falls within the realm of DOJ's continuing antitrust-oversight.
Thus, NRC's antitrust regulation of its licensees is condi-tiened on a finding that the conduct over which NRC has an inter-the construction and operation of a nuclear power plant --
est --
" creates or maintains a situation inconsistent with the antitrust laws."
If it does not, NRC has no statutory basis for oversseing-the licensee's business conduct, however anticompetitive it may be.
g/
As.the Appeal Board stated in the Farley case, "By_ amending 1
-the Atomic Energy Act'in 1970, Congress gave this Commission added duties to fulfill in connection with its licensing of -
nuclear power plants.
Since that time, it has'had to consider, in addition to_ safety.and' environmental matters, the. antitrust:
ramifications of its ' licensing actions. "
Alabama Power Co.
(Joseph M. Earley Nuclear Plant, Units 1.and 2),.ALAB-646, 13-N.R.C.'1027, 1035 (1981), aff'd, 692 F.2d 1362 (11th Cir. 1982)
See Section 105(c)(6)'of the Act, 42 U.S.C. $ 2135(c)(6).,
'l
F f
IL A.
The Legislative. History of Section 105(c)
The. legislative history of Section 105(c) of the Act makes plain two points:
that Congress expected: nuclear power _to be low-cost power, and that NRC's jurisdiction over antitrust con.
cerns related to NRC-licensed activities'in no way restricted the' t
responsibilities.of other agencies over antitrust matters.-
1.
The Cost of Nuclear Power The legislative history of Section 105(c)_ abounds with 11-lustrationsHof Congress' presumption that nuclear power plants I
would be a primary source of low-cost power in the United States a
in the decades ahead, and that access to nuclear power would sig-nificantly increase a utility's competitive advantage in the mar--
ketplace.
Enunciating a recurrent theme at the time, Senator Aiken, a member of the Joint Committee on Atomic Energy, com-mented that it was " utterly ridiculous" for the NRC to further postpone the conclusion that "the modern atomic power plant is a profitmaking enterprise."7/
The fear, instead, was that issues I
7/
Prelicensing Antitrust Review of Nuclear' Powerplants,_ Hear-:
i ings1Before the Joint Comm. on Atomic Energy, Part 1, 91st Cong.,.
1st Sess. 15 (1970) (hereinafter " Joint Committee I"); see also Houston ~ Lighting & Power Co. (South Texas. Proj ect, Units 1 and 2), CLI-77-13, 5 N.R.C. 1303, 1313 (1977) (hereinafter " South' Texas"),' citing 116 Cong. Rec. H. 9447 (daily ed. Sept.- 30,-1970).
("in 1970 Congress found nuclear-powerLto-have acquired 'commer-cial value,' and amended.the Act to' remove the ' anachronism'-
requiring an AEC finding of commercial value").
. i
'l I of health and safety would take a back seat to "the altar of uncontrolled economic desire."9/
1 The anticipated low cost, and consequent economic advantage, of large nuclear facilities is reflected in the statement to the Joint Committee by Roland W. Donnem, the Director of Policy Plan-ning in the Antitrust Division of the Department of Justice.
As Mr. Donnem observed:
With regard to the establishment of a large-scale nuclear power plant, it is necessary to first determine the extent to which such plants might afford the participants therein decisive competitive advantage over their competitors.
The economies of scale associ-ated with such large plants are truly sub-stantial, and' access to this low-cost power may wel.1 be decisive in any competitive race I
between electric power companies.
Access may i
we l..' be required for the continued operation-of a given company or sector of the indus-l try.9/
i 1
l The issue of whether a competitor could rely on an alterna-tive facility to a nuclear plant was important because if not, the "new low-cost facility would probably create a decisive com-
}
petitive advantage for the participants over those excluded, and exclusion, therefore, should not be permitted."lO/
Thus, it was 8/
Joint Committee I at 5.
9/
Id. at 9 (emphasis added).
lp M. :
1-
" access to low-cost power" that was "ccmpelled by the policy of the antitrust laws."ll/
The views of the witnesses who appeared'before the Joint Committee on the 1970 legislation to amend Section 105 of the Act uniformly echoed the presumption of Congress that nuclear power was low-cost power.
In a colloquy among Joint Committee Chairman Holifield, Con-gressman Hosmer, and AEC Ceneral Counsel Hennessey, the low cost of nuclear power was identified as the critical factor mandating a need for an antitrust provision in the Atomic Energy Act, not-withstanding the absence of a parallel requirement that would be applicable to fossil plants:12/
REPRESENTATIVE HOSMER.
Is there any more vice in a plant that is to be con-structed, including some monopolistic or other anticc=petitive tendencies, if it is fired by nuclear fuel than if it is. fired by i
coal or oil?
MR. HENNESSEY.
I see no distinction between the types of fuel as far as the antitrust im-plications are concerned.
REPRESENTATIVE HOSMER.
. Yet there is no provision for plants fueled by conventional fuel to be subjectsd to this kind of review.
Is that correct?
11/
Id. at 10.
i 12/
Id. at 75-77 (emphasis added).
l
' a i
I i
i I
1 MR. HENNESSEY.
That is correct.
The eroblem centers on the very larae olants that do oro-i vide the most economical source of enercy, whether they be nuclear fuel or fossil fuel, and an opportunitf for the small publicly owned-utilities to have access to that newly available cheae source of cover.
MR. HENNESSEY.
At the time the 1946 and the 1954 acts were enacted, there may have been a basis for distinction.
This was a newly developing industry that had been brought along in large measure by the Government's financial input and there was a small r. umber of competitors and perhaps more of a danger of anticompetitive situations, monopolies ap-pearing in the atomic energy industry, an op-portunity that did not exist in the long time competitive coal and other fuels.
But I don't think that a plausible basis for dia--
tinguishing between nuclear and fossil fuel plants exists in the present state of the nuclear industry.
CHAIRMAN HOLIFIELD.
It is your opinion, then, that a small cooperative or municipali-ty that wanted to participate in a large nuclear plant output would have to establish that not on the basis of the Government con-tribution to the development of this new source of electricity, but on the basis of the antitrust laws which apply generally.
MR. HENNESSEY.
That is right, on the basis that the operation of the plant as proposed would have an effect on him that would be in.
restraint of trade, would have anti-competitive consequences on him, that it would put him at a disadvantage as against people who have the power from the plant in providing service to their customers.
I The conviction that nuclear power is or would be economi-cally advantageous was also reflected in the statement made to the Joint Committee by S. David Freeman, the Director of the En-ergy Policy Staff of the United States Office of Science and Technology:13/
As I discussed previously, nuclear power is vital to meeting the nation's electric en-ergy needs in the coming decades.
Its growth will be due primarily to the fact that it offers low-cost power to utilities.
These low costs are achieved only in very large-sizo individual units.
For the foreseeable future, only a small proportion of individual utilities can accommodate such large units in their own systems without joint arrangements and certainly few, if any, of the thousands of smaller utilities can ever do so.
Indi-vidual utilities, of necessity, are engaging in joint ventures to own and operate nuclear plants.
Since nuclear plants come only in large sizes, it is particularly important that pre-construction anti-trust review be implemented to assure that smaller utilities are not fro-zen out of the generation end of the power business.
I do not suggest that every small utility should be in the generating business, but I do suggest that the question of fair and reasonable access to the benefits of low-cost power is not universally satisfied by wholesale purchases, especially if the whole-saler is competing with the small utility at retail.
Similarly, in his discussions with the Joint Ccmmittee, Mr.
Walter BJ Comegys, Deputy Assistant Attorney General, Antitrust 13/
Id. at 106 (emphasis added).
t I
t Division of the Department of Justice, commented:14/
We have not wished to take the position that i
where competitive policies require that smaller firms have access to a large low-cost power facility the access.must always be fur-nished by ownership share in the new plant.
Nor have we wished to assert that it will always be acceptable to have contracts for the sale of power from the plant.
We do think that adequate access implies the same opportunity to receive low-cost power for the same uses as those who have the unique low-cost facility.
The Department of Justice's perspective about the low cost of nuclear power was perhaps stated most succinctly in response to a question from the Joint Committee.
DOJ stated, "The in-formation we have seen indicates that there are now, and that there are even more likely to be in the future, substantial eco-nomic advantages for many electric utilities in installing large-scale nuclear generating plants rather than conventional fossil fuel plants."J,5/
Other documents included in the legislative 5
history of the 1970 amendments share this perspective.16/
14/
Id. at 128 (emphasis added).
15/
Id. at 148.
16/
- See, e.g., Petition to Intervene and Become Parties for All Purposes,." dated Nov. 6, 1969, filed by North Carolina. Electric i
Membership Corporation and Four County Electric Membership Corpo-ration in the Brunswick docket, Docket Nos. 50-324 and 50-325, reprinted in Joint Committee I at 287 (" inaccessibility of Peti-I tieners to the more economical supply of' bulk power made possible by large scale nuclear generating plants penalizes them as would-be competitors of CP&L"). I J
]:
t 2.
The Role of Other Agencies The Cc= mission's involvement in the economic regulation of nuclear power was not intended to, nor did it, preempt the many other bodies charged with enforcing the antitrust laws.
This conclusion is evident from the language of Section 105, which
"[n]othing contained in this Act shall relieve any states that person from the operation of the [ antitrust laws)."17/
Thus, the Court of Appeals for the District of Columbia concluded, "Section-105(a)
. provides that nothing in [ thel Act preempts the nor-mal operation of the antitrust laws."18/
To the extent any question whatsoever remains about the role of other agencies vis-a-vis alleged anticompetitive conduct of electric power utilities, the 1970 legislative history of Section 105 fully addressed the issue.
For example, in summarizing the contents of the 1970 legislation, Congressman Holifield, the Chairman of the Joint Committee on Atomic Energy, stated:19/
I must emphasize, and it must be borne in mind, that this whole antitrust feature of the Atomic Energy Commission's licensing pro-cedure will be completely separate and apart from the application of the antitrust laws 17/
Section 105(a) of the Act, 42 U.S.C. 5 2135(a).
18/
Ft. Pierce Utilities Authority v. United States, 606 F.2d 986, 1001 (D.C. Cir. 1979).
19/
115 Cong. Rec. H. 34,309 (Sept. 30, 1970). i i
I I
I now on the statute books.
The antitrust laws, and the authorities and responsibil-ities of the Attorney General and others by virtue of these laws or in connection there-with, and the implementation of these laws, remain completely unaffected by the antitrust-review dealt with in section 6 of the bill.
The antitrust laws referred to in subsection 105(a) of the Atomic Energy Act are not qual-ified, limited, extended, or interfered with in any way whatsoever.
Senator Pastore, Vice Chairman of the Joint Committee, simi-larly addressed this matter:
I want to stress in the clearest possible way that subsection 105c. in no way extends, re-vises, impairs, modifies, or impinges en the antitrust laws of our statute books, or pre-vents or limits their full application.
The authorities and responsibilities of the At-torney General and others by virtue of our antitrust laws remain completely uninterfered with and unaffected by the review functions dealt with in section 105c.20/
And, Congressman Hosmer, the ranking minority member of the Joint Committee, emphasized that the NRC's antitrust review responsi-bility "in no way extends, impairs, amends, or affects any of the antitrust laws or prevents their application. "21/
20/
116 Cong. Rec. S.
39,619 (1970).
21/
116 Cong. Rec. 34,316 (1970); see also 116 Cong. Rec. H.
34,316 (1970) (statement by Congressman Holifield); Joint Commit-tee on Atomic Energy Report on P.L.91-560, reprinted in 1970 U.S. Code Cong. & Admin. News 4981; Joint Committee I at 70 (statement by Joseph F. Hennessey).
.y
~
r
-i l'
In sum, in=the event the NRC were.to conclude that its basis i
no longer' existed for imposing.the licensing. conditions at issue-j
. here and accordingly, it suspended thoseLconditions, the " anti-1t t
trust laws now on the statute books" would continue.in full: force.
and effect.
=:
L B.
Judicial and Administrative Applications of i
Section lO5(c)
-i The judicial and administrative decisions spplying i
Section 105 of the Atomic Energy Act, although limited in number, are consistent in content.
The NRC's interest in antitrust' mat-ters stems from-congress' concern in 1970 that the construction.
?
and operation of large and efficient nuclear power plants would.
" create-or maintain a situation inconsistent with the antitrust laws."
In the decisions.on Section 105, emphasis.is placed on-s ensuring that access to the perceived economic boon of nuclear-
~
power is not limited because of anticompetitive conduct by-the proposed facility licensee.
It also is. evident from the case law r
that.in the absence of an economic advantage resulting from ac-cess to a nuclear power plant, anticompetitive conduct by a licensee is not subject to NRC oversight.
t 1.
Judicial Applications I
q Only one federal court has reviewed a final agency order.
'I under Section 105(c) of the Atomic Energy Act.
In Alabama' Power 4
i,
I
f 5
1 1
E Co. v. Nuclear Regulatory Commission,22/ the Eleventh Circuit
{
t affirmed the NRC's-imposition of ownership conditions on the
-operating license for the Joseph M. Farley Nuclear Plant,' Units-1 and 2, along with conditions providing for access to. labama A
-Power's transmission facilities.
The Court of Appeals endorsed the NRC's conclusion that the agency's inquiry into antitrust matters included not only likely violations of the antitrust
- laws, 4
but also potential _contraventions of the policies-under-lying those laws.23/
This, the court concluded, was fully con-sistent with Congress' basic policies towards that extraordinary _
new economic resource, nuclear power.
i I
Those who had worked with the government were not to be the unbridled beneficiaries'of the i
windfall-head start they.would have when pri-vate parties ~were allowed into nuclear power production.24/
2.
Administrative Decisions In the handful of administrative decisions on Section 105(c), the NRC has elaborated further on the purpose of Section 105(c) and the Commission's enforcement role with re'spect to it.
s 22/
692'F.2d 1362 (11th Cir. 1982).
2_3/
-Id. at 1368.
24/
Id. at 1368-69.
l t i
l
There are five Commission decisions on Section-105, none of which review an agency decision on the merits of a Section 105 challenge.
In the two South Carolina decisions 25/ discussed in Section III.B.1 below, the Commission articulated the -standard applicable to a. determination that there have been."significant changes" in the antitrust circumstances-surrounding theioperation of a nuclear power plant which merit further agency considera-tion; it found that the standard had not been met in that-case.
In its 1977 South Texas decision, which involved the timing of the agency's antitrust review at the operating license phase,
]
the Commission observed that Congress fashioned only a limited role for the NRC in antitrust matters associated with the licens-1 ing of nuclear power plants.
The NRC's primary concern is.its regulation of the technical complexities associated with nuclear.
. power that are designed to protect the public health and safe-j:
ty.26/ Nevertheless, the Commission is also authorized to in-volve itself in antitrust matters "if," and only if, it finds "that an applicant's plans may be inconsistent with the antitrust laws or their underlying policies."22/
This authority stems.from the fact that "[njo nuclear power can be generated without an NRC 25/
So. Carolina I, CLI-80-28, 11 N.R.C. 817 (1980); So.
Carolina II, CLI-81-14, 13 N.R.C. 862 (1981).
26/
South Texas, supra, 5 N.R.C. at 1316.
22/
Id-.i
~~.-a
- l license"; consequently, the licensing process allows the NRC to act in a unique way -- through the imposition of license condi-tions -- to fashion antitrust remedies.28/
In two 1973 Waterford decisions, the first decisions issued by the agency under amended Section 105, the Commission articu-lated the so-called " nexus" standard which required that NRC ex-ercise its antitrust jurisdiction only if activities under an NRC license would contribute to creating or maintaining an an-ticompetitive situation.
Focusing first upon the purpose of Sec-tion 105, the Commission observed:
[T]he requirement in section 105 for prelicensing antitrust review reflects a basic Congressional concern over access to power produced by nuclear facilities.
The Commission's antitrust responsibilities rep-resent inter alla a Congressional recognition that the nuclear industry originated as a Government monopoly and is in great measure the product of public funds.
It was the in-tent of Congress that the original public control should not be permitted to develop into a private monopoly via the AEC licensing process, and that access to nuclear facili-ties be as widespread as possible.29/
4 28/
Id.
29/
Louisiana Power & Light Co. (Waterford Steam Electric Gener-ation Station, Unit 3), CLI-73-25, 6 A.E.C. 619, 620 (1973)
("Waterford II"); see also Louisiana Power & Light Co. (Waterford Steam Electric Generating Station, Unit 3), CLI-73-7, 6 A.E.C.
48 (1973) ("Waterford I").,
I Thus, the Ccmmission plainly recognized the importance of the Congressional mandate to assure that AEC-licensed activities not run afoul of the antitrust laws.
But the Commission also ap--
preciated the limited interest of the agency in antitrust mat-ters, and so stated:
At the same time, however, we must emphasize that the specific standard which Congress re-quired for antitrust reviews -
"whether the activities under the license would create or maintain a situation inconsistent with the antitrust laws as specified in subsection 105a" -- has inherent boundaries.
It does not authorize an unlimited inquiry into all alleged ant 1 competitive practices in the utility industry.
The statute involves licensed activities, and not the electric utility industry as a whole.
If Congress had intended to enact a broad remedy against all anticompetitive practices throughout the electric utility industry, it would have been anomalous to assign review responsibility to the Atomic Energy Commission, whose regula-tory jurisdiction is limited to nuclear fa-cilities.
It is the status and role of these facilities which lie at the heart of anti-trust proceedings under the Atomic Energy Act.30' Other than the CAPCO case, the Commission's nexus standard has been applied three times by the Appeal Board.
Two cases, Midland and Earley, involved a Section 105 merits decision.
The third is the Appeal Board's interlocutory review of Wolf creek.
30/
Waterford II, supra, 6 A.E.C.
at 620 (emphasis in original).
r 11-t In its 1975 Wolf Creek decision, the Appeal Board reiterated the Waterford standard that "lijf activities relating to a facil-ity have no substantial connection with alleged anticompetitive practices, there is no need for a hearing
."31/
At issue in Wolf Creek was the definition of the " activities under the license" that fell within the scope of Section 105.
A local co-operative that had intervened in the proceeding argued that the applicant's alleged refusal to wheel supplemental power to it would prevent the cooperative from acquiring an interest in Wolf This was purportedly true because without the right to Creek.
have supplemental power wheeled to it, the cooperative argued that it would not be able to demonstrate to the financial commu-nity that it could use the nuclear power from Wolf Creek in an economically viable manner; consequently, it would be unable to borrow the necessary funds to purchase a share of the nuclear plant.32/
The Ar.pual Board held that the anticompetitive activity al-leged by the cooperative fell within the scope of Section 105.
While the described conduct was "not traceable immediately and directly to operations of the licensed nuclear facility itself,"
31/
Kansas Gas & Electric Co. (Wolf Creek Generating Station, Unit No. 1), ALAB-279, 1 N.R.C.
559, 566-(1975), citing Waterford II, supra, 6 A.E.C.
at 621.
32/
Id. at 567.
.I it was apparent that such conduct might enhance the applicant's
" ability to use nuclear-generated power to the disadvantage of competitors."33/
In short, nexus was not to be interpreted to preclude from NRC's oversight anticompetitive consequences which ineluctably flowed from the economic advantage that the nuclear plant repre-sented.
Citing the 1970 Report on Section 105 by the Joint Com-mittee on Atomic Energy, the Appeal Board in Wolf Creek stated:
[ Als the Commission's antitrust responsibil-ities are linked to license applications, the Commission's antitrust mandate extends only to anticompetitive situations intertwined with or exacerbated by the award of a-license to construct or operate a nuclear facil-ity.34/
On the other hand, if an anticompetitive situation is not so in-tertwined or exacerbated, NRC need not scrutinize the applicant's' business activities.
"{A]lleged anticompetitive practices --
however serious -- which have no substantial connection with the nuclear facility, are beyond the scope of antitrust review under the Atomic Energy Act."35/
3,3/
Id.'at 568.
34/
Id. at 569 (emphasis added).
35/ Waterford II, supra, 6 A.E.C.
at 621.
+
di Midland was the first. full-fledged antitrust-decision on the-merits subject to Appeal: Board review.36/J The licensing board.
- i had rendered a decision in favor of the applicant, Consumers-
[
Power-Company, and the complaining parties appealed.
They main '
c tained that anticompetitive acts by Consumers " blocked theirLac '
cess to cheaper sources of power," and resulted in Consumers' - re--
taining "the cost advantages of the nuclear; facility.
.,:thus enhancing its' monopolistic dominance over the available~ sources' of cheaper power."37f
^
The Appeal Board reversed and remanded th'e case,, finding it l
reasonably probable that Consumers' activities under the Midland licenses would maintain the present situation inconsistent with-t the antitrust laws. 33/
Referencing the Wolf Creek " intertwined or exacerbated" test, the Appeal' Board concluded that Consumers-had monopolized the relevant markets for coordination services, and wholesale and retail electric power. 'Given this situation,.
~
Consumers'-installation of large nuclear powered generating l units
"[m}anifestly.
. will exacerbate the anticompetitive-situa-tion."39/
The Appeal Board emphasized, t
36/. Consumers Power Co. (Midland Plant, Units 1 and-2),
ALAB-452,.6 N.R.C. 892 (1977).
37/ Id. at 900.
~
3g/
Id. at 1098.
39/. Id. at 1095.
r
-t s d l
.h 5
- }
{O]necof the reasons for (Congress'] amending section.105c to its present form was the de-sire to prevent the. foreclosing of the advantages of nuclear power to all but the very largest electric utilities.
But unless we step in, that is precisely what will hap-pen in this case:
Consumers will have suc-cessfully used its monopoly power to retain the benefit of nuclear-powered baseload ceneration for itself, to the disadvantage of its " land-locked" smaller ccmpetitors.40/
The Appeal Board concurred with the Department of Justice that the Midland units would operate almost full-time, and were expected to provide "the cheapest available power."41/
It also found that because of the Midland plants, Applicant would be able to " integrate low-cost nuclear generation with its system,"
thereby reducing its average cost, while " denying its competitors the same advantage."42/
Consumers' anticompetitive conduct was of significance to the Appeal Board because it would be furthered -- exacerbated.--
by the use of the low-cost Midland units.
But it was the cost
" advantages" of nuclear power along with the " foreclosing" of l
those advantages that constituted the two critical independent variables in the Appeal Board's analysis.
40/
id. (emphasis added).
4y Id. at 1096 n.722.
42/
Id. at 1098. --
.l-Relying particularly on its analysis in the Midland case, in its 1981 Farlev decision,43/ the Appeal Board concluded that the
?
unconditional licensing of the'Farley plants would create or.
maintain a situation inconsistent with the antitrust laws.
- Thus, the-Appeal Board concluded that "the antitrust ramifications of its licensing actions"44/ were adverse.
In resolving the ques-tion of the appropriate remedy to impose, the Appeal Board ccr.-
~
I mented on the purposes and objectives to be served by its deci-sion.
r I
Ona of the basic foundations on which the i
Atomic Energy Act rests is the principle of free competition in private enterprise.
This principle is manifested at the very outset of the Act by the policy declaration that the
" development, use, and control'offatomic ener-4 gy shall be directed so as to.
. strengthen free competition in private enterprise..This policy finds manifestation again'in Section 105 of the Act Thus,' through the mech-anism of.the antitrust laws, the' Congress-sought to protect free competition in private i
enterprise.in the development and'use of atom-ic. energy.45/
Applying these broad principles to the findings of fact in Farley, and recognizing the " benefits of: lower-cost nuclear l
43/ Alabama Power Co. (Joseph M. Farley Nuclear Plant, Units-1 and 2), ALAB-646, 13 N.R.C.
1027 (1981), aff'd, 692-F.2d 1362 (11th Cir. 1982).
44/ Id. at 1035.
45/
13 N.R.C.
at 1102. i e
'i }
l power,"46/ the Appeal Board concluded that Alabama Power would be required to share its economically beneficial ownership interest in the plant with the aggrieved local cooperative.
3.
Summary of Judicial and Administrative Decisions The decisions applying Section 105 uniformly begin their analysis with the understanding, either presumed or established, that nuclear power is low in cost.
The need to restrict licens-ees' business conduct through the imposition of license condi-tions on proposed nuclear facilities resulted not primarily but exclusively because of this understanding about the beneficial economic impact of nuclear power.
If nuclear power was an eco-nomic windfall, it indeed follows that limited ownership of it might cause or maintain anticompetitive conditions in the rele-vant market place.
Thus, the focus of the decisions was not on this syllogism, but on the factual inquiry as to the specific market conditions in each case.
In some instances, the NRC's review has focused on the le-gitimacy of an NRC-imposed remedy not conspicuously or even di-rectly associated with a proposed nuclear power plant.
It is clear from the cases that NRC is not limited in its license con-dition authority once it is apparent that a nuclear facility's 46/
Id. at 1110.
l use is intertwined with or would exacerbate anticompetitive ac-tivity.
But if a nuclear facility is not economically suoerior, thus maintaining or creating in its owners an automatically advantageoue competitive position in the marketplace, there is no statutory basis for NRC conditioning the grant of licensure for that plant.
At the same time, it remains the domain of other federal agencies to more broadly police the competitive conduct of the utility or utilities in question.
III.
THE BASIS FOR RELIEF In March, 1973, The Toledo Idison Company ("TECo"), The Cleveland Electric Illuminating Company ("CEI"), OE, Pennsylvania Power Company ("Penn Power") and Duquesne Light Company
("Duquesne") filed a joint application with the AEC to build two proposed nuclear plants, Perry 1 and 2, to be located on Lake, Erie approximately 35 miles northeast-of Cleveland, Ohio.
Each of these plants was to have a net electrical output of 1205 megawatts.
CEI sought AEC approval to own, construct and, upon subsequent approval, to operate the proposed new facilities.
The other applicants, including OE, sought approval of their proposed ownership status.47/
In particular, OE sought approval of its proposed 35.60 percent ownership interest in the Perry facility.
47/ Application for Construction Permit, dated March 28, 1973; see 38 Fed. Reg. 18052 (July 6, 1973). i
l' id.4p/
On December 17, 1973, pursuant to AEC's regulations, the At-torney General of the United States advised the AEC that the Perry application raised antitrust questions, the resolution of which required a hearing.49/
A public hearing was called and pe-titions to intervene were filed by the City of Cleveland and by American Municipal Power - Ohio
(" AMP-O").
AMP-O subsequently withdrew its intervention.
The State of Ohio also initially par-ticipated as an interested state pursuant to 10 C.F.R.
$ 2.715(c), although it later effectively withdrew from the case.50/
i In March, 1974, the Perry case was consolidated with the then-pending antitrust litigation involving Davis-Besse Unit 1, a
nuclear power plant in north central chio being built by TECo and CEI.
Subsequently, an antitrust proceeding addressing Davis-Besse Units 2 and 3 was combined with the consolidated Perry / Davis Besse Unit 1 proceeding.51/
48/
Subsequently, OE and CEI modified their ownership shares; OE's current share of Perry 1 is 30.00 percent.
49/
39 Fed. Reg. 2029 (Jan. 16, 1974).
5_Of See ALAB-560, 10 N.R.C.
at 276 n.29.
51/
See Toledo Edison Co. (Davis-Besse Nuclear Power Station, Units 1, 2 and 3), LBP-77-1, 5 N.R.C.
133, 138-40 (1977) (herein-after "LBP-77-1").
.I ! ~
The antitrust' proceeding that ultimately resulted in the license conditions at issue here was a lengthy and complex liti-gation much of which is not relevant to the' issues raised in this license amendment application.
Attachments 2, 3,.and 4 summarize che Licensing.and Appeal Board decisions and the positions of the parties in the CAPCO antitrust proceeding.
In summary, the NRC's factual predicate for imposing anti-trust license conditions on OE was that it was anticipated that the construction and operation of Perry, in fact, would create or maintain a situation inconsistent with the antitrust laws.
There were two elements to this conclusion.
First, that a situation inconsistent with the antitrust laws existed in the OE service area for which OE was responsible.
And, second, that this situa-tion was expected to be maintained by NRC's authorization to con-struct and operate the Perry plant.
As to the first element --
dealing with the situation inconsistent with the antitrust laws
-- for purposes of this license amendment application, OE will assume arguendo that the Licensing and Appeal Board findings are correct and that the situation is unchanged from the mid-1970's.
But, as to the second element -- addressing whether the. licensing of Perry creates or maintains the anticompetitive situation --
the facts today belie NRC's expectation at the time.
In fact, because of the relatively high cost of nuclear power, the opera-tion of Perry is not competitively advantageous to OE.
Perry 1
f therefore cannot and does not create or maintain an anticom-petitive situation.
A.
Why Conditions Were Imposed on OE The major controversy in the CAPCO antitrust proceeding con--
cerned the characterization of the conduct of CAPCO and of the marketplace at issue.
This characterization was relevant to the first element of the conclusion in the case, viz., that a situa-tion inconsistent with the antitrust laws existed in the OE ser-vice area for which OE was responsible.
As to the second ele-ment, whether the licensing of Perry created or maintained an anticompetitive situation, there was also some dispute.
But there was absolutely no di_sagreement among the' participants that nuclear power from Perry would be low in cost.
This understand-ing is evident in the decisions of the case and the underlying evidentiary record.
Moreover, it is clear that-in the absence of this factual predicate, the NRC would not have had a basis for-meeting the " create or maintain" standard or, consequently, for imposing antitrust license conditions on OE.
1.
The Decisions Below In the CAPCO antitrust proceeding, the Appeal Board conclud-ed that it was appropriate to impose antitrust license conditions on OE.
The Appeal Board's factual findings included a number of I
statements about the low cost of nuclear power, and the 1
I i
consequent need to ensure access to it and to impose other com-t petitive restrictions on Applicants' conduct so that the owners of the proposed nuclear facilities would not control or monopo-lize the relevant markets.
Thus, in describing the CAPCO coordinated planning and transmission system, the Appeal Board observed that CAPCO "per-mits applicants to take advantage of ' economies of scale' (i.e.,
to build larger plants capable of generating power at' lower cost).
."52/
The effect of the CAPCO arrangement was "to
~
allow applicants to increase the reliability of their electric power systems while lowering the costs of operating them. "S3/
Unquestionably, the value of -- and hence, the competitive threat posed by -- the nuclear plants, including Perry, was.their use as low-cost sources of power.
This fact essentially was assumed by the Appeal Board.
For example, in summarizing the Licensing Board's findings, the Appeal Board stated:
Given applicants' one-system planning and co-ordinated operations, [the Licensing Board-found that] the unconditional addition of five large nuclear power plants advantageous for "baseload" (low operating cost) genera-tion would increase the CAPCO system's bulk power generating capacity by nearly a third.
This would exacerbate:the existing anti-competitive situation, making it even more difficult for the isolated public power 52/
ALAB-560, 10 N.R.C. at 274 (emphasis added).
53/ Id.,
i
l systems to continue to compete with the applicants.ji4 /
s In short, the linchpin of the Appeal Board's determination I
that NRC could impose competitive restraints on OE was that the nuclear plants in question would be competitively advantageous since they would be cheap.
Because of this fact, the " specific and (in the overall context of the electric power industry) rela-tively limited activities" that the NRC licenses authorized would contribute to situations inconsistent.with the antitrust laws.55/
The Licensing Board's decision also is laced with findings concerning the presumption that NRC intervention into the compet-itive conduct of its licensees was warranted because of the low cost of nuclear power.
In the Preamble to LBP-77-1, the Licens-ing Board explained that this issue becomes of " statutory con-cern" to the NRC only when the benefits of the power generated from proposed nuclear stations will have a substantial (presuma-bly adverse) impact on.the delivery and sale of electric energy in the relevant market.5p/ Noting the large quantity of addi-tional generation contemplated by CAPCO, with the addition of five large nuclear units totalling 4,500 megawatts, the Licensing Sy Id..at 281.
EE/
Id. 284.
1 56/
LBP-77-1, 5 N.R.C.
at 141.
. i
)
1 l
I Board stated:57/
Applicants are of the opinion that these units will produce economies of scale and will provide for long term generation costs well under average system costs which could be obtained either compared to the cost of operating their present generating equipment or in comparison to new generation relying upon fossil fueled units.
Thus, the~ opera-tion of the Davis-Besse and Perry stations will have a substantial effect upon both the supply and the cost of electricity within the CCCT area.
In the Licensing Board's view, because of the benefits from the proposed nuclear plants, the competitive conduct of the Applicants, in all of its potential forms, was subject to NRC scrutiny.
Conversely, if the subject facilities did not provide
" low cost base load power,"5B/ with associated " benefits of economies of scale,"59/ the Applicants' conduct, however an-t1 competitive, would not be of interest to the NRC.
The NRC is not charged with the respon'aibili-ty of the general enforcement or administra-tion of the antitrust laws.
Its particular interest is focused not upon a regulatory mandate to investigate all market activities of Applicants but only to consider the effect of granting a nuclear license on the competi-tive environment in which Applicants oper-ate.60/
57/
Id. at 143 (emphasis added).
58/
Id. at 155.
59/ id.
60/ Id. at 237.
I 2.
The Evidentiary Record The desirability of OE utilizing nuclear generation to pro-duce baseload power appeared so obvious to all of the parties at the time of the hearing that the Licensing Board was not faced with any argument on the issue.
Considerable evidence neverthe 1
less existed in the record which uniformly supported this conclu-sion.
This evidence was in three forms:
(1) Economic studies; (ii) Expert testimony; and (iii) Demands for access to nuclear-power.
In the first instance, however, the Licensing Board relied on the fact that the Applicants themselves were of the opinion that the unite would produce long-term generation costs well under average system costs calculated in comparison to ei-ther existing or new fossil-fueled units.sl/
DOJ, and the ex-4 parts for both DOJ and the NRC Staff, also placed great reliance l
on the Applicants' decision to construct nuclear power plants.62/
This decision was treated as establishing that nuclear power was presumptiveiy cost-advantageous.g3/
gl/
LBP-77-1, 5 N.R.C at 143.
See also id. at 49.
g2/ DOJ Prehearing Brief at 115; Hughes NRC 207, p. 30-31; Tr.
5900, 5922 (Kampmeier); Tr. 7074, 7236, 7277-78 (Wein).
g3/
See'Tr. 7277 (Wein).
In fact, the Licensing Board had-in-correctly articulated the Applicants' position.
The Applicants-actually had contended that "[t]he installation of nuclear units increases Applicants' average embedded costs
.[although),that (Continued Next Page).
1-As DOJ observed, "It is undisputed (in this proceeding) that the power available from the subject nuclear units is expected to be the cheapest base load power available to serve new and growing loads."64/
Indeed, the factual record was peppered with.
comments made by witnesses from all sides asserting the superior-ity of nuclear power.65/
(Continued) increase is less in the long run than it would be if Applicants were to build, instead, similarly-sized fossil plants."
Appli-
~
cants'. Joint Reply Brief, September 15, 1976 at 10 (citations to expert testimony omitted).
Similarly, on March 6, 1974, in pro-viding information requested by the United States Attorney Gener-al for his antitrust review, OE had indicated that the total es-timated annual cost of Perry Unit 1 in-mills /KWh exceeded OE's 1970 average cost of bulk power by 4.78 mills /KWh.
NRC 157, "In-formation Requested By The Attorney Oeneral For Antitrust Review:
Answers of Ohio Edison System," at pp. 18, 20.
Interestingly, like the Licensing Board, DOJ was so convinced of the cheapness of nuclear power that it had ignored this OE answer to its own question.
In both its Prehearing and Reply Briefs, DOJ alleged that "{t]he marketing of power from the subject nuclear plants will enable Applicants to lower their average cost of power."
DOJ Prehearing Brief at 115; DOJ Reply Brief at 179.
This alle-gation was at odds with the testimony of DOJ's own expert, who had agreed with OE's projections.
Tr. 6042 (Kampmeier).
64/
DOJ Appeal Brief'at 179 (citations to record omitted).
65/
See.Kampmeier DOJ 450, pp. 24-25, 52; Kekela DOJ 574, p.
123; Masters DOJ 567, pp. 55-56; DOJ 285, pp. 10-14; Rudolph, DOJ 558, p. 165; Sullivan DOJ 578, pp. 210-11; Williamson DOJ 581, pp. 36-38; Hughes NRC 207, pp. 30-32, 38, 152, 153; Mozer NRC 205, p. 61; Tr. 8873 (Dempler); Tr. 6122-23 (Kampmeier); Tr.
10129 (Smart).
I i
a.
Economic Studies There were a number of economic studies relied on by the Li-censing Board in its 41ndings on the low cost of Perry.
A 1973
~ CAPCO Planning Committee Report, inter alia, had " determine (d) the relative economics.
of a 1200_MW nuclear unit program and a 1200 MW coal unit program."sp/
By pursuing a program using nuclear units, it was calculated that total annual costs from 1981 through 1986 would be reduced by over $500 m1111on.17/
The present worth of the savings in annual costs from 1981 to 1995 achieved by using nuclear power was calculated to be in excess of two and a quarter billion dollars.68/
This report confirmed the conclusions of an earlier study presented by CAPCO to the Edison Electric Institute.69/
Other studies, prepared or introduced in evidence by the NRC Staff and DOJ, supported the Licensing Board's conclusion that nuclear power was anticipated to be the lowest-cost source of new power for OE.
In both the Draft Environmental Statement and the g6/
"CAPCO Base Load Generating Capacity Requirements ' Following Perry 2, 1981-84," Planning Committee Report no. 5 ("CAPCO Plan-ning Rpt"), June 14, 1973 at 21; see LBP-77-1, 5 N.R.C.
133, 155 n.30 (1970).
g7/
CAPCO Planning Rpt at 22.
SE/ l$
69/ DOJ 285, "Recent Generating Capacity Commitments of the CAPCO Group," February 4, 1974.
I L
I Final Environmental Statement for the proposed Perry Nuclear Power Plant,70/ the NRC had made a cent comparison "between the Applicant's proposed nuclear plant and coal-fired and oil-fired plants of the same size and the same cooling system."71/
The t
Perry FES had concluded that on a total annualized basis, the Perry facility was expected to be $46.8 million cheaper than the least expensive coal-fired facility of the same size and $113.2 million cheaper than an oil-fired facility of the some size.
DOJ also offered in evidence a Toledo Edison chart dated April 18, 1973, entitled " Comparative Costs of Coal and Nuclear Units."72/
On a levelized basis, electricity produced by an 1100 megawatt nuclear facility located in Ohio was calculated to be the least expensive, costing only 15.79 dollars per megawatt-hour
("MWh").
In comparison, it was estimated that coal-fired 70/
United States Atomic Energy Commission, Draft Environmental Statement Related To The Proposed Perry Nuclear Power Plant, Units 1 and 2 (November 1973) (" Perry DES"); United States Atomic Energy Commission, Final Environmental Statement Related To The Proposed Perry Nuclear Power Plant, Units 1 and 2 (April 1974)
(" Perry FES").
The cost comparisons in the Perry DES were iden-tical to those in the Perry FES.
71/
The NRC Staff only compared Perry to oil-fired and coal-fired plants because it had concluded that other energy sources
-- natural gas, liquified natural gas, methanol, gas turbines, combined-cycle turbines, hydroelectric, solar, fusion, magne-tohydrodynamics, geothermal, and purchases of power from other-utilitie's -- were not viable alternatives in the CCCT.
Perry FES at 9-5 to 9-11.
72/ DOJ 94.
)
1 1
facilities of an identical size would cost 16.75 or 19.26 dollars i
per MWh, depending upon whether the facility was located in Pennsylvania or Ohio.
A 300 megawatt coal-fired facility located in Ohio would also be more expensive, generating electricity for 16.75 dollars per MWh.
Another Toledo Edison report offered in evidence by DOJ, entitled " Forecasts For Electric Generation and Transmission:
1974-1984", had concluded that "[n]uclear fuel presently prcrides the least costly energy source for large base-load generating plants."73/
b.
Expert Testimony Further support for the Licensing Board's position on the economic superiority of the nuclear option was available from the testimony of the' parties' experts.
Dr. William R. Hughes,74/ the NRC staff economist, stated that the " ability of the applicants to add nuclear plants such as the Perry and Davis-Besse units confers an added economic advantage over systems' that are unable to add nuclear capacity.
."75/_ Dr. Hughes-further testified that "[njuelear units will contribute to the effectiveness of the l
applicants' bulk power supply systems and enhance the economic.
advantage these - systems enjoy over alternative sources,- thus 73/ DOJ 511 at 92.
74/
See LBP-77-1, 5 N.R.C at 155, 241, 249.
75/ Hughes NRC 207, p.
30; see also id. at pp. 30-32; Tr. 3686.
)
,l enhancing their market power."76/
Other experts for the NRC Staff and DOJ concurred with Dr. Hughes about the low cost of power produced by nuclear generating facilities.
Mr. Mozer stated that "(n]uclear power has a lower overall cost at many locations'than other alterna-tives."71/
Mr. Kampmeier testified that "the cost of' coal and oil have risen io much that [a] nuclear plant has a large cost advantage."78/
In short, it is indisputable that the record in the CAPCO antitrust proceeding amply supported DOJ's assertion, with which the other parties concurred, that "[t}he power.
. generated
[by the proposed nuclear units] will be more economical than any other form of new base load generating capacity.
."79/
It was this critical finding which inexorably led to the conclusion that the licensing of Perry would create or maintain an anti-competitive situation in the OE service area.
t 76/ Huges, NRC 207, p.
31.
77/ Mozer, NRC 205, p.
61.
78/
Kampmeier, DOJ 450, pp. 24-25.
79/ DOJ Prehearing Brief at 118.
6 i 1
i
3
'j M
i c.
Demands for Access to Nuclear Power j
The economic significance of the anticipated low cost of
.l nuclear power, magnified by multiple units, related directly to the extensive discussion in the record of.the extent to which the Applicants were found to have denied their competitors ~ direct' participation in their proposed nuclear-construction program.
The clamor over the issue of access stemmed from the belief that-licensing the CAPCO nuclear facilities without imposing economic.
restrictions on CAPCO vould " den (y] these competitors the
[
low-cost power they will need to compete with Applicants' -nuclear-r power for new and growing loads
."go/
Ori as the-NRC Staff..
thad stated, " Applicants' denials of access to nuclear units" con-1stitutes denials of access to an essential resource,"g1/ posses-I sion of.which was believed to be necessary "in order to compete with Applicants and meet their future loads."g2/
Thus, in all of-the extensive discussions by the NRC Staff and DOJ about access, y
the assumption was made that without nuclear power, the I
non-Applicant. utilities would be incapable of competing with the Applicants.g3/
a
'a 80/
DOJ Prehearing Brief at 118-19.
81/
NRC, Proposed Conclusions of Law 7.10.
g2/
NRC Proposed Findings of Fact 2.06.
g3/
For example,.the City of Cleveland,.the operator of MELP,
]
had stated that "(u]nless small. electric systems in the (Continued Next Page)
, 4 i
I
I Not surprisingly, then, there also was uniform agreement by the parties that to compe:e, the non-Applicant CCCT utilities would have to secure thr, economic benefits provided by access to the nuclear units.
For example, DOJ witness Kampmeier testified that "[w]ithout access to the nuclear (units) the competitive positions of the small systems would deteriorate very seriously, if not beyond the point of continued viability.84/
Similarly, DOJ's Dr. Wein maintained that' joint ownership of a nuclear facility was one of the terms on which a non-CAPCO com-pany would have to be admitted into the CAPCO pool in order to prevent anticompetitive effects.81/
The Applicants did not con-test the economic benefits of access, arguing instead that such benefits were available to the small utilities through other means, including Applicants' proposed license conditions,8{/
(Continued)
CCCT.
obtain access to nuclear power.
the small elec-tric systems will lose their ability to compete with Applicants.
It is necessary that Cleveland, like Applicants, have access to nuclear capacity "Prehearing Brief of the City of Cleveland, " November 26, 1975 (citations omitted) (emphasis supplied).
This assertion was accepted by the Licensing Board:
"In order to remain or to become a viable competitor Cleveland must have access to nuclear power.
LBP-77-1, 5 N.R.C.
at 176.
84/
Kampmeier, DOJ 450, p.
52.
81/ Wein, DOJ 587, pp. 144-45.
86/
App. 44.
- See, e.g.,
Applicants' Joint Brief in Support at 678-80, 689-90.
n :
)
r-I.
wholesale sales,@7/ or the construction of a small coal-fired facility.gg/
I In short, the stated desire for access to the CAPCO nuclear j
facilities, expressed by some parties and presumed to be the case for every CAPCO competitor given the opportunity, in itself, con-stituted evidence of the perceived economic superiority of these plants.
d.
Other Factors once it became apparent -- as it was to everyone at the time
-- that nuclear power was low in cost, the Licensing Board found that the impact of operating such a plant was heightened by a number of characteristics of the situation extant within the CAPCO service areas.
These included the quantity of such low-cost nuclear power plants -- five large units,g9/ the transmis-sion expansion plan designed to transmit this low-cost power,90/
and the CAPCO coordinated planning which allowed for an exclusive sharing of the benef4ts of nuclear power.91/
The Licensing Board g7/
- See, e.g., Applicants' Joint Brief in Support at 681-84.
gg/
E.g.,
id. at 688-89.
g9/
- See, e.g.,
id. at 239, 240.
90/
Id.
91/
Id. at 223-37, 240-41.
)
felt free to remedy the anticompetitive impact of the CAPCO nuclear plants by means that affected all of these factors, e.g.,
through access to the plants, use of transmission facilities and wheeling, and the opportunity to participate in CAPCO.92/
The critical fact, he, wever, for purposes of Section 105(c) review, and the fact at issue today, was the low cost of nuclear power.
The analysis used oy the Licensing Board and the NRC Staff's own expert indicates that where this is not the case, characteristics of the electric utility industry, such as wheeling or transmis-sion capability, which allow for the use of nuclear power are not of concern to the NRC.
This is because "(1}t is the effect of the licensed activities" -- construction and operation of Perry
" measured against particular situations which is the predicate for Commission involvement in Section 105(c) license considera-tion."93/
A good example of the NRC's analysis in the,CAPCO case of i
other factors that were affected by the anticipated low. cost of nuclear power was the trepidation aroused by the massive commit-(
ment of the Applicants in the 1970's to expand their nuclear generating capacity.
At the time of the hearing, the Applicants had constructed, were in the process of constructing, or had 9 '/
Id. at 256-59; see also ALAB-560, 10 N.R.C. Hat 296-99.
93/
LBP-77-1, 5 N.R.C.
at 238.
l 1 !
,I committed themselves to construct fourteen generating units with a total generating capacity of slightly over 13,000 megawatts
("MW").94/
Nine of these facilities were nuclear units which would have a total generating capacity of over 9,000 MW;95/ the five remaining facilities were coal-fired units.96/
To place this construction program in perspective, in 1973 the total generating capacity of the Applicants was approximately 13,000 MW.97/
Thus, constructing the nine proposed nuclear fa-cilities was the equivalent of replacing over 70% of the existing fossil-fueled generating capacity of the Applicants.
Upon com-pletion of the construction program, the nine nuclear units would have constituted approximately 35% of ths total generating capac -
ity of the Applicants (assuming that none of the earlier units were removed from operation).
Even if one looks only at the five nuclear units which were the subject of the hearing, they were the equivalent to almost 40% of the existing capacity, and would 94/
LBP-77-1, 5 N.R.C.
at 153; Applicants' Brief In Support at 274-75; NRC 157 (Question 12).
95/
Beaver Valley 1 and 2 (856 MW each); Davis-Besse 1, 2 and 3 (906 MW each); Perry 1 and 2 (1205 MW each); Erie 1 and 2 (1260 MW each).
Applicants' Brief In Support'at 275 nn.170 & 171.
96/
Sammis 7 (625 MW), Eastlake 5 (625 MW), and Mansfield 1, 2 and 3 (825 MW'ench).
Id.
The CAPCO companies also were jointly committed to three blocks of fossil-fueled, short-lead-time--
capacity to compensate for slippages in the in-service dates of the proposed units.
Id.
97/
LBP-77-1, 5 N.R.C.
at 143.
LJ have constituted almost one quarter of the Applicants' total ca-pacity even if the other nuclear units had been cancelled (again, assuming that none of the earlier units were removed from opera-tion).
1 Most importantly, these units would generate base load
" power and energy for the lower part of the load cycle,
- power, generally up to or slightly above the. minimum load level."98/
Since base load units " supply loads which occur a greater number of hours during a year" compared to " peaking" units,99/ a utility has more opportunity to obtain the benefits of the anticipated low cost from such base load units.
As DOJ noted, the " nuclear electric power produced by the installation which are the subject of this proceeding, together with the power from the BeaverLVal-ley Power Station, Unit No.
2,_ will represent approximately 50%
of Applicants' present generating capacity, and will represent an even greater percentage of Applicants' base load capacity."100/
Not surprisingly, then, the NRC Staff considered,'CAPCO to be "a power pool overwhelmingly committed to the planning, construc-tion, and operation of predominantly large-scale, nuclear base load units and integrating that nuclear capacity into a bulk 98f NRC Trial Brief at A-1.
99/ DOJ Proposed Findings of Fact 2.11.
100/ DOJ Prehearing Brief at 114.,
V
power supply system."101/
4 The commitment of CAPCO to nuclear generation was expected to have an even greater potential impact on competition than would the isolated construction of a single nuclear facility.
"Where nuclear generation is the superior base-load choice, the I
cumulative effect on market power of a sequence of nuclear plants will be greater than the impact of any one plant alone, because I
each successive nuclear-addition will confer an incremental advantage."102/
In effect, the Licensing Board recognized the simple truism that the higher the percentage of bulk power that is generated by a low-cost method, the more the advantage of that method is reflected in average cost.103/
Because multiple y
nuclear facilities were viewed as "the superior base-load choice," they conferred "an incremental advantage."
of course, 101/ NRC Reply Brief at 14.
102/ LBP-77-1, 5 N.R.C. at 241 (emphasis added), citing NRC Staff witness Dr. Hughes; see Hughes NRC 207, pp. 31-32; see also NRC Proposed Findings of Fact 3.16; NRC Trial Brief at 72 (quoting Dr. Hughes).
As Dr. Hughes further explained, "the benefits of-each new unit would leave the applicants free to exercise pro-gressively greater market power as nuclear generation increased ~
its share of the total generation of this area."
Hughes~NRC 207, pp. 31-32.
103/ Dr. Wein, DOJ's expert witness, recognized that the converse-of this also is true.
He therefore argued that a utility could.
protect itself to the extent it anticipated rising prices by.
purchasing an interest in the first nuclear plant,-and thereby avoiding the impact of increasing incremental costs ~on average Tr. 6632-33, 7075-78 (Wein).
cost. u 1
-l 1
l in the absence of such an assumption, there would be no "advan-tage" to be " reflected in average cost" from the construction of multiple units, nor would there be anticompetitive significance to CAPCO's major nuclear commitment.
This same analysis applies to an examination of the signifi-cance of power supply services, such as transmission and coordination.104/
The Licensing Board had found and, for purpos-es of this Application, OE assumes that these services would be necessary for the non-Applicant CCCT utilities to avail them-selves of nuclear power.105/
But as Dr. Hughes' analysis had in-dicated -- an analysis which the Licensing Board found "particu-larly helpful"106/ -- this " impediment" had competitive significance only because its continued existence was viewed as granting the Applicants the exclusive use of nuclear power, thereby improving their competitive position.
But where nuclear 104/ See, e.g., NRC Proposed Findings of Fact 1.022.054, 1.087.112, 1.114.162, 1.179.266, 1.282.293, 1.298.361; DOJ Proposed Findings of Fact 6.01.16, 6.18.23, 7.01.09, 7.11.18, 8.01.12, 9.01.25, 9.29.33, 10.01.20.
Since both the NRC Staff and DOJ believed that " effective utilization' of nuclear power require [d] other power supply option and bulk power ser-vices which would not be available except with the applicants' cooperation," the denial of access to coordination was tantamount to denial of naclear power.
NRC Trial Brief at 71.
See also DOJ Proposed Findings 2.27 ("A small municipal system without access to coordinated operation and development could not ' efficiently install or use nuclear generation.") (citations omitted).
105/ LBP-77-1, 5 N.R.C.
at 240-41.
106/ Id.
}
power is not "the superior base load choice," Applicants' posi-tion would not be improved by virtue of such an exclusive use.
In fact, as is later demonstrated, OE's position would be (and has been) worsened.
Thus, transmission and coordination were significant during the CAPCO proceeding because of competitive assumptions about the transmission of low-cost nuclear power and coordination to better utilize low-cost nuclear power that are not true today.
In short, the Licensing and Appeal Boards and the parties were interested in the size of the CAPCO nuclear program, the as-sociated transmission expansion plan, and coordination because these circumstances affected the ability of CAPCO's competitors to gain access to nuclear power.
In view of the common under-standing that nuclear units were the superior economic choice, such access was essential.
Conversely, in the absence of cost-advantageous nuclear power, municipalities would not have been interested in access or disadvantaged without it, thereby.
eliminating the basis for the NRC's interest in the structure of CAPCO.
B.
The" Legal Standard For Suspending The Conditions In its evaluation of OE's present request to amend the Perry operating license, the determinative question that the NRC Staff.
q must resolve is whether there are changed circumstances that l
ccmpel issuance of the proposed amendment --
i.e.,
suspension of the antitrust license conditions as they apply to OE.
It is CE's position that unquestionably, the relative economic cost of nuclear power, and the anticipated benefits from nuclear genera-tien, have changed dramatically from those assumed and relied upon by both the Licensing and Appeal Boards when they imposed antitrust license conditions on OE.
The consequence of this change is not merely the inappropriateness of the subject license conditions; it is their impermissibility.
1.
The Section 105(c) Changed Circumstances Test Section 105(c) of the Act establishes "a particularized re-gime for the consideration and accommodation of possible anti-trust concerns arising in connection with the licensing of nuclear power plants."107/
As evidenced in this case, a thorough antitrust review takes place at the construction permit stage of the facility licensing process.
A "second narrower review"108/
occurs during the OL phase if, and only if, there have been "sig-nificant changes in the licensee's activities or proposed activi-ties"109/ subsequent to the first detailed review.
No such 107/ Houston Lighting & Power Co. (South Texas Project, Units 1-and 2), CLI-77-13, 5 N.R.C.
1303, 1309 (1977) (" South Texas").
108/ Id. at 1312.
109/ Section 105(c)(2) of the Act, 42_U.S.C.
$ 2135(c)(2); see South Carolina Electric & Cas Co. (Virgil C.1 Summer Nuclear Sta-tion, Unit No. 1), CLI-80-28, 11 N.R.C.
817, 823 (1980) ("So.
Carolina I"). i
I changes occurred in this instance.110/
Subsequent to the issuance of an OL for a nuclear power plant, no further antitrust evaluations ordinarily take place unless a license amendment is sought which is determined would result in "significant [ antitrust] changes" to the licensed ac-tivities.111/
In such circumstances, the NRC undertakes another antitrust review.112/
110/ 51 Fed. Reg. 41,711 (Nov. 18, 1986).
111/ See 10 C.F.R. 5 50.80(b); Detroit Edison Co. (Enrico Fermi Atomic Power Plant, Unit No. 2), ALAB-475, 7 N.R.C.
752, 755 n.7 (1978); South Carolina Electric & Gas Co. (Virgil C.
Summer Nuclear Station, Unit No. 1), CLI-81-14, 13 N.R.C.
862, 874 n.47 (1981) ("So. Carolina II").
In South Texas, supra, the NRC focused on the two-step anti-trust review process, rejecting the argument that Congress placed general antitrust policy authority in the NRC.
The'Comission in-stead concluded that there were "more suitable forums" for gener-al antitrust enforcement, alluding to the Department of Justice's Antitrust Division and others.
5 N.R.C.
at 1314-18.
In reaching this conclusion, the Commission was careful, however, to distin-guish its " continuing police power over conditions properly placed on licenses, after 105(c) antitrust review," and situa-tions where "significant changes" occur after an operating license is issued.
Neither of these circumstances'was at issue in South Texas.
Id. at-1317-18.
112/ Three criteria have been identified that circumscribe the circumstances in which a change in licensed activities is consid-ered to be significant, for antitrust purposes.- Those criteria are whether the change (1) occurred since the previous, detailed antitrust review of the licensee (s); (2) is reasonably attribut-able to the licensee (s); and (3) has antitrust implications that would likely warrant some antitrust remedy.
So. Carolina I, 11 N.R.C. at 824; So. Carolina II, 13 N.R.C. at 864 n.3.
This third critical criterion has been-further explained as. establishing that " changes would be considered 'significant' only when the competitive structure, as changed, would likely warrant and'be susceptible to a greater than de minimus license modification."
Id.,
1
)
i
- i Board's exceptions concerned Mr. Sharfman's view that the Licens-ing Board should be vested with continuing jurisdiction over the CAPCO antitrust proceeding.
Mr. Sharfman had. concluded ~that this t
remedy was necessary so that in.the future the Licensing Board-could " relieve the applicants from conditions that might prove an extreme hardship or impossible of' compliance. "114/ As Mr.
i Sharfman explained:
However, should this license condition [ con--
carning wheeling) confront 1the applicants with a situation of extreme hardship or im-possibility at some time in the future, they may petition.the Licensing Board for relief from it. 'We hereby vest the Licensing, Board with continuing jurisdiction to entertain,
1 such a petition.
This is precisely what the-1 District Court did.in response to a similar argument.in~ Otter Tail, supra,115/ that interconnection or wheeling would " erode its integrated system and threaten its capacity.
j to serve adequately the public";.and the Su-preme Court' held that that was.a.properfexer-cise of discretion.
410 U.S. at 381-82.116/.
l The Appeal Board majority agreed, with Mr. Sharfman - that
- )
" license conditions seemingly fair today may prove inequitable ~
- 1 tomorrow."117/
But,.it concluded that Mr. Sharfman's proposed j
~114/-Id. at 294.
115/ Otter Tail' Power Co. v. United States, 410 U.S. 366'(1973).
q 116/ 10 $.R.C. at 392 (separate opinion of~J. Sharfman)-(footnote i
added).
117/ Id. at 294. )
+
,s-
I jurisdictional approach to relief was unnecessary.
As the Appeal Board observed, " Commission regulations give the Director of Nuclear Reactor Regulation -- who is assisted by an able anti-trust staff -- authority to modify license conditions where nee-essary and provide as well as [ sic] means for review of his de-terminations.
10 CFR Sections 2.200-2.204 and Section P
2.206."118/
~
The Appeal Board noted that a modification of one of the an-titrust license conditions already had taken place between the Licensing Board's decision in LBP-77-1 and the Appeal Board's opinion in ALAB-560.
It therefore was clear to the Appeal. Board that the impact of changed conditions could readily be remedied by the NRC Staff.
Thus, the Appeal Board saw "no occasion to continue the Licensing Board's jurisdiction over aspects of the case."119/
In summary, the Appeal Board that imposed the license condi-tiens at issue here expressly considered the circumstances which OE submits are true today:
that the subject conditions are no longer appropriate.
The Appeal Board held that, in such circum-stances, the NRC Staff has the authority to remedy the situation.
118/ Id.
119/ 10 N.R.C. at 294-95 (footnote omitted).,
1 C.
The Circumstances Today Having described the fundamental underlying premise of the CAPCO antitrust case -- that nuclear power would'be low in cost
-- it remains to compare this central premise with current realities.
That comparison shows the obvious:
that nuclear power not only is not low cost but that it is high cost; conse-quently, OE's participation in Perry, is not competitively advan-tageous.
Moreover, even if one looks beyond the central issue of the cost of nuclear power and considers the other related factors considered by the Licensing and Appeal Boards, it is apparent that these factors also have changed in ways that prevent the operation of the Perry plant to create or maintain a situation' inconsistent with the antitrust laws.
1.
OE Compliance With The Conditions As a preliminary matter, the record reflects the fact that antitrust license conditions have been imposed on OE since the Licensing Board's 1977 decision and the issuance of the Perry construction permits in May 1977.
In connection with the anti-trust reviews for the Perry and Beaver Valley 2 operating licenses, OE has affirmed under oath on three separate occasions' that OE "is committed to and has complied with all applicable
[ antitrust} license conditions."120/
The NRC has. conducted i
120/ See Affidavits by Justin T.
Rogers (President of OE) at Item 2 (dated May 12, 1981, December 13, 1982 and October 8, 1985), filed with the NRC. t
I antitrust reviews for these two operating licenses and has found no antitrust concerns-about any OE conduct, nor any reason to doubt OE's commitment to comply with the antitrust license condi-tions.121/
a.
Nuclear Access on December 29, 1978, twenty-one wholesale customers of OE and the four municipal wholeskie customers of TEco gave notics of a general intent to obtain access to the Perry 1 and 2 and the Davis-Besse 1, 2 and 3 nuclear units.
By letter dated March 26, 1979, attorneys for these wholesale customers requested a meeting between representatives of the municipalities and representatives of each of the CAPCO companies to exchange views and information.
The requested meeting was held in Cleveland on June 1, 1979.
During that meeting, the establishment of an Ohio Municipal Elec-tric Authority to be set up as a financing vehicle for 83 Chio i
municipalities was discussed.
Creation of such an authority re-quired an amendment to the Ohio constitution which was defeated by Ohio voters on June 3, 1980.
No further action has been taken by the requesting entities to obtain access to the nuclear units i
-- two of which have since been cancelled.
121/ See 48 Fed. Reg. 52992 (Nov. 23, 1983); 52 Fed. Reg. 15402 (Apr. 28, 1987).
i l-It is the stated policy of OE to offer reasonable access to the nuclear units in which OE has an ownership interest.
That policy continues today.
Although there have been some informal discussions about municipal involvement in the Perry plant, no entity has made any commitment to participate in Perry.
- Indeed, none has expressed any interest in such access since 1979, thus confirming the rNanged economic attractiveness of nuclear power.
b.
Other Conditions At the time of the Davis-Besse/ Perry.'ntitrust review, OE had 21 municipal customers that i dividually bought capacity from OE under a Federal Power Commission (and later Federal Energy Regulatory Commission) regulated full requirements wholesale rate and resold this capacity to their retail customers.
As part of a-negotiated rate settlement in FERC Docket No. ER77-530, a partial requirement rate for wholesale customers was established.
This rate became effective on April 1, 1981 (FERC Docket No.
ER-80-361).
Under this rate, OE agreed to sell specified amounts of wholesale power.to its municipal customers requesting such service and to transmit (or " wheel"). additional capacity' required by such customers.
Thereafter, the municipals bought a small' amount of capacity from Buckeye Power, but generally remained individual full requirement customers of OE.
f 1^
In 1983, OE was advised that the municipals had agreed to purchase capacity frota American Municipal Power - Ohio, Inc.
(" AMP-O") as a group, and that henceforth AMP-O would be the'mu-nicipals' agent for dealing with OE.
The effect of this change was'to eliminate OE's municipal resale class of customers.
In-stead, OE was to deal with an independent power broker (AMP-0) t who could purchase. capacity from the lowest bidder anywhere with-
~
in or outside Ohio.
1 OE would then transmit this capacity.to its former municipal customers.
Following a lengthy. negotiating pro-OE and AMP-O agreed on a service contract, effective
- cess, October 1, 1983.
The key points of this service contract are:
1.
OE will sell AMP-O 105 megawatts of capacity and asso-ciated energy at an off-system competitive market rate.
This amount will be increased by 3 megawatts each year during the. term.
j i
of the contract.
This sale is referred to as " base capacity" in the contract.
i i
2.
AMP-O retained the right to buy 480 megawatt-months'of capacity per year from other sources and reduce the amount of base power being taken by an. equivalent amount.
This is referred to as " alternate capacity" in the contract.
In effect, this pro-i vision gives AMP-O the option of purchasing about 40 megawatts.a' i
month at'the lowest available price.
'OE is, of course, free to' bid on this 40 megawatts.
- l 1
i I
i i
j i
.. =.
4
.y 3.
OE will sell AMP-O additional capacity and associated energy required by AMP-O in order to serve the full needs of OE's i
former municipal resale customers.
This sale-is referred to as
" regulation capacity" in the contract. -The charge to AMP-O"for-regulation capacity is that charged by OE under its Public-Utilities Commission of Ohio ("PUCO")-regulated rate for General Service - Large, Rate No. 53, with specified maximum charges.
I This provision provides AMP-O with the additional capacity neces-sary to serve the full requirements of OE's former municipal re-3 sale customers at a rate no greater than the lowest industrial I
rate charged by CE.
4.
To effectuate the purposes of the service contract, OE agreed to provide all necessary transmission services at a specified rate.
5.
The service. contract is to continue for a term of five years ending on September 30, 1988.
If no agreement is reached for continuing the arrangement, OE is obligated to file rate schedules with FERC which provide either a' full or a partial j
requirement service to OE's former municipal customers or to AMP-O on behalf of such customers.
It is apparent that under the OE/ AMP-O' service contract,LOE-has-made available to its former municipal' customers a flexible mechanism that allows those municipalities to " shop-around" for L '
+
l One stark illustration of the utter absence of a competitive edge from an ownership interest in Perry is the recent considera-tion by the City of Marion to establish its own electric power company.
The argument advanced in support of the establishment of a city-owned system was OE's increased cost of. power from "ex-pensive nuclear plant construction."
Because a municipal system could " shop around" and thereby avoid purchasing capacity from Perry (and, in the future, Beaver Valley II), it was argued that a Marien public power company's electricity rates would be lower than would be achievable by the city's purchasing of electricity directly from OE.125/
Unquestionably, then, at least to some of those who argued otherwise a decade ago, access to Perry nuclear power is far from an economic boon.126/
Compounding the competitive disincentive associated with ac-cess to and use of Perry nuclear power, is-the potential use'of the antitrust license conditions placed on OE to further exacer-bate the economic impact of Perry on OE's customers.
For exam-ple, in the Marion case, through merely a paper transaction and without the expenditure of any capital (except for the possible 125/ See An Alternative to High Utility Rates:
MARION PUBLIC POWER SYSTEM Fact Book (1986).
126/ As Mr. Kenneth Hagerman, the Vice President of Operations of AMP-0, stated in testimony on August 11, 1986 before the City Council of the City of Marion,
. we are not'looking for nuclear power plants.
[W]e are looking for power sources that are not saddled with the cost of nuclear power." >
l 1
cost of a single meter), the proposed municipal. system would'ob-tain cheap power using the OE condition requiring wheeling.
With that advantage, it was proposed that Marion would obtain as its only customer a major OE industrial customer currently serviced directly by CE.
Thus, it was argued, not only would the proposed municipal power company (through the Perry license conditions) be able to avoid buying capacity from Perry, and to take away from OE a major industrial customer, but it would be Male,.through the OE license conditions, to obtain power from other sources and from OE at the below-cost (i.e.,
subsidized) rate unavailable to the remaining OE retail customers (including other industrial customers).
2.
The Unachieved Promise of Nuclear Power a.
The Cost of Nuclear Power Worldwide and national events have adversely affected the economics of energy generally, and of nuclear power particularly.
These events dramatically increased the cost of Perry capacity.
(1)
The Regulatory and Economic Morass of the 1970's.and 19BO's The impact on Perry's cost of changing regulatory require-ments and economic conditions is discussed'in detail in a compre-hensive review of the history and development of the Perry project prepared for state regulatory proceedings by Pickard, e
- i
+f a
j Lowe & Garrick (PLG), a' nuclear engineering firm, on behalf'of
- CEI.127/~ As summarized.by PLG, Between the 1950s and the mid-1970s, the U.'S..
government actively endorsed and encouraged the development of nuclear power and self-regulation by the industry.
There was a spirit of cooperation and common purpose-be-t tween the government and the industry.
Both believed in the development.of the. nuclear power option.
Both were confident about the potential' contribution of nuclear. energy to the nation's power supply.
i However, contrary to the government's and the l
industry's earlier expectations, nuclear 1
plant 1 design and construction ~ commencing in the late 1960s, and especially since:the early 1970s, have been subjected to ever-
~,
expanding, ever-changing. regulatory require-ments..The-industry has also faced unprece-dented inflationary cycles, and other political and economic obstacles.
- Although, as discussed in. subsequent sections, CEI.has been able to manage effectively the dramatic changes that have occurred, these adverse historical developments have nonetheless led to significant schedule delays and costlin-creases at Perry -- as they have. for all.
~'
other nuclear plants built in the same time
.i period.128/
The historical developments that adversely affected the nuclear power industry are well known.
Foremost among these-de-i velopments was the fact that plants, such as Perry, built in the A
-1970s'and 1980s, were inundated with massive new,. changing.and i
127 Perry Nuclear Power Plant Assessment of Management Prudence ~
.( PLG Report"), Section 3.2 (March 1986).
i 128/'Id., Section 3.2.1. ;
i 1
l
j largely unanticipated environmental and technical regulatory requirements.129/
The NRC regulatory system did not permit freezing the design of a plant once construction had begun.
To the contrary, utilities remained vulnerable to costly design changes and construction retrofit work throughout the entire en-gineering, construction and start-up process.
For example, with the passage of the' National Environmental Policy Act of 1969 (NEPA) and judicial decisions interpreting that statute, extensive and costly new environmental analyses, reviews and hearings were mandated.
And NEPA was one of many new federal environmental protection laws passed in this timeframe.130/
Furthermore, Ohio and other states also enacted extensive new requirements in the 1970s, in response to the envi-ronmental movement, which significantly affected nuclear plant siting, design and construction -- and hence, cost.131/
And, of course, this is only one illustration among many.
In 1974, with the passage of the Energy Reorganization Act, Congress transferred to the Energy Research and Development Ad-ministration (ERDA, now part of the Department of Energy), the 129/ Id.,
Section 3.2.3.
130/ Others included the Clean Air Act Amendments of 1970 and 1977, the Federal Water Pollution Control Act Amendments of 1972, and the Endangered Species Act of 1973.
131/ See PLG Report, Section 4.5..
IL AEC's research and development activities, and established the NRC as an independent regulatory commission with licensing and
-i related regulatory responsibilities over. nuclear-powered'facili-ties.132/
This change corresponded with the significant. shift'in responsibility for nuclear power plant safety that had begun in the late-1960s.
As former NRC Staffer Roger Mattson has explained:
By.the late 1960s,-the AEC Regulatory Staff began to codify nuclear plant-design practic-es in General Design Criteria (10 CFR 50, Ap-pendix A) and Quality Assurance requirements (10 CFR 50, Appendix B).
These practices had been developed-in the licensing review of the early plants before AEC adopted them-as re-quired features for later plants.
Their sub-sequent interpretation and still later reinterpretations by the AECLand NRC Staff J
eventually led to a shift in responsibility for the details of safety away from the utilities and toward the-regulators.
The regulators simply tock over some of the deci-sion making authority of the utilities-on many of the design deta11s.133/
l Corresponding with the transfer of regulatory authority.from the AEC to the NRC, an extraordinary expansion in regulatory-re-view of plants under construction took place.
The effort ex-pended by the NRC in a typical operating license review grew from i
about seven professional staff-years in the mid-1970s to about 132/ Id., Section 3.2.3.2.
133/ Testimony of Roger J. Mattson, before the PennsylvaniaLPub '
l lic Utility Commission in Philadelphia Electric's-Limerick Pro-ceeding (Docket No. R-850152],. Sept. 2 7, : 1985.
'l
'I =l
-i
1 twenty in the early 1980s.
This increase reflected the ever-increasing number and types of requirements that were being im-posed on nuclear power plants.
These NRC requirements were some-times the product of specific events in the nuclear industry, the 1975 Browns Ferry fire and the 1979 Three Mile Island e.g.,
accident.
In other cases, they were simply the consequence of evolving and expanding industry standards.
For example, the num-ber of standards produced by organizations accredited by the American National Standards Institute (ANSI) increased from ap-proximately 100 in 1970 to approximately 1,700 in 1975.
In both 1
cases, the consequence was the same:
a vastly expanding number of manhours of work in order to complete plant construction,134/
and rapidly escalating costs for nuclear facilities.
In sum, "The regulatory climate at the NRC between 1975 and i
1981 can be best described as highly unstable."135/
The " ripple i
effects" of the multiple NRC regulatory changes that took place included sharply increased manheurs for architect-engineers and for craftsmen at the construction site, significant increases in 134/ A 1985 study indicates that during the 1970s and 1980s, the number of engineering manhours for a typical plant grew at-an av-erage rate of 17.2 percent per year.
Budwani, Ramesh N._(Burns' and Roe, Inc.), "The Data Base for U.S. Power Plants," Power Engineering, Jan. 1985.
I 135/ Testimony of Roger J. Mattson, before the Pennsylvania Pub-lic Utility Commission in Philadelphia Electric's Limerick Pro-ceeding [ Docket No. R-850152], Sept. 27, 1985.
> l-
I the physical quantities of commodities needed and new or changed equipment, and less efficient construction due to increasingly complex and congested designs.
All of these activities were very costly to the nuclear industry nationwide.
A recent study by Booz, Allen & Hamilton 136/ concluded that approximate!y 71 to 76 percent of the increased costs in constracting nuclear plants was caused by nuclear regulation.
In addition, adverse trends in the general economy had a direct and substantial impact on nuclear power plant costs.
Nuclear projects require huge investments in labor,-equipment, and materials, and rely on external financing for a large portion of their total investment costs.
Plants like Perry that were begun in the early 1970s had to cope with sustained high infla-tion and high interest rates in the 1970s and early 1980s, which dramatically increased plant costs.
Described as "[p]erhaps the most dramatic economic event that occurred during the Nixon years," the 1973-1974 energy cri-sis forced the issue of energy into the consciousness of the con-sumer, as millions of Americans at the request of the President, both turned down their thermostats to save heating fuel, and slowed their cars on the highways to save gasoline.
The Arab 136/ Boo =, Allen & Hamilton, Inc., The Impact of Regulation on Nuclear Power Plant Construction Costs (1985).
k,
.j oil-producing nations imposed a five-month oil embargo, from October, 1973 to March, 1974.
In response to the embargo, Presi-dent Nixon unveiled Project Independence in November, 1973, designed to mako America energy independent by the end of the de-cade.
Although estimates varied, the 1973 oil embargo was said to have resulted in the loss to the United States of. about two mil-Lien barrels of oil per day -- about one ninth of U.S. daily con-sumption.
In addition to the experienced shortage of oil, there was a 400% imported oil price increase, from about $3 to $12 a barrel.
Moreover, once raised, these prices were not lowered by the Arab oil producers.
The soaring price of energy was consid-ered to account for about 50% of the annual increase in the con-sumer and wholesale price indices, which now were rising faster than 10% a year.
In 1972, the' rate of' inflation had averaged 3.3%.
It was 6.2% in 1973, and 11.0% in 1974.137/ Reflecting
- he energy and economic crisis, the national consumer price.for electricity rose 41% between November, 1973 and January, 1974.138/
This stimulated intensive energy conservation efforts, which ultimately, but not predictably, dramatically slowed the rate of growth of demand for electricity.
137/ Consumer Price Index, U.S. Department of Labor Bureau of Labor Statistics, June 22, 1983.
138/ " Continuing Energy Crisis in America," Congressional Quar-terly-(1975), at 1, 2, 13-14, 32-36; New York Times, Nov. 12, 1973 at 1; New York Times, Aug. 9, 1974 at 45, 50.
j' In 1974 and 1975, the United States experienced its worst recession in 40 years.
Economic growth stagnated.
In 1974, in-flation averaged 12% and unemployment. soared to the highest level since 1941.
In January 1975, the deepest drop in. industrial pro-duction occurred since 1937 -- a one-month plunge of 3.6%.
Labor's George Meany labeled the slump a full depression and de-
~t manded a tax cut of $30 billion -- $14 billion more than Presi-dent resd's tax-cut proposal.139/
By 1976, the consensus fore-cast once again called for real growth -- 6% or moro.
Yet'the 1974 recession had been so deep, ano 1975's recovery so far short of prosperity, that less than spectacular growth was unimpres-sive.
As one pollster stated, consumers were battered by "per-sistent pessimism" over the nation's long-term prospects.140/
In the aftermath of the recession, business investment lagged behind the economic recovery, deterred by the uncer-tainties of energy supplies and prices, fear of the recently ex-perienced steep recession and inflation, and the high costs.of capital goods.
At the same time, between 1974 and 1978, the rate of inflation declined substantially -- from about 12% to about 6%
by 1978.141/
139/ "The Economy:
Can They Fix It," Newsweek, Feb. 24, 1975 at 85; "The Economy:
How Muc~ Is Too Much?'
Newsweak, March 24, 1975 at 24.
140/ "The Economy:
Almost Boomy," Newsweek, Jan. 19, 1976, at 61.
141/ President Carter's economic message to Congress, Jan. 20, 1978, reprinted in 1978 Congressional Quarterly at 216-22~(Jan.
28, 1978).
- \\
In 1979, there was a revolution in Iran, which resulted in a 68-day Iranian oil embargo and a second international oil crisis.
As a result of the Iranian oil embargo, oil prices rose precipi-tously from a $13/bbi price, to as high as $41/bbi by the end.of 1980.142/
Gross oil imports had averaged 6.1 million barrels a day in 1975, and 8.8 million barrels a day in 1977.
After the Iranian crisis, President Carter announced that 1979 imports-would be limited to an average of 8.2 million barrels a day, and that all future oil imports would not exceed 8.6 million barrels annually.143/
i The 1980 to 1985 period was a time of economic readjustment in the United States.
In the late 1970s and early 1980s, the United States experienced the longest and deepest recession since the Great Depression.
In January 1980, the prime interest rate was over 15%.
By the end of the year, it passed the 21% mark.
That year, inflation averaged 13.5%.
Record prime rates contin-ued through mid-1982.
The three years between 1980 and 1982 also were characterized by near stagnation of production output, and a-sharp rise in unemployment.
By January of 1983, the prime rate stabilized at the " low" rate of about 11%.
The combination of 142/ Energy Policy (2d ed), Ca! iressional Quarterly (March 1981) i at 5, 21-23.
143/ " Quotas on Oil Imports Not New to U.S.
. ", 1979 Congr.
Quarterly Almanac at 612 (Vol. XXXV, 1978).
i
'l high inflation rates and high interest rates resulted in dramatic.
i increases in the cost of borrowed funds to capital intensive industries, such as the utility industry.
The impact of these harsh economic conditions was the reluctance of business to bor-row money for major capital expenditures, e.g.,
new industrial plants.
By 1983, an economic recovery was underway.
Inflation slowed from an average of over 10% in 1982, to 6% in 1983 and 3%
in 1984.144/
In summary, adverse regulatory and economic conditions affected nuclear power plant projects throughout the United States in the 1970s and 1980s.
The Perry plant was not immune from these adverse national and international circumstances.
And, as a consequence of them, the capital cost of the Perry plant -- a significant component of its levelized cost -- greatly exceeded all expectations.
(ii)
OE's Costs for Perry In connection with this license omendment Applic. tion, OE has compared the cost between what, in 1976, would have been ar.-
ticipated to be the costs of proposed new nuclear and coal plants, and the costs that in fact would be experienced today.
144/ Consumer Price Index, U.S. Department of Labor, Bureau of Labor Statistics, June 22, 1983; Economic Report of the President (February 1986) at 332; OECD Economic Surveys 1985/1986,' United States (November 1985) at 8.
1 CE's comparison shows that in'1976 it would have been anticipated that the 30-year levelized cost (including. capital, operations and maintenance, and fuel) for a nuclear power plant would be about $27 per MWh.
The actual 1987 30-year levelized cost for Perry (including capital, operation and maintenance, and fuel) is S184 per MWh, or 580% higher than the $27 per MWh projected in 1
1976.
By contrast, the projected 30-year levelized cost of a coal plant in 1976 would have been $38 per MWh, or 41 percent higher than the then-estimated cost for Perry.145/
Based on a recent Electric Power Research Institute survey 146/, the current levelized cost estimate of a 300 MW coal-fired unit with a 1987 in-servi,ce date, which represents OE's approximate ownership share in Perry, would be approximately $92 per MWh -- one-half of the cost of Perry.147/
145/ OE's calculation of 1976-anticipated costs is substantiated by actual estimates made in 1977 in connection with OE's applica-tien to build Erie 1 and 2.
In the Erie Environmental Report, Vol. 5 at Figure ER 9.3-1 (Amend. 3 8/29/77), OE projected the-10-year levelized cost for a 1200 MW nuclear and a coal plant brought on line in 1986.
The cast (mills /KWh) for the nuclear plant ranged from 37.8 to 46.8, depending on whether one assumed-an 80, 70 or 60 percent capacity factor.
The cost of a coal' plant ranged from 48.5 to 55.2 mills /KWh.
A comparable analysis by the NRC Staff estimated nuclear from 31.8 to 42.6 mills /KWh:
coal was estimated at 46.5 to 56.6 mills /KWh.
NUREG-0337, Draft Environmental Statement related to construction of Erie Nuclear Flant, Units 1 and 2 (Nov. 1977) at Table 9.12.
146/ Electric Power Research Institute Technical Assessment Guide
("EPRI-P-4463-SR").
147/ The estimated levelized cost of a 1,000 MW coal p!. ant, the approximate size of Perry, brought on-line in 1987, would be even less. -
a j:
r t
h
~W q
the stark _ realities of-the high cost of Perry are reflected'
.in nationwide statistics.
For example, the Atomic Industrial i
Forum ("AIF") conducts an annual survey to develop actual average 1 costs for different types of generating units.
Those surveys y
show that nuclear was a lower cost generation source than coal prior to 1983, but that after 1983 nuclear became.more expensive.
2 t Indeed,:the AIF survey shows that in 1985 nuclear-generated power' i
was, on average, 26.5 percent more expensive than' coal-fired power.
Since the AIF figures include a large number of older:
t (and therefore relatively less expensive) nuclear plants,'the significant increase in the _ average cost of nuclear power' re-flects the sharp increase resulting from the very high. capital M
costs-of recent nuclear plants like Perry.
It is thus obvious that, rather than'being about 41 percent
less expensive than a coal plant as originally expected, Perry is
~
substantially more expensive than.what a coal' plant' would have j
There can be little doubt that the situation anticipated cost.
during the CAPCo antitrust case has changed dramatically.
Perry is not the low cost,. superior alternative it was assumed-and ex-l pected it would be.
Certainly, it has no competitively advanta-geous impact.
. 4 w
r n
i R
- J.
[
r i
change'made1 nuclear construction and operation an increasingly j
complex and unstable business.
9 In contrast-to the Licensing and Appeal Board' expectations, the CAPCO construction. program _has not foreclosedfopportunities for other smaller. systems.
The fear has not materialized that
- a CAPCC could entrench its dominant position by building so many large, low cost nuclear units.
Of the nine new nuclear plants-o-
i expected to be in service in the CAPCO service are'a by the late 19BO's, only four will be operating -- Davis-Besse 1, Perry 1, and Beaver Valley 1 and 2.
Two of-those plants'(Davis-Besse l' and Beaver Valley 1) were essentially finished at the time of the-l CAPCO antitrust proceeding.
Of the seven additional nuclear plants expected to be constructed since then, only two (Perry 1 and Beaver Valley 2) have been built.
By~any measure, the situa-tion is materially changed from that anticipated during the CAPCO antitrust proceeding.
c.
The Termination of the CAPCO: Pool During the antitrust proceeding, extensive time was spent i
identifying and describing how the CAPCO pool functioned,-
t evaluating and assessing the enormous competitive advantages as-sociated.with CAPCO pool membership, and provingfApplicants' al-leged denials of pool' membership to their smaller competitors.
Key findings and conclusions by the Licensing Board and the v
i
c L'
r Appeal Board were based on the unique economic advantages of nuclear access when combined with the "one-system" planning and operation concept embodied in the CAPCO pool.
See Attachments 3 and 4.
Like the cost of nuclear power and the extent of the con-struction program, the anticipated advantages from the CAPCO pool have not materialized.
Instead, the CAPCO pool has been termi-nated and the existing cooperative efforts among its former mem-I bers are the bare essentials necessary to support those limited joint efforts begun during the period when the pool did exist.
In summary, the-following important changes have occurred in the CAPCO pool:
1.
On December 31, 1979, the CAPCO companies ceased mandatory purchases and sales that were required to be made among them under prior agreements.
2.
On September 1, 1980, the CAPCO companies terminated the CAPCO Memorandum of Understanding (dated September 14, 1967) and certain other agreements.
The com-panies also agreed to implement pool restructuring princi-pies, the most significant of which was the abandonment of the "one-system" planning concept.
Each company is now re-sponsible for future capacity planning, authorization of ad-ditional generating units, and establishing acceptable reserve margins.
. t
I 3.
The CAPCO Basic Operating Agreement was amended on September 1, 1980, August 1, 1981, September 1, 1982 and July 1, 1984.
Ao a result, the companies no longer have unqualified entitlements to replacement capacity and energy.
Instead more limited and qualified rights to "back-up" and emergency power have been established.
4.
In addition, numerous other (less signifi-cant) administrative and operating principles have been re-vised or eliminated.
It should be understood that these changes were made because the CAPCO companies found little advantage, and substantial costs, from continuing to operate under CAPCO's previous princi-ples.
Thus, the competitive advantages perceived to flow from CAPCO membership failed to materialize.
Perhaps the clearest ev-idence of this is that no municipal or rural electric cooperative has ever sought to join CAPCO under the very favorable access terms provided in the antitrust license conditions.
In summary, in at least three material respects, important premises underlying the conclusion that licensing the Perry plant would create or maintain a situation inconsistent with the anti-trust laws have changed significantly.
Of critical importance is
}\\the first premise, viz., that rather than being low cost, Perry
~
nuclear power is high cost.
The impact of this unanticipated I j
outcome is compounded _ by several other changes. ;}Rather than con.
structing numerous, large baseload nuclear plants, only two new And furthermore,d )there are no sub-l units have been constructed.
+
i stantial. competitive advantages from membership in the CAPCO pool.
i 3.
The Actual Economic Impact of Perry on OE There is an obvious impact from the economic and other busi-i ness developments that OE has described:
ten years later, it is-clear that the prediction of all concerned was wrong, as unex-pected and uncontrollable events have dramatically-and adversely affected the economics of nuclear power.
Contrary to the expec-tations o# DOJ when Congress proposed the amendment to Section 105(c), access to the nuclear power from Perry -- unquestionably not low in cost -- is, if anything, adversely " decisive in any competitive race between electric power companies."149/ 10E's cost for capacity generated by Perry certainly is not cheaper t
than the cost of capacity CE generates from similarly sized fossil-fuel plants.150/
As a result, in contrast to stated ex-pectations at the time,151/ Perry's capacity does not provide to 149/ See Joint Committee I at 9 (R.W. Donnem).
150/ Combare Applicants' Joint Proposed Findings FOF 23.14;-
Applicants' Joint Reply Brief at 10.
151/ See DOJ Reply Brief at 179; DOJ Prehearing Brief at 115; Kampmeier. DOJ 450, p. 24-25.
1 ;
i l
11 ]
1 OE a competitive edge-in the market place.. OE therefore has not
.been able to " enhance and maintain" any " dominance and.monopolyi power" it may have, "to the detriment of-[its]Ecompetitors."152/
Section 105(c) of the Atomic Energy Act wasipromulgated in-order to-ensure eeuitable access to nuclear power; it certainly-was not intended to promote the deliberate avoidance of that re -
i source, with a consequent inequitable economic penalty to nuclear-energy users.
As previously described, OE's customers -- partic-ularly, the municipalities that complained of the CAPCO compa-nies' dominant interest in Perry -- have not endeavored to become Perry owners.153 ' The driving impetus for _ Congress' decision to f
allow the NRC to impose licensing conditions on its applicants
I business -- not health and safety -- activities was to ensure S
" access to that newly available cheap source of power."154/
That' g
impetus is wholly inapplicable with respect to 7 interest in the. Perry plant.
OE is not able to "use nuclear-generated power to the disadvantage of competitors."155/; Irrespective'of the:
propriety of OE's conduct in the marketplace,'any'anticompetitive' conduct in which CE might conceivably engage cannot be directly 152/ See DOJ Reply Brief at 180-81; 40 Fed. Reg.- 8395-96E(Feb.
l 27, 1975); Hughes, NRC 207, pp. 30-32.
'153/ See Section III.C.1.a, supra.
154/ Id. at 75-77 (AEC Ceneral Counsel Hennessey).
155/ Wolf Creek, supra, ALAS-279, 1 N.R.C.
at 568.
. 1 i
i
-l
1 or indirectly perpetuated or exacerbated by OE's ownership ' inter-est in Perry.
In sum, there are no " antitrust ramifications"156/ to OE's license to own 30 percent of Perry.
Nuclear power has not been an economic windfall,157/ at least insofar as its impact on the competitive stance of OE, one of the owners of the Perry facility; OE therefore is not an " unbridled beneficiary. "158/
To treat it as such, by continuing to impose restrictive conditions on OE's business activities, has no basis in fact, and is not supported by law.
In promulgating Section 105(c), Congress recognized that it was not in the public interest for MRC's licensing of nuclear power plants to create or maintain anticompetitive. conditions in the energy marketplace.
See Section II.A, supra.
In order to ensure that this consequence did not ensue, the agency was vested with the authority to condition the construction permit and oper-ating licenses it issued so as to avoid any such anticompetitive consequences.
But the limits of this authority were expressly stated in Section 105(c), discussed during the congressional 156/ Farley, supra, ALAB-646, 13 N.R.C.
at 1035.
157/ Alabama Power Co.
- v. NRC, 692 F.2d 1362, 1368-69 (lith Cir.
1982).
158/ Id.,
Ll.
debate on the proposed legislation, and succinctly summarized by the Appeal Board in its Wolf Creek decision:159/
[A}s the Commission's antitrust respon-sibilities are linked to license appli-cations, the Comr41ssion's antitrust man-date extends only to anticompetitive situations intertwined with or exacer-bated by the award of a license to con-struct or operate a nuclear facility.
The time has come for the NRC Staff to be governed in its actions by the well-recognized " inherent boundaries"160/ of its antitrust responsibilities.
The NRC has no statutory basis for continuing to r;ondition OE's ownership interest in Perry.
Un-questionably, circumstances have significantly changed.
However appropriate the Perry antitrust license conditions may have been when they were imposed, in the case.of OE they do not remedy any circumstance for which they were designed.
In short, at best, they are an anachronism for which OE and many of its retail cus-temers pay a heavy and unjustifiably high price.
In the absence of any continuing basis for imposing the an-titrust licensing-conditions on OE, fairness and, indeed, law dictate that the conditions be removed.
OE therefore respect-fully requests the Director of Nuclear Reactor Regulation to issue an Order suspending those conditions until such time as there may be any basis for reinstituting them.
l 159/ Wolf Creek, supra, ALAB-279, 1 N.R.C.
at 569.
160/ Waterford II, supra, CLI-73-25, 6 A.E.C.
at 620.
' 3
l IV.
CONCLUSION Activities under OE's ownership license for the Perry nuclear power plant do not " create or maintain a situation incon-sistent with the antitrust laws" because nuclear power is no longer the economically superior energy alternative.
Consequent-ly, the NRC's license conditions are not responding to any an-ticompetitive situation that relates to -- is " intertwined with or exacerbated by" -- OE's ownership in Perry.
In short, the li-censing conditions that were imposed on OE about a decade ago no longer serve their intended purpose.
The NRC Staff has the authority to suspend the license con-ditions at issue and, as a matter of law and equity, is bound to remove unjustified restrictions on OE's business activities.
A' contrary conclusion would place the NRC in the untenable position of regulating business activities of its licensees that are'whol-ly unrelated to the economic impact of a licensed facility, a
function that the NRC has no authority to assume.
Continued im-position on CE of the Perry antitrust license conditions also would be inconsistent with the clear mandate of Congress in pass-ing Section 105(c), and the understanding of this agency as evi-denced by decisions on the subject, that the NRC involves itself in antit' rust matters if and only if a nuclear power plant poses a competitive advantage.
Perry is not economically advantageous to OE. r L.
+
l t
l For-the reasons articulated in.this Application,.OE respect-fully requests the. Director of. Nuclear Reactor Requiation to sus-
.l pend the license conditions in question until such time as there may he a factual' basis for imposing them.
Respectfully submitted,.
I M k. $_ > > A -
Gerald Charnoff--
Robert E. Zahler-
- Deborah B.-Bauser M. Thurman Senn j
SHAW, PITTMAN, POTTS T: TROWBRIDGE-2300 N Street,.N.W.
Washington, D.C.
20037 i
(202) 663-8000 Dated:
September 18, 1987 E
.1 4
4 l -
i i
i l
l ATTACHMENT 1 APPENDIX C PERRY NUCLEAR POWER PLANT, UNIT NO. 1 NPF-58 ANTITRUST CONDITIONS FOR CLEVELAND ELECTRIC ILLUMINATING COMPANY DUQUESNE LIGHT COMPANY OHIO EDISON COMPANY PENNSYLVANIA POWER COMPANY TOLEDO EDISON COMPANY A,
The licensees are subject to the following antitrust conditions:
Definitions Applicants shall mean Cleveland Electric Illuminating Company, Duquesne Light Company, Pennsylvania Power Company and Toledo Edison Company.
For purposes of this Appendix, the term Applicants does not include Ohio Edison Company. With respect to Ohio Edison campany, the antitrust condi-tions contained in this Appendix C are suspended until such time as circum-stances sienificantly change such that their i m sition is recuired.
Entity shall mean any electric generation and/or distribution system or municipality or cooperative with'a statutory right or privilege to engage in either of these functions.
Wheeling shall mean transportation of electricity by a utility over its lines for another utility including the receipt from and delivery to another system of like amounts but not necessarily the same energy.
Federal Power Commission. The 1970 National Power Survey, Part 1
- p. I-24-8.
Licensing Conditions (1) Applicants shall not condition the sale or exchange of wholesale power or coordination services upon the condition that any other entity:
(a) enter into any agreement or understanding restricting the use of or alienation of such energy or services to any customers or territories; (b) enter into any agreement or understanding requiring the receiving entity to give up any other power supply alternatives or to deny itself any market opportunities; (c) withdraw any petition to intervene or forego participation in any i
proceeding before the Nuclear Regulatory Commission or refrain from instigating or prosecuting any antitrust action in any other forum.
1-1
..wea
-=.=4 a
4,_
,..- w m._
a.
q u.._,.
,e4s a _; e c
1 q
q v
l 1
(2) Applicants, and each of them, shall offer interconnections upon reasonable terms and conditions' at the request of any other electric-entity (tes) in.
- i the combined CAPCO Company Territories (CCCT such interconnection to' be available (with due regard for any necessa)r,y and applicable' safety d
procedures) for. operation in a closed-switch synchronous operating mode 1
if requested by the interconnecting entity (fes).- Ownership of. trans-i mission lines and switching stations associated with such interconnection' shall remain in the hands of the party funding the interconnection' subject. -
i however, to any.necessary safety procedures relating to. disconnection facilities at the point of power delivery.. Such limitations on ownership 1
shall be the 'least necessary to achieve reasonable safety practices' and shall not serve to deprive purchasing entities of a means to-effect-1 additional power supply options.
(3) Applicants shall engage in wheeling for and at the request'of other l
entities in the CCCT:
(a) of electric energy from delivery points of Applicants to the.
^j entity (tes); and.
i (b) of power generated by or available to the other entity.'as a j
result of its ownership or entitlements* in generating >
facilities, to delivery points of Applicants designated by the other entity.
Such wheeling services shall be available with respect to any unused,
l capacity on the transmission lines of Applicants.: the use of which will-not jeopardize Applicants' system. In the event Applicants-~must reduce jl wheeling services to other entities due to lack of capacity.-such-1 reduction shall not be effected until reductions of at,least 5 percent have been made in transmission capacity allocations to other Applicants-in these proceedings and thereafter shall'be made. in proportion to reductions ** 1mposed upon other Applicants to.this proceeding..
li t
i,
" Entitlement" includes but is not limited to power made available to an i
entity pursuant to an exchange agreement.
i
~
J
- The. objective of.this requirement is to prevent the' pre-emption of ~ unused l
capacity on the 11res of one Applicant by other Applicants or by entities the:
. transmitting Applicant deems noncompetitive. Competitive entities are to be allowed the opportunity to develop bulk ~ power services options even.1f this-j
.results in re-allocation of CAPC0 (Central Area Power Coordination Group)~..
1 transmission channels.
This relief is required'in order to avoid prsiongation of the effects of Applicants' illegally sustained dominance.
1-2
],
l I;
a Applicants shall make reasonable provisions for disclosed transmission I
requirements of other entities. in the CCCT in planning future trans-mission.either individually or within the.CAPC0 grouping. By " disclosed"
~
is meant the giving of reasonable advance notification of future require.
i ments by entities utilizing wheeling services. to be made available by Applicants.
(4)
(a) Applicants shall make available membership in CAPC0 to any entity in the CCCT with a system capability of 10 Mw or greater; (b) A group of entities with an aggregate system caoability of 10 Mw i
or greater may obtain a single membership in'CAPC0 on a collective i
basts;*
(c) Entities applying for membership in CAPC0 pursuant to License Condition 4 shall become members subject to the terms-and con-ditions of the CAPCO Memorandum of Understanding of September 14,.
l 1967, and its implementing agreements; except that new members may-elect to participate on an equal percentage.of reserve basis-rather than a P/N allocation formula.for a period of.tmelve years from date of entrance.** Following the twelfth year'of entrance..new members shall be expected to adhere to such allocation methods as are then-employed by CAPC0 (subject to equal opportunity for waiver or special' i
consideration granted to original CAPCO mee6ers which~ then are in effect).
g
- E.g., Wholesale Customer of Ohio Edison (WCOE).
l The' selection of the 12-year period reflects our determination that an adjustment period is necessary.since the P/N formula has a recognized offact of discriminating against small systems and forcing them to foreno economies j
.of scale in generation in order to avoid carrying excessive leve's of reserves.
i We-also found the P/M is'not entirely irrational as a method of reserve allo-cation.. We have observed that Applicants themselves provided adjustment periods-and waivers to integrate certain Applicants into the CAPC0 reserve'
{
requirement. program. The'12-year period should permit new entrants to avoid initial discrimination but to accommodate and adjust to the CAPCO system over some reasonable period of time. Presumably new entrants will be acquiring :
j ownership shorts and entitlements during the 12-year period so' that adverse consequences of applying the P/N formula will be mitigated.
~
I l
1-3
~
r
+
(d) New members joining CAPCO pursuant to this provision of relief shall not be entitled to exercise voting rights until such time as the system capability of the joining member equais or exceeds the system capability of the smallest member of CAPC0 which enjoys voting rights.*
(5) Applicants shall sell maintenance power to requesting entities in the CCCT upon terms and conditions no less favorable than those Applicants make available:
(a) to each other either pursuant to the CAPCO agree-ments or pursuant to bilateral contract; or (b) to non-Applicant entities outside the CCCT.
(6) Applicants shall sell emergency power to requesting entities in the CCCT upon terms and conditions no less favorable than those Applicants make available:
(a) to each other either pursuant to the CAPCO agreements or pursuant to bilateral contract; or (b) to non-Applicant entities outside the CCCT.
(7) Applicants shall sell economy energy to requesting entities in the CCCT, when available, on terms and conditions no less favorable than those available:
(a) to each other either pursuant to the CAPC0 agreements or pursuant to bilateral contract; or (b) to non-Applicant entities.Outside the CCCT.
(8) Applicants shall share reserves with any interconnected generation entity in the CCCT upon request. The requesting entity shall have the option of sharing reserves on an equal percentage basis or by use of the CAPC0 P/N allocation formula or on any other mutually agreeable basis.
(9)
(a) Applicants shall make available to entities in the CCCT access to the Davis-Besse 1. 2 and 3 and the Perry I and 2 nuclear units and any other nuclear units for which Applicants or any of them, shall apply for a construction permit or operating license during the
- Our objective is to prevent impediments to the operation and development of an area-wide power pool through the inability of lesser entities to respond timely or to make necessary planning comeitsents. While we grant new member entities the opportunity to participate in CAPCO it is not our intent to relieve joining entities of responsibilities and obligations necessary to the successful operation of the pool.
For those smaller entities which do ut cish to assume the broad range of obligations associated with CAPCO member-ship we have provided for access to bulk power service options which will further their ability to survive and offer competition in the CCCT.
1-4
il-1 (11) These conditions'are intended as minimum conditions and'do not preclude Applicants from offering additional. wholesale power. or coordination services to entities within'or without the CCCT.-
However, Applicants shall not deny wholesale power or coordination services -required by these conditions to non-Applicant entities in the CCCT based upon prior commitments arrived at in the CAPCO Memo-randum of Understanding or implementing agreements. Such denial shall be regarded as inconsistent with the purpose and intent of these con-ditions.
The above conditions are to be implemented in a manner consistent with the provisions of the Federal Power Act and all rates, charges or practices in connection therewith are to be subject to the approval of regulatory agencies having jurisdiction over them.
T f
1-6 I
I ATTACHMENT 2 A Summary of LBP-77-1, the 1977 Licensing Board Decision Following a seven-month evidentiary hearing, which commenced in December, 1975, the Licensing Board in the CAPCO antitrust proceeding rendered its initial decision in January, 1977.161/
The decision "austained in large measure the complaining parties' allegations, rejected applicants' legal defenses, concluded that licensing these five nuclear power plants would continue or worsen a situation inconsistent with the antitrust laws, and im-posed remedial conditions on their licenses to ameliorate those consequences."162/
In reaching this outcome, the Licensing Board evaluated the evidence in the context of the following two Broad Issues:
(A)
Whether the structure of the relevant market and Applicants' position in that market gives them the ability, acting individually or jointly,. to hinder or prevent other electric entities from achieving access to-the benefits of co-ordinated operation and access to the benefits of economy of size of large electric generating units, and, if so, (B)
Whether Applicants' ability has been used, is being used, or might be used-to create and maintain a situation 161/ LBP-77-1, 5 N.R.C. 133 (1977).
162/ ALAB-560, 10 N.R.C, at 278.
2-1
t
- ).
l
'i inconsistent with the. antitrust laws or f
-their~ underlying policies.163/i a
4 The findings related to Broad Issue'A focused.on the "com--
prehensive power pooling agreement," the CAPCO agreement,.which 1
provided that operation and development of Applicants' systems would be conducted "to the maximum extent possible, asL a unified 1 system."164/' In its findings, the Licensing; Board described in-
'I
~
detail the nature and effect of the CAPCO agreement.
It found-that the CAPCO companies had a-14-facility construction' program of jointly-committed generating units.under,-a one-system planning-concept.165/
In addition, "{c]omplementing the generation con-2 struction program" was a one-system transmission line plan designed to effectuate the goals of the CAPCO companies.166/. The ~
/,
Licensing Board' concluded that the combined effect-of these coor-'
dinated plans was that each of the CAPCO companies 1would be-able
.j to obtain the benefits of economies of scale associated with the construction of large units even'though individually and in isolation the anticipated needs and-load growth of each company' would not permit or require their construction.
.Because nuclear
' l 163/ LBP-77-1, 5 N.R.C.
at 142.
4 164/ Id. at 143.
5 165/ Id. at 153, 223-37.
166/ _Id.
2-2 l
P P
.t
l.
power was found to be a distinctly superior choice for er::Anding base load capacity over the fossil-fueled alternatives, it was concluded by the Licensing Board that the nuclear units would in-crease the effectiveness of the Applicants' bulk pouer supply systems 167/ and enhance the economic advantage those systems en-joyed over alternative sources, thus enhancing their market power.168/
As to Broad Issue B, the Licensing Board found that a number of activities of the Applicants, both collectively and individu-ally, constituted a misuse of their positions of dominance in order to achieve anticompetitive results.169/
In its findings 167/ " Bulk power" transactions were defined by the Licensing Board as transactions " involving individual contracts for sale for resale of firm electric power or for emergency, deficiency or other types of wholesale power."
Id. at 159.
The Licensing Board distinguished the bulk power product market from regional power exchange transactions and retail power transactions.
The bulk power market identified by the Licensing Board was considered by the Appeal Board to overlap with another identified market, that of coordinated services (or regional power ex-changes).
The Appeal Board therefore rejected the bulk power market in favor of a coordinated services market, together with the retail and wholesale power product markets.
ALAB-560, 10 N.R.C. at 3 01, citing Consumers Power Co. (Midland Plant, Units 1 and 2), ALAB-452, 6 N.R.C.
892, 977-90 (1977).
The Appeal Board defined the wholesale power market to include all firm bulk power production, whether retained for in-house retail purposes or wholesaled outside for independent retail distribution.
ALAB-560, 10 N.R.C.
at 301, citing Midland, supra, 6 N.R.C.
at 991.
168/ LBP-77-1, 5 N.R.C.
at 152-58.
169/ Id. at 145.
1 2-3 i
b ll
-concerning OE, the, Licensing' Beard concluded that'OE had "pos--
~
i sessed and used the power to control prices and other conditions of sale, the power to refuse to. engage in transactions.which.
would otherwise be economically beneficial and [the power]
to ex -
clude competition."170/ As a result,.OE was'found to have been
- j able to.and to have exercised its ability to~ prevent'other enti-i ties within its service area from achieving the benefits ~of coordination and economies of scale associated'with the licensing.
of the Perry-plant.171/
f i
t i
. i 1
.i t
170/ Id. at 187.
[
171/ Id. fat 187; see generally id. at 188-211.
i 2-4
-4 ATTACHMENT 3 A Summary of ALAB-560, the Appeal Board Decision In ALAB-560, the Appeal Board substantially affirmed the findings of the Licensing Board, holding that "the CAPCO compa-nies dominate generation and control transmission in the relevant electric power markets."172/
As a result, it was concluded that the CAPCO nuclear facilities would " enhance substantir.11y appli-cants' monopolistic position."173/
In order to remedy this im-pact, the Appeal Board conditioned the Applicants' rights to such facilities on their " dealing fairly with ' landlocked' competi-tors."174/
The license conditions imposed by the Appeal Board were intended to accomplish this purpose; they'" essentially [did]
no more than oblige Applicants to offer similar bulk supply options and access to nuclear units to other electric utilities as they make available, by action or agreement,.to each other."175/
172/ ALAB-560, 10 N.R.C.
at 294.
173/ Id.
174/ Id.
175/ Id. at 294 and n.75, quoting NRC Staff Opening Brief at 200 n.lBl.
3-1
I' Ten substantive antitrust license conditions were imposed by-the Appeal Board on the Perry and Davis-Besse licenses.176/
Con-dition One prohibits the CAPCO companies from conditioning the' sale of wholesale power on specified adverse terms.
Condition Two requires interconnectior.s within the CAPCO companies' service area.177/
Condition Three requires Applicants to wheel power for and at the request of other entities in the CCCT.
Condition Ecur delineates the circumstances under which CCCT entities are enti-tied to membership in CAPCO.
Conditions Five through Seven con-cern the sale to requesting entities of maintenance power, emer-gency power and economy energy.178/
Condition Eight requires the sharing of available reserves to requesting entities in the CCCT.
Condition Nine provides to entities within the CCCT the right to purchase an ownership interest in the Perry or Davis-Besse units, 176/ An eleventh condition nullified outstanding agreements among the CAPCO members to the extent they were inconsistent with the purpose and intent of the Appeal Board's conditions.
ALAB-560, 10 N.R.C.
at 299.
177/ The CAPCO companies' service area was called the CCCT, or the Combined CAPCO Company Territories.
-LBP-77-1, 5 N.R.C.
at 142; ALAB-560, 10 N.R.C.
at 274 n.19.
178/ " Maintenance power" means power supplied or received to re-place needed power that is unavailable because a generating or transmission unit is out for scheduled maintenance.
" Emergency power" means power needed, supplied, or received in an emergency situation, i.e.,
an unscheduled outage.
" Economy energy" means energy supplied to or received by a utility from another utility which power costs less than the receiving utility's current pro-duction cost.
See Consumers Power Co. (Midland Plant, Units 1 and 2), ALAB-452, 6 N.R.C.
892, 903 nn.22-24 (1977).
3-2 l
1
I as well as in future CAPCO nuclear units.
Finally, Condition Ten mandates the sale of wholesale power by CAPCO to entities within the CCCT.179/
i i
P t
4 l
5 179/ ALAB-560, 10 N.R.C.
at 298-99.
+
k 3-3 J
Ii ATTACHMENT 4 A Summary of the Positions of the Parties in the CAPCO Antitrust Proceeding The decisions of both the Licensing Board and the Appeal Board substantially tracked the views of the non-Applicant par -
ties.
But what is significant today is that these decisions were premised on the finding that nuclear power was low-cost, and hence the superior energy alternative, a presumption on which both the Applicants and the non-Applicant parties were in accord.
1.
The Department of Justice The core theory of the Department of Justice ("DOJ") was set out in its Prehearing Brief:
The Department maintains that the low-cost, large-unit base-load nuclear power to be supplied by the subject units will strengthen and expand Appli-cants' systems and will increase their ability in the future to install and ob-tain low-cost power from large units --
and that this would clearly further Applicants' respective monopolies.180/
The DOJ devoted the bulk of its efforts to proving its allegation of past monopolization.
Thus, DOJ was largely focused on the 180/ "Prehearing Brief of the Department of Justice," November.
26, 1975 at 1 ("DOJ Prehearing Brief"); see also id. at 115.
4-1
i!
" situation" that existed in the CCCT orlor to the imposition of the Perry antitrust licensing conditions -- facts which OE does not challenge in this amendnent application.181/
Significantly, the linchpin of DOJ's position was that eco-nomic benefits would accrue to the Applicants from their program of constructing nuclear generating facilities.
Specifically, in 1971, when "[ijt appear [ed] that the estimated cost of producing power at the [ proposed] plant [would] be about the same as the applicant's average system costs and higher than the estimated production costs of at least one of the similar sized fossil-fuel plants being constructed by CAPCO members," DOJ comfortably advised the NRC that no antitrust hearing was required.182/
Lcter, when DOJ believed that granting an unconditional license would provide the Applicants "with a new source of relatively low-cost power and energy," DOJ changed its view, instead recom-mending that a hearing be convened to review the competitive ad-vantages associated with the construction of the new CAPCO d
181/ See, e.g., DOJ Prehearing Brief at 35-114; " Findings of Fact and Conclusions of Law of the United States Department of Jus-tice," August 23, 1976 ("DOJ Proposed Findings") at 57-140;
" Reply Brief of the Department of Justice to Applicants' Appeal Brief in Support of Their Individual and Common Exceptions to the Initial Decision," June 30, 1977 ("DOJ Reply Brief") at 42-43,90-175.
182/ Department of Justice Antitrust Review ' Letter to the Atomic Energy Commission Regarding Davis-Besse Power Station, Unit 1, 36 Fed. Reg. 17888, 17890 (September 4, 1971).
l 4-2 i
I nuclear plants.183/
At the hearing, DOJ maintained that "[t]he marketing of power from the subject nuclear plants will enable Applicants to lower their average cost of power."184/ DOJ then argued that "[t}o the extent that Applicants are able to reduce their average cost of power while preventing their actual and potential competitors from doing so, they enhance and maintain their dominance and monopoly power to the detriment of their com-petitors."185/
Having concluded that nuclear power was the superior alter-native, DOJ analyzed the interrelationship of low-cost nuclear facilitiem, CAPCO membership and the Applicants'" transmission fa-cilities.
DOJ contended that coordinated operation and develop-ment was essential to the construction of nuclear units.186/
In-deed, DOJ alleged that without theser abilities, the Applicants would be unable to produce " firm" bulk power to the full extent of a nuclear facility's generating capacity.187/
DOJ believed 183/ Department of Justice Antitrust Review Letter to the Nuclear Regulatory Commission Regarding Davis-Besse. Power Station, Units 2 & 3, 40 Fed. Reg. 8395, 8396 (Feb. 27, 1975).
184/ DOJ Reply Brief at 179.
See also DOJ Prehearing Brief at
- 115, 185/ DOJ Reply Brief at 180-81.
This language is. identical to that appearing in the DOJ's recommendation that an antitrust hearing be held concerning Davis-Besse Nuclear Power Station, Units 2 and 3.
40 Fed. Reg. 8395-96 (February 27, 1975).
186/ E.g., DOJ Prehearing Brief at 116; DOJ Appeal-Brief at 180.
187/ E.g., DOJ Prehearing Brief at 116; DOJ Appeal Brief at 171 4-3
)
j j
_. ~.
I 4
t
't that the Applicants had precluded their competitors.from-coordinating by denying membership in CAPCO and by upgrading 1
their transmission facilities.188/ This had prevented'the com-
)
i petitors from constructing nuclear facilities,.thereby preventing
)
them from securing the lower costs of fully-utilized' nuclear-generated firm power.
Consequently, DOJ: concluded that the con-struction and operation of the five proposed nuclear. facilities-
.would create and maintain a situation inconsistent with the anti-O h
trust laws.189/
j DOJ. sponsored two expert witnesses:
Dr. Harold-H. Wein'and-Mr. Roland A. Kampmeier.
Dr.~Wein, DOJ's economic expert, af-j e
firmed that the essential concern of the proceeding wass access to i;
'l low-cost sources of electricity.190/
In Dr. Wein's view, "[t]he:
j n
188/ E.g., DOJ Prehearing Brief at 118; DOJ Appeal lBrief at 26-27,-152-71.
'4 189/ E.g., DOJ Prehearing Brief at 118-19~ DOJ' Appeal Brief at~
d 180-81.
190/.Dr. Wein also discussed the impset.of economies 1of scale in d,
electric generation.. These economies had led-tonthe construction' of larger generating units and.to: increased concentration of the.
0
' industry.
Wein DOJ:587, pp.'40-41, 49-52,-.58-62.
7 According to
'(
Dr. Wein, these economies could also be captured andl maximized i
through contractual. coordination agreements,- such as-the.one that l governed.the.CAPCO pool. -Wein DOJ'587, pp.y104-.06, 108-10; Tr.
6623-25, 7303-04 (Wein).
He ' believed thatfittwas highly..unlikely:
+
thatEsmall, utilities could match the economies availableito'the
. Applicants by the-construction of their own{ generating.facili-i.
~ ies.. Tr. 7147-49,.7150 (Wein).
Furthermore, Dr4 Wein saw: par -
l t
ticipation in suchLeontractual~ agreements as providing benefits 3,
that are not-present ' when 'a : utility ' purchases wholesale base ' load power to' capture economies-of scale.~ Tr. 6627-33, 7205-06,n7229,.
]
7266-80, 7326-(Wein).
4-4 3
i y
< i 3
-1 essential economic analyses [ sic] in this case is not determinent l
upon whether it is nuclear or fossil fuel [except] with one as-sumption and with one caveat and that is that the nuclears are more economical than the fossil fuels "191/
Appli-cants' belief that nuclear power had superior economies of scale indicated to Dr. Wein that nuclear power was the most economic generation source,192/and that denied of this most economic source of generation to smaller competitive entities would en-hance Applicants' competitive position.193/
Conversely, Dr. Wein i
stated that "if you assume they [ fossil and nuclear plants) are.
both equal, then it would make no difference."194/. Thus, DOJ made plain that the critical factor in the NRC's investigation into the CAPCO companies' business practices was the superiority of the nuclear option.
The DOJ testimony of Roland A.
Kampmeier concentrated on the benefits and techniques of utility coordination and on how elec-tric utilities can obtain the cost benefits of large generating units.195/
Mr. Kampmeier explained how the inability to 191/ Tr. 7072 (Wein).
192/ Tr. 7074 (Wein); see also Tr. 7236,.7277-78 (Wein).
193/ Tr.,7071-72 (Wein).
194/ Tr. 7074 (Wein).
195/ See generally Kampmeier DOJ 450.
4-5
i coordinate affected the Applicants' competitors.196/ Mr.
Kampmeier also explained how "the advent of nuclear technology serve [s) to magnify the competitive disadvantage of a small isolated power system as compared with a large power pool."197/
He noted that two factors were involved.
First, that "the large power pool can build a nuclear power plant, whereas that would be out of the question for a small isolated system."198/
- Second, Mr. Kampmeier testified that "the cost of coal and oil have risen so much that (a) nuclear plant has a large cost advantage."199/
Mr. Kampmeier later repeated his view that it was the cost advan-tage of nuclear power over coal-fired power plants which was an-
" essential element" in explaining how "the ability to market nuclear power.
improve [s] the economies of the CAPCO compa-nies."200/
196/ Kampmeier DOJ 450, p. 24.
197/ Id. at 25.
198/ Id.
199/ Id. at 24-25, 200/ Id. at 52.
Since a transmission network'is required to transmit. the power produced by a nuclear plant and 'since coordination arrangements are necessary to use nuclear power as baseload capacity, Mr. Kampmeier also listed these as ess,atial-elements in improving the economic position of the Applicants.
Id.
4-6
1-2.
The NRC Staff The general theory of the NRC Staff in the CAPCO antitrust proceeding was that the addition of the proposed low-cost nuclear power plants would reduce the essential bulk power supply options available to the Applicants' competitors.
In the Staff's view, this would strengthen the Applicants' dominance and allow the Applicants to continue a pattern of abuse of their market power.201/
Like DOJ, the bulk of the Staff's argument on these points involved proving that, prior to the proposal to build nuclear facilities, Applicants had, in fact, abused their domi-nant position in the relevant markets, thereby creating a situa-tion inconsistent with the antitrust laws.202/
While not ignoring the cost benefits anticipated to flow from the use of nuclear power,203/ the NRC Staff had emphasized 201/ " Proposed Findings of Fact and Conclusions of Law of NRC Staff," August 23, 1976 at Proposed Findings of Fact 3.01.16; Proposed Conclusions of Law 7.11.
As the NRC Staff separated Proposed Findings of Fact, Proposed Conclusions of Law, and Pro-posed Relief within the brief, for ease of reference we respec-tively refer to these sections of the brief as "NRC Proposed Findings of Fact", "NRC Proposed Conclusions of Law", and "NRC Proposed Relief".
202/ See " Summary of the Theory of Staff's Case," Reply Brief of the Nuclear Regulatory Commission Staff, September 22, 1976 at 4
("NRC Reply Brief").
See generally NRC Proposed Findings of Fact' l.001-2.13, 3.01; NRC Proposed Conclusions of Law 7.01.10; "Brief of the NRC Staff in Opposition to Applicants' Exceptions to the Initial Antitrust Decision," June 30, 1977 at 78-195 ("NRC Appeal Brief").
203/ E.g., NRC Proposed Findings of Fact 3.01, 3.03.05, 3.07
.09, 3.11
.16.
In a contemporaneous analysis of antitrust (Continued Next Page) 4-7
.1 the interrelationship between a particular nuclear generating facility and the other power supply services necessary to inte-grate the facility into "a reliable and efficient bulk power sup-ply system."204/
This was because without access to coordinated planning and operations, and without the ability to transmit any power generated, most utilities, and especially the non-Applicant entities, would be incapable of availing themselves of the bene-fits of nuclear power.
These interrelated activities were there-fore viewed by the NRC Staff as " essential" or " bottleneck" re-sources.205/
Conversely, the NRC Staff also contended that (Continued) economics in the electric utility industry, the NRC Staff ob-served:
While a nuclear-fueled generating unit repre-sents only a part of a total system that de-livers electric energy to ultimata-customers, it usually is the lowest cost power supply increment and some forecasts estimate.that by the year 2000, nuclear generation will grow from about five percent to over fifty percent of total electric generating capacity in the United States.
NUREG-75/061, Coordination, Competition, and Regulation in the Electric Utility Industry (June 1975), United States Nuclear Reg-ulatory Commission, Economic Analyses Section, Office of Anti-trust and Indemnity at 1.
204/ " Trial Brief," November 10, 1975 at 71 ("NRC Trial Brief").
205/ NRC' Proposed Findings of Fact 2.01.13; NRC Proposed Con-clusions of Law 7.09.10.
The Licensing Board noted that a
" bottleneck resource" is one "to which access is essential.if the (Continued Next Pace-4-6
I constructing the preposed economically beneficial nuclear facili-ties would have positive benefits for the CAPCO system's coordination and transmission capability.206/
In support of its position in the CAPCO case, the NRC Staff sponsored two expert witnesses:
Dr. William R. Hughes and Mr. Harold M. Mozer.
The bulk of the testimony of Dr. Hughes, the Staff's economic expert, addressed the definition of'the rel-evant markets 207/ and the organizational and competitive (Continued) utilizing party is to function as an effective competitor."
LBP-77-1, 5 N.R.C.
at 150.
As we note, see Section II.B.' infra #
the non-Applicant utilities, to date, have not sought to partici-pate in the " essential" Perry facility notwithstanding the.gener-ous terms of the antitrust license conditions.
206/ E.g., NRC Trial Brief at 71-72.
Not surprisingly, then, the Staff rejected the Applicants' view that neutralizing the impact of the nuclear plants on the cost of power sold by the Applicants was a sufficient remedy.
The Staff argued that Applicants' reme-dy was inadequate in that it ignored the " Applicants' other an-t1 competitive practices (such as refusing to wheel, imposing ter-ritorial allocation agreements), and how those competitive disadvantages would be affected by the addition of the nuclear units to Applicants' systems."
Arguing that the. remedy must address the entire situation that had been created or maintained by the activities under the license, the Staff asserted that the NRC had the authority to implement broad remedial steps _under Section 105(c) of the Act.
NRC Proposed Relief at 13-14.
See also NRC Appeal Brief at' A-2 through A-3.
This analysis of the appropriate scope of relief was adopted by the Appeal Board in ALAB-560.
10 N.R.C.
at 290-94; compare 10 N.R.C.
at 394-98 (sep-arate opinion of Judge Sharfman);
see also Alabama Power Co. v.
NRC, 692'F.2d 1362, 1369-70 (11th Cir. 1982).
For purposes of this amendment application, OE does not challenge the validity of this position.
207/ E.g., Hughes, NRC 207, pp. 8-29; Tr. 3636-38, 3640-43, 3671-87, 3710-27, 4030-41, 4055-77 (Hughes).
4-9
l' implications that flow from the economies of scale in the elec-tric industry.208/
In developing the latter subject-area, Dr.
Hughes engaged in an analysis of how, under an assumption that base load nuclear power was an economically superior choice, nuclear facilities would affect the Applicants' market power.209/
He stated that, "[t]o the extent that this belief was correct, the nuclear units would contribute to the effectiveness of the applicants' bulk power supply systems and enhance the economic advantage those systems enjoyed over alternative sources, thus enhancing their market power.210/
In keeping with the NRC Staff's emphasis on bulk power sup-ply options, Mr. Harold M. Mozer's testimony addressed "from an engineering standpoint what a power supply planner would like to have available in the way of power (supply] options.
."211/
208/ E.g., Hughes, NRC 207, pp. 33-40, 44; Tr. 3770-71, 3788, 3848, 3874-78 (Hughes).
209/ Hughes, NRC 207, pp. 30-32; Tr. 3686, 4090-92 (Hughes).
210/ Hughes, NRC 207, pp. 30-32.
On the issue of the relative cost of nuclear power, Dr. Hughes explicitly stated that he had performed no study of the issue.
Tr. 3659-60 (Hughes).
Dr.-
Hughes did state that the expectation in the industry was that the newest and most advanced generation methods would be less costly than historical imbedded costs.
Tr. 4090-92.
- However, Dr. Hughes expected the cost of nuclear units to exceed the aver-age system cost, although this conclusion would ultimately depend-upon inflation rates, environmental protection requirements, and' safety standards.
Tr. 3660-61, 4090-92 (Hughes).
211/ Tr. 3382 (Mozer).
4-10
ll-Mr. Mozer concluded that "[aln electrical system planner or sys-tem operator needs to have as many power supply options as possi-ble to choose from in order to obtain the lowest overall cost of I
power supply."212/
While Mr. Mozar's testimony went only to the theoretical' benefits of having options from which to choose, Mr. Mozer recog-nized that the viability of an option was important.
He consid-ered nuclear power to be a desirable power supply option.213/
Q:
Does it really make any difference whether the units are coal-fired or whether they are light water nuclear units?
A:
It makes a lot of difference in general, of course.
What sort of difference?
Q:
In terms of the benefits to be derived from the.one-system concept, does it make any difference?
A:
In terms [that) they both produce elec-tricity which is the objective of.the generating plant, then the only.dif-furence in the benefits would be the relative costs of the units.214/
212/ Mozer, NRC 205, p. 56; see also id. at'p. 49; Tr. 3351-53, i
3457 (Mozer).
Mr. Mozer also testified that for nuclear power to be included as a power supply option, the non-Applicant CCCT.
utilities would have to ( and. the Applicants probably would have to) coordinate with other utilities.- Mozer, NRC'205,-pp. 62-65,.
69-71; Tr. 3533-35.
Mr. Mozer further noted that:the Applicants' transmission system affected the ability of the non-Applicant-CCCT utilities to coordinate.
E.g., Mozer, NRC 205, pp. 9, 47 1 49, 57-61, 66.
213/ Mozer, NRC 205, pp. 61-62; Tr. 3573 '(Mozer).
214/ Tr. 3468 (Mozer).
[
4-11
l Thus, Mr. Mozer recognized that it was the cost of -the power pro '
i i
duced by the nuclear facilities which determined whether the
" option" would be exercised.215/
And with respect to the cost _of
.t nuclear power, Mr. Mozer assumed that it was lower.than its alternatives.216/
P 3.
The Applicants The Applicants viewed the licensing proceeding as an attempt-to obtain, from the Applicants and for their competitors, ser-vices which had no relationship to the " activities under the license."
Specifically, the Applicants contended that general I
wheeling of electric power and general participation in a coordi-nated arrangement were not " activities under the license" and were not necessary to obtain the full. benefits derived by ths
~
operation of the nuclear facilities at issue.217/
While not denying the need to, and indeed offering to, sup-ply replacement power to competitors participating in the' pro-i posed nuclear facilities, the Applicants considered their i
1 215/ Tr. 3468-70 (Mozer).
t 216/ Mozer, NRC 205, p. 61; see also'Tr. 3573 (Mozer).
217/ E.g., "Prehearing Legal _Brief on Behalf of The Applicants,"
~
December 1, 1975, at 136-41-(" Applicants' Prehearing Legal Brief").
4-12 1
)
1.
competitors' demand for additional wheeling and coordination to effectively constitute a broad attack on the basic structure of the electric energy industry.
This, it was argued, far exceeded the purposes of Section 105(c),218/ ignored the inability of the small utilities to assume their fair share of wheeling and pool-ing responsibilities,219/ and failed to take. account of the reg-ulated, natural monopoly characteristics of the utility industry which had led to the regulated development of relatively large electric power companies engaged in coordinated development.220/
Emphatically, OE does not now seek to litigate the issue of the authority of the NRC under Section 105(c) to consider the re-lationship of wheeling and coordination to low-cost nuclear power.
This discussion is only intended to apprise the NRC Staff of the focus of the prior hearing so that the Staff can properly appreciate the assumptions made at the time, as well as the extent to which these assumptions no longer are. valid.
218/ E.g., Applicants' Prehearing Legal Brief at 121-43; Appli-cants' Joint Reply Brief at 5-9.
The Applicants' also~ contended that there must be a nexus between the activities under the license and each element of the situation inconsistent with the antitrust laws.
E.g., " Applicants' Joint Proposed Findings of Fact and Conclusions of Law," August 30, 1976, at COL 20.02
(" Applicants' Joint Proposed Findings"); " Applicants' Joint Brief in Support of Their Proposed Findings of Fact and Conclusions of Law," August 30, 1976, at 676 (" Applicants' Brief in Support").
219/ E.g., Applicants' Prehearing Legal Brief at 209-12, 217-22; Applicants' Joint Proposed Findings 33.21, 33.41, 33.53.
220/ E.g., Applicants' Prehearing Legal Brief at 94-113, 204-08, 213-15; Applicants' Joint Proposed Findings 22.03, 22.04.
4-13 4
~
l' In addition to contesting the statutory basis for such a far-reaching review of the electric utility industry, the Appli-cants argued that, in any event, a situation inconsistent with the antitrust laws neither existed in the CCCT nor would be cre-ated or maintained by the addition of the proposed nuclear facil-ities.221/
Again, for purposes of this amendment application OE-does not challenge the conclusions reached about the competitive situation existing in its service area.
Applicants also main-I tained that their proposed license conditions were a part of the
" situation" to be considered and that when so considered, no an-ticompetitive situation could be created or maintained by the ad-dition of facilities subject to such license conditions.222/
221/ E.g., Applicants' Brief in Support at 252-674; " Applicants' Joint Proposed Findings at FOF 22.04, 32.00 and,37.40; Appli-cants' Appeal Brief at 137-39, 272-73; Tr. 3867-70.
222/ E.g., Prehearing Legal Brief at 129-30, 135-41; Applicants' Joint Reply Brief at 11.
The Applicants filed with the Licensing. Board on March 14, 1975, proposed license conditions which they explicitly proposed to have affixed to their nuclear licenses.
Applicants Exhibit No. 44.
The proposed license conditions provided for, inter alia, (a) the opportunity to participate in the nuclear units ei-ther by an ownership interest, a contractual prepurchase'of power, or a unit power purchases (b) sufficient transmission ser-vices to, deliver to the participating entity its share of the nuclear pow (r; (c) sufficient transmission services to provide replacement power equivalent to' the amount of power purchased from the nucitar unit when the nuclear unit was unavailable as a result of a forced or scheduled outage.
4-14
r~
l
?
a I
n On the. issue of the costs of the power generated by~the pro-
.7 posed nuclear: facilities, the Applicants believed-that the addi-tion.of:the proposed facilities would increase average' embedded.
t but the Applicants also believed'that the cost of poweriso.
costs; l
generated would be cheaper than the cost of power. generated bya similarly-sized fossil-fuel plants.223/ NotwithstandingLthese cost advantages, the Applicants denied that nuclear power would-t affect their< competitive stance because, in 't2m Applicants' -opin-ion, their competitors:could otherwise obtain at least the same benefits.
This was because any savings realized by the Appli-cants would be. passed through to wholesale customers.in the j
i wholesale power rate.224/
The Applicants also argued that their:
I competitors could construct, on account of preferential tax treatment, a small coal-fired facility at;a cost that produced
't electricity at the same per-kilowatt-hour cost as'the proposed r
nuclear-facilities.225/
223/_ Applicants' Joint Proposed Findings FOF 23.14; Applicants' Joint Reply Brief!at 10.
224/ E.g., " Applicants' Appeal Brief"in Support of:Their Individ-ual and common Exceptions to.the Initial: Decision," April'14,.
1977, at 127 28.
Applicants' LJoint Reply Brief :ati10; JAppli-cants' Joi.7t Proposed Findings FOF-38.03.-
Indeed,Jthe~ Applicants.
a also contended that:the smaller utilities couldJgain=an advantage over the Applicants by purchasingLa share ~of the nuclearJ.
facility, thereby taking advantage of their=1ower cost of' capi-
- - tal.
Applicants Joint Reply;Brief at110;icolloquy between l
Chairman Rigler and.Mr. Wm. Bradford Reynolds,:Tr.. 5907-12;: Pace-1 App. 190,-p. 17; Tr. 11570'(Gerber).:
i 225/ Applicants' JointiProposed Findings FOF 38.04,-COL.38.02.
I
-l 4-15 a
)
n
=
x=
I Dr. Joe D. Pace, the Applicants' economic expert, testified how-an economist would assess the impact of a new nuclear plant on the competitive situation in the electric utility industry within a given area.226/
This analysis " required a determination of whether or not the nuclear plant offers to its owners cost ad-vantages of such a magnitude that those excluded from access to the nuclear unit
. are at a significant competitive disadvan-tage."227/ Dr. Pace was asked to assume that "it has been deter-mined that the nuclear unit would confer a siguificant cost advantage of its owners;"228/ therefore, the bulk cf his testi-mony concerned the means by which such an advantage might be eliminated.229/
Dr. Pace had supported the Applicant's conten-tion that a small non-generating utility that purchased power at a wholesale rate based upon the Applicants' average cost would obtain its share of the benefits of the nuclear facility.230/
226/ Pace, App. 190, pp. 4-8.
227/ Id. at 5.
228/ Id. at 8.
229/ Id. at 8-26; see also Tr. 11718-19 (Pace).
Dr. Pace also supported other positions advanced by the Applicants.
He noted that the tax subsidies held by the Applicants' competitors affected the competitive situation.
Pace, App. 190,-pp. 17-20.
The inability of a small system to meaningfully coordinate with a large utility was also a subject on which Dr. Pace testified.
Id. at 31-36.
230/ Id. at 14-15, 20; see also Tr. 11720-21 (Pace).
4-16 2
c..
I' 4
Where the small utility generated its own power, Dr. Face viewed it as sufficient for the Applicants to provide unit power to it on a proportionate basis.231/
Mr. Abraham Gerber provided the basis for the Applicants' argument that the competitive disadvantage experienced by the Applicants' competitors was not caused by anticompetitive activi-ty but resulted from the natural and efficient development of the electric utility industry.
Mr. Gerber testified that inherent economic factors -- capital intensiveness, economies of scale, long construction lead times, lack of product inventory capacity, and the need for direct physical connection between production and consumption -- lead naturally to the development of rela-tively large vertically and horizontally integrated utilities.232/ Mr. Gerber also noted that the cost of power gen-erated by new facilities was not following the historical trend because incremental costs were exceeding, rather than falling below, average costs.233/
231/ Id. at 11-16, 20; see also Tr. 11719-20, 11722-25 (Pace).
232/ E.g.,
Gerber, App. 189, pp. 23-24.
233/ Tr. 11487 (Gerber).
4-17 l