ML20062M274
| ML20062M274 | |
| Person / Time | |
|---|---|
| Site: | 05000463, 05000464 |
| Issue date: | 12/04/1981 |
| From: | Kepford C YORK COMMITTEE FOR SAFE ENVIRONMENT |
| To: | NRC COMMISSION (OCM) |
| References | |
| ALAB-657, ISSUANCES-CP, NUDOCS 8112170132 | |
| Download: ML20062M274 (2) | |
Text
c~~ 7
/~
+
U::ITED STATES OF f" ERICA
- UCLCAR RECULATORY C0!?!SSIO:i In the ?:atter of
'81 DEC 10 P4:32' FilILADELPilI A ELCCTRIC COMPNi'l O cket flos. WM3 C (Fulton Generating Station, Units 1 and &)
)
G iG$$
a
'!!THDPA'.lfL OF Tl!E REGU:ST OF THE I:!TER1T!! OPS FOR TJ EXTEUS10.4 JF TI!.E 1.1 Ji!ICH TO RESPT:0 TO ALKt-C57 On ovember 25, 1901, the Intervenors York Corraittee for a Safe Environnant and Central Pennsylvania Cocuaittee on !!uclear Power requested
. an extension of tice in which to respond to ALA3-657 in this proceeding.
As was stated in that request, the legal representative of these inter-venors was absent and had not had an opportunity to receive and consider the Appeal Doard's decision within the brief pariod of time provided for filing an appeal of the decision.
Having now had an opportunity to exaraine AhAB-657, the Intervenors' representative withdraws the request for an extension of time to respond to this decision.
Since Alt 3-657 is an interia decision remanding the issue to the Licensing Coard and further evidence may be developed sub-sequently, the Intervenors will await a conclusion of the natter before determining whether or not an appaal would be appropriate. '!e reserve the right to file an appeal following reconsideration of the issues in question as the Co:aaission's Rules of Practice provide.
Respectfully submitted,
/tuSZ$0 /W Judith H. Johnsrud, for
- Chauncey Kopford, Representative of the Intervenors DateJ this //
day of Dece:Ser,1901 4
I k~
b[
di
.l 9
i DEC L 5 1931, --
0
- I-greer ll
~
S l
j P"nwaiin:,
.PDR
o
- s U.lITED STATES OF /N FICA.
q g:
- UCLCAR P.CCULATORY C0
- 'ilISSIO1 m
In tne !:atter of
- FilILAuELPilI A ELCCTRIC C0:'PA17
'81 DEC 10 P4:32
.)
D cket flos.
63 CP (Fulton-Cenerating Station, Units 1 and 2)
)
g
. a i SEFV.CE MU WITHDPA'IfL OF Tl!E FE'UCST OF THE I:!TErNF'iOPS FOR M XTE.: Slat of~TI!.E I.:.!HICH TO f.CSDO*:D TO AL A3-057 On I'ovember 25, 1901, the Intervenors York Cor:raittee for a Safe -
Environmant and Central Pennsylvania Conuittee on 'iuclear Power ' requested
. an extension of tire in which to respond to ALA3-657 in this proceeding.
As was stated in that request, the Icgal representative of these inter-venors was absent and had not had an opportunity to receive and consider the Appeal Doard's decision within the brief period of time provided, for filing an appeal of the decision.
Having now had an opportunity to examine AhAC-657, the Intervenors' representative withdraws the request for an extension of time to respond to this decision.
Since ALA3-6E7 is an interim decision remanding the issue to the Licensing Coard and further evidence may be developed sub---
sequently, the Intervenors will await a conclusion of the matter before deternining whether or not an apneal would be appropriate. Ua reserve the right to file an appeal following reconsideration of the issues in question as the Comaission's Rules of Practice provide.
Respectfully submitted, pado. H w'!
Judith II. Johnsrud, for
- Chauncey Kopford, Representative of the Intervenors DatcJ this #
day of Deccabe r,1901 6
9 See w
- e-4e